Abandoned projects presentation
•
Download as PPTX, PDF
•
0 likes
•
65 views
Elya Dayana
Follow
by Caspar Chia, IMPERIA Institute of Technology, Subang Jaya, Selangor
Read less
Read more
Education
Report
Share
Report
Share
1 of 10
Download now
Recommended
Capitalism has a long history of boom and bust, we have to continue to learn by every crisis. Two key problems arose especial in Mega Developments in the region with the soft economy and mix use / market shift, the first being most developments are designed for continuous construction rather than phased and the second most master plans could not be phased efficiently with sustainability issues pushes to the forefront. The Presentation focuses on Developers dilemmas and lessons learned and highlight some of the solutions including cost share and cost recovery mechanisms adopted through a project case study.
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Loay Ghazaleh MBA, BSc Civil Eng.
Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environment
Bohitesh Misra, PMP
QC_Supplier Management_ALL En
QC_Supplier Management_ALL En
Jorge Torres
According to Juran, for the average American manufacturer, the costs of not quality in some cases come to represent 30% of the sales price. For the builder or client company, a non compliance of contract causes delays in the delivery date, affecting site operations, these delays can generate additional costs not covered: costs of Labor, equipment and penalties if it affect start up of the project. In Peru, in national projects, 75% of projects had delays of up to 60 days. In this situation, Supplier Management should be an alternative that allows early identification of a delay in delivery date, decline in the quality requirements, the possibility to capture information relevant to decision-making, in order to prevent and mitigate its effects on the project progress.
Supplier Management Service
Supplier Management Service
Jorge Torres
Presentation made at the CBD/IUCN TAPAS Group meeting on "Tourism partnerships and concessions in protected areas: Cooperating for success" meeting in the iSimangaliso Wetland Park
Managing concessions in protected areas, Paul F J Eagles
Managing concessions in protected areas, Paul F J Eagles
Anna Spenceley
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independent Engineer's Perspective, May 7, 2014 Kevin Joyce, Black & Veatch
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
Sandia National Laboratories: Energy & Climate: Renewables
SICKNESS IN SMALL INDUSTRIES – REASONS AND REHABILITATION
SICKNESS IN SMALL INDUSTRIES – REASONS AND REHABILITATION.pptx
SICKNESS IN SMALL INDUSTRIES – REASONS AND REHABILITATION.pptx
kittustudy7
15 Annual General Meeting
15 Annual General Meeting
Namgay Tshering
Recommended
Capitalism has a long history of boom and bust, we have to continue to learn by every crisis. Two key problems arose especial in Mega Developments in the region with the soft economy and mix use / market shift, the first being most developments are designed for continuous construction rather than phased and the second most master plans could not be phased efficiently with sustainability issues pushes to the forefront. The Presentation focuses on Developers dilemmas and lessons learned and highlight some of the solutions including cost share and cost recovery mechanisms adopted through a project case study.
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Loay Ghazaleh MBA, BSc Civil Eng.
Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environment
Bohitesh Misra, PMP
QC_Supplier Management_ALL En
QC_Supplier Management_ALL En
Jorge Torres
According to Juran, for the average American manufacturer, the costs of not quality in some cases come to represent 30% of the sales price. For the builder or client company, a non compliance of contract causes delays in the delivery date, affecting site operations, these delays can generate additional costs not covered: costs of Labor, equipment and penalties if it affect start up of the project. In Peru, in national projects, 75% of projects had delays of up to 60 days. In this situation, Supplier Management should be an alternative that allows early identification of a delay in delivery date, decline in the quality requirements, the possibility to capture information relevant to decision-making, in order to prevent and mitigate its effects on the project progress.
