THE GREAT EGYPTIANTHE GREAT EGYPTIAN
DREAMDREAM
FIRST PROJECT:FIRST PROJECT:
SUEZ CANAL AREASUEZ CANAL AREA
DEVELOPMENT PROJECTDEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAMTHE GREAT EGYPTIAN DREAM
1- Egypt’s pressing
need for giant
national economic
projects that would
support the Egyptian
economy to the
benefit of present
and future
generations
1- Egypt’s pressing
need for giant
national economic
projects that would
support the Egyptian
economy to the
benefit of present
and future
generations
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
2- Making use of the
existing potential at
the Project ports,
and creating well
developed industrial
zones that would
benefit from the
goods transported
through the Suez
Canal
2- Making use of the
existing potential at
the Project ports,
and creating well
developed industrial
zones that would
benefit from the
goods transported
through the Suez
Canal
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
3-Providing job
opportunities and
creating new urban
communities that
would attract people
from densely
populated areas to
the Canal zone
3-Providing job
opportunities and
creating new urban
communities that
would attract people
from densely
populated areas to
the Canal zone
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
East
Asia
East
Asia
Western
Europe
Western
Europe
South East
Asia
South East
Asia
East Coast of the
United States
East Coast of the
United States
Southern
Europe
Southern
Europe
4-Getting ready to
maximize benefits
from the growth of
world trade in places
such as China, South
East Asia and India,
going to Europe and
the United States via
the Suez Canal
4-Getting ready to
maximize benefits
from the growth of
world trade in places
such as China, South
East Asia and India,
going to Europe and
the United States via
the Suez Canal
IndiaIndia
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
‫الحلم‬
Geography of the Project
Adabeya PortAdabeya Port
East Port Said
Port
East Port Said
Port
7
Al Arish
Port
Al Arish
Port
The Valley of
Technology east of
Ismailia
The Valley of
Technology east of
Ismailia
West Port
Said Port
West Port
Said Port
The
industrial
area north
west of the
Gulf of Suez
The
industrial
area north
west of the
Gulf of Suez
Al Tour
Port
Al Tour
Port
Sokhna PortSokhna Port
Suez Canal Area Development Project
8
East Port said PortEast Port said Port
The East Port said Port is a very important location for the world trade Transported between
Europe and ports east of the Mediterranean, as well as Asian ports. The port, with its unique
location to the east of the northern entrance of the Suez Canal eastern bypass, is at the junction
of three continents, thus joining east to West. It covers an area of 72.10 Square kilometers, and
a water area of 1.5 Square kilometers.
The East Port said Port is a very important location for the world trade Transported between
Europe and ports east of the Mediterranean, as well as Asian ports. The port, with its unique
location to the east of the northern entrance of the Suez Canal eastern bypass, is at the junction
of three continents, thus joining east to West. It covers an area of 72.10 Square kilometers, and
a water area of 1.5 Square kilometers.
Suez Canal Area Development Project
9
‫المساحة‬ ‫إجمالى‬‫المساحة‬ ‫إجمالى‬72.1072.10‫مربع‬ ‫متر‬ ‫كيلو‬‫مربع‬ ‫متر‬ ‫كيلو‬
‫المائية‬ ‫المساحة‬‫المائية‬ ‫المساحة‬1.51.5‫مربع‬ ‫متر‬ ‫كيلو‬‫مربع‬ ‫متر‬ ‫كيلو‬
East Port said PortEast Port said Port
Suez Canal Area Development Project
West Port Said portWest Port Said portWest Port Said portWest Port Said port
Suez Canal Area Development Project
750 m750 m
The Proposed Master plan for Al-Areesh PortThe Proposed Master plan for Al-Areesh Port
Suez Canal Area Development Project
The Proposed master plan for Al-Areesh PortThe Proposed master plan for Al-Areesh Port
Total added areas
Area Square Meters
1 Liquid Bulk
Stations
63,300
2 Dry Bulk
Stations
425,200
3 Storage 116,900
Total Area 605,400
Internal Highways 140 km
Suez Canal Area Development Project
The Valley of Technology East of IsmailiaThe Valley of Technology East of Ismailia
Suez Canal Area Development Project
• Located east of Ismailia, 10 kilometersLocated east of Ismailia, 10 kilometers
away from Ismailia Ferryboataway from Ismailia Ferryboat
• In close contact with existing urbanIn close contact with existing urban
communities such as Ismailia and Qantaracommunities such as Ismailia and Qantara
• In close integration with national projectsIn close integration with national projects
and industrial areas such as east Port saidand industrial areas such as east Port said
bypass, the area north west of the Gulf ofbypass, the area north west of the Gulf of
Suez, the Tenth of Ramadan and BadreSuez, the Tenth of Ramadan and Badre
CitiesCities
• In close range of reclamation areas alongIn close range of reclamation areas along
Sheikh Zayed and Sheikh Jaber fresh waterSheikh Zayed and Sheikh Jaber fresh water
canalscanals
• Located east of Ismailia, 10 kilometersLocated east of Ismailia, 10 kilometers
away from Ismailia Ferryboataway from Ismailia Ferryboat
• In close contact with existing urbanIn close contact with existing urban
communities such as Ismailia and Qantaracommunities such as Ismailia and Qantara
• In close integration with national projectsIn close integration with national projects
and industrial areas such as east Port saidand industrial areas such as east Port said
bypass, the area north west of the Gulf ofbypass, the area north west of the Gulf of
Suez, the Tenth of Ramadan and BadreSuez, the Tenth of Ramadan and Badre
CitiesCities
• In close range of reclamation areas alongIn close range of reclamation areas along
Sheikh Zayed and Sheikh Jaber fresh waterSheikh Zayed and Sheikh Jaber fresh water
canalscanals
The Valley of Technology East of IsmailiaThe Valley of Technology East of Ismailia
Suez Canal Area Development Project
About 215 AcresAbout 215 Acres
The Valley of Technology East of IsmailiaThe Valley of Technology East of Ismailia
Suez Canal Area Development Project
Sanitary drainage plant and
waste water network
Desalination plant and
network
An integrated
communication network
Direct access to Sokhna
Port
Southern
area
Northern
area
Gulf of SuezGulf of Suez
Sokhna
Port
SEZ North West of the gulf of SuezSEZ North West of the gulf of Suez
Suez Canal Area Development Project
To
Suez
ToHurghada
Sukhna
Port
Southern area
Northern area
Proposed
area
for housing
Solid waste sanitary dump
Wind energy-generating plant
Gulf of SuezGulf of Suez
Proposed master plan for the area north west of the Gulf of SuezProposed master plan for the area north west of the Gulf of Suez
6 km2
20
km2
Suez Canal Area Development Project
Sukhna PortSukhna Port
Suez Canal Area Development Project
Live stock
Logistics Area
Liquid Bulk Station
Sugar Factory
Navigation
Channels
Sukhna Laboratory
First
Basin
Third
Basin
Present status of Sukhna PortPresent status of Sukhna Port
Suez Canal Area Development Project
Suez Gulf
First Basin
Third Basin
Live stock
Sugar Factory
Power Station
Sukhna Laboratory
Proposed Master Plan of Sukhna PortProposed Master Plan of Sukhna Port
Suez Canal Area Development Project
Adabia PortAdabia Port
Suez Canal Area Development Project
Proposed master plan for Adabia PortProposed master plan for Adabia Port Before
development
After
development
Increase
Total area 832,000m2
1.5million
m2
180%
Length of
quays
1800m 4500m 250%
Depth of
quays
9-12m up to 17 m
The Port consists of a
berth at a length of
200m and a depth of
8m.
Master plan for the development of
Tour Port
The proposed port includes an area of
464,000 square meters that shall be
implemented in several successive
stages. It comprises the development of
1000m of quays and services at a depth
ranging from 10-12m, in addition to
another quay for the naval forces
Implementation
Road Map
Stages of the
Project
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
DoneDone
Determine the overall plan and requirements of theDetermine the overall plan and requirements of the
Project in coordination with concerned ministriesProject in coordination with concerned ministriesPlanningPlanning
Prepare specifications, RFP and evaluation criteria Done
Presentation to local and international consulting
houses
Done
Evaluation of proposals according to unified criteria, in
cooperation with international expertise to select the
consortiums that would be allowed to buy the RFP
Done
Launching the Project by announcing the winner
consortiums that would buy The RFP
Done
6th
January
2014
RoadmapRoadmap StatusStatusStageStage
Stages of the Project
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
Winner consortiums buy the RFP and prepare the master
plan
Done
Jan.23,2014
Preparation of the legislations pertaining to the project in
coordination with the Ministry of Justice and the
ministerial committee
From 15th
January,2014
to 15th
April
2014
Legal and logistic preparations for opening envelopes and
starting the evaluation of the proposals
Done
Completed proceduresCompleted procedures TimeTimeStageStage
DoneDoneSelecting the winner consortium, and announcing the
result after presentation to the ministerial committee
Selecting the winner consortium, and announcing the
result after presentation to the ministerial committee
Stages of the Project
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬The World Bank has been
requested to nominate a
number of international,
highly qualified consulting
houses to technically
evaluate the proposals of
the various consortiums,
in due coordination with
the Egyptian Ministry of
Planning and International
Cooperation
Procedures of the Technical Evaluation
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
Procedures of the Technical Evaluation
 Having satisfied the set requirements, it
has been agreed that the French
consulting house EGIS would be in charge
of the evaluation process. It is to be
noted that no French company is
represented in any of the consortiums.
 As soon as Egis has completed the
technical evaluation of the proposals
