SlideShare a Scribd company logo
1 of 5
Download to read offline
www.boomerangbuildings.com
Boomerang 4201 Delp Street, Memphis, TN 901.362.8700
	
  
	
  
	
  
Introduction
	
  
Expansion in an uncertain economy is a tricky ordeal for businesses, both small and large. With
huge upfront costs, long-term financial obligations and an uncertain tax code, organizations face
numerous obstacles in their efforts to grow. Because of this, some businesses are reluctant to
make the necessary infrastructure additions to increase revenue or enhance their market share.
	
  
A temporary building provides a unique, cost-effective solution that enables businesses to
overcome these obstacles, especially when it has an appealing build-to-lease model. In most cases,
these buildings are ready to install in a matter of weeks. Installation is fast and turnkey, completed
in just 21 days. Upon lease end, the removal takes just days.
	
  
An added benefit with temporary buildings is that they can be completely customized. Depending on
project needs, it provides a fully enclosed dark interior with lighting, or a naturally lit interior with
windows. These buildings can be insulated, resulting in a CO2 footprint reduction with the use of PV
panels.
	
  
Project locations or special circumstances – including the risk of high winds, cooling and/or heating
demand and security requirements – dictate engineering requirements for the structure. It has a
standard wind load of 90 mph, which can be increased with further engineering, as well as a snow
load of 50 lbs. per sq. ft. Security requirements, such as structural hardening, are met thanks to
the metal siding with which these structures are built.
	
  
	
  
	
  
Business Case
	
  
Why are temporary buildings important to consider?
	
  
The cost of new buildings is high and the lifespan is anywhere from 30 to 50 years, whether you
need it that long or not. Construct and lease a building for exactly what you need and only for how
long you need it. Though typical capital leases are 2-5 years, a lease can be extended should a
project take longer than the initial time frame. If more space is required, these modular buildings
can be expanded to meet your needs.
	
  
When in doubt, ask yourself the question: do I need to have this building in place for 50 years? Is it
really necessary, or will it be in the way of new expansion in 5-10 years?
	
  
If you are not sure you want to build a permanent building or your answers to the above questions
are not crystal clear, consider the alternative.
www.boomerangbuildings.com
Boomerang 4201 Delp Street, Memphis, TN 901.362.8700
	
  
	
  
Overview
	
  
Tents were sustainable long before there was a green movement. Since 1924, Mahaffey has taken
numerous steps to adapt to these needs and decrease our ecological footprint.
	
  
All elements of these temporary structures are carefully deconstructed after each use, and then
refurbished or repurposed for another project. Once the structure has reached the end of its useful
life, it is recycled after selective deconstruction by contacting the local recycling centers and
shipping directly to the nearest mill or smelter. The frame is then melted down and reused.
	
  
The Boomerang Building was designed with these goals in mind, resulting from customer demands
to quickly rebuild fire stations and schools following the devastating tornados in Alabama and
Joplin, Missouri.
	
  
Transform the thought of new or permanent construction by leasing a sustainable building that can
be rapidly adapted to society’s changing needs.
	
  
	
  
	
  
Proposed Alternative
	
  
Introduction of the Alternative Solution
Boomerang is the answer. Here’s why: New buildings have a lifespan of 30-50 years. Once they are
built, you have to continually pay taxes, keep up with maintenance costs and budget for expensive
utility bills – for interior/exterior lighting and heating/cooling.
	
  
Should the need arise for a temporary building and you have a limited installation time frame,
Boomerang provides the ideal solution in just 21 days. For companies who don't want to commit to
a large capital investment or when new construction is not yet in the budget, Boomerang's short-
term lease frees up cash flow. It is also a smart alternative to the waste of resources constructing
permanent buildings for needs of only 2-5 years. The Boomerang has a high content of recycled
materials, is 100% repurposed after each project and is itself recyclable at the end of its useful life.
This can contribute to the LEED credit ”Construction Waste Management” and may represent a 1-2
LEED point potential in MRc2.
	
  
The structural frame of the Boomerang Building is made from recycled steel and is manufactured in
the United States, less than 70 miles from our headquarters. The total Post Consumer Recycled
Content (Steel) is 80.9%.
	
