SlideShare a Scribd company logo
1 of 16
Download to read offline
Corporate Presentation
November 2020
TSX: ETG | OTCQB: ERLFF
Partner in World Class Oyu Tolgoi Underground
Copper-Gold Mine
Entrée Resources | Investor Presentation | November 2020 | 2
Cautionary Statement
This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking
information within the meaning of applicable Canadian securities laws.
Forward-looking statements include, but are not limited to, statements with respect to corporate strategies and plans; requirements for additional capital; uses of funds and
projected expenditures; the expectations set out in OTFS20; timing and status of Oyu Tolgoi underground development; the mine design for Hugo North Lift 1 Panel 0 and
the related cost and production schedule implications; the re-design study for Panels 1 and 2 of Hugo North (including Hugo North Extension) Lift 1 and the possible
outcomes, content and timing thereof; timing of completion of the Definitive Estimate and the scope thereof; timing and amount of production from Lift 1 of the Entrée/Oyu
Tolgoi JV property, potential production delays and the impact of any delays on the Company’s cash flows, expected copper and gold grades, liquidity, funding
requirements and planning; the potential impact of COVID-19 (coronavirus) on Oyu Tolgoi underground development and the Company’s business, operations and
financial; future commodity prices; the estimation of mineral reserves and resources; projected mining and process recovery rates; estimates of capital and operating
costs, mill throughput, cash flows and mine life; capital, financing and project development risk; mining dilution; discussions with the Government of Mongolia and other
Oyu Tolgoi stakeholders; exploration potential; potential metallurgical recoveries and grades; plans for future exploration and development programs and budgets;
permitting time lines; anticipated business activities; proposed acquisitions and dispositions of assets; and future financial performance. While the Company has based
these forward-looking statements on its expectations about future events as at the date that such statements were prepared, the statements are not a guarantee of
Entrée’s future performance and are based on numerous assumptions regarding present and future business strategies; the correct interpretation of agreements, laws and
regulations; local and global economic conditions and markets; the outcome of negotiations; the ability of the Company to continue operations during the COVID-19
(coronavirus) pandemic; the environment in which the Company will operate in the future, including commodity prices, projected grades, projected dilution, anticipated
capital and operating costs, anticipated future production and cash flows; the anticipated location of certain infrastructure and sequence of mining within and across panel
boundaries; the construction and continued development of the Oyu Tolgoi underground mine; and the status of the Company’s relationship and interaction with the
Government of Mongolia and other Oyu Tolgoi stakeholders. With respect to the construction and continued development of the Oyu Tolgoi underground mine, important
risks, uncertainties and factors which could cause actual results to differ materially from future results expressed or implied by such forward-looking statements and
information include the timing and cost of the construction and expansion of mining and processing facilities; the timing and availability of a long term domestic power
source for Oyu Tolgoi (or the availability of financing for Oyu Tolgoi LLC (“OTLLC”) or the Government of Mongolia to construct such a source); the potential impact of
COVID-19; the ability of OTLLC to secure and draw down on the supplemental debt under the Oyu Tolgoi project finance facility and the availability of additional financing
on terms reasonably acceptable to Oyu Tolgoi stakeholders to further develop Oyu Tolgoi; the impact of changes in, changes in interpretation to or changes in
enforcement of, laws, regulations and government practises in Mongolia; delays, and the costs which would result from delays, in the development of the underground
mine; the status of the relationship and interaction between Oyu Tolgoi stakeholders including the Government of Mongolia on the continued operation and development
of Oyu Tolgoi, future funding plans and requirements and OTLLC internal governance; the anticipated location of certain infrastructure and sequence of mining within and
across panel boundaries; projected commodity prices and demand; and production estimates and the anticipated yearly production at the Oyu Tolgoi underground mine.
With respect to the 2018 PEA, it is based on a conceptual mine plan that includes Inferred resources. Numerous assumptions were made in the preparation of the 2018
PEA, including with respect to mineability, capital and operating costs, production schedules, the timing of construction and expansion of mining and processing facilities,
and recoveries, that may change materially once production commences at Hugo North Extension Lift 1 and additional development and capital decisions are required.
… continued
Entrée Resources | Investor Presentation | November 2020 | 3
Cautionary Statement (cont’d)
Any changes to the assumptions underlying the 2018 PEA could cause actual results to be materially different from any future results, performance or achievements
expressed or implied by forward-looking statements and information relating to the 2018 PEA. Other risks, uncertainties and factors which could cause actual results to
differ materially from future results expressed or implied by forward-looking statements and information are discussed in the section entitled “Risk Factors” in Entrée’s
Annual Information Form dated March 16, 2020 and in the section entitled “Critical Accounting Estimates, Risks and Uncertainties” in the Company’s most recently filed
MD&A, available at www.sedar.com. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such statements. Except as required under applicable securities legislation, Entrée undertakes no obligation to publicly update
or revise forward-looking statements.
Robert Cinits, P.Geo., Entrée’s former Vice President of Corporate Development and currently a consultant to Entrée has approved the technical information in this
presentation. Mr. Cinits is a “qualified person” as defined in National Instrument 43-101- Standards of Disclosure for Mineral Projects (“NI 43-101”).
All minerals reserves and mineral resources have been calculated in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum and
NI 43-101. Cautionary Note to United States Investors: The definitions of “Proven” and “Probable” mineral reserves used in NI 43-101 differ from the definitions in the
United States Securities and Exchange Commission (“SEC”) Industry Guide 7. In addition, the terms “mineral resource”, “Measured mineral resource”, “Indicated
mineral resource” and “Inferred mineral resource” are not defined terms under SEC Industry Guide 7 and have historically not been permitted to be used in reports and
registration statements filed with the SEC. Investors are cautioned not to assume that all or any part of mineral deposits in these categories will ever be converted into
reserves. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot
be assumed that all or any part of an Inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred mineral
resources may not form the basis of Feasibility or Pre-feasibility studies, except in rare cases. Accordingly, information contained in this presentation containing
descriptions of the Company’s mineral deposits may not be comparable to similar information made public by U.S. companies pursuant to SEC Industry Guide 7.
“Cash costs after credits” (C1) and All-in sustaining cost (ASIC) are non-IFRS performance measurements. These performance measurements are included because
these statistics are widely accepted as the standard of reporting cash costs of production in North America. These performance measurements do not have a meaning
within IFRS and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. These performance measurements