according to the terms of reference, a
detailed and duly signed report has been
presented with relevant certificates,
technical analysis and a short list of the
proposals
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬
Illustration of the technically qualified proposals as selected by EGIS,
with over 80% as per the RFP
•‫المظاريف‬ ‫ححح‬‫ت‬‫ف‬ ‫حدحح‬‫بموع‬ ‫فنيا‬ ‫حةح‬‫ل‬‫المؤه‬ ‫التحالفات‬ ‫إخطار‬ ‫حمح‬‫ت‬
‫.المالية‬
Name of Consortium
Technical
Evaluation
First
Dar Al-Handasah (Shair & Partners(
Dar Al-Handasah Egypt
86,00
Second
Royal Haskoning (DHV(
Pacer
81.67
Third
Witteveen + Bos
EGEC
80.64
Fourth
Inros Lackner AG
Hamza & Partners
80.43
Final Results of the Technical Evaluation
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬
• Commercial envelopes were opened in the presence of respective
representatives of all the qualified consortiums.
Commercial proposals
Name of Consortium
commercial
proposal in US
dollar
First
Dar Al-Handasah (Shair & Partners(
Dar Al-Handasah Egypt
, ,1 773 0
00
Second
Royal Haskoning (DHV(
Pacer
2,473,303
Third
Inros Lackner AG
Hamza & Partners
3,254,785
Fourth
Witteveen + Bos
EGEC
, ,5 996 8
65
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬Final arrangement of involved consortiums after due
consideration of technical and commercial evaluation
Final arrangement of involved consortiums after due
consideration of technical and commercial evaluation
Name of Consortium
First
Dar Al-Handasah (Shair & Partners(
Dar Al-Handasah Egypt
Second
Royal Haskoning (DHV(
Pacer
Third
Inros Lackner AG
Hamza & Partners
Fourth
Witteveen + Bos
EGEC
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
• The SCA has contacted The Home
Security Department in order to get the
relevant security approval for the first
and second consortiums
• The Home Security Department stated
that it had no objection as to the
involvement of the two consortiums in
works related to the Suez Canal Area
Development Project. Head of the
ministerial committee was informed
that necessary security approvals had
been obtained for the winner
consortiums.
Home Security Acceptance
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬The State Council
has approved the
proposed draft
contract between
the Suez Canal
Authority and the
winner consortium
on August 10, 2014
Perusal of the draft contract by the State Council
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
Signing the contract with the winner consortium that will prepare the master
plan for the Suez Canal Area Development Project in the presence of HE the
Prime Minister; Head of the Ministerial Committee
Signing the contract with the winner consortium that will prepare the master
plan for the Suez Canal Area Development Project in the presence of HE the
Prime Minister; Head of the Ministerial Committee
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
Future proceduresFuture procedures TimeTimeStageStage
Hold a conference for
businessmen and related
work groups to exchange
viewpoints that would be
considered in the detailed
Master Plan of the project
‫مراحل‬
‫المشروع‬
Expected Results of the
Project
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
1- Developing and upgrading the national economy of Egypt
by making use of the unique geographical location and the
Suez Canal Zone.
1- Developing and upgrading the national economy of Egypt
by making use of the unique geographical location and the
Suez Canal Zone.
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
2- Turning Egypt into an important economic and logistics center with an
impact on world trade, through the development of industrial and
commercial activities. New industrial and logistics centers at the project area
may depend on the added value that complementary industries can provide.
This can be attained by re-exporting the end product inside and outside
Egypt through logistic distribution centers set for that purpose. Existing
entities may also be used and further developed.
2- Turning Egypt into an important economic and logistics center with an
impact on world trade, through the development of industrial and
commercial activities. New industrial and logistics centers at the project area
may depend on the added value that complementary industries can provide.
This can be attained by re-exporting the end product inside and outside
Egypt through logistic distribution centers set for that purpose. Existing
entities may also be used and further developed.
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
3- Encouraging national, Arab and foreign capital investment to
participate in the implementation of the master plan of Project, in
order to achieve the set objectives without jeopardizing the national
security of Egypt.
3- Encouraging national, Arab and foreign capital investment to
participate in the implementation of the master plan of Project, in
order to achieve the set objectives without jeopardizing the national
security of Egypt.
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
4- Giving a boost to the national income of Egypt, and an increase of
foreign currency earnings through the expected increase of the Suez
Canal revenues, as more ships shall be using the waterway as a result
of the Project. Maritime transport to and from the Arab Republic of
Egypt shall be on the rise, as more ships will be using the
Mediterranean and the Red Sea ports. The area can very well turn
into a very important center for electronic communication.
4- Giving a boost to the national income of Egypt, and an increase of
foreign currency earnings through the expected increase of the Suez
Canal revenues, as more ships shall be using the waterway as a result
of the Project. Maritime transport to and from the Arab Republic of
Egypt shall be on the rise, as more ships will be using the
Mediterranean and the Red Sea ports. The area can very well turn
into a very important center for electronic communication.
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
5- Giving a chance to national companies to participate in the
implementation of the Project master plan, and infrastructure works,
according to international standards, the matter that will add to the
potential and expertise of such companies, and improve their
operating conditions and capabilities.
5- Giving a chance to national companies to participate in the
implementation of the Project master plan, and infrastructure works,
according to international standards, the matter that will add to the
potential and expertise of such companies, and improve their
operating conditions and capabilities.
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
6- Promoting the development process up to the expectations of the
people of Egypt following the two recent revolutions
6- Promoting the development process up to the expectations of the
people of Egypt following the two recent revolutions
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
Industries Proposed to be
Included in the General
Framework
Car Assembly Plants
Electronics
Oil and Refining
industries
Petrochemical
Industries
Light metal Industries
Distribution and Redistribution
Logistics Centers
Bunkering
Shipbuilding and Ship Repair
Industries
Manufacture and Repair
of Containers
Furniture and
Wood works
Textiles
Glass Manufacturing
Plants
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
To maximize the benefits of the Project we had to
think of some activities that would generate fast
returns and provide much needed job
opportunities for the young people of Egypt. Fish
Farming or Aqua Culture is one of the most
suitable projects by virtue of the available land
extending along the eastern bank of the Suez
Canal.
The National Project of Fish Farming
‫العظيم‬ ‫المصري‬ ‫الحلم‬
‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬
‫العظيم‬ ‫المصري‬ ‫الحلم‬
‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
THE GREAT EGYPTIAN DREAM
SUEZ CANAL AREA DEVELOPMENT PROJECT
Suggested site of the project: The
sedimentation basins east of the Suez Canal
23 Sedimentation Basins, totaling 120 km in length, and ranging from
3 to 5 km into the East bank of the Canal, extending from the bypass
all the way down to the Gulf of Suez.
23 Sedimentation Basins, totaling 120 km in length, and ranging from
3 to 5 km into the East bank of the Canal, extending from the bypass
all the way down to the Gulf of Suez.
The National Project of
Fish Farming
Vision of the
Project
Production of the fish farms will certainly be a positive
contribution to face the ever increasing food demand, as a result
of over population. The project shall also represent a base for
related industries and for high quality products that would be
suitable for exportation
Mission of the
project
Development of the fish farming in the sedimentation
basins along the eastern bank of the Suez Canal, and
providing specialized training in the field and creating job
opportunities that would participate in the overall
development of the area.
Fish
Farms
Markets
MarketsMarkets
Expected ResultsExpected Results
Drain of fish farms
Fish input
Canal water
MedicineMedicinePerfumePerfumeWood
works
Wood
works
Meat
processing
Meat
processing
Leather
tanning
Leather
tanning
Wool
production
Wool
production
Oil
manufacture
Oil
manufacture
Bio
fuel
Bio
fuel
Fodder
production
Fodder
production
Organic
fertilizers
Organic
fertilizers
Milk
production
Milk
production
Fish
processing
Fish
processing
Fish
freezing
Fish
freezing
Fish
salting
Fish
salting
Fodder
production
Fodder
production
The Suez Canal Area Development Project has been
subject to a lot of feasibility studies conducted by the
SCA economic unit in cooperation with all other
concerned departments, comprising staff members in
all technical and administrative fields. They are the
same people who have been in charge of the successful
marketing policies of the waterway, and who have
achieved the highest possible safety levels for the
navigable channel. They are a group of highly qualified
professionals whose expertise is quite invaluable. They
are in fact the true wealth of Egypt…