Supplier Management Service
Supplier Management Service
Jorge Torres
Presentation made at the CBD/IUCN TAPAS Group meeting on "Tourism partnerships and concessions in protected areas: Cooperating for success" meeting in the iSimangaliso Wetland Park
Managing concessions in protected areas, Paul F J Eagles
Managing concessions in protected areas, Paul F J Eagles
Anna Spenceley
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independent Engineer's Perspective, May 7, 2014 Kevin Joyce, Black & Veatch
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
Sandia National Laboratories: Energy & Climate: Renewables
SICKNESS IN SMALL INDUSTRIES – REASONS AND REHABILITATION
SICKNESS IN SMALL INDUSTRIES – REASONS AND REHABILITATION.pptx
SICKNESS IN SMALL INDUSTRIES – REASONS AND REHABILITATION.pptx
kittustudy7
15 Annual General Meeting
15 Annual General Meeting
Namgay Tshering
NUS-ISS 4th Agile Community of Practice (CoP): Agile Development with Agile Contract, by Mr Steven Koh, Assistant Director (Agile Coach), IDA-Government Digital Services (GDS)
Agile Development with Agile Contract
Agile Development with Agile Contract
NUS-ISS
Fidic yellow vs fidic silver
Fidic yellow vs silver
Fidic yellow vs silver
Weero Koster
Budget Planning
Budget Planning
Nilesh Padwal
OPERATIONS
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
Himani Maheshwari
Nature- Need for Project Management – types of projects – Project Management Knowledge areas and processes – Project skills – The role of Project Manager – Project Management Processes – Impact of Delays in Project Completions – Essential of Project Management Philosophy – Project Management Principles
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
Niruban Projoth
Assignment on presenting a terrace house building's tender document
Measurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
Haziq1511
Financial and technical assistance of a project
Financial and technical assistance of a project
Financial and technical assistance of a project
Anuja Chavan
a. project life cycle and risk management
3 b. project life cycle and risk management
3 b. project life cycle and risk management
Dr.R. SELVAM
First lecture for student of Lublin University of Technology, Poland
Project Managemet Basics
Project Managemet Basics
Лана Ратнер
Nasscom study of
Nasscom mumbai workshop
Nasscom mumbai workshop
Anirban Mukerji
DLV2000 Press Event Presentation_RMEDIA
DLV2000 Press Event Presentation_RMEDIA
Richard Goins
https://www.irjet.net/archives/V9/i12/IRJET-V9I1202.pdf
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
IRJET Journal
Project finance is the financing of long-term infrastructure, industrial projects and public services based upon a non-recourse or limited recourse financial structure, in which project debt and equity used to finance the project are paid back from the cash flow generated by the project. Project financing is a loan structure that relies primarily on the project's cash flow for repayment, with the project's assets, rights and interests held as secondary security or collateral. Project finance is especially attractive to the private sector because companies can fund major projects off balance sheet.
Project finance
Project finance
Vishnu Rajendran C R
UC/PNC Outlook Conference 2015 Debt Markets panel with Laura Brunner Port of Greater Cincinnati Development Authority UC Real Estate Program
UC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority tools
The Port
When a software project gets off the rails in most cases the blame is on inaccurate business requirements. There is no difference between Traditional or Agile projects. If business requirements were not captured correctly the project is doomed to fail before it even started. I put together a slide deck on structuring, improving the requirements gathering process to ensure that everything is ready to start the delivery of the project. Another slide deck will follow describing useful methodologies, techniques to ease the process.
How to Capture Better Business Requirements in Software Projects
How to Capture Better Business Requirements in Software Projects
Gabor Schönekker
Construction Futures Wales - Project Bank Accounts November 2018
Construction Futures Wales - Project Bank Accounts
Construction Futures Wales - Project Bank Accounts
Rae Davies
BDMA Conference 2019
Ian Gibbs
Ian Gibbs
Realia Marketing
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
Sanjeewa Mahawedage
Project
Estimating Cost & Time.ppt
Estimating Cost & Time.ppt
341741357
Project management (1)
Project management (1)
Hetal Visaria
Students will get the knowledge of the following- meaning of the pricing, its importance, objectives, methods of pricing, factors affecting the price of products, An overview of DPCO (Drug Price Control Order) and NPPA (National Pharmaceutical Pricing Authority)
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
VishalSingh1417
An introduction on the challenges that face food testing labs.