should not be considered in isolation as a substitute for measures of performance in accordance with IFRS.
The information in this presentation is for informational purposes only. Readers should not rely on the information for any purpose other than to gain general
knowledge of Entrée. This information is not intended to be, and should not be construed as, part of an offering or solicitation of securities.
For additional information regarding the Entrée/Oyu Tolgoi JV property, see the technical report titled “Entrée/Oyu Tolgoi Joint Venture Project, Mongolia” with an
effective date of January 15, 2018 (“2018 Technical Report”) prepared by Wood Canada Limited (formerly Amec Foster Wheeler Americas Limited) a copy of which is
available on SEDAR at www.sedar.com.
Entrée Resources | Investor Presentation | November 2020 | 4
About Entrée Resources Ltd.
▪ Well-funded: ~US$7.4 million cash (as at Sept 30, 2020)
▪ Cornerstone shareholders: Sandstorm Gold, Turquoise Hill & Rio Tinto
▪ Robust future cash flows*
▪ Characteristics of a Royalty
▪ Low risk profile: low capital and development risk
Oyu Tolgoi mill complex (September 2017)
Entrée has a unique carried joint venture interest in a significant
portion of the Oyu Tolgoi copper-gold project in Mongolia
*See the 2018 Technical Report for the life-of-mine cash flows for the 2018 Reserve Case and 2018 PEA. Assumptions in the 2018 Technical Report are subject to change.
Entrée Resources | Investor Presentation | November 2020 | 5
Entrée Overview
TSX: ETG
OTCQB: ERLFF
Treasury
~US$7.4 million
(as of Sept 30, 2020)
Market
Capitalization
~C$85 million
(as of Nov 2, 2020)
Shares
Outstanding
~185.9 million
(as of Nov 1, 2020)
Listings
Cornerstone Shareholders
(as at Nov 1, 2020)
Ownership %
Sandstorm Gold Ltd. 21.4%
Rio Tinto PLC 9.4%
Turquoise Hill Resources* 7.8%
* Rio Tinto holds beneficial ownership over shares held by Turquoise Hill.
Entrée Resources | Investor Presentation | November 2020 | 6
Experienced Leadership Team
Stephen Scott
President, CEO & Director
Mr. Scott has more than 30 years global experience in all mining industry sectors. Prior to joining Entrée he held various global operational and
corporate executive positions with Rio Tinto Ltd. and RGC Ltd. Mr. Scott currently sits on the board of directors of Atalaya Mining PLC and has
previously served on the board of directors of several public mining companies.
Duane Lo
CFO
Mr. Lo has 20 years of experience in financial management for mining operations in Brazil, Africa and other jurisdictions. He was previously the
Chief Financial Officer of Luna Gold Corp. and Corporate Controller for First Quantum Minerals Ltd. He holds a Chartered Professional Accountant,
Chartered Accountant designation from the Institute of Chartered Accountants of British Columbia.
Susan McLeod
VP, Legal Affairs
Ms. McLeod has been practicing law in BC since 1997. Prior to joining Entrée she worked as outside counsel to public companies engaged in
international mineral exploration and mining. She has advised clients on corporate finance, M&A, corporate governance and mining-related
commercial agreements. Ms. McLeod holds a B.Sc. and an LLB from the University of British Columbia and is a member of the Law Society of BC.
Mark Bailey
Chair
Mr. Bailey is a mining executive and registered professional geologist with over 40 years of industry experience. He is currently CEO and a director
of Core Gold Ltd. and Chairman of Fiore Gold Ltd. Mr. Bailey was the President and CEO of Minefinders Corporation Ltd. and has also held senior
positions with Equinox Resources Inc. and Exxon Minerals.
Alan Edwards
Director
Mr. Edwards has more than 35 years of diverse mining industry experience. Mr. Edwards is President of AE Resources Corp. He also serves on the
board of directors of Orvana Minerals Corp. and Americas Silver Corporation. Mr. Edwards was previously CEO of Oracle Mining Corporation,
Copper One Inc. and Frontera Copper Corporation, and Senior VP Operations at the Grasberg copper mine. Mr. Edwards holds a B.Sc. in Mining
Engineering and an MBA (Finance) from the University of Arizona.
James Harris
Director
Mr. Harris was formerly a corporate, securities and business lawyer with over 30 years’ experience in Canada and internationally. He has extensive
experience with the acquisition and disposition of assets, corporate structuring and restructuring, and corporate governance. Mr. Harris has
completed the Directors’ Education Program of the Institute of Corporate Directors and is an Institute accredited Director (ICD.D).
Michael Price
Director
Dr. Price has extensive experience in mining and mining finance. He is currently a director of Eldorado Gold Corp. and Asanko Gold Inc. and is the
London Representative of Resource Capital Funds. Dr. Price has served as Managing Director, Joint Global Head of Mining and Metals, Barclays
Capital, Managing Director, Global Head of Mining and Metals, Societe Generale and Head of Resource Banking and Metals Trading, NM
Rothschild and Sons. He holds B.Sc. and Ph.D. qualifications in Mining Engineering from University College Cardiff and a Mine Manager’s
Certificate of Competency (South Africa).
Anna Stylianides
Director
Ms. Stylianides has over 20 years of experience in global capital markets and has spent much of her career in investment banking, private equity,
and corporate management and restructuring. She began her career in corporate law after graduating from the University of the Witwatersrand in
Johannesburg, South Africa. Ms. Stylianides is currently a director of Eco Oro Minerals Corp., Capfin Partners, LLC, Altius Minerals Corporation,
Sabina Gold & Silver Corp. and the Fraser Institute.
Entrée Resources | Investor Presentation | November 2020 | 7
Entrée/Oyu Tolgoi JV Structure
20%*
80%
34% 66%
Oyu Tolgoi LLC
(OTLLC)
Entrée
ResourcesEntrée 20%* carried interest in
the Entrée/Oyu Tolgoi JV
Mongolian Government Turquoise Hill
Rio Tinto**
51%
Entrée/Oyu
Tolgoi JV
Hugo North Extension & Heruga deposits
Significant exploration potential along the
OT trend
* Entrée has a 30% participating interest with respect to mineralization extracted from above 560m depth.
** Rio Tinto is project operator of Oyu Tolgoi.
▪ Entrée not responsible for upfront
payment of capital costs of surface
infrastructure and underground
development on the Oyu Tolgoi mining
licence
▪ OTLLC will contribute Entrée’s share
of project/exploration costs on the
Entrée/Oyu Tolgoi JV property as a
loan
▪ Loan bears interest at prime +2%,
repayable to OTLLC only from 90% of
free cash flow
Entrée Resources | Investor Presentation | November 2020 | 8
Entrée/Oyu Tolgoi JV Deposits
Entrée/Oyu Tolgoi JV (EJV)
property is an integral part
of the world-class Oyu
Tolgoi copper-gold project
Entrée has a 20% carried interest in the Hugo North Extension and Heruga
resources and reserves.
* Shivee West is subject to a License Fees Agreement between Entrée and
OTLLC and may ultimately be included in the Entrée/Oyu Tolgoi JV property.
** Outline of mineralization projected to surface.
The EJV property includes:
• Hugo North Extension (HNE)
• Heruga
• Significant exploration potential
Entrée Resources | Investor Presentation | November 2020 | 9
Entrée/Oyu Tolgoi JV Deposits: Large, Long Life
2018 Technical Report for the Entrée/Oyu Tolgoi JV property*:
• HNE Lift 1: 14 year mine life (2018 Reserve Case)
• HNE Lift 1 + Lift 2: 33 year conceptual mine life (first half of 2018 PEA)
• HNE Lift 1 + Lift 2 + Heruga**: 77 years from start of Lift 1 to completion of Heruga (2018 PEA)
*Based on assumptions in the 2018 Technical Report, which are subject to change following delivery and review of OTFS20 and completion and delivery to the Company of the Definitive Estimate and Panel 1 optimization
studies by OTLLC, Rio Tinto and Turquoise Hill. Assumptions are also subject to change as a result of the impacts of the COVID-19 pandemic.
** The economic analysis in the 2018 PEA (HNE Lift 1 + HNE Lift 2 + Heruga) does not have as high a level of certainty as the 2018 Reserve Case (HNE Lift 1). The 2018 PEA is preliminary in nature and includes Inferred
mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the