The Great Egyptian DreamThe Great Egyptian Dream
Revenues of the Suez Canal in July 2014 as compared with the
revenues in July 2013
The Great Egyptian DreamThe Great Egyptian Dream
An increase of 14.4%An increase of 14.4%An increase of 12.2%An increase of 12.2%
Revenues of the Suez Canal in August 2014 as compared with the
revenues in August 2013
The Great Egyptian DreamThe Great Egyptian Dream
An increase of 12.5%An increase of 12.5%An increase of 10%An increase of 10%
An increase of 8.9%An increase of 8.9% An increase of 11.9%An increase of 11.9%
Revenues of the Suez Canal in January-August 2014 as compared with
the revenues in January-August 2013
The Great Egyptian DreamThe Great Egyptian Dream
However, in order to cope with all this
development in the Suez Canal Area we had to
think about the future of the Suez Canal as a
waterway, in light of the growth of world trade,
and the pressing need to boost the national
economy of Egypt. This was the main reason
behind the idea of the Second Project:
Digging of the New Suez Canal
The Great Egyptian DreamThe Great Egyptian Dream
‫الحاليه‬ ‫القناه‬
‫الجديده‬ ‫القناه‬
‫حرم‬ ‫الاراضى‬
‫القناه‬
‫الغربيه‬ ‫البل ح‬ ‫تفريعة‬
‫الكبرى‬ ‫البحيرات‬
‫الغربيه‬ ‫البل ح‬ ‫تفريعة‬
‫الكبرى‬ ‫البحيرات‬
‫الثاني‬ ‫المقترح‬
‫الكيلومتر‬ ‫من‬ ‫موازية‬ ‫قناة‬ ‫إنشاء‬ ‫مقترح‬60‫الكيلومتر‬ ‫الى‬125
‫الغربية‬ ‫البلح‬ ‫تفريعة‬ ‫وتعميق‬ ‫توسيع‬ ‫إلى‬ ‫بالضافة‬ (‫قناة‬ ‫)ترقيم‬
‫بطول‬10‫كيلومتر‬
‫الثاني‬ ‫المقترح‬
‫الكيلومتر‬ ‫من‬ ‫موازية‬ ‫قناة‬ ‫إنشاء‬ ‫مقترح‬60‫الكيلومتر‬ ‫الى‬125
‫الغربية‬ ‫البلح‬ ‫تفريعة‬ ‫وتعميق‬ ‫توسيع‬ ‫إلى‬ ‫بالضافة‬ (‫قناة‬ ‫)ترقيم‬
‫بطول‬10‫كيلومتر‬
‫الجديدة‬ ‫القناة‬ ‫طول‬65‫كم‬
‫كم‬60‫كم‬60
‫كم‬125‫كم‬125
LOT 1
10 km
15,450,000 Cu.m
‫بواسطة‬ ‫تنفيذها‬ ‫يتم‬
‫السويس‬ ‫قناة‬ ‫هيئة‬
‫عدد‬6‫كراكات‬
LOT 2
7 km
LOT 3
8.5 km
46,570,400 Cu.m
LOT 4
8.2 km
45,849,100
Cu.m
44,660,500 Cu.m
LOT 5
8.8 km
45,877,350 Cu.m
LOT 6
27 km
40,000,000 Cu.m
Total Project Quantities 250,000,000 Cu. m
‫عدد‬ ‫بواسطة‬ ‫تنفيذها‬ ‫يتم‬22‫التحالف‬ ‫لشركات‬ ‫التابعة‬ ‫كراكة‬
(‫الوطنية‬ ‫الجرافات‬ – ‫بوسكاليس‬ – ‫أوارد‬ ‫فان‬ – ‫دونيل‬ ‫)جان‬
‫عدد‬ ‫بواسطة‬ ‫تنفيذها‬ ‫يتم‬8‫التابعة‬ ‫كراكة‬
‫التحالف‬ ‫لشركات‬
(‫ديمي‬ - ‫ليكس‬ ‫)جريت‬
Total Quantities 190,000,000 Cu. m
‫كم‬ ‫الكراكات‬ ‫مدخل‬65.000
= ‫الطول‬750‫م‬
= ‫العمق‬6‫م‬
= ‫التكريك‬ ‫كميات‬360.000‫م‬3
‫بوارسعيد‬ ‫السويس‬
‫كم‬ ‫الكراكات‬ ‫مدخل‬75.847
= ‫الطول‬1700‫م‬
= ‫العمق‬10‫م‬
= ‫التكريك‬ ‫كميات‬1.870.000‫م‬3
‫كم‬ ‫الكراكات‬ ‫مدخل‬86.450
= ‫الطول‬540‫م‬
= ‫العمق‬10‫م‬
= ‫التكريك‬ ‫كميات‬594.000‫م‬3
‫كم‬ ‫الكراكات‬ ‫مدخل‬89,800
= ‫الطول‬500‫م‬
= ‫العمق‬6‫م‬
= ‫التكريك‬ ‫كميات‬250.000‫م‬3
‫للقناة‬ ‫الجنوبي‬ ‫المدخل‬
‫الجديدة‬
‫الشمالي‬ ‫المدخل‬
‫الجديدة‬ ‫للقناة‬
‫البلح‬ ‫تفريعة‬
‫ى‬‫ر‬‫ب‬‫ك‬‫ل‬‫ا‬ ‫ة‬‫ر‬‫م‬‫ل‬‫ا‬ ‫ت‬‫ا‬‫ر‬‫ي‬‫ح‬‫ب‬‫ل‬‫ا‬
‫التكريك‬ ‫خطة‬
‫الكيلومتر‬ ‫من‬ ‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬60‫الكيلومتر‬ ‫الى‬95
( )‫قناة‬ ‫ترقيم‬
‫إجمالي‬ ‫بطول‬ ‫والبلح‬ ‫الكبرى‬ ‫البحيرات‬ ‫وتعميق‬ ‫توسيع‬ ‫الى‬ ‫بالضافة‬37
‫كم‬
‫المشروع‬ ‫أطوال‬ ‫إجمالي‬72–‫الكراكات‬ ‫عدد‬ ‫إجمالي‬ ‫كم‬36‫كراكة‬
‫السماعيلية‬
Objectives of the Project
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Total works and estimated cost of the
New Canal Project including tunnels
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Item
volume of
work
Cost in EGP Cost in USD
Dry excavation works
258m cubic
meters
4 billion 550 million
Dredging and deepening (37km)
242mcubic
meters
15 billion 2.1 billion
Revetments- sedimentation basins-
Ferry boats and navigational aids 10 billion 1.3 billion
Total estimated cost for excavation,
dredging and utilities
29 billion 4 billion
Tunnels 6 tunnels 28.9 billion 4 billion
Armed Forces utilities: 2.1 billion 289 million
Total estimated cost 60 billion 8.2 billion
The role played by the SCA in the next stage
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Dredging works (deepening and widening)
Over 250 million cubic meters of soil have to be excavated (from zero level). 25 giant
dredgers of various types shall be deployed to deepen and widen the Canal in order to
accommodate vessels with 66ft draft in both directions
Dredging works (deepening and widening)
Over 250 million cubic meters of soil have to be excavated (from zero level). 25 giant
dredgers of various types shall be deployed to deepen and widen the Canal in order to
accommodate vessels with 66ft draft in both directions
The role played by the SCA in the next stage
‫العظيم‬ ‫المصري‬ ‫الحلم‬
‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
‫العظيم‬ ‫المصري‬ ‫الحلم‬
‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
Removal and re-construction of revetments
The SCA has to design and set specifications for the revetments that protect the
sloping sides of the New Canal at a length of about 100 km. The new revetments
should be constructed in a different manner that would minimize future maintenance
Removal and re-construction of revetments
The SCA has to design and set specifications for the revetments that protect the
sloping sides of the New Canal at a length of about 100 km. The new revetments
should be constructed in a different manner that would minimize future maintenance
The role played by the SCA in the next stage
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Design and carry out siphon works for the relevant utilities (water-
electricity- communication cables- signal- fuel supply). 24, 600 meter
siphons, with different diameters have to be placed to serve the Project.
Design and carry out siphon works for the relevant utilities (water-
electricity- communication cables- signal- fuel supply). 24, 600 meter
siphons, with different diameters have to be placed to serve the Project.
The role played by the SCA in the next stage
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Design and construct the signal stations along the waterway, together
with the relevant quays and platforms
Design and construct the signal stations along the waterway, together
with the relevant quays and platforms
The role played by the SCA in the next stage
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Navigational aids
Preparations of pilot buoys and accessories
Navigational aids
Preparations of pilot buoys and accessories
The role played by the SCA in the next stage
‫العظيم‬ ‫المصري‬ ‫الحلم‬
‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
‫العظيم‬ ‫المصري‬ ‫الحلم‬
‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
Activate and monitor the SCA Vessel Traffic Management
System VTMS
Activate and monitor the SCA Vessel Traffic Management
System VTMS
The role played by the SCA in the next stage
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Ferryboats working between the two banks of the CanalFerryboats working between the two banks of the Canal
The role played by the SCA in the next stage
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Sedimentation basinsSedimentation basins
The role played by the SCA in the next stage
The Great Egyptian Dream
Digging the New Suez Canal
The Great Egyptian Dream
Digging the New Suez Canal
Training of pilots using most up to date simulation systemsTraining of pilots using most up to date simulation systems
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
The Great Egyptian Dream
Digging of the New Suez Canal
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
The Great Egyptian Dream
Suez Canal Area Development Project
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
Finally, in order to make that dream come
true, we do hope that all Egyptians join
forces and work hand in hand for the
success of that great Project. The Armed
Forces of Egypt has played quite an
invaluable role to give life to that dream,
and to change it into reality for the well
being of all the people of our beloved Egypt.
The Great Egyptian DreamThe Great Egyptian Dream
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬There is nonstop coordination with the Egyptian Armed Forces so
far as the Project calculations are concerned. The SCA is in direct
contact with the Armed Forces Operations and Engineering
Authorities to thoroughly study all details of the Project with due
consideration to military and security aspects.
Due to national security issues, the SCA has found it appropriate
that the Engineering Authority of the Armed Forces would be in
charge of the dry excavation works, together with the
implementation of the tunnels, through the deployment of
national companies that would provide lots of job opportunities.
The SCA on the other hand would be responsible for the
revetment and dredging works, in addition to navigation, siphons
and ferryboats.
The Great Egyptian DreamThe Great Egyptian Dream
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
87
InvitationInvitation
Thank you our friends, and our partners for your attention.Thank you our friends, and our partners for your attention.
We have the honor and the pleasure to invite you to visit our safe Canal,We have the honor and the pleasure to invite you to visit our safe Canal,
and invest in our great country. We shall be very happy to welcome youand invest in our great country. We shall be very happy to welcome you
in Egypt, and your participation in the new great project, “The Suezin Egypt, and your participation in the new great project, “The Suez
Canal Area Development Project”, located in the best and the mostCanal Area Development Project”, located in the best and the most
important location in the world will certainly add to our pleasureimportant location in the world will certainly add to our pleasure
Best wishes for a successful investment in our country.Best wishes for a successful investment in our country.
Vice Admiral Mohab MamieshVice Admiral Mohab Mamiesh
Chairman of the Suez Canal AuthorityChairman of the Suez Canal Authority
Chairman of Executive Council of the ProjectChairman of Executive Council of the Project
‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬
‫السويس‬
‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬
88
And Now, we present a
documentary film describing the
digging of the new Suez Canal