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
Sherif Taha
More Related Content
Similar to Abandoned projects presentation
NUS-ISS 4th Agile Community of Practice (CoP): Agile Development with Agile Contract, by Mr Steven Koh, Assistant Director (Agile Coach), IDA-Government Digital Services (GDS)
Agile Development with Agile Contract
Agile Development with Agile Contract
NUS-ISS
Fidic yellow vs fidic silver
Fidic yellow vs silver
Fidic yellow vs silver
Weero Koster
Budget Planning
Budget Planning
Nilesh Padwal
OPERATIONS
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
Himani Maheshwari
Nature- Need for Project Management – types of projects – Project Management Knowledge areas and processes – Project skills – The role of Project Manager – Project Management Processes – Impact of Delays in Project Completions – Essential of Project Management Philosophy – Project Management Principles
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
Niruban Projoth
Assignment on presenting a terrace house building's tender document
Measurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
Haziq1511
Financial and technical assistance of a project
Financial and technical assistance of a project
Financial and technical assistance of a project
Anuja Chavan
a. project life cycle and risk management
3 b. project life cycle and risk management
3 b. project life cycle and risk management
Dr.R. SELVAM
First lecture for student of Lublin University of Technology, Poland
Project Managemet Basics
Project Managemet Basics
Лана Ратнер
Nasscom study of
Nasscom mumbai workshop
Nasscom mumbai workshop
Anirban Mukerji
DLV2000 Press Event Presentation_RMEDIA
DLV2000 Press Event Presentation_RMEDIA
Richard Goins
https://www.irjet.net/archives/V9/i12/IRJET-V9I1202.pdf
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
IRJET Journal
Project finance is the financing of long-term infrastructure, industrial projects and public services based upon a non-recourse or limited recourse financial structure, in which project debt and equity used to finance the project are paid back from the cash flow generated by the project. Project financing is a loan structure that relies primarily on the project's cash flow for repayment, with the project's assets, rights and interests held as secondary security or collateral. Project finance is especially attractive to the private sector because companies can fund major projects off balance sheet.
Project finance
Project finance
Vishnu Rajendran C R
UC/PNC Outlook Conference 2015 Debt Markets panel with Laura Brunner Port of Greater Cincinnati Development Authority UC Real Estate Program
UC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority tools
The Port
When a software project gets off the rails in most cases the blame is on inaccurate business requirements. There is no difference between Traditional or Agile projects. If business requirements were not captured correctly the project is doomed to fail before it even started. I put together a slide deck on structuring, improving the requirements gathering process to ensure that everything is ready to start the delivery of the project. Another slide deck will follow describing useful methodologies, techniques to ease the process.
How to Capture Better Business Requirements in Software Projects
How to Capture Better Business Requirements in Software Projects
Gabor Schönekker
Construction Futures Wales - Project Bank Accounts November 2018
Construction Futures Wales - Project Bank Accounts
Construction Futures Wales - Project Bank Accounts
Rae Davies
BDMA Conference 2019
Ian Gibbs
Ian Gibbs
Realia Marketing
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
Sanjeewa Mahawedage
Project
Estimating Cost & Time.ppt
Estimating Cost & Time.ppt
341741357
Project management (1)
Project management (1)
Hetal Visaria
Similar to Abandoned projects presentation
(20)
Agile Development with Agile Contract
Agile Development with Agile Contract
Fidic yellow vs silver
Fidic yellow vs silver
Budget Planning
Budget Planning
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
Measurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
Financial and technical assistance of a project
Financial and technical assistance of a project
3 b. project life cycle and risk management
3 b. project life cycle and risk management
Project Managemet Basics
Project Managemet Basics
Nasscom mumbai workshop
Nasscom mumbai workshop
DLV2000 Press Event Presentation_RMEDIA
DLV2000 Press Event Presentation_RMEDIA
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
Project finance
Project finance
UC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority tools
How to Capture Better Business Requirements in Software Projects
How to Capture Better Business Requirements in Software Projects
Construction Futures Wales - Project Bank Accounts
Construction Futures Wales - Project Bank Accounts
Ian Gibbs
Ian Gibbs
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
Estimating Cost & Time.ppt
Estimating Cost & Time.ppt
Project management (1)
Project management (1)
Recently uploaded
Students will get the knowledge of the following- meaning of the pricing, its importance, objectives, methods of pricing, factors affecting the price of products, An overview of DPCO (Drug Price Control Order) and NPPA (National Pharmaceutical Pricing Authority)
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
VishalSingh1417
An introduction on the challenges that face food testing labs.
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
Sherif Taha
Group presentation on verbal communication
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
dhanalakshmis0310
Basic Civil Engineering notes first year Notes Building notes Selection of site for Building Layout of a Building What is Burjis, Mutam Building Bye laws Basic Concept of sunlight ventilation in building National Building Code of India Set back or building line Types of Buildings Floor Space Index (F.S.I) Institutional Vs Educational Building Components & function Sills, Lintels, Cantilever Doors, Windows and Ventilators Types of Foundation AND THEIR USES Plinth Area Shallow and Deep Foundation Super Built-up & carpet area Floor Area Ratio (F.A.R) RCC Reinforced Cement Concrete RCC VS PCC
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Denish Jangid
Python notes for Unit 1 Avanthi PG College
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
Ramakrishna Reddy Bijjam
https://medicaleducationelearning.blogspot.com/2024/02/using-micro-scholarship-to-incentivize.html
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
Poh-Sun Goh
Brief to be read ahead of the Student Project Simulation event.
