Saving 70% on Subways !
“Smart Stations” NO Station BOX required
“Smart Subways” ONLY 1 Tunnel required
“Smart Safety” ONLY ... 8 Automated Doors
NO
Traditional
ST AT I O N BOXES REQUIRED !
ONLY
ONE Car Trains Required
ONLY
Short Platforms Required
“Smart Stations” Innovation
Why build a 6 car station ?
When you know ....
Your “End of the Lines” Capacity ...
Is not a ...
6 CAR CapacityTrain
5 CAR
4 CAR
3 CAR
Or likely even...
A 2 Car CapacityTrain
1. So why BUILD THIS ?
And ALL OF THIS ...
2. Since it used to be just this ...
3. Brighter Station with “timed descent”
INNOVATIVE
Heated/Safer
SUBWAY STATION?
It's ALL about
SAFETY, FLOW, TIMING & CAPACITY
Safety is “simple”
where there is the will for Safety
Safety Achieved
OFF the Platform !
Saving 9 Million/Station
4. “Smart Stations”
Commuter Crossover
P PS S
100% Paid by
Developer
Except for
Platform
Easy Extended
BUS STOPS
ALONG ALL 4
SIDES OF
McCown and
Sheppard
Eliminating the
Need for a
Bus Station
While “Smart
Stations”
eliminates the
Expensive
costs of a
separate TTC
Station at NO
Cost to
Taxpayers
Taxpayers
ONLY PAY
FOR:
1.Faregates
2.Platform
3.Signage
CONDO 1
POOL for
Both Condos
CONDO 2
NO
STATION
BOX
REQUIRED
E E E E
All 4 stations ...
Meet 100% Demand
“Smart Stations”
COST 80 to 100% LESS
Any one of these 4 Buildings
both sides of street
Can create
“Smart Stations” Technology
No More Digging Required
Creating this aboveground for years ?
3 - Short 1 Minute Commutes
2 - EASY 30 Second Transfers
COMMUTE TIME = 4 Minutes
● l
1
2
3
Train Available: EITHER DIRECTION
EVERY 2.5 MINUTES !
C
C
C
C
C
C
C
C
7 DOORS FIT PER CAR
Breakdown (3.5 Kilometers)
27.23 Million/Km Tunnelling (2013) 95.3 Million
3.6 Million/Km Concrete Liners (2011) 12.6 Million
12 Million/Km Track (S+I) 44.1 Million
30 Million – 3 Short Trains (2 cars) 30 Million
Plus Almost Free Stations
JUST 182 Million for 3 Stop Subway !
Sounds too good to be true !
3 Stop Subway to Markham Road
Using “Smart Subways”
JUST
182 MILLION Dollars
Cheaper than 3.56 Billion
I priced in ...
All Trains
All Track
All Tunnelling “Smart Subways” Style (2013 Rate)
All Concrete Liners (2011)
ZERO SIGNALLING COSTS
ZERO OPERATIONS COSTS
Except at 6 AM and 1 AM
WASTEFUL Transit Planning
Grass Development?
When ONLY a 1 Car Station Required?
Money Pits MUST be “Smarter”
Since York Subway ...
“Smart Stations” NO Station BOX required
“Smart Subways” ONLY 1 Tunnel required
“Smart Safety” ONLY ... 8 Automated Doors
Together SAVES 70% on Subways!
Above Grade Station
Town Centre
Station:
Paid by
Developer
Lawrence
Station:
Paid by
Developer
Paid by
Developer
1 Train “CAR”
1 Train “CAR”
1 Train “CAR”
2 Train “CARS” Danforth Station:
Paid by Developer
“Smart Subways”
And “Smart Stations”
NEW COST ABOUT
1 Billion Dollars
This “Smart Subways” and
“Smart Stations” Flow Technology
Cannot be used in part, in whole
Or tweaked variations without
The written consent of
Sharon Yetman of
Platform Technology Consultancy.
Travel Time Sheppard to
Kennedy Station under
5 Minutes. 1 Minute per
Section + 30 Second
Crossover.
“A Mini-System Built within
A Larger System SAVING
Very big money, with free
Bonus Operational costs.
A “Mini-System” Built within
A Larger System, while
SAVING VERY BIG MONEYSAVING Very Big Money,
With FREE Operation Costs
“KEY KENNEDY TRANSFER”
No one Followed Council's Ruling
Affordability is Public's #1 PRIORITY
Why would Mr. Byford reject
my work on behalf of taxpayers?
No More Wrecking up Roads Required
JUST 19
MILLION
PER/KM
Slide presented to TTC
CEO Feb 14th
, 2012
“Smart LRT” is Brilliant (19 Million/Km)
1. Gains 4 Lanes of Roadspace - Comparatively
2. Safer Transit
3. Shorter Traffic Lights
4. Stops all Transit Bunching
5. Stops all Transit Gapping
6. Stops all Transit Unreliability
7. Supplies EXPRESS Bus Lanes
8. ZERO Construction Costs
and have 6 above Benefits
The Magic of “Smart LRT” is ...
● How do you use 13 Metres LESS Roadspace?
● How do you gain 4 Roadspace Lanes?
While making Transit Faster, Safer, & More Reliable,
eliminating a “worldwide” problem called Transit
Gapping and Transit Bunching
Why spend 70 to 250 Million/Km
To make Transportation Worse
AND
Make Transit LESS Safe
AND Not fix Bunching, Gapping & Unreliability
When “Smart LRT”
1. Costs about 19 Million/Km
2. Makes Transit Safer
3. Makes Transit Technically Faster
4. Makes Transit Technically 100% Reliable
5. Provides Express Bus Opportunities
6. AND DOES NOT LOSS LANES
7. AND HAS NO LANE COMBOS
Costing I can PROVE!
The Work of Sharon Yetman
Canada's Only Transit Flow Technologist
Platform Technology Consultancy
IS Ontario's First Transit Innovation Firm
Inventions INCLUDE:
● “Smart Stations” “Smart Streetcars”
● “Smart Subways” “3 Subway Inventions”
● “Smart Track” “Smart Yonge/Bloor Solution”
● “Smart LRT” “Smart BRT”
More Details ? contact: platformtechnology@yahoo.ca
●
All “Unique Flow Technology Solutions” strictly cannot be used in part, in whole or tweaked variations
without the written consent of Sharon Yetman of Platform Technology Consultancy. Intellectual Property
Rights Protected. All rights reserved. C Copyright. Corbin Smith Subway Photos.