More Related Content

What's hot

City Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for VibrancyCity Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for VibrancyDesigningHongKong
 
Sharjah Waterfront Villas | Brochures
Sharjah Waterfront Villas | BrochuresSharjah Waterfront Villas | Brochures
Sharjah Waterfront Villas | BrochuresSharjahOasis
 
Capt. Prabhat Nigam - Traffic Laneing on the Indian Coast
Capt. Prabhat Nigam - Traffic Laneing on the Indian CoastCapt. Prabhat Nigam - Traffic Laneing on the Indian Coast
Capt. Prabhat Nigam - Traffic Laneing on the Indian Coastcmmindia2017
 
TOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COAST
TOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COASTTOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COAST
TOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COASTStephanie Villedrouin
 
mblj_zhang guan xiao_3s1_40
mblj_zhang guan xiao_3s1_40mblj_zhang guan xiao_3s1_40
mblj_zhang guan xiao_3s1_40Projectsss
 
Sowwah Square Business District
Sowwah Square Business DistrictSowwah Square Business District
Sowwah Square Business Districtjihadmakhoul
 
Chennai port trust
Chennai port trustChennai port trust
Chennai port trustim_sushant
 
ILE A VACHE / TOURISM DEVELOPMENT PROJECT
ILE A VACHE / TOURISM DEVELOPMENT PROJECTILE A VACHE / TOURISM DEVELOPMENT PROJECT
ILE A VACHE / TOURISM DEVELOPMENT PROJECTStephanie Villedrouin
 
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarReview of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarEcotist
 
Cite du havre : a neglected gem
Cite du havre : a neglected gemCite du havre : a neglected gem
Cite du havre : a neglected gemHabitat67
 
Vizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridgedVizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridgedAjay Prasad
 
Ben Seibel Portfolio
Ben Seibel PortfolioBen Seibel Portfolio
Ben Seibel PortfolioBen Seibel
 

What's hot (15)

City Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for VibrancyCity Speak 2008 - Vincent Ng - Designing for Vibrancy
City Speak 2008 - Vincent Ng - Designing for Vibrancy
 
Sharjah Waterfront Villas | Brochures
Sharjah Waterfront Villas | BrochuresSharjah Waterfront Villas | Brochures
Sharjah Waterfront Villas | Brochures
 
Capt. Prabhat Nigam - Traffic Laneing on the Indian Coast
Capt. Prabhat Nigam - Traffic Laneing on the Indian CoastCapt. Prabhat Nigam - Traffic Laneing on the Indian Coast
Capt. Prabhat Nigam - Traffic Laneing on the Indian Coast
 
TOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COAST
TOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COASTTOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COAST
TOURISM DEVELOPMENT PROJECTS / HAITI'S CARIBBEAN COAST
 
mblj_zhang guan xiao_3s1_40
mblj_zhang guan xiao_3s1_40mblj_zhang guan xiao_3s1_40
mblj_zhang guan xiao_3s1_40
 
Sowwah Square Business District
Sowwah Square Business DistrictSowwah Square Business District
Sowwah Square Business District
 
Chennai port trust
Chennai port trustChennai port trust
Chennai port trust
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
ILE A VACHE / TOURISM DEVELOPMENT PROJECT
ILE A VACHE / TOURISM DEVELOPMENT PROJECTILE A VACHE / TOURISM DEVELOPMENT PROJECT
ILE A VACHE / TOURISM DEVELOPMENT PROJECT
 
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarReview of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
 
Cite du havre : a neglected gem
Cite du havre : a neglected gemCite du havre : a neglected gem
Cite du havre : a neglected gem
 
Visakhapatnam port
Visakhapatnam portVisakhapatnam port
Visakhapatnam port
 
Crz goals purpose & act
Crz goals  purpose & actCrz goals  purpose & act
Crz goals purpose & act
 
Vizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridgedVizhinjam way forward Sep 7 2012 abbridged
Vizhinjam way forward Sep 7 2012 abbridged
 
Ben Seibel Portfolio
Ben Seibel PortfolioBen Seibel Portfolio
Ben Seibel Portfolio
 

Viewers also liked

Viewers also liked (6)

The Suez Canal - A vital shortcut for global commerce
The Suez Canal - A vital shortcut for global commerceThe Suez Canal - A vital shortcut for global commerce
The Suez Canal - A vital shortcut for global commerce
 
The New suez canal
The New suez canalThe New suez canal
The New suez canal
 
The Suez Canal
The Suez CanalThe Suez Canal
The Suez Canal
 
Suez canal
Suez canalSuez canal
Suez canal
 
Suez canal
Suez canalSuez canal
Suez canal
 
Suez canal
Suez canalSuez canal
Suez canal
 

Similar to 58

Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis HarbourTristan Wiggill
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1Wagdy Garas
 
The port of Walvis Bay and Namport
The port of Walvis Bay and Namport The port of Walvis Bay and Namport
The port of Walvis Bay and Namport Tristan Wiggill
 
7 of the Most Exciting Development Projects in Saudi Arabia
7 of the Most Exciting Development Projects in Saudi Arabia7 of the Most Exciting Development Projects in Saudi Arabia
7 of the Most Exciting Development Projects in Saudi ArabiaDr. Ehsan Bayat
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalEdison Mugoya
 
Dredging and Marine Works (EN) V2015-3
Dredging and Marine Works (EN)  V2015-3Dredging and Marine Works (EN)  V2015-3
Dredging and Marine Works (EN) V2015-3Séamus Day
 
Jan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdf
Jan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdfJan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdf
Jan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdfPolycarp Otieno Onyango
 
Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)Isha Joshi
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdfKhalidJ6
 

Similar to 58 (20)

Great Egyptioan Dream.pptx
Great Egyptioan Dream.pptxGreat Egyptioan Dream.pptx
Great Egyptioan Dream.pptx
 
4-5
4-54-5
4-5
 
Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis Harbour
 
Sines Close the Loop
Sines Close the LoopSines Close the Loop
Sines Close the Loop
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1
 
Port.pptx
Port.pptxPort.pptx
Port.pptx
 
The port of Walvis Bay and Namport
The port of Walvis Bay and Namport The port of Walvis Bay and Namport
The port of Walvis Bay and Namport
 
Sines close the loop
Sines   close the loopSines   close the loop
Sines close the loop
 
The Suez Canal.pptx
The Suez Canal.pptxThe Suez Canal.pptx
The Suez Canal.pptx
 
7 of the Most Exciting Development Projects in Saudi Arabia
7 of the Most Exciting Development Projects in Saudi Arabia7 of the Most Exciting Development Projects in Saudi Arabia
7 of the Most Exciting Development Projects in Saudi Arabia
 
IT port report
IT port reportIT port report
IT port report
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final final
 
Impact of the New Suez Canal on North America
Impact of the New Suez Canal on North AmericaImpact of the New Suez Canal on North America
Impact of the New Suez Canal on North America
 
Dredging and Marine Works (EN) V2015-3
Dredging and Marine Works (EN)  V2015-3Dredging and Marine Works (EN)  V2015-3
Dredging and Marine Works (EN) V2015-3
 
Jan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdf
Jan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdfJan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdf
Jan 2022_Uganda Investment Benefits from the Nile Basin Cooperation.pdf
 
Safina suez-canal-transit%20 guide
Safina suez-canal-transit%20 guideSafina suez-canal-transit%20 guide
Safina suez-canal-transit%20 guide
 
Safina Suez Canal Transit Guide
Safina Suez Canal Transit GuideSafina Suez Canal Transit Guide
Safina Suez Canal Transit Guide
 
Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)Working of a port - JNPT (Mumbai)
Working of a port - JNPT (Mumbai)
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf
 
Gwadar
GwadarGwadar
Gwadar
 

Recently uploaded

Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 

Recently uploaded (20)

Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 

58

  • 1.
  • 2. 2 THE GREAT EGYPTIANTHE GREAT EGYPTIAN DREAMDREAM FIRST PROJECT:FIRST PROJECT: SUEZ CANAL AREASUEZ CANAL AREA DEVELOPMENT PROJECTDEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAMTHE GREAT EGYPTIAN DREAM
  • 3. 1- Egypt’s pressing need for giant national economic projects that would support the Egyptian economy to the benefit of present and future generations 1- Egypt’s pressing need for giant national economic projects that would support the Egyptian economy to the benefit of present and future generations THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 4. 2- Making use of the existing potential at the Project ports, and creating well developed industrial zones that would benefit from the goods transported through the Suez Canal 2- Making use of the existing potential at the Project ports, and creating well developed industrial zones that would benefit from the goods transported through the Suez Canal THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 5. 3-Providing job opportunities and creating new urban communities that would attract people from densely populated areas to the Canal zone 3-Providing job opportunities and creating new urban communities that would attract people from densely populated areas to the Canal zone THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 6. East Asia East Asia Western Europe Western Europe South East Asia South East Asia East Coast of the United States East Coast of the United States Southern Europe Southern Europe 4-Getting ready to maximize benefits from the growth of world trade in places such as China, South East Asia and India, going to Europe and the United States via the Suez Canal 4-Getting ready to maximize benefits from the growth of world trade in places such as China, South East Asia and India, going to Europe and the United States via the Suez Canal IndiaIndia THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 7. ‫الحلم‬ Geography of the Project Adabeya PortAdabeya Port East Port Said Port East Port Said Port 7 Al Arish Port Al Arish Port The Valley of Technology east of Ismailia The Valley of Technology east of Ismailia West Port Said Port West Port Said Port The industrial area north west of the Gulf of Suez The industrial area north west of the Gulf of Suez Al Tour Port Al Tour Port Sokhna PortSokhna Port
  • 8. Suez Canal Area Development Project 8 East Port said PortEast Port said Port The East Port said Port is a very important location for the world trade Transported between Europe and ports east of the Mediterranean, as well as Asian ports. The port, with its unique location to the east of the northern entrance of the Suez Canal eastern bypass, is at the junction of three continents, thus joining east to West. It covers an area of 72.10 Square kilometers, and a water area of 1.5 Square kilometers. The East Port said Port is a very important location for the world trade Transported between Europe and ports east of the Mediterranean, as well as Asian ports. The port, with its unique location to the east of the northern entrance of the Suez Canal eastern bypass, is at the junction of three continents, thus joining east to West. It covers an area of 72.10 Square kilometers, and a water area of 1.5 Square kilometers.
  • 9. Suez Canal Area Development Project 9 ‫المساحة‬ ‫إجمالى‬‫المساحة‬ ‫إجمالى‬72.1072.10‫مربع‬ ‫متر‬ ‫كيلو‬‫مربع‬ ‫متر‬ ‫كيلو‬ ‫المائية‬ ‫المساحة‬‫المائية‬ ‫المساحة‬1.51.5‫مربع‬ ‫متر‬ ‫كيلو‬‫مربع‬ ‫متر‬ ‫كيلو‬ East Port said PortEast Port said Port
  • 10. Suez Canal Area Development Project West Port Said portWest Port Said portWest Port Said portWest Port Said port
  • 11. Suez Canal Area Development Project 750 m750 m The Proposed Master plan for Al-Areesh PortThe Proposed Master plan for Al-Areesh Port
  • 12. Suez Canal Area Development Project The Proposed master plan for Al-Areesh PortThe Proposed master plan for Al-Areesh Port Total added areas Area Square Meters 1 Liquid Bulk Stations 63,300 2 Dry Bulk Stations 425,200 3 Storage 116,900 Total Area 605,400 Internal Highways 140 km
  • 13. Suez Canal Area Development Project The Valley of Technology East of IsmailiaThe Valley of Technology East of Ismailia
  • 14. Suez Canal Area Development Project • Located east of Ismailia, 10 kilometersLocated east of Ismailia, 10 kilometers away from Ismailia Ferryboataway from Ismailia Ferryboat • In close contact with existing urbanIn close contact with existing urban communities such as Ismailia and Qantaracommunities such as Ismailia and Qantara • In close integration with national projectsIn close integration with national projects and industrial areas such as east Port saidand industrial areas such as east Port said bypass, the area north west of the Gulf ofbypass, the area north west of the Gulf of Suez, the Tenth of Ramadan and BadreSuez, the Tenth of Ramadan and Badre CitiesCities • In close range of reclamation areas alongIn close range of reclamation areas along Sheikh Zayed and Sheikh Jaber fresh waterSheikh Zayed and Sheikh Jaber fresh water canalscanals • Located east of Ismailia, 10 kilometersLocated east of Ismailia, 10 kilometers away from Ismailia Ferryboataway from Ismailia Ferryboat • In close contact with existing urbanIn close contact with existing urban communities such as Ismailia and Qantaracommunities such as Ismailia and Qantara • In close integration with national projectsIn close integration with national projects and industrial areas such as east Port saidand industrial areas such as east Port said bypass, the area north west of the Gulf ofbypass, the area north west of the Gulf of Suez, the Tenth of Ramadan and BadreSuez, the Tenth of Ramadan and Badre CitiesCities • In close range of reclamation areas alongIn close range of reclamation areas along Sheikh Zayed and Sheikh Jaber fresh waterSheikh Zayed and Sheikh Jaber fresh water canalscanals The Valley of Technology East of IsmailiaThe Valley of Technology East of Ismailia
  • 15. Suez Canal Area Development Project About 215 AcresAbout 215 Acres The Valley of Technology East of IsmailiaThe Valley of Technology East of Ismailia
  • 16. Suez Canal Area Development Project Sanitary drainage plant and waste water network Desalination plant and network An integrated communication network Direct access to Sokhna Port Southern area Northern area Gulf of SuezGulf of Suez Sokhna Port SEZ North West of the gulf of SuezSEZ North West of the gulf of Suez
  • 17. Suez Canal Area Development Project To Suez ToHurghada Sukhna Port Southern area Northern area Proposed area for housing Solid waste sanitary dump Wind energy-generating plant Gulf of SuezGulf of Suez Proposed master plan for the area north west of the Gulf of SuezProposed master plan for the area north west of the Gulf of Suez 6 km2 20 km2
  • 18. Suez Canal Area Development Project Sukhna PortSukhna Port
  • 19. Suez Canal Area Development Project Live stock Logistics Area Liquid Bulk Station Sugar Factory Navigation Channels Sukhna Laboratory First Basin Third Basin Present status of Sukhna PortPresent status of Sukhna Port
  • 20. Suez Canal Area Development Project Suez Gulf First Basin Third Basin Live stock Sugar Factory Power Station Sukhna Laboratory Proposed Master Plan of Sukhna PortProposed Master Plan of Sukhna Port
  • 21. Suez Canal Area Development Project Adabia PortAdabia Port
  • 22. Suez Canal Area Development Project Proposed master plan for Adabia PortProposed master plan for Adabia Port Before development After development Increase Total area 832,000m2 1.5million m2 180% Length of quays 1800m 4500m 250% Depth of quays 9-12m up to 17 m
  • 23. The Port consists of a berth at a length of 200m and a depth of 8m.
  • 24. Master plan for the development of Tour Port The proposed port includes an area of 464,000 square meters that shall be implemented in several successive stages. It comprises the development of 1000m of quays and services at a depth ranging from 10-12m, in addition to another quay for the naval forces
  • 27. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ DoneDone Determine the overall plan and requirements of theDetermine the overall plan and requirements of the Project in coordination with concerned ministriesProject in coordination with concerned ministriesPlanningPlanning Prepare specifications, RFP and evaluation criteria Done Presentation to local and international consulting houses Done Evaluation of proposals according to unified criteria, in cooperation with international expertise to select the consortiums that would be allowed to buy the RFP Done Launching the Project by announcing the winner consortiums that would buy The RFP Done 6th January 2014 RoadmapRoadmap StatusStatusStageStage Stages of the Project
  • 28. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ Winner consortiums buy the RFP and prepare the master plan Done Jan.23,2014 Preparation of the legislations pertaining to the project in coordination with the Ministry of Justice and the ministerial committee From 15th January,2014 to 15th April 2014 Legal and logistic preparations for opening envelopes and starting the evaluation of the proposals Done Completed proceduresCompleted procedures TimeTimeStageStage DoneDoneSelecting the winner consortium, and announcing the result after presentation to the ministerial committee Selecting the winner consortium, and announcing the result after presentation to the ministerial committee Stages of the Project
  • 29. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬The World Bank has been requested to nominate a number of international, highly qualified consulting houses to technically evaluate the proposals of the various consortiums, in due coordination with the Egyptian Ministry of Planning and International Cooperation Procedures of the Technical Evaluation
  • 30. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ Procedures of the Technical Evaluation  Having satisfied the set requirements, it has been agreed that the French consulting house EGIS would be in charge of the evaluation process. It is to be noted that no French company is represented in any of the consortiums.  As soon as Egis has completed the technical evaluation of the proposals according to the terms of reference, a detailed and duly signed report has been presented with relevant certificates, technical analysis and a short list of the proposals