Spatium Project Simulation student brief
Spatium Project Simulation student brief
Association for Project Management
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi Welcome to VIP Call Girl In Delhi Hello! Delhi Call Girls is one of the most popular cities in India. Girls who call in Delhi frequently Advertise their services in small promgons in magazines, as well as on the Internet but We do not act as a direct-promoter. We will do everything we can to make sure that you're safe to the max to the best of our abilities and making sure of our ability and ensuring that you're obtained to the best of our abilities and making sure that you get what you want. Sexuality of our females is recognized by our Business proposals. Top-of-the-line, fully-featured Delhi girl call number and we offer To be aware of it is a major reason in deciding to use our services to ensure that our customers realize the worth of their lives swiftly and in a pleasant manner by engaging with web series performers for a cost of 10000.Here you are able to be Relax knowing that personal information is stored in the business proposals, giving an appearance of like you're as if you are a full affirmation. Call Girls Service Now Delhi +91-9899900591 *********** N.M.************* 01/04/2024 ▬█⓿▀█▀ 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 CALL 𝐆𝐈𝐑𝐋 𝐕𝐈𝐏 𝐄𝐒𝐂𝐎𝐑𝐓 SERVICE ✅ ❣️ ⭐➡️HOT & SEXY MODELS // COLLEGE GIRLS AVAILABLE FOR COMPLETE ENJOYMENT WITH HIGH PROFILE INDIAN MODEL AVAILABLE HOTEL & HOME ★ SAFE AND SECURE HIGH CLASS SERVICE AFFORDABLE RATE ★ SATISFACTION,UNLIMITED ENJOYMENT. ★ All Meetings are confidential and no information is provided to any one at any cost. ★ EXCLUSIVE PROFILes Are Safe and Consensual with Most Limits Respected ★ Service Available In: - HOME & HOTEL Star Hotel Service .In Call & Out call SeRvIcEs : ★ A-Level (star escort) ★ Strip-tease ★ BBBJ (Bareback Blowjob)Receive advanced sexual techniques in different mode make their life more pleasurable. ★ Spending time in hotel rooms ★ BJ (Blowjob Without a Condom) ★ Completion (Oral to completion) ★ Covered (Covered blowjob Without condom SAFE AND SECURE
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
test
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
Skills of introducing the lesson presents by Mrs. Amanpreet Kaur, Assistant Professor Khalsa College of Education, G.T. Road Amritsar
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
Amanpreet Kaur
Wednesday 20 March 2024, 09:30-15:30.
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
Jisc
Spell
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
This Presentation is about the Unit 5 Mathematical Reasoning of UGC NET Paper 1 General Studies where we have included Types of Reasoning, Mathematical reasoning like number series, letter series etc. and mathematical aptitude like Fraction, Time and Distance, Average etc. with their solved questions and answers.
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
Nirmal Dwivedi
In this webinar, nonprofits learned how to delve into the minds of funders, unveiling what they truly seek in qualified grant applicants, and tools for success. Learn more about the Grant Readiness Review service by Remy Consulting at TechSoup to help you gather, organize, and assess the strength of documents required for grant applications.
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
TechSoup
A short exhibit showcasing three concepts from sociology.