2018 PEA will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Assumes long-term metals prices: US$3.00/lb Cu, US$1,300.00/oz Au and US$19.00/oz Ag.
Entrée Resources | Investor Presentation | November 2020 | 10
Entrée/Oyu Tolgoi JV: Hugo North Extension Update
OTLLC:HugoSouth&
HugoNorthDeposits
Oyu Tolgoi Lift 1 underground
development is underway
▪ Haulage decline started in Q1 2017
▪ Shafts 1,2 and 5 are complete
▪ Shafts 3 and 4 are on care and maintenance
pending return of expert service providers to site
▪ Design change for Panel 0 on Oyu Tolgoi licence
approved
▪ Will form the basis of the Definitive
Estimate cost and schedule update for
Panel 0, expected fourth quarter 2020.
EJV - LIFT 1
Basis of the 2018 Reserve Case
OR
Initial lift to be mined in the 2018
PEA
EJV - LIFT 2
Second lift to be mined
in the 2018 PEA;
together with Lift 1
these form the initial 33
years of mine life
HNE is located at the northern portion of Panel 1.
A review of mine designs options for Panel 1 is expected
to be finalized as early as possible in 2021.
Entrée Resources | Investor Presentation | November 2020 | 11
Entrée/Oyu Tolgoi JV: Hugo North Extension Update
• Underground development on Oyu Tolgoi mining licence has continued to progress despite COVID-19 controls and ongoing
international travel restrictions.
• Care and maintenance activities continue at Shafts 3 & 4 but some commissioning activities have advanced in preparation for shaft
sinking.
• OTLLC completed updated Oyu Tolgoi Feasibility Study (OTFS20)* that incorporates new mine design for Lift 1 of Hugo North
Panel 0.
Photo from Oyu Tolgoi website: http://ot.mn/
Oyu Tolgoi Underground development
• Lift 1 mine plan incorporates the development of three panels (Panels 0, 1 & 2):
o HNE located at northern portion of Panel 1
o To reach full sustainable production rate of 95,000 tonnes per day, all
three panels must be in production
• Entrée’s partners believe the existing feasibility study design for Panel 1
remains executable based on current orebody understanding.
• Introduction of two, 120 metre structural pillars, both on Oyu Tolgoi mining
licence on the north and south boundary of Panel 0; Panels 1 & 2 become
independent block caves, allowing for more operational flexibility and optionality
of sequencing.
• Optimization studies underway to explore opportunities to:
o Optimize extraction level for each panel independently
o Evaluate potential to convert mineral resources below current Lift 1
extraction level to Probable mineral reserves
o Complete additional drilling and data collection in support of Panel 1 & 2
design refinements
• Drilling work ongoing; resulting updates to geotechnical modelling and mine.
• Once Definitive Estimate and Panel 1 optimization studies completed and delivered to Entrée with OTFS20, Company
expects to be able to assess potential impact on EJV reserves and resources and production and financial assumptions
and outputs from 2018 Reserve Case and 2018 PEA.
*OTFS20 does not reflect the impacts of the COVID-19 project, which continue to be assessed.
Entrée Resources | Investor Presentation | November 2020 | 12
Entrée/Oyu Tolgoi JV: Mineral Resources & Reserves
• Effective date of mineral resources and reserves estimates is January 15, 2018.
• Entrée has a 20% carried interest in the Hugo North Extension and Heruga resources and reserves.
• The mineral reserves are not additive to the mineral resources.
• HNE CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942))/(3.01*22.0462)
• Heruga CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942)+(Mo*11.9*0.0022046*0.736))/(3.01*22.0462)
• Once the Definitive Estimate and Panel 1 optimization studies have been completed and delivered to Entrée with OTFS20, the Company expects to be able to assess the potential impact on EJV
mineral resources and reserves.
High-grade, large resources
Entrée/Oyu Tolgoi JV Property – Mineral Resources
Classification
Tonnage
(Mt)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Mo
(ppm)
CuEq
(%)
Contained Metal
Cu (Mlb) Au (koz) Ag (koz) Mo (Mlb)
Hugo North Extension (>0.37% CuEq Cut-Off)
Indicated 122 1.68 0.57 4.21 - 2.03 4,515 2,200 16,500 -
Inferred 174 1.00 0.35 2.73 - 1.21 3,828 2,000 15,200 -
Heruga (>0.37% CuEq Cut-Off)
Inferred 1,700 0.39 0.37 1.39 113.2 0.64 14,604 20,410 75,932 424
Entrée/Oyu Tolgoi JV Property – Mineral Reserves – Hugo North Extension Lift 1
Classification
Tonnage
(Mt)
NSR
(US$/t)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Recovered Metal
Cu (Mlb) Au (koz) Ag (koz)
Probable 35 100.57 1.59 0.55 3.72 1,121 519 3,591
Entrée Resources | Investor Presentation | November 2020 | 13
2018 PEA – Mill Feed
Entrée has a 20% attributable interest in the above resources, reserves and recovered metal.
The economic analysis in the 2018 PEA does not have as high a level of certainty as the 2018 Reserve Case. The 2018 PEA is preliminary in nature and includes Inferred mineral resources that are considered too
speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the 2018 PEA will be realized. Mineral
resources are not mineral reserves and do not have demonstrated economic viability.
HNE CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942))/(3.01*22.0462)
Heruga CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942)+(Mo*11.9*0.0022046*0.736))/(3.01*22.0462)
Based on assumptions in the 2018 Technical Report, which are subject to change.
2018 PEA Indicated Resources + Inferred Resources
Mill
Feed
(MT)
Cu
(%)
Au
(g/t)
Ag
(g/t)
CuEq
(%)
Mill Feed
(MT)
Cu
(%)
Au
(g/t)
Ag
(g/t)
CuEq
(%)
HNE Lift 1 34.8 1.59 0.55 3.72 1.93 --- --- --- --- ---
HNE Lift 2 78.4 1.34 0.48 3.59 1.64 88.4 1.34 0.48 3.59 1.64
HNE Lift 1+2 113.2 1.42 0.50 3.63 1.73 88.4 1.34 0.48 3.59 1.64
Heruga --- --- --- --- --- 619.7 0.42 0.43 1.53 0.71
Total 113.2 1.42 0.50 3.63 1.73 708.1 0.53 0.44 1.79 0.82
HNE Lift 1+2+Heruga Recovered Metal
• 10,497 Mlb copper
• 9,367 koz gold
• 45,378 koz silver
High Grade
HNE Lift 1+2 Recovered Metal
• 5,579 Mlb copper
• 2,637 koz gold
• 20,442 koz silver
Entrée Resources | Investor Presentation | November 2020 | 14
2018 Reserve Case: Capital & Cash Costs
2018 Reserve Case
Capital, C1 & AISC costs (in US$, attributable to Entrée)*
Total Development + Sustaining Capital ($M) $52.3**
Cash Cost after Credits (C1) - $/lb payable Cu $0.56
All-In Sustaining Cost (AISC) after Credits - $/lb payable Cu $1.03
* Based on assumptions in the 2018 Technical Report, which are subject to change. .
** Includes ETG’s share of capital for Shaft 4, originally designed on the EJV property, which has moved onto the Oyu Tolgoi mining licence subsequent to the publication
of the 2018 Technical Report.
▪ JV partner, Oyu Tolgoi LLC (OTLLC), carries almost all of the financial burden and execution risk
on the Oyu Tolgoi underground project, including the EJV property
▪ Manageable project development risk with Rio Tinto as operator
▪ Entrée not responsible for upfront payment of capital costs of surface infrastructure and
underground development on the Oyu Tolgoi mining licence
▪ OTLLC will contribute Entrée’s share of project/exploration costs on the EJV property as a loan
▪ Loan bears interest at RBC prime +2%, repayable to OTLLC from 90% of free cash flow
Low C1 cash costs attributable to Entrée
Low capital and development risk for Entrée
Entrée Resources | Investor Presentation | November 2020 | 15
Entrée: Maximizing Potential
Near term priorities:
▪ Continue constructive discussions with
the Government of Mongolia
▪ Work with partners to advance
potential amendments to the JV
agreement that align the interests of all
stakeholders as they are now
understood
▪ Advocate increased exploration on
Entrée/Oyu Tolgoi JV property,
including several priority near-surface
targets
▪ Continue to focus efforts on conserving cash reserves and remaining prudent with
expenditures
TSX: ETG | OTCQB: ERLFF
For more information, please contact:
Stephen Scott
President & Chief Executive Officer
sscott@EntreeResourcesLtd.com
David Jan
Investor Relations
djan@EntreeResourcesLtd.com
604.687.4777 (office) | 1.866.368.7330 (toll free)
EntreeResourcesLtd.com