More Related Content

Viewers also liked

Exclusive Charity Handover and Partner Announcement.
Exclusive Charity Handover and Partner Announcement. Exclusive Charity Handover and Partner Announcement.
Exclusive Charity Handover and Partner Announcement.
Colin Bell
 
Grace Wang MBA
Grace Wang MBAGrace Wang MBA
Grace Wang MBA
??Grace ?
 
Comms Presentation Pascal for InCountry
Comms Presentation Pascal for InCountryComms Presentation Pascal for InCountry
Comms Presentation Pascal for InCountry
Pascal Masuba
 
Work Experience Certificate From The Arab Contractors Company
Work Experience Certificate From The Arab Contractors Company Work Experience Certificate From The Arab Contractors Company
Work Experience Certificate From The Arab Contractors Company
Hassan Ramadan
 

Viewers also liked (11)

10 motivi per scegliere emc vspex con xtremio
10 motivi per scegliere emc vspex con xtremio10 motivi per scegliere emc vspex con xtremio
10 motivi per scegliere emc vspex con xtremio
 
Exclusive Charity Handover and Partner Announcement.
Exclusive Charity Handover and Partner Announcement. Exclusive Charity Handover and Partner Announcement.
Exclusive Charity Handover and Partner Announcement.
 
Grace Wang MBA
Grace Wang MBAGrace Wang MBA
Grace Wang MBA
 
Come riconosco la voce di Dio?
Come riconosco la voce di Dio?Come riconosco la voce di Dio?
Come riconosco la voce di Dio?
 