  
Boomerang Buildings use high performance, CFC-free polyurethane insulation, resulting in energy
efficiency, reducing the need for heating or cooling. The metal siding is made from steel that
contains up to 80% recycled material. Insulated structures help reduce CO2 emissions by the lower
energy need of the building climate control systems.
	
  
This building’s lighting system is designed using ENERGY STAR certified T5 (5/8" in diameter)
lamps, or LED lighting for improved energy efficiency. Its metal roof is composed of 35% recycled
content and is 100% reusable after each project.
	
  
Green buildings:
Reduce construction costs.
Reduce CO2 emissions.
Reduce environmental impacts of new construction.
www.boomerangbuildings.com
Boomerang 4161 Delp Street, Memphis, TN 901.362.8700
	
  
	
  
Reduce liability, and by this, lower insurance costs.
Achieve more predictable results in the design, construction and operation of built
environments.
Save money through tax benefits (lease cost vs. depreciation deduction).
Once the need no longer exists, the temporary building’s site can easily be restored to its
landscaped origin.
	
  
The cumulative impact of the design, construction and operation of built environments has
profound implications on the environment and the economy. So the question remains, does your
organization really need to build a new, permanent building?
	
  
	
  
Application of the Alternative Solution
Boomerang is easy and installed quickly. From the time the contract is signed until you have a fully
functional building, averages out to just 21 days.
	
  
All components and materials that make up the Boomerang Building are recyclable and fully
repurposed after each use. They are designed for deconstruction (D4D), providing flexibility and
adaptability. So as your needs change, so can your building. The Boomerang can be reconfigured,
expanded, dismantled and even relocated with ease. This design can help improve construction as
well as reduce costs over the life of the building. D4D also minimizes building components and
materials and reduces building complexity.
	
  
It is a structurally sound building. It has a standard wind load of 90 mph, which can be increased
with further engineering, as well as a snow load of 50 lbs. per sq. ft. However, the building can be
customized and fully engineered based on your location and local code requirements.
	
  
While we typically anchor into the ground, the Boomerang is designed not to require a foundation.
We can erect on a number of different surfaces such as asphalt, concrete pads, gravel or dirt. Local
codes may require a traditional foundation, and the Boomerang can certainly be erected on one.
The design is meant to be “light on the land” causing the least amount of negative impact on our
environment. This also makes the structure easier to move, should that be necessary.
	
  
The Boomerang’s lease structure allows for low start-up costs and overall financial savings with a
full deduction of the cost in the same year. It also provides tax relief, as lease payments are usually
considered a business expense.
	
  
	
  
Future Direction / Long-Term Focus
	
  
Think of an actual boomerang. It goes out; it comes back in. This process is repeated over and over,
just as with the concept of repurposing. Maximize your dollar value when possible and keep options
open for using the site for something else in the future.
	
  
While Boomerang may not be the only option, it is worthwhile to consider in the short term. Keep in
mind that a flexible lease time it is a major cost factor. This building can provide breathing room to
get long-term projects completed on time and on budget.
www.boomerangbuildings.com
Boomerang 4161 Delp Street, Memphis, TN 901.362.8700
	
  
	
  
Conclusion
	
  
This concept takes green building to the next level. It encourages project teams to create
environments that may be completely restored or regenerated once the need for the temporary
building no longer exists. Through this effort, we are ultimately able to provide positive
environmental, social and economic impacts.
	
  
The cost of new buildings is high and depreciation is slow: 39 years. Savings are considerable
compared to a permanent building. When considering a lease versus depreciation savings…this
could be your bonus fund!
	
  
By using these structures “doing the right thing” becomes the logical, economical and
environmentally correct choice. Make a difference by leasing a temporary, sustainable Boomerang
Building.
www.boomerangbuildings.com
Boomerang 4161 Delp Street, Memphis, TN 901.362.8700
	
  
	
  
Appendices
	
  
Appendix A – Scenarios
ENR Sourcebooks for building costs: http://enr.construction.com/toplists/sourcebooks/
	
  
	
  
Appendix B – Options
Building Specifications: http://boomerangbuildings.com
Fabric Structure Options: http://fabricstructures.com/products
	
  
	
  
Appendix C – Authors
Joey Barker, Marketing Director
Mahaffey Fabric Structures/Boomerang Buildings
901.604.0072
beth@boomerangbuildings.com
	