More Related Content

What's hot

Entree Resources - Sep 2019 Corporate Presentation
Entree Resources - Sep 2019 Corporate PresentationEntree Resources - Sep 2019 Corporate Presentation
Entree Resources - Sep 2019 Corporate PresentationEntree Resources Ltd.
 
Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019Entree Resources Ltd.
 
Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017Entree Resources Ltd.
 
Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018Entree Resources Ltd.
 
Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018Entree Resources Ltd.
 
Entree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentationEntree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentationEntree Resources Ltd.
 
Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018Entree Resources Ltd.
 
Augusta Gold Corporate Update - February 2021
Augusta Gold Corporate Update - February 2021Augusta Gold Corporate Update - February 2021
Augusta Gold Corporate Update - February 2021Augusta Gold Corp.
 
December 2020 - Bullfrog Gold
December 2020 - Bullfrog Gold December 2020 - Bullfrog Gold
December 2020 - Bullfrog Gold bullfroggold
 
Augusta Gold - Corporate Update January 2021
Augusta Gold - Corporate Update January 2021Augusta Gold - Corporate Update January 2021
Augusta Gold - Corporate Update January 2021Augusta Gold Corp.
 
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona ForsterThe Business Council of Mongolia
 
Trent Mell - First Cobalt
Trent Mell - First Cobalt Trent Mell - First Cobalt
Trent Mell - First Cobalt cwiemeexpo
 
Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013Company Spotlight
 
Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022Osisko Gold Royalties Ltd
 
Augusta Corporate Update - June 2021
Augusta Corporate Update - June 2021Augusta Corporate Update - June 2021
Augusta Corporate Update - June 2021Augusta Gold Corp.
 
Denver meetings presentation final
Denver meetings presentation finalDenver meetings presentation final
Denver meetings presentation finalGoldenStarResources
 
BeMetals presentation March 10, 2022
BeMetals presentation March 10, 2022BeMetals presentation March 10, 2022
BeMetals presentation March 10, 2022Derek Iwanaka
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corp.
 
BeMetals Presentation_April 6, 2022.pdf
BeMetals Presentation_April 6, 2022.pdfBeMetals Presentation_April 6, 2022.pdf
BeMetals Presentation_April 6, 2022.pdfDerek Iwanaka
 

What's hot (20)

Entree Resources - Sep 2019 Corporate Presentation
Entree Resources - Sep 2019 Corporate PresentationEntree Resources - Sep 2019 Corporate Presentation
Entree Resources - Sep 2019 Corporate Presentation
 
Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019
 
Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017
 
Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018
 
Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018
 
Entree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentationEntree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentation
 
Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018
 
Augusta Gold Corporate Update - February 2021
Augusta Gold Corporate Update - February 2021Augusta Gold Corporate Update - February 2021
Augusta Gold Corporate Update - February 2021
 
December 2020 - Bullfrog Gold
December 2020 - Bullfrog Gold December 2020 - Bullfrog Gold
December 2020 - Bullfrog Gold
 
Augusta Gold - Corporate Update January 2021
Augusta Gold - Corporate Update January 2021Augusta Gold - Corporate Update January 2021
Augusta Gold - Corporate Update January 2021
 
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
 
Trent Mell - First Cobalt
Trent Mell - First Cobalt Trent Mell - First Cobalt
Trent Mell - First Cobalt
 
Entree gold presentation14
Entree gold presentation14Entree gold presentation14
Entree gold presentation14
 
Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013
 
Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022Osisko Gold Royalties - Corporate Presentation, January 13, 2022
Osisko Gold Royalties - Corporate Presentation, January 13, 2022
 
Augusta Corporate Update - June 2021
Augusta Corporate Update - June 2021Augusta Corporate Update - June 2021
Augusta Corporate Update - June 2021
 
Denver meetings presentation final
Denver meetings presentation finalDenver meetings presentation final
Denver meetings presentation final
 
BeMetals presentation March 10, 2022
BeMetals presentation March 10, 2022BeMetals presentation March 10, 2022
BeMetals presentation March 10, 2022
 
Equinox Gold Corporate Presentation
Equinox Gold Corporate PresentationEquinox Gold Corporate Presentation
Equinox Gold Corporate Presentation
 
BeMetals Presentation_April 6, 2022.pdf
BeMetals Presentation_April 6, 2022.pdfBeMetals Presentation_April 6, 2022.pdf
BeMetals Presentation_April 6, 2022.pdf
 

Similar to Entree Resources Corporate Presentation - November 2020

Entree Resources April 2019 Corporate Presentation
Entree Resources   April 2019 Corporate PresentationEntree Resources   April 2019 Corporate Presentation
Entree Resources April 2019 Corporate PresentationEntree Resources Ltd.
 