Cover_Page_IJPSS_April_2012
Cover_Page_IJPSS_April_2012Cover_Page_IJPSS_April_2012
Cover_Page_IJPSS_April_2012
 
Powerpoint completo musica
Powerpoint completo musicaPowerpoint completo musica
Powerpoint completo musica
 
Comms Presentation Pascal for InCountry
Comms Presentation Pascal for InCountryComms Presentation Pascal for InCountry
Comms Presentation Pascal for InCountry
 
Plan de trabajo 4º año matemática dic 2016
Plan de trabajo 4º año matemática   dic 2016Plan de trabajo 4º año matemática   dic 2016
Plan de trabajo 4º año matemática dic 2016
 
Work Experience Certificate From The Arab Contractors Company
Work Experience Certificate From The Arab Contractors Company Work Experience Certificate From The Arab Contractors Company
Work Experience Certificate From The Arab Contractors Company
 
Lengua 3er año-trim1-dic 2015
Lengua 3er año-trim1-dic 2015Lengua 3er año-trim1-dic 2015
Lengua 3er año-trim1-dic 2015
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environment
 

Similar to Smart stations 2, by sharon yetman

Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart Cities
IPPAI
 
Vision for Delhi UTTIPEC
Vision for Delhi UTTIPECVision for Delhi UTTIPEC
Vision for Delhi UTTIPEC
Paromita Roy
 
Mass Transit Presentation Raj Naidu
Mass Transit Presentation Raj NaiduMass Transit Presentation Raj Naidu
Mass Transit Presentation Raj Naidu
rnglobalgroup
 

Similar to Smart stations 2, by sharon yetman (20)

Metro train prototype
Metro train prototypeMetro train prototype
Metro train prototype
 
MISTER PRT AUT Lecture 2014-05-24
MISTER PRT AUT Lecture 2014-05-24MISTER PRT AUT Lecture 2014-05-24
MISTER PRT AUT Lecture 2014-05-24
 
Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart Cities
 
Vision for Delhi UTTIPEC
Vision for Delhi UTTIPECVision for Delhi UTTIPEC
Vision for Delhi UTTIPEC
 
Traintaxi traveline5
Traintaxi traveline5Traintaxi traveline5
Traintaxi traveline5
 
Sky bus an emerging technology
Sky bus an emerging technologySky bus an emerging technology
Sky bus an emerging technology
 
2018 San Diego Quickway Presentation
2018 San Diego Quickway Presentation2018 San Diego Quickway Presentation
2018 San Diego Quickway Presentation
 
ITDP India Networking Event WUF9
ITDP India Networking Event WUF9ITDP India Networking Event WUF9
ITDP India Networking Event WUF9
 
Tick mobility
Tick mobilityTick mobility
Tick mobility
 
Subway
SubwaySubway
Subway
 
Mercedes Benz Future Bus
Mercedes Benz Future BusMercedes Benz Future Bus
Mercedes Benz Future Bus
 
Mobility designs
Mobility designsMobility designs
Mobility designs
 
TRANSIT ELEVATED BUS (straddle bus)
TRANSIT ELEVATED BUS (straddle bus)TRANSIT ELEVATED BUS (straddle bus)
TRANSIT ELEVATED BUS (straddle bus)
 
Mister 2010 12 General 02
Mister 2010 12 General 02Mister 2010 12 General 02
Mister 2010 12 General 02
 
Urban Transport Ingrdients
Urban Transport IngrdientsUrban Transport Ingrdients
Urban Transport Ingrdients
 
metrolite.pdf
metrolite.pdfmetrolite.pdf
metrolite.pdf
 
Mass Transit Presentation Raj Naidu
Mass Transit Presentation Raj NaiduMass Transit Presentation Raj Naidu
Mass Transit Presentation Raj Naidu
 
Transit 2050 (oct 2012)
Transit 2050 (oct 2012)Transit 2050 (oct 2012)
Transit 2050 (oct 2012)
 
Skybus an emerging technology
Skybus   an emerging technologySkybus   an emerging technology
Skybus an emerging technology
 
Forget last mile travel - a new modality rising!
Forget last mile travel - a new modality rising!Forget last mile travel - a new modality rising!
Forget last mile travel - a new modality rising!
 