  
Joseph Marfi, Director of Sustainable Design and Construction
Turner Construction
714.863.2059
jmarfi@tcco.com
	
  
	
  
Appendix D – References
Boomerang Building Components: http://boomerangbuildings.com
	
  
USGBC Green Building Facts and Figures:
http://new.usgbc.org/articles/green-building-facts
https://www.usgbc.org/ShowFile.aspx?DocumentID=18693
http://www.epa.gov/greenbuilding/pubs/gbstats.pdf

More Related Content

More from Mahaffey Fabric Structures

Hurricane Relief Shelters Case Study - Beaumont, TX
Hurricane Relief Shelters Case Study - Beaumont, TXHurricane Relief Shelters Case Study - Beaumont, TX
Hurricane Relief Shelters Case Study - Beaumont, TXMahaffey Fabric Structures
 
Mahaffey Super Series™ - Clear Span Fabric Structure
Mahaffey Super Series™ - Clear Span Fabric StructureMahaffey Super Series™ - Clear Span Fabric Structure
Mahaffey Super Series™ - Clear Span Fabric StructureMahaffey Fabric Structures
 
Buckman Testimonial - Mahaffey Fabric Structures
Buckman Testimonial - Mahaffey Fabric StructuresBuckman Testimonial - Mahaffey Fabric Structures
Buckman Testimonial - Mahaffey Fabric StructuresMahaffey Fabric Structures
 

More from Mahaffey Fabric Structures (20)

Hurricane Relief Shelters Case Study - Beaumont, TX
Hurricane Relief Shelters Case Study - Beaumont, TXHurricane Relief Shelters Case Study - Beaumont, TX
Hurricane Relief Shelters Case Study - Beaumont, TX
 
Mahaffey Super Series™ - Clear Span Fabric Structure
Mahaffey Super Series™ - Clear Span Fabric StructureMahaffey Super Series™ - Clear Span Fabric Structure
Mahaffey Super Series™ - Clear Span Fabric Structure
 
Environmental Containment Solutions
Environmental Containment SolutionsEnvironmental Containment Solutions
Environmental Containment Solutions
 
Rayford letter [testimonial]
Rayford letter [testimonial]Rayford letter [testimonial]
Rayford letter [testimonial]
 
Buffalo bills
Buffalo billsBuffalo bills
Buffalo bills
 
Black jack bbq team
Black jack bbq teamBlack jack bbq team
Black jack bbq team
 
Art of the Party [testimonial]
Art of the Party [testimonial]Art of the Party [testimonial]
Art of the Party [testimonial]
 
A bash
A bashA bash
A bash
 
Wegmans Testimonial - Mahaffey Event Rentals
Wegmans Testimonial - Mahaffey Event RentalsWegmans Testimonial - Mahaffey Event Rentals
Wegmans Testimonial - Mahaffey Event Rentals
 
Viking Range cooking team [testimonial]
Viking Range cooking team [testimonial]Viking Range cooking team [testimonial]
Viking Range cooking team [testimonial]
 
Todd Bagwell [testimonial]
Todd Bagwell [testimonial]Todd Bagwell [testimonial]
Todd Bagwell [testimonial]
 
Buckman Testimonial - Mahaffey Fabric Structures
Buckman Testimonial - Mahaffey Fabric StructuresBuckman Testimonial - Mahaffey Fabric Structures
Buckman Testimonial - Mahaffey Fabric Structures
 
Auburn University fundraiser [testimonial]
Auburn University fundraiser [testimonial]Auburn University fundraiser [testimonial]
Auburn University fundraiser [testimonial]
 
AT&T advertising and publishing [testimonial]
AT&T advertising and publishing [testimonial]AT&T advertising and publishing [testimonial]
AT&T advertising and publishing [testimonial]
 
Art of the party la france wedding
Art of the party   la france weddingArt of the party   la france wedding
Art of the party la france wedding
 
Art of the party alotian
Art of the party   alotianArt of the party   alotian
Art of the party alotian
 
Rock and rain 2009
Rock and rain 2009Rock and rain 2009
Rock and rain 2009
 
Norfolk southern mark
Norfolk southern   markNorfolk southern   mark
Norfolk southern mark
 