Entree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate PresentationEntree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate PresentationEntree Resources Ltd.
 
Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017Entree Resources Ltd.
 
Entree Resources Corporate Presentation - Sept 2017
Entree Resources Corporate Presentation - Sept 2017Entree Resources Corporate Presentation - Sept 2017
Entree Resources Corporate Presentation - Sept 2017Entree Resources Ltd.
 
Entree Resources Corporate Presentation - Oct 2017
Entree Resources Corporate Presentation - Oct 2017Entree Resources Corporate Presentation - Oct 2017
Entree Resources Corporate Presentation - Oct 2017Entree Resources Ltd.
 
Entree Gold: Restructuring for Success March 2017
Entree Gold:  Restructuring for Success March 2017Entree Gold:  Restructuring for Success March 2017
Entree Gold: Restructuring for Success March 2017Monica Hamm
 
Entree Gold Inc. February 2017 Presentation
Entree Gold Inc. February 2017 PresentationEntree Gold Inc. February 2017 Presentation
Entree Gold Inc. February 2017 PresentationMonica Hamm
 
Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Monica Hamm
 
Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Monica Hamm
 
PDAC March 2016 Presentation
PDAC March 2016 PresentationPDAC March 2016 Presentation
PDAC March 2016 PresentationMonica Hamm
 
April2016 presentation web
April2016 presentation webApril2016 presentation web
April2016 presentation webMonica Hamm
 
Entree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 PresentationEntree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 PresentationMonica Hamm
 
10 may2016 presentation
10 may2016 presentation10 may2016 presentation
10 may2016 presentationMonica Hamm
 
July2016 presentation final
July2016 presentation finalJuly2016 presentation final
July2016 presentation finalMonica Hamm
 
Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016 Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016 Monica Hamm
 
Entree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 PresenatationEntree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 PresenatationMonica Hamm
 
Entree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 PresentationEntree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 PresentationMonica Hamm
 
Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014Company Spotlight
 

Similar to Entree Resources Corporate Presentation - November 2020 (20)

Entree Resources April 2019 Corporate Presentation
Entree Resources   April 2019 Corporate PresentationEntree Resources   April 2019 Corporate Presentation
Entree Resources April 2019 Corporate Presentation
 
Entree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate PresentationEntree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate Presentation
 
Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017
 
Entree Resources Corporate Presentation - Sept 2017
Entree Resources Corporate Presentation - Sept 2017Entree Resources Corporate Presentation - Sept 2017
Entree Resources Corporate Presentation - Sept 2017
 
Entree Resources Corporate Presentation - Oct 2017
Entree Resources Corporate Presentation - Oct 2017Entree Resources Corporate Presentation - Oct 2017
Entree Resources Corporate Presentation - Oct 2017
 
Corporate Presentation (June 2017)
Corporate Presentation (June 2017)Corporate Presentation (June 2017)
Corporate Presentation (June 2017)
 
Entree Gold: Restructuring for Success March 2017
Entree Gold:  Restructuring for Success March 2017Entree Gold:  Restructuring for Success March 2017
Entree Gold: Restructuring for Success March 2017
 
Entree Gold Inc. February 2017 Presentation
Entree Gold Inc. February 2017 PresentationEntree Gold Inc. February 2017 Presentation
Entree Gold Inc. February 2017 Presentation
 
Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017
 
Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017Entree Gold TD Conference January 2017
Entree Gold TD Conference January 2017
 
PDAC March 2016 Presentation
PDAC March 2016 PresentationPDAC March 2016 Presentation
PDAC March 2016 Presentation
 
April2016 presentation web
April2016 presentation webApril2016 presentation web
April2016 presentation web
 
Entree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 PresentationEntree Gold Inc. April 2016 Presentation
Entree Gold Inc. April 2016 Presentation
 
10 may2016 presentation
10 may2016 presentation10 may2016 presentation
10 may2016 presentation
 
July2016 presentation final
July2016 presentation finalJuly2016 presentation final
July2016 presentation final
 
Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016 Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016
 
Entree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 PresenatationEntree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 Presenatation
 
Entree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 PresentationEntree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 Presentation
 
Entree Gold Presentation
Entree Gold Presentation Entree Gold Presentation
Entree Gold Presentation
 
Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014
 

Recently uploaded

Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfProbe Gold
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...SUHANI PANDEY
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationLeonardo
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...mriyagarg453
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...tanu pandey
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsgwenoracqe6
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)kojalkojal131
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024Kweku Zurek
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...tanu pandey
 

Recently uploaded (20)

Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
Dubai Call Girls O525547&19 Calls Girls In Dubai (L0w+Charger)
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 