Recently uploaded

Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
ZurliaSoop
 
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Smartinfologiks
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarkacall Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka
vikas rana
 

Recently uploaded (20)

Dàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptxDàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptx
 
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Dehradun Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Karol Bagh, Delhi Call girls :8448380779 Model Escorts | 100% verified
Karol Bagh, Delhi Call girls :8448380779 Model Escorts | 100% verifiedKarol Bagh, Delhi Call girls :8448380779 Model Escorts | 100% verified
Karol Bagh, Delhi Call girls :8448380779 Model Escorts | 100% verified
 
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceHyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Hyderabad Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceSohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Sohna Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
 
How to structure your pitch - B4i template
How to structure your pitch - B4i templateHow to structure your pitch - B4i template
How to structure your pitch - B4i template
 
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
 
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
 
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.inEV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
 
NEON LIGHT CITY pitch deck for the new PC game
NEON LIGHT CITY pitch deck for the new PC gameNEON LIGHT CITY pitch deck for the new PC game
NEON LIGHT CITY pitch deck for the new PC game
 
Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceTirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Tirupati Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Dive into Angel Investing s 2024 0502.pptx
Dive into Angel Investing s 2024 0502.pptxDive into Angel Investing s 2024 0502.pptx
Dive into Angel Investing s 2024 0502.pptx
 
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceBangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Bangalore Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
 
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceLucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Lucknow Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Famedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . FullsailFamedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . Fullsail
 
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarkacall Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka
 