Mistletoe marketplace 2009
Mistletoe marketplace 2009Mistletoe marketplace 2009
Mistletoe marketplace 2009
 
Michael carbine
Michael carbineMichael carbine
Michael carbine
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Boomerang Buildings - A Sustainability Whitepaper

  • 1. www.boomerangbuildings.com Boomerang 4201 Delp Street, Memphis, TN 901.362.8700       Introduction   Expansion in an uncertain economy is a tricky ordeal for businesses, both small and large. With huge upfront costs, long-term financial obligations and an uncertain tax code, organizations face numerous obstacles in their efforts to grow. Because of this, some businesses are reluctant to make the necessary infrastructure additions to increase revenue or enhance their market share.   A temporary building provides a unique, cost-effective solution that enables businesses to overcome these obstacles, especially when it has an appealing build-to-lease model. In most cases, these buildings are ready to install in a matter of weeks. Installation is fast and turnkey, completed in just 21 days. Upon lease end, the removal takes just days.   An added benefit with temporary buildings is that they can be completely customized. Depending on project needs, it provides a fully enclosed dark interior with lighting, or a naturally lit interior with windows. These buildings can be insulated, resulting in a CO2 footprint reduction with the use of PV panels.   Project locations or special circumstances – including the risk of high winds, cooling and/or heating demand and security requirements – dictate engineering requirements for the structure. It has a standard wind load of 90 mph, which can be increased with further engineering, as well as a snow load of 50 lbs. per sq. ft. Security requirements, such as structural hardening, are met thanks to the metal siding with which these structures are built.       Business Case   Why are temporary buildings important to consider?   The cost of new buildings is high and the lifespan is anywhere from 30 to 50 years, whether you need it that long or not. Construct and lease a building for exactly what you need and only for how long you need it. Though typical capital leases are 2-5 years, a lease can be extended should a project take longer than the initial time frame. If more space is required, these modular buildings can be expanded to meet your needs.   When in doubt, ask yourself the question: do I need to have this building in place for 50 years? Is it really necessary, or will it be in the way of new expansion in 5-10 years?   If you are not sure you want to build a permanent building or your answers to the above questions are not crystal clear, consider the alternative.
  • 2. www.boomerangbuildings.com Boomerang 4201 Delp Street, Memphis, TN 901.362.8700     Overview   Tents were sustainable long before there was a green movement. Since 1924, Mahaffey has taken numerous steps to adapt to these needs and decrease our ecological footprint.   All elements of these temporary structures are carefully deconstructed after each use, and then refurbished or repurposed for another project. Once the structure has reached the end of its useful life, it is recycled after selective deconstruction by contacting the local recycling centers and shipping directly to the nearest mill or smelter. The frame is then melted down and reused.   The Boomerang Building was designed with these goals in mind, resulting from customer demands to quickly rebuild fire stations and schools following the devastating tornados in Alabama and Joplin, Missouri.   Transform the thought of new or permanent construction by leasing a sustainable building that can be rapidly adapted to society’s changing needs.       Proposed Alternative   Introduction of the Alternative Solution Boomerang is the answer. Here’s why: New buildings have a lifespan of 30-50 years. Once they are built, you have to continually pay taxes, keep up with maintenance costs and budget for expensive utility bills – for interior/exterior lighting and heating/cooling.   Should the need arise for a temporary building and you have a limited installation time frame, Boomerang provides the ideal solution in just 21 days. For companies who don't want to commit to a large capital investment or when new construction is not yet in the budget, Boomerang's short- term lease frees up cash flow. It is also a smart alternative to the waste of resources constructing permanent buildings for needs of only 2-5 years. The Boomerang has a high content of recycled materials, is 100% repurposed after each project and is itself recyclable at the end of its useful life. This can contribute to the LEED credit ”Construction Waste Management” and may represent a 1-2 LEED point potential in MRc2.   The structural frame of the Boomerang Building is made from recycled steel and is manufactured in the United States, less than 70 miles from our headquarters. The total Post Consumer Recycled Content (Steel) is 80.9%.   Boomerang Buildings use high performance, CFC-free polyurethane insulation, resulting in energy efficiency, reducing the need for heating or cooling. The metal siding is made from steel that contains up to 80% recycled material. Insulated structures help reduce CO2 emissions by the lower energy need of the building climate control systems.   This building’s lighting system is designed using ENERGY STAR certified T5 (5/8" in diameter) lamps, or LED lighting for improved energy efficiency. Its metal roof is composed of 35% recycled content and is 100% reusable after each project.   Green buildings: Reduce construction costs. Reduce CO2 emissions. Reduce environmental impacts of new construction.