Entree Resources Corporate Presentation - November 2020

  • 1. Corporate Presentation November 2020 TSX: ETG | OTCQB: ERLFF Partner in World Class Oyu Tolgoi Underground Copper-Gold Mine
  • 2. Entrée Resources | Investor Presentation | November 2020 | 2 Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements include, but are not limited to, statements with respect to corporate strategies and plans; requirements for additional capital; uses of funds and projected expenditures; the expectations set out in OTFS20; timing and status of Oyu Tolgoi underground development; the mine design for Hugo North Lift 1 Panel 0 and the related cost and production schedule implications; the re-design study for Panels 1 and 2 of Hugo North (including Hugo North Extension) Lift 1 and the possible outcomes, content and timing thereof; timing of completion of the Definitive Estimate and the scope thereof; timing and amount of production from Lift 1 of the Entrée/Oyu Tolgoi JV property, potential production delays and the impact of any delays on the Company’s cash flows, expected copper and gold grades, liquidity, funding requirements and planning; the potential impact of COVID-19 (coronavirus) on Oyu Tolgoi underground development and the Company’s business, operations and financial; future commodity prices; the estimation of mineral reserves and resources; projected mining and process recovery rates; estimates of capital and operating costs, mill throughput, cash flows and mine life; capital, financing and project development risk; mining dilution; discussions with the Government of Mongolia and other Oyu Tolgoi stakeholders; exploration potential; potential metallurgical recoveries and grades; plans for future exploration and development programs and budgets; permitting time lines; anticipated business activities; proposed acquisitions and dispositions of assets; and future financial performance. While the Company has based these forward-looking statements on its expectations about future events as at the date that such statements were prepared, the statements are not a guarantee of Entrée’s future performance and are based on numerous assumptions regarding present and future business strategies; the correct interpretation of agreements, laws and regulations; local and global economic conditions and markets; the outcome of negotiations; the ability of the Company to continue operations during the COVID-19 (coronavirus) pandemic; the environment in which the Company will operate in the future, including commodity prices, projected grades, projected dilution, anticipated capital and operating costs, anticipated future production and cash flows; the anticipated location of certain infrastructure and sequence of mining within and across panel boundaries; the construction and continued development of the Oyu Tolgoi underground mine; and the status of the Company’s relationship and interaction with the Government of Mongolia and other Oyu Tolgoi stakeholders. With respect to the construction and continued development of the Oyu Tolgoi underground mine, important risks, uncertainties and factors which could cause actual results to differ materially from future results expressed or implied by such forward-looking statements and information include the timing and cost of the construction and expansion of mining and processing facilities; the timing and availability of a long term domestic power source for Oyu Tolgoi (or the availability of financing for Oyu Tolgoi LLC (“OTLLC”) or the Government of Mongolia to construct such a source); the potential impact of COVID-19; the ability of OTLLC to secure and draw down on the supplemental debt under the Oyu Tolgoi project finance facility and the availability of additional financing on terms reasonably acceptable to Oyu Tolgoi stakeholders to further develop Oyu Tolgoi; the impact of changes in, changes in interpretation to or changes in enforcement of, laws, regulations and government practises in Mongolia; delays, and the costs which would result from delays, in the development of the underground mine; the status of the relationship and interaction between Oyu Tolgoi stakeholders including the Government of Mongolia on the continued operation and development of Oyu Tolgoi, future funding plans and requirements and OTLLC internal governance; the anticipated location of certain infrastructure and sequence of mining within and across panel boundaries; projected commodity prices and demand; and production estimates and the anticipated yearly production at the Oyu Tolgoi underground mine. With respect to the 2018 PEA, it is based on a conceptual mine plan that includes Inferred resources. Numerous assumptions were made in the preparation of the 2018 PEA, including with respect to mineability, capital and operating costs, production schedules, the timing of construction and expansion of mining and processing facilities, and recoveries, that may change materially once production commences at Hugo North Extension Lift 1 and additional development and capital decisions are required. … continued
  • 3. Entrée Resources | Investor Presentation | November 2020 | 3 Cautionary Statement (cont’d) Any changes to the assumptions underlying the 2018 PEA could cause actual results to be materially different from any future results, performance or achievements expressed or implied by forward-looking statements and information relating to the 2018 PEA. Other risks, uncertainties and factors which could cause actual results to differ materially from future results expressed or implied by forward-looking statements and information are discussed in the section entitled “Risk Factors” in Entrée’s Annual Information Form dated March 16, 2020 and in the section entitled “Critical Accounting Estimates, Risks and Uncertainties” in the Company’s most recently filed MD&A, available at www.sedar.com. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Except as required under applicable securities legislation, Entrée undertakes no obligation to publicly update or revise forward-looking statements. Robert Cinits, P.Geo., Entrée’s former Vice President of Corporate Development and currently a consultant to Entrée has approved the technical information in this presentation. Mr. Cinits is a “qualified person” as defined in National Instrument 43-101- Standards of Disclosure for Mineral Projects (“NI 43-101”). All minerals reserves and mineral resources have been calculated in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum and NI 43-101. Cautionary Note to United States Investors: The definitions of “Proven” and “Probable” mineral reserves used in NI 43-101 differ from the definitions in the United States Securities and Exchange Commission (“SEC”) Industry Guide 7. In addition, the terms “mineral resource”, “Measured mineral resource”, “Indicated mineral resource” and “Inferred mineral resource” are not defined terms under SEC Industry Guide 7 and have historically not been permitted to be used in reports and registration statements filed with the SEC. Investors are cautioned not to assume that all or any part of mineral deposits in these categories will ever be converted into reserves. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred mineral resources may not form the basis of Feasibility or Pre-feasibility studies, except in rare cases. Accordingly, information contained in this presentation containing descriptions of the Company’s mineral deposits may not be comparable to similar information made public by U.S. companies pursuant to SEC Industry Guide 7. “Cash costs after credits” (C1) and All-in sustaining cost (ASIC) are non-IFRS performance measurements. These performance measurements are included because these statistics are widely accepted as the standard of reporting cash costs of production in North America. These performance measurements do not have a meaning within IFRS and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. These performance measurements should not be considered in isolation as a substitute for measures of performance in accordance with IFRS. The information in this presentation is for informational purposes only. Readers should not rely on the information for any purpose other than to gain general knowledge of Entrée. This information is not intended to be, and should not be construed as, part of an offering or solicitation of securities. For additional information regarding the Entrée/Oyu Tolgoi JV property, see the technical report titled “Entrée/Oyu Tolgoi Joint Venture Project, Mongolia” with an effective date of January 15, 2018 (“2018 Technical Report”) prepared by Wood Canada Limited (formerly Amec Foster Wheeler Americas Limited) a copy of which is available on SEDAR at www.sedar.com.