  • 31. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ ‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬ Illustration of the technically qualified proposals as selected by EGIS, with over 80% as per the RFP •‫المظاريف‬ ‫ححح‬‫ت‬‫ف‬ ‫حدحح‬‫بموع‬ ‫فنيا‬ ‫حةح‬‫ل‬‫المؤه‬ ‫التحالفات‬ ‫إخطار‬ ‫حمح‬‫ت‬ ‫.المالية‬ Name of Consortium Technical Evaluation First Dar Al-Handasah (Shair & Partners( Dar Al-Handasah Egypt 86,00 Second Royal Haskoning (DHV( Pacer 81.67 Third Witteveen + Bos EGEC 80.64 Fourth Inros Lackner AG Hamza & Partners 80.43 Final Results of the Technical Evaluation
  • 32. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ ‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬ • Commercial envelopes were opened in the presence of respective representatives of all the qualified consortiums. Commercial proposals Name of Consortium commercial proposal in US dollar First Dar Al-Handasah (Shair & Partners( Dar Al-Handasah Egypt , ,1 773 0 00 Second Royal Haskoning (DHV( Pacer 2,473,303 Third Inros Lackner AG Hamza & Partners 3,254,785 Fourth Witteveen + Bos EGEC , ,5 996 8 65
  • 33. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ ‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬Final arrangement of involved consortiums after due consideration of technical and commercial evaluation Final arrangement of involved consortiums after due consideration of technical and commercial evaluation Name of Consortium First Dar Al-Handasah (Shair & Partners( Dar Al-Handasah Egypt Second Royal Haskoning (DHV( Pacer Third Inros Lackner AG Hamza & Partners Fourth Witteveen + Bos EGEC
  • 34. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ • The SCA has contacted The Home Security Department in order to get the relevant security approval for the first and second consortiums • The Home Security Department stated that it had no objection as to the involvement of the two consortiums in works related to the Suez Canal Area Development Project. Head of the ministerial committee was informed that necessary security approvals had been obtained for the winner consortiums. Home Security Acceptance
  • 35. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬The State Council has approved the proposed draft contract between the Suez Canal Authority and the winner consortium on August 10, 2014 Perusal of the draft contract by the State Council
  • 36. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ Signing the contract with the winner consortium that will prepare the master plan for the Suez Canal Area Development Project in the presence of HE the Prime Minister; Head of the Ministerial Committee Signing the contract with the winner consortium that will prepare the master plan for the Suez Canal Area Development Project in the presence of HE the Prime Minister; Head of the Ministerial Committee THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 37. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ Future proceduresFuture procedures TimeTimeStageStage Hold a conference for businessmen and related work groups to exchange viewpoints that would be considered in the detailed Master Plan of the project ‫مراحل‬ ‫المشروع‬
  • 38. Expected Results of the Project
  • 39. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ 1- Developing and upgrading the national economy of Egypt by making use of the unique geographical location and the Suez Canal Zone. 1- Developing and upgrading the national economy of Egypt by making use of the unique geographical location and the Suez Canal Zone. THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 40. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ 2- Turning Egypt into an important economic and logistics center with an impact on world trade, through the development of industrial and commercial activities. New industrial and logistics centers at the project area may depend on the added value that complementary industries can provide. This can be attained by re-exporting the end product inside and outside Egypt through logistic distribution centers set for that purpose. Existing entities may also be used and further developed. 2- Turning Egypt into an important economic and logistics center with an impact on world trade, through the development of industrial and commercial activities. New industrial and logistics centers at the project area may depend on the added value that complementary industries can provide. This can be attained by re-exporting the end product inside and outside Egypt through logistic distribution centers set for that purpose. Existing entities may also be used and further developed. THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 41. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT 3- Encouraging national, Arab and foreign capital investment to participate in the implementation of the master plan of Project, in order to achieve the set objectives without jeopardizing the national security of Egypt. 3- Encouraging national, Arab and foreign capital investment to participate in the implementation of the master plan of Project, in order to achieve the set objectives without jeopardizing the national security of Egypt.
  • 42. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ 4- Giving a boost to the national income of Egypt, and an increase of foreign currency earnings through the expected increase of the Suez Canal revenues, as more ships shall be using the waterway as a result of the Project. Maritime transport to and from the Arab Republic of Egypt shall be on the rise, as more ships will be using the Mediterranean and the Red Sea ports. The area can very well turn into a very important center for electronic communication. 4- Giving a boost to the national income of Egypt, and an increase of foreign currency earnings through the expected increase of the Suez Canal revenues, as more ships shall be using the waterway as a result of the Project. Maritime transport to and from the Arab Republic of Egypt shall be on the rise, as more ships will be using the Mediterranean and the Red Sea ports. The area can very well turn into a very important center for electronic communication. THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 43. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ 5- Giving a chance to national companies to participate in the implementation of the Project master plan, and infrastructure works, according to international standards, the matter that will add to the potential and expertise of such companies, and improve their operating conditions and capabilities. 5- Giving a chance to national companies to participate in the implementation of the Project master plan, and infrastructure works, according to international standards, the matter that will add to the potential and expertise of such companies, and improve their operating conditions and capabilities. THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 44. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ 6- Promoting the development process up to the expectations of the people of Egypt following the two recent revolutions 6- Promoting the development process up to the expectations of the people of Egypt following the two recent revolutions THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 45. Industries Proposed to be Included in the General Framework
  • 53. Shipbuilding and Ship Repair Industries
  • 58. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ To maximize the benefits of the Project we had to think of some activities that would generate fast returns and provide much needed job opportunities for the young people of Egypt. Fish Farming or Aqua Culture is one of the most suitable projects by virtue of the available land extending along the eastern bank of the Suez Canal. The National Project of Fish Farming ‫العظيم‬ ‫المصري‬ ‫الحلم‬ ‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬ ‫العظيم‬ ‫المصري‬ ‫الحلم‬ ‫السويس‬ ‫قناة‬ ‫بمنطقة‬ ‫التنمية‬ ‫مشروع‬ THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT THE GREAT EGYPTIAN DREAM SUEZ CANAL AREA DEVELOPMENT PROJECT
  • 59. Suggested site of the project: The sedimentation basins east of the Suez Canal 23 Sedimentation Basins, totaling 120 km in length, and ranging from 3 to 5 km into the East bank of the Canal, extending from the bypass all the way down to the Gulf of Suez. 23 Sedimentation Basins, totaling 120 km in length, and ranging from 3 to 5 km into the East bank of the Canal, extending from the bypass all the way down to the Gulf of Suez. The National Project of Fish Farming
  • 60. Vision of the Project Production of the fish farms will certainly be a positive contribution to face the ever increasing food demand, as a result of over population. The project shall also represent a base for related industries and for high quality products that would be suitable for exportation
  • 61. Mission of the project Development of the fish farming in the sedimentation basins along the eastern bank of the Suez Canal, and providing specialized training in the field and creating job opportunities that would participate in the overall development of the area.
  • 62. Fish Farms Markets MarketsMarkets Expected ResultsExpected Results Drain of fish farms Fish input Canal water MedicineMedicinePerfumePerfumeWood works Wood works Meat processing Meat processing Leather tanning Leather tanning Wool production Wool production Oil manufacture Oil manufacture Bio fuel Bio fuel Fodder production Fodder production Organic fertilizers Organic fertilizers Milk production Milk production Fish processing Fish processing Fish freezing Fish freezing Fish salting Fish salting Fodder production Fodder production
  • 63. The Suez Canal Area Development Project has been subject to a lot of feasibility studies conducted by the SCA economic unit in cooperation with all other concerned departments, comprising staff members in all technical and administrative fields. They are the same people who have been in charge of the successful marketing policies of the waterway, and who have achieved the highest possible safety levels for the navigable channel. They are a group of highly qualified professionals whose expertise is quite invaluable. They are in fact the true wealth of Egypt… The Great Egyptian DreamThe Great Egyptian Dream