  • 3. www.boomerangbuildings.com Boomerang 4161 Delp Street, Memphis, TN 901.362.8700     Reduce liability, and by this, lower insurance costs. Achieve more predictable results in the design, construction and operation of built environments. Save money through tax benefits (lease cost vs. depreciation deduction). Once the need no longer exists, the temporary building’s site can easily be restored to its landscaped origin.   The cumulative impact of the design, construction and operation of built environments has profound implications on the environment and the economy. So the question remains, does your organization really need to build a new, permanent building?     Application of the Alternative Solution Boomerang is easy and installed quickly. From the time the contract is signed until you have a fully functional building, averages out to just 21 days.   All components and materials that make up the Boomerang Building are recyclable and fully repurposed after each use. They are designed for deconstruction (D4D), providing flexibility and adaptability. So as your needs change, so can your building. The Boomerang can be reconfigured, expanded, dismantled and even relocated with ease. This design can help improve construction as well as reduce costs over the life of the building. D4D also minimizes building components and materials and reduces building complexity.   It is a structurally sound building. It has a standard wind load of 90 mph, which can be increased with further engineering, as well as a snow load of 50 lbs. per sq. ft. However, the building can be customized and fully engineered based on your location and local code requirements.   While we typically anchor into the ground, the Boomerang is designed not to require a foundation. We can erect on a number of different surfaces such as asphalt, concrete pads, gravel or dirt. Local codes may require a traditional foundation, and the Boomerang can certainly be erected on one. The design is meant to be “light on the land” causing the least amount of negative impact on our environment. This also makes the structure easier to move, should that be necessary.   The Boomerang’s lease structure allows for low start-up costs and overall financial savings with a full deduction of the cost in the same year. It also provides tax relief, as lease payments are usually considered a business expense.     Future Direction / Long-Term Focus   Think of an actual boomerang. It goes out; it comes back in. This process is repeated over and over, just as with the concept of repurposing. Maximize your dollar value when possible and keep options open for using the site for something else in the future.   While Boomerang may not be the only option, it is worthwhile to consider in the short term. Keep in mind that a flexible lease time it is a major cost factor. This building can provide breathing room to get long-term projects completed on time and on budget.
  • 4. www.boomerangbuildings.com Boomerang 4161 Delp Street, Memphis, TN 901.362.8700     Conclusion   This concept takes green building to the next level. It encourages project teams to create environments that may be completely restored or regenerated once the need for the temporary building no longer exists. Through this effort, we are ultimately able to provide positive environmental, social and economic impacts.   The cost of new buildings is high and depreciation is slow: 39 years. Savings are considerable compared to a permanent building. When considering a lease versus depreciation savings…this could be your bonus fund!   By using these structures “doing the right thing” becomes the logical, economical and environmentally correct choice. Make a difference by leasing a temporary, sustainable Boomerang Building.
  • 5. www.boomerangbuildings.com Boomerang 4161 Delp Street, Memphis, TN 901.362.8700     Appendices   Appendix A – Scenarios ENR Sourcebooks for building costs: http://enr.construction.com/toplists/sourcebooks/     Appendix B – Options Building Specifications: http://boomerangbuildings.com Fabric Structure Options: http://fabricstructures.com/products     Appendix C – Authors Joey Barker, Marketing Director Mahaffey Fabric Structures/Boomerang Buildings 901.604.0072 beth@boomerangbuildings.com   Joseph Marfi, Director of Sustainable Design and Construction Turner Construction 714.863.2059 jmarfi@tcco.com     Appendix D – References Boomerang Building Components: http://boomerangbuildings.com   USGBC Green Building Facts and Figures: http://new.usgbc.org/articles/green-building-facts https://www.usgbc.org/ShowFile.aspx?DocumentID=18693 http://www.epa.gov/greenbuilding/pubs/gbstats.pdf