  • 4. Entrée Resources | Investor Presentation | November 2020 | 4 About Entrée Resources Ltd. ▪ Well-funded: ~US$7.4 million cash (as at Sept 30, 2020) ▪ Cornerstone shareholders: Sandstorm Gold, Turquoise Hill & Rio Tinto ▪ Robust future cash flows* ▪ Characteristics of a Royalty ▪ Low risk profile: low capital and development risk Oyu Tolgoi mill complex (September 2017) Entrée has a unique carried joint venture interest in a significant portion of the Oyu Tolgoi copper-gold project in Mongolia *See the 2018 Technical Report for the life-of-mine cash flows for the 2018 Reserve Case and 2018 PEA. Assumptions in the 2018 Technical Report are subject to change.
  • 5. Entrée Resources | Investor Presentation | November 2020 | 5 Entrée Overview TSX: ETG OTCQB: ERLFF Treasury ~US$7.4 million (as of Sept 30, 2020) Market Capitalization ~C$85 million (as of Nov 2, 2020) Shares Outstanding ~185.9 million (as of Nov 1, 2020) Listings Cornerstone Shareholders (as at Nov 1, 2020) Ownership % Sandstorm Gold Ltd. 21.4% Rio Tinto PLC 9.4% Turquoise Hill Resources* 7.8% * Rio Tinto holds beneficial ownership over shares held by Turquoise Hill.
  • 6. Entrée Resources | Investor Presentation | November 2020 | 6 Experienced Leadership Team Stephen Scott President, CEO & Director Mr. Scott has more than 30 years global experience in all mining industry sectors. Prior to joining Entrée he held various global operational and corporate executive positions with Rio Tinto Ltd. and RGC Ltd. Mr. Scott currently sits on the board of directors of Atalaya Mining PLC and has previously served on the board of directors of several public mining companies. Duane Lo CFO Mr. Lo has 20 years of experience in financial management for mining operations in Brazil, Africa and other jurisdictions. He was previously the Chief Financial Officer of Luna Gold Corp. and Corporate Controller for First Quantum Minerals Ltd. He holds a Chartered Professional Accountant, Chartered Accountant designation from the Institute of Chartered Accountants of British Columbia. Susan McLeod VP, Legal Affairs Ms. McLeod has been practicing law in BC since 1997. Prior to joining Entrée she worked as outside counsel to public companies engaged in international mineral exploration and mining. She has advised clients on corporate finance, M&A, corporate governance and mining-related commercial agreements. Ms. McLeod holds a B.Sc. and an LLB from the University of British Columbia and is a member of the Law Society of BC. Mark Bailey Chair Mr. Bailey is a mining executive and registered professional geologist with over 40 years of industry experience. He is currently CEO and a director of Core Gold Ltd. and Chairman of Fiore Gold Ltd. Mr. Bailey was the President and CEO of Minefinders Corporation Ltd. and has also held senior positions with Equinox Resources Inc. and Exxon Minerals. Alan Edwards Director Mr. Edwards has more than 35 years of diverse mining industry experience. Mr. Edwards is President of AE Resources Corp. He also serves on the board of directors of Orvana Minerals Corp. and Americas Silver Corporation. Mr. Edwards was previously CEO of Oracle Mining Corporation, Copper One Inc. and Frontera Copper Corporation, and Senior VP Operations at the Grasberg copper mine. Mr. Edwards holds a B.Sc. in Mining Engineering and an MBA (Finance) from the University of Arizona. James Harris Director Mr. Harris was formerly a corporate, securities and business lawyer with over 30 years’ experience in Canada and internationally. He has extensive experience with the acquisition and disposition of assets, corporate structuring and restructuring, and corporate governance. Mr. Harris has completed the Directors’ Education Program of the Institute of Corporate Directors and is an Institute accredited Director (ICD.D). Michael Price Director Dr. Price has extensive experience in mining and mining finance. He is currently a director of Eldorado Gold Corp. and Asanko Gold Inc. and is the London Representative of Resource Capital Funds. Dr. Price has served as Managing Director, Joint Global Head of Mining and Metals, Barclays Capital, Managing Director, Global Head of Mining and Metals, Societe Generale and Head of Resource Banking and Metals Trading, NM Rothschild and Sons. He holds B.Sc. and Ph.D. qualifications in Mining Engineering from University College Cardiff and a Mine Manager’s Certificate of Competency (South Africa). Anna Stylianides Director Ms. Stylianides has over 20 years of experience in global capital markets and has spent much of her career in investment banking, private equity, and corporate management and restructuring. She began her career in corporate law after graduating from the University of the Witwatersrand in Johannesburg, South Africa. Ms. Stylianides is currently a director of Eco Oro Minerals Corp., Capfin Partners, LLC, Altius Minerals Corporation, Sabina Gold & Silver Corp. and the Fraser Institute.
  • 7. Entrée Resources | Investor Presentation | November 2020 | 7 Entrée/Oyu Tolgoi JV Structure 20%* 80% 34% 66% Oyu Tolgoi LLC (OTLLC) Entrée ResourcesEntrée 20%* carried interest in the Entrée/Oyu Tolgoi JV Mongolian Government Turquoise Hill Rio Tinto** 51% Entrée/Oyu Tolgoi JV Hugo North Extension & Heruga deposits Significant exploration potential along the OT trend * Entrée has a 30% participating interest with respect to mineralization extracted from above 560m depth. ** Rio Tinto is project operator of Oyu Tolgoi. ▪ Entrée not responsible for upfront payment of capital costs of surface infrastructure and underground development on the Oyu Tolgoi mining licence ▪ OTLLC will contribute Entrée’s share of project/exploration costs on the Entrée/Oyu Tolgoi JV property as a loan ▪ Loan bears interest at prime +2%, repayable to OTLLC only from 90% of free cash flow
  • 8. Entrée Resources | Investor Presentation | November 2020 | 8 Entrée/Oyu Tolgoi JV Deposits Entrée/Oyu Tolgoi JV (EJV) property is an integral part of the world-class Oyu Tolgoi copper-gold project Entrée has a 20% carried interest in the Hugo North Extension and Heruga resources and reserves. * Shivee West is subject to a License Fees Agreement between Entrée and OTLLC and may ultimately be included in the Entrée/Oyu Tolgoi JV property. ** Outline of mineralization projected to surface. The EJV property includes: • Hugo North Extension (HNE) • Heruga • Significant exploration potential
  • 9. Entrée Resources | Investor Presentation | November 2020 | 9 Entrée/Oyu Tolgoi JV Deposits: Large, Long Life 2018 Technical Report for the Entrée/Oyu Tolgoi JV property*: • HNE Lift 1: 14 year mine life (2018 Reserve Case) • HNE Lift 1 + Lift 2: 33 year conceptual mine life (first half of 2018 PEA) • HNE Lift 1 + Lift 2 + Heruga**: 77 years from start of Lift 1 to completion of Heruga (2018 PEA) *Based on assumptions in the 2018 Technical Report, which are subject to change following delivery and review of OTFS20 and completion and delivery to the Company of the Definitive Estimate and Panel 1 optimization studies by OTLLC, Rio Tinto and Turquoise Hill. Assumptions are also subject to change as a result of the impacts of the COVID-19 pandemic. ** The economic analysis in the 2018 PEA (HNE Lift 1 + HNE Lift 2 + Heruga) does not have as high a level of certainty as the 2018 Reserve Case (HNE Lift 1). The 2018 PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the 2018 PEA will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Assumes long-term metals prices: US$3.00/lb Cu, US$1,300.00/oz Au and US$19.00/oz Ag.