  • 64. Revenues of the Suez Canal in July 2014 as compared with the revenues in July 2013 The Great Egyptian DreamThe Great Egyptian Dream An increase of 14.4%An increase of 14.4%An increase of 12.2%An increase of 12.2%
  • 65. Revenues of the Suez Canal in August 2014 as compared with the revenues in August 2013 The Great Egyptian DreamThe Great Egyptian Dream An increase of 12.5%An increase of 12.5%An increase of 10%An increase of 10%
  • 66. An increase of 8.9%An increase of 8.9% An increase of 11.9%An increase of 11.9% Revenues of the Suez Canal in January-August 2014 as compared with the revenues in January-August 2013 The Great Egyptian DreamThe Great Egyptian Dream
  • 67. However, in order to cope with all this development in the Suez Canal Area we had to think about the future of the Suez Canal as a waterway, in light of the growth of world trade, and the pressing need to boost the national economy of Egypt. This was the main reason behind the idea of the Second Project: Digging of the New Suez Canal The Great Egyptian DreamThe Great Egyptian Dream
  • 68. ‫الحاليه‬ ‫القناه‬ ‫الجديده‬ ‫القناه‬ ‫حرم‬ ‫الاراضى‬ ‫القناه‬ ‫الغربيه‬ ‫البل ح‬ ‫تفريعة‬ ‫الكبرى‬ ‫البحيرات‬
  • 69. ‫الغربيه‬ ‫البل ح‬ ‫تفريعة‬ ‫الكبرى‬ ‫البحيرات‬ ‫الثاني‬ ‫المقترح‬ ‫الكيلومتر‬ ‫من‬ ‫موازية‬ ‫قناة‬ ‫إنشاء‬ ‫مقترح‬60‫الكيلومتر‬ ‫الى‬125 ‫الغربية‬ ‫البلح‬ ‫تفريعة‬ ‫وتعميق‬ ‫توسيع‬ ‫إلى‬ ‫بالضافة‬ (‫قناة‬ ‫)ترقيم‬ ‫بطول‬10‫كيلومتر‬ ‫الثاني‬ ‫المقترح‬ ‫الكيلومتر‬ ‫من‬ ‫موازية‬ ‫قناة‬ ‫إنشاء‬ ‫مقترح‬60‫الكيلومتر‬ ‫الى‬125 ‫الغربية‬ ‫البلح‬ ‫تفريعة‬ ‫وتعميق‬ ‫توسيع‬ ‫إلى‬ ‫بالضافة‬ (‫قناة‬ ‫)ترقيم‬ ‫بطول‬10‫كيلومتر‬ ‫الجديدة‬ ‫القناة‬ ‫طول‬65‫كم‬ ‫كم‬60‫كم‬60 ‫كم‬125‫كم‬125
  • 70. LOT 1 10 km 15,450,000 Cu.m ‫بواسطة‬ ‫تنفيذها‬ ‫يتم‬ ‫السويس‬ ‫قناة‬ ‫هيئة‬ ‫عدد‬6‫كراكات‬ LOT 2 7 km LOT 3 8.5 km 46,570,400 Cu.m LOT 4 8.2 km 45,849,100 Cu.m 44,660,500 Cu.m LOT 5 8.8 km 45,877,350 Cu.m LOT 6 27 km 40,000,000 Cu.m Total Project Quantities 250,000,000 Cu. m ‫عدد‬ ‫بواسطة‬ ‫تنفيذها‬ ‫يتم‬22‫التحالف‬ ‫لشركات‬ ‫التابعة‬ ‫كراكة‬ (‫الوطنية‬ ‫الجرافات‬ – ‫بوسكاليس‬ – ‫أوارد‬ ‫فان‬ – ‫دونيل‬ ‫)جان‬ ‫عدد‬ ‫بواسطة‬ ‫تنفيذها‬ ‫يتم‬8‫التابعة‬ ‫كراكة‬ ‫التحالف‬ ‫لشركات‬ (‫ديمي‬ - ‫ليكس‬ ‫)جريت‬ Total Quantities 190,000,000 Cu. m ‫كم‬ ‫الكراكات‬ ‫مدخل‬65.000 = ‫الطول‬750‫م‬ = ‫العمق‬6‫م‬ = ‫التكريك‬ ‫كميات‬360.000‫م‬3 ‫بوارسعيد‬ ‫السويس‬ ‫كم‬ ‫الكراكات‬ ‫مدخل‬75.847 = ‫الطول‬1700‫م‬ = ‫العمق‬10‫م‬ = ‫التكريك‬ ‫كميات‬1.870.000‫م‬3 ‫كم‬ ‫الكراكات‬ ‫مدخل‬86.450 = ‫الطول‬540‫م‬ = ‫العمق‬10‫م‬ = ‫التكريك‬ ‫كميات‬594.000‫م‬3 ‫كم‬ ‫الكراكات‬ ‫مدخل‬89,800 = ‫الطول‬500‫م‬ = ‫العمق‬6‫م‬ = ‫التكريك‬ ‫كميات‬250.000‫م‬3 ‫للقناة‬ ‫الجنوبي‬ ‫المدخل‬ ‫الجديدة‬ ‫الشمالي‬ ‫المدخل‬ ‫الجديدة‬ ‫للقناة‬ ‫البلح‬ ‫تفريعة‬ ‫ى‬‫ر‬‫ب‬‫ك‬‫ل‬‫ا‬ ‫ة‬‫ر‬‫م‬‫ل‬‫ا‬ ‫ت‬‫ا‬‫ر‬‫ي‬‫ح‬‫ب‬‫ل‬‫ا‬ ‫التكريك‬ ‫خطة‬ ‫الكيلومتر‬ ‫من‬ ‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬60‫الكيلومتر‬ ‫الى‬95 ( )‫قناة‬ ‫ترقيم‬ ‫إجمالي‬ ‫بطول‬ ‫والبلح‬ ‫الكبرى‬ ‫البحيرات‬ ‫وتعميق‬ ‫توسيع‬ ‫الى‬ ‫بالضافة‬37 ‫كم‬ ‫المشروع‬ ‫أطوال‬ ‫إجمالي‬72–‫الكراكات‬ ‫عدد‬ ‫إجمالي‬ ‫كم‬36‫كراكة‬ ‫السماعيلية‬
  • 71. Objectives of the Project The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal
  • 72. The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal
  • 73. Total works and estimated cost of the New Canal Project including tunnels The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Item volume of work Cost in EGP Cost in USD Dry excavation works 258m cubic meters 4 billion 550 million Dredging and deepening (37km) 242mcubic meters 15 billion 2.1 billion Revetments- sedimentation basins- Ferry boats and navigational aids 10 billion 1.3 billion Total estimated cost for excavation, dredging and utilities 29 billion 4 billion Tunnels 6 tunnels 28.9 billion 4 billion Armed Forces utilities: 2.1 billion 289 million Total estimated cost 60 billion 8.2 billion
  • 74. The role played by the SCA in the next stage The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Dredging works (deepening and widening) Over 250 million cubic meters of soil have to be excavated (from zero level). 25 giant dredgers of various types shall be deployed to deepen and widen the Canal in order to accommodate vessels with 66ft draft in both directions Dredging works (deepening and widening) Over 250 million cubic meters of soil have to be excavated (from zero level). 25 giant dredgers of various types shall be deployed to deepen and widen the Canal in order to accommodate vessels with 66ft draft in both directions
  • 75. The role played by the SCA in the next stage ‫العظيم‬ ‫المصري‬ ‫الحلم‬ ‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ ‫العظيم‬ ‫المصري‬ ‫الحلم‬ ‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ Removal and re-construction of revetments The SCA has to design and set specifications for the revetments that protect the sloping sides of the New Canal at a length of about 100 km. The new revetments should be constructed in a different manner that would minimize future maintenance Removal and re-construction of revetments The SCA has to design and set specifications for the revetments that protect the sloping sides of the New Canal at a length of about 100 km. The new revetments should be constructed in a different manner that would minimize future maintenance
  • 76. The role played by the SCA in the next stage The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Design and carry out siphon works for the relevant utilities (water- electricity- communication cables- signal- fuel supply). 24, 600 meter siphons, with different diameters have to be placed to serve the Project. Design and carry out siphon works for the relevant utilities (water- electricity- communication cables- signal- fuel supply). 24, 600 meter siphons, with different diameters have to be placed to serve the Project.
  • 77. The role played by the SCA in the next stage The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Design and construct the signal stations along the waterway, together with the relevant quays and platforms Design and construct the signal stations along the waterway, together with the relevant quays and platforms
  • 78. The role played by the SCA in the next stage The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Navigational aids Preparations of pilot buoys and accessories Navigational aids Preparations of pilot buoys and accessories
  • 79. The role played by the SCA in the next stage ‫العظيم‬ ‫المصري‬ ‫الحلم‬ ‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ ‫العظيم‬ ‫المصري‬ ‫الحلم‬ ‫الجديدة‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ Activate and monitor the SCA Vessel Traffic Management System VTMS Activate and monitor the SCA Vessel Traffic Management System VTMS
  • 80. The role played by the SCA in the next stage The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Ferryboats working between the two banks of the CanalFerryboats working between the two banks of the Canal
  • 81. The role played by the SCA in the next stage The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Sedimentation basinsSedimentation basins
  • 82. The role played by the SCA in the next stage The Great Egyptian Dream Digging the New Suez Canal The Great Egyptian Dream Digging the New Suez Canal Training of pilots using most up to date simulation systemsTraining of pilots using most up to date simulation systems
  • 83. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ The Great Egyptian Dream Digging of the New Suez Canal
  • 84. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ The Great Egyptian Dream Suez Canal Area Development Project
  • 85. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ Finally, in order to make that dream come true, we do hope that all Egyptians join forces and work hand in hand for the success of that great Project. The Armed Forces of Egypt has played quite an invaluable role to give life to that dream, and to change it into reality for the well being of all the people of our beloved Egypt. The Great Egyptian DreamThe Great Egyptian Dream
  • 86. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬There is nonstop coordination with the Egyptian Armed Forces so far as the Project calculations are concerned. The SCA is in direct contact with the Armed Forces Operations and Engineering Authorities to thoroughly study all details of the Project with due consideration to military and security aspects. Due to national security issues, the SCA has found it appropriate that the Engineering Authority of the Armed Forces would be in charge of the dry excavation works, together with the implementation of the tunnels, through the deployment of national companies that would provide lots of job opportunities. The SCA on the other hand would be responsible for the revetment and dredging works, in addition to navigation, siphons and ferryboats. The Great Egyptian DreamThe Great Egyptian Dream
  • 87. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ 87 InvitationInvitation Thank you our friends, and our partners for your attention.Thank you our friends, and our partners for your attention. We have the honor and the pleasure to invite you to visit our safe Canal,We have the honor and the pleasure to invite you to visit our safe Canal, and invest in our great country. We shall be very happy to welcome youand invest in our great country. We shall be very happy to welcome you in Egypt, and your participation in the new great project, “The Suezin Egypt, and your participation in the new great project, “The Suez Canal Area Development Project”, located in the best and the mostCanal Area Development Project”, located in the best and the most important location in the world will certainly add to our pleasureimportant location in the world will certainly add to our pleasure Best wishes for a successful investment in our country.Best wishes for a successful investment in our country. Vice Admiral Mohab MamieshVice Admiral Mohab Mamiesh Chairman of the Suez Canal AuthorityChairman of the Suez Canal Authority Chairman of Executive Council of the ProjectChairman of Executive Council of the Project
  • 88. ‫قناة‬ ‫بمنطقة‬ ‫التنميه‬ ‫مشروع‬ ‫السويس‬ ‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬‫الجديده‬ ‫السويس‬ ‫قناة‬ ‫مشروع‬ 88 And Now, we present a documentary film describing the digging of the new Suez Canal