Smart stations 2, by sharon yetman

  • 1. Since York Subway ... Saving 70% on Subways ! “Smart Stations” NO Station BOX required “Smart Subways” ONLY 1 Tunnel required “Smart Safety” ONLY ... 8 Automated Doors
  • 2. NO Traditional ST AT I O N BOXES REQUIRED !
  • 5. “Smart Stations” Innovation Why build a 6 car station ?
  • 6. When you know .... Your “End of the Lines” Capacity ...
  • 7. Is not a ... 6 CAR CapacityTrain 5 CAR 4 CAR 3 CAR
  • 8. Or likely even... A 2 Car CapacityTrain
  • 9. 1. So why BUILD THIS ?
  • 10. And ALL OF THIS ...
  • 11. 2. Since it used to be just this ...
  • 12. 3. Brighter Station with “timed descent” INNOVATIVE Heated/Safer SUBWAY STATION?
  • 13. It's ALL about SAFETY, FLOW, TIMING & CAPACITY Safety is “simple” where there is the will for Safety
  • 14. Safety Achieved OFF the Platform ! Saving 9 Million/Station
  • 15. 4. “Smart Stations” Commuter Crossover P PS S 100% Paid by Developer Except for Platform Easy Extended BUS STOPS ALONG ALL 4 SIDES OF McCown and Sheppard Eliminating the Need for a Bus Station While “Smart Stations” eliminates the Expensive costs of a separate TTC Station at NO Cost to Taxpayers Taxpayers ONLY PAY FOR: 1.Faregates 2.Platform 3.Signage CONDO 1 POOL for Both Condos CONDO 2 NO STATION BOX REQUIRED E E E E
  • 16. All 4 stations ... Meet 100% Demand “Smart Stations” COST 80 to 100% LESS
  • 17.
  • 18. Any one of these 4 Buildings both sides of street Can create “Smart Stations” Technology No More Digging Required
  • 19.
  • 20.
  • 21.
  • 23.
  • 24.
  • 25. 3 - Short 1 Minute Commutes 2 - EASY 30 Second Transfers COMMUTE TIME = 4 Minutes ● l 1 2 3 Train Available: EITHER DIRECTION EVERY 2.5 MINUTES ! C C C C C C C C
  • 26. 7 DOORS FIT PER CAR
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33. Breakdown (3.5 Kilometers) 27.23 Million/Km Tunnelling (2013) 95.3 Million 3.6 Million/Km Concrete Liners (2011) 12.6 Million 12 Million/Km Track (S+I) 44.1 Million 30 Million – 3 Short Trains (2 cars) 30 Million Plus Almost Free Stations JUST 182 Million for 3 Stop Subway ! Sounds too good to be true !
  • 34. 3 Stop Subway to Markham Road Using “Smart Subways” JUST 182 MILLION Dollars Cheaper than 3.56 Billion
  • 35. I priced in ... All Trains All Track All Tunnelling “Smart Subways” Style (2013 Rate) All Concrete Liners (2011) ZERO SIGNALLING COSTS ZERO OPERATIONS COSTS Except at 6 AM and 1 AM
  • 37. When ONLY a 1 Car Station Required?
  • 38. Money Pits MUST be “Smarter”
  • 39. Since York Subway ... “Smart Stations” NO Station BOX required “Smart Subways” ONLY 1 Tunnel required “Smart Safety” ONLY ... 8 Automated Doors Together SAVES 70% on Subways!
  • 40. Above Grade Station Town Centre Station: Paid by Developer Lawrence Station: Paid by Developer Paid by Developer 1 Train “CAR” 1 Train “CAR” 1 Train “CAR” 2 Train “CARS” Danforth Station: Paid by Developer “Smart Subways” And “Smart Stations” NEW COST ABOUT 1 Billion Dollars This “Smart Subways” and “Smart Stations” Flow Technology Cannot be used in part, in whole Or tweaked variations without The written consent of Sharon Yetman of Platform Technology Consultancy. Travel Time Sheppard to Kennedy Station under 5 Minutes. 1 Minute per Section + 30 Second Crossover. “A Mini-System Built within A Larger System SAVING Very big money, with free Bonus Operational costs. A “Mini-System” Built within A Larger System, while SAVING VERY BIG MONEYSAVING Very Big Money, With FREE Operation Costs “KEY KENNEDY TRANSFER”
  • 41. No one Followed Council's Ruling
  • 43.
  • 44.
  • 45.
  • 46. Why would Mr. Byford reject my work on behalf of taxpayers? No More Wrecking up Roads Required JUST 19 MILLION PER/KM Slide presented to TTC CEO Feb 14th , 2012
  • 47. “Smart LRT” is Brilliant (19 Million/Km) 1. Gains 4 Lanes of Roadspace - Comparatively 2. Safer Transit 3. Shorter Traffic Lights 4. Stops all Transit Bunching 5. Stops all Transit Gapping 6. Stops all Transit Unreliability 7. Supplies EXPRESS Bus Lanes 8. ZERO Construction Costs and have 6 above Benefits
  • 48.
  • 49. The Magic of “Smart LRT” is ... ● How do you use 13 Metres LESS Roadspace? ● How do you gain 4 Roadspace Lanes? While making Transit Faster, Safer, & More Reliable, eliminating a “worldwide” problem called Transit Gapping and Transit Bunching
  • 50. Why spend 70 to 250 Million/Km To make Transportation Worse AND Make Transit LESS Safe AND Not fix Bunching, Gapping & Unreliability
  • 51. When “Smart LRT” 1. Costs about 19 Million/Km 2. Makes Transit Safer 3. Makes Transit Technically Faster 4. Makes Transit Technically 100% Reliable 5. Provides Express Bus Opportunities 6. AND DOES NOT LOSS LANES 7. AND HAS NO LANE COMBOS Costing I can PROVE!
  • 52. The Work of Sharon Yetman Canada's Only Transit Flow Technologist
  • 53. Platform Technology Consultancy IS Ontario's First Transit Innovation Firm Inventions INCLUDE: ● “Smart Stations” “Smart Streetcars” ● “Smart Subways” “3 Subway Inventions” ● “Smart Track” “Smart Yonge/Bloor Solution” ● “Smart LRT” “Smart BRT” More Details ? contact: platformtechnology@yahoo.ca ● All “Unique Flow Technology Solutions” strictly cannot be used in part, in whole or tweaked variations without the written consent of Sharon Yetman of Platform Technology Consultancy. Intellectual Property Rights Protected. All rights reserved. C Copyright. Corbin Smith Subway Photos.