  • 10. Entrée Resources | Investor Presentation | November 2020 | 10 Entrée/Oyu Tolgoi JV: Hugo North Extension Update OTLLC:HugoSouth& HugoNorthDeposits Oyu Tolgoi Lift 1 underground development is underway ▪ Haulage decline started in Q1 2017 ▪ Shafts 1,2 and 5 are complete ▪ Shafts 3 and 4 are on care and maintenance pending return of expert service providers to site ▪ Design change for Panel 0 on Oyu Tolgoi licence approved ▪ Will form the basis of the Definitive Estimate cost and schedule update for Panel 0, expected fourth quarter 2020. EJV - LIFT 1 Basis of the 2018 Reserve Case OR Initial lift to be mined in the 2018 PEA EJV - LIFT 2 Second lift to be mined in the 2018 PEA; together with Lift 1 these form the initial 33 years of mine life HNE is located at the northern portion of Panel 1. A review of mine designs options for Panel 1 is expected to be finalized as early as possible in 2021.
  • 11. Entrée Resources | Investor Presentation | November 2020 | 11 Entrée/Oyu Tolgoi JV: Hugo North Extension Update • Underground development on Oyu Tolgoi mining licence has continued to progress despite COVID-19 controls and ongoing international travel restrictions. • Care and maintenance activities continue at Shafts 3 & 4 but some commissioning activities have advanced in preparation for shaft sinking. • OTLLC completed updated Oyu Tolgoi Feasibility Study (OTFS20)* that incorporates new mine design for Lift 1 of Hugo North Panel 0. Photo from Oyu Tolgoi website: http://ot.mn/ Oyu Tolgoi Underground development • Lift 1 mine plan incorporates the development of three panels (Panels 0, 1 & 2): o HNE located at northern portion of Panel 1 o To reach full sustainable production rate of 95,000 tonnes per day, all three panels must be in production • Entrée’s partners believe the existing feasibility study design for Panel 1 remains executable based on current orebody understanding. • Introduction of two, 120 metre structural pillars, both on Oyu Tolgoi mining licence on the north and south boundary of Panel 0; Panels 1 & 2 become independent block caves, allowing for more operational flexibility and optionality of sequencing. • Optimization studies underway to explore opportunities to: o Optimize extraction level for each panel independently o Evaluate potential to convert mineral resources below current Lift 1 extraction level to Probable mineral reserves o Complete additional drilling and data collection in support of Panel 1 & 2 design refinements • Drilling work ongoing; resulting updates to geotechnical modelling and mine. • Once Definitive Estimate and Panel 1 optimization studies completed and delivered to Entrée with OTFS20, Company expects to be able to assess potential impact on EJV reserves and resources and production and financial assumptions and outputs from 2018 Reserve Case and 2018 PEA. *OTFS20 does not reflect the impacts of the COVID-19 project, which continue to be assessed.
  • 12. Entrée Resources | Investor Presentation | November 2020 | 12 Entrée/Oyu Tolgoi JV: Mineral Resources & Reserves • Effective date of mineral resources and reserves estimates is January 15, 2018. • Entrée has a 20% carried interest in the Hugo North Extension and Heruga resources and reserves. • The mineral reserves are not additive to the mineral resources. • HNE CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942))/(3.01*22.0462) • Heruga CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942)+(Mo*11.9*0.0022046*0.736))/(3.01*22.0462) • Once the Definitive Estimate and Panel 1 optimization studies have been completed and delivered to Entrée with OTFS20, the Company expects to be able to assess the potential impact on EJV mineral resources and reserves. High-grade, large resources Entrée/Oyu Tolgoi JV Property – Mineral Resources Classification Tonnage (Mt) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) CuEq (%) Contained Metal Cu (Mlb) Au (koz) Ag (koz) Mo (Mlb) Hugo North Extension (>0.37% CuEq Cut-Off) Indicated 122 1.68 0.57 4.21 - 2.03 4,515 2,200 16,500 - Inferred 174 1.00 0.35 2.73 - 1.21 3,828 2,000 15,200 - Heruga (>0.37% CuEq Cut-Off) Inferred 1,700 0.39 0.37 1.39 113.2 0.64 14,604 20,410 75,932 424 Entrée/Oyu Tolgoi JV Property – Mineral Reserves – Hugo North Extension Lift 1 Classification Tonnage (Mt) NSR (US$/t) Cu (%) Au (g/t) Ag (g/t) Recovered Metal Cu (Mlb) Au (koz) Ag (koz) Probable 35 100.57 1.59 0.55 3.72 1,121 519 3,591
  • 13. Entrée Resources | Investor Presentation | November 2020 | 13 2018 PEA – Mill Feed Entrée has a 20% attributable interest in the above resources, reserves and recovered metal. The economic analysis in the 2018 PEA does not have as high a level of certainty as the 2018 Reserve Case. The 2018 PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the 2018 PEA will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability. HNE CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942))/(3.01*22.0462) Heruga CuEq is calculated using the following equation: CuEq=Cu+((Au*1250*0.0321507*0.913)+(Ag*20.37*0.0321507*0.942)+(Mo*11.9*0.0022046*0.736))/(3.01*22.0462) Based on assumptions in the 2018 Technical Report, which are subject to change. 2018 PEA Indicated Resources + Inferred Resources Mill Feed (MT) Cu (%) Au (g/t) Ag (g/t) CuEq (%) Mill Feed (MT) Cu (%) Au (g/t) Ag (g/t) CuEq (%) HNE Lift 1 34.8 1.59 0.55 3.72 1.93 --- --- --- --- --- HNE Lift 2 78.4 1.34 0.48 3.59 1.64 88.4 1.34 0.48 3.59 1.64 HNE Lift 1+2 113.2 1.42 0.50 3.63 1.73 88.4 1.34 0.48 3.59 1.64 Heruga --- --- --- --- --- 619.7 0.42 0.43 1.53 0.71 Total 113.2 1.42 0.50 3.63 1.73 708.1 0.53 0.44 1.79 0.82 HNE Lift 1+2+Heruga Recovered Metal • 10,497 Mlb copper • 9,367 koz gold • 45,378 koz silver High Grade HNE Lift 1+2 Recovered Metal • 5,579 Mlb copper • 2,637 koz gold • 20,442 koz silver
  • 14. Entrée Resources | Investor Presentation | November 2020 | 14 2018 Reserve Case: Capital & Cash Costs 2018 Reserve Case Capital, C1 & AISC costs (in US$, attributable to Entrée)* Total Development + Sustaining Capital ($M) $52.3** Cash Cost after Credits (C1) - $/lb payable Cu $0.56 All-In Sustaining Cost (AISC) after Credits - $/lb payable Cu $1.03 * Based on assumptions in the 2018 Technical Report, which are subject to change. . ** Includes ETG’s share of capital for Shaft 4, originally designed on the EJV property, which has moved onto the Oyu Tolgoi mining licence subsequent to the publication of the 2018 Technical Report. ▪ JV partner, Oyu Tolgoi LLC (OTLLC), carries almost all of the financial burden and execution risk on the Oyu Tolgoi underground project, including the EJV property ▪ Manageable project development risk with Rio Tinto as operator ▪ Entrée not responsible for upfront payment of capital costs of surface infrastructure and underground development on the Oyu Tolgoi mining licence ▪ OTLLC will contribute Entrée’s share of project/exploration costs on the EJV property as a loan ▪ Loan bears interest at RBC prime +2%, repayable to OTLLC from 90% of free cash flow Low C1 cash costs attributable to Entrée Low capital and development risk for Entrée
  • 15. Entrée Resources | Investor Presentation | November 2020 | 15 Entrée: Maximizing Potential Near term priorities: ▪ Continue constructive discussions with the Government of Mongolia ▪ Work with partners to advance potential amendments to the JV agreement that align the interests of all stakeholders as they are now understood ▪ Advocate increased exploration on Entrée/Oyu Tolgoi JV property, including several priority near-surface targets ▪ Continue to focus efforts on conserving cash reserves and remaining prudent with expenditures
  • 16. TSX: ETG | OTCQB: ERLFF For more information, please contact: Stephen Scott President & Chief Executive Officer sscott@EntreeResourcesLtd.com David Jan Investor Relations djan@EntreeResourcesLtd.com 604.687.4777 (office) | 1.866.368.7330 (toll free) EntreeResourcesLtd.com