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
jbellavia9
Klinik_ Apotek Onlin 085657271886 Solusi Menggugurkan Masalah Kehamilan Anda Jual Obat Aborsi Asli KLINIK ABORSI TERPEECAYA _ Jual Obat Aborsi Cytotec Misoprostol Asli 100% Ampuh Hanya 3 Jam Langsung Gugur || OBAT PENGGUGUR KANDUNGAN AMPUH MANJUR OBAT ABORSI OLINE" APOTIK Jual Obat Cytotec, Gastrul, Gynecoside Asli Ampuh. JUAL ” Obat Aborsi Tuntas | Obat Aborsi Manjur | Obat Aborsi Ampuh | Obat Penggugur Janin | Obat Pencegah Kehamilan | Obat Pelancar Haid | Obat terlambat Bulan | Ciri Obat Aborsi Asli | Obat Telat Bulan | Pil Aborsi Asli | Cara Menggugurkan Konten | Cara Aborsi Tuntas | Harga Obat Aborsi Asli | Pil Aborsi | Jual Obat Aborsi Cytotec | Cara Aborsi Sendiri | Cara Aborsi Usia 1 Bulan | Cara Aborsi Usia 2 Tahun | Cara Aborsi Usia 3 Bulan | Obat Aborsi Usia 4 Bulan | Cara Abrasi Usia 5 Bulan | Cara Menggugurkan Konten | Kandungan Obat Penggugur | Cara Menghitung Usia Konten | Cara Mengatasi Terlambat Bulan | Penjual Obat Aborsi Asli | Obat Aborsi Garansi | Kandungan Obat Peluntur | Obat Telat Datang Bulan | Obat Telat Haid | Obat Aborsi Paling Murah | Klinik Jual Obat Aborsi | Jual Pil Cytotec | Apotik Jual Obat Aborsi | Kandungan Dokter Abrasi | Cara Aborsi Cepat | Jual Obat Aborsi Bergaransi | Jual Obat Cytotec Asli | Obat Aborsi Aman Manjur | Obat Misoprostol Cytotec Asli. "APA ITU ABORSI" “Aborsi Adalah dengan membendung hormon yang di perlukan untuk mempertahankan kehamilan yaitu hormon progesteron, karena hormon ini dibendung, maka jalur kehamilan mulai membuka dan leher rahim menjadi melunak,sehingga mengeluarkan darah yang merupakan tanda bahwa obat telah bekerja || maksimal 1 jam obat diminum || PENJELASAN OBAT ABORSI USIA 1 _7 BULAN Pada usia kandungan ini, pasien akan merasakan sakit yang sedikit tidak berlebihan || sekitar 1 jam ||. namun hanya akan terjadi pada saatdarah keluar merupakan pertanda menstruasi. Hal ini dikarenakan pada usiakandungan 3 bulan,janin sudah terbentuk sebesar kepalan tangan orang dewasa. Cara kerja obat aborsi : JUAL OBAT ABORSI AMPUH dosis 3 bulan secara umum sama dengan cara kerja || DOSIS OBAT ABORSI 2 bulan”, hanya berbedanya selain mengisolasijanin juga menghancurkan janin dengan formula methotrexate dikandungdidalamnya. Formula methotrexate ini sangat ampuh untuk menghancurkan janinmenjadi serpihan-serpihan kecil akan sangat berguna pada saat dikeluarkan nanti. APA ALASAN WANITA MELAKUKAN ABORSI? Aborsi di lakukan wanita hamil baik yang sudah menikah maupun belum menikah dengan berbagai alasan , akan tetapi alasan yang utama adalah alasan-alasan non medis (termasuk aborsi sendiri / di sengaja/ buatan] MELAYANI PEMESANAN OBAT ABORSI SETIAP HARI, SIAP KIRIM KESELURUH KOTA BESAR DI INDONESIA DAN LUAR NEGERI. HUBUNGI PEMESANAN LEBIH NYAMAN VIA WA/: 085657271886
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
SGLG2024
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
Mehran University Newsletter is a Quarterly Publication from Public Relations Office
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University of Engineering & Technology, Jamshoro
ICT Role in 21st Century Education & its Challenges •This presentation gives an overall view of education in 21st century and how it is facilitated by the integration of ICT. •It also gives a detailed explanation of the challenges faced in ICT-based education and further elaborates the strategies that can help in overcoming the challenges.
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
AreebaZafar22
38 K-12 educators from North Carolina public schools
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
Mebane Rash
Recently uploaded
(20)
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
Spatium Project Simulation student brief
Spatium Project Simulation student brief
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
Abandoned projects presentation
1.
ENGLISH II CASPAR CHIA 1008585
2.
•The negative effect
of abandoned project in Malaysia
3.
Cause? Financial problems Good and
Service Tax (GST 6%) Unfavorable economic condition Mismanagement Faulty tender process
4.
DEFINITION • THE PROJECT
IS NOT COMPLETED WITHIN OR LATER THAN THE DELIVERY DATE SALE
5.
EFFECTS • INDIVIDUAL • PUBLIC •
DEVELOPERS/CONTRACTORS • INVESTORS
6.
DEVELOPERS/CONTRACTORS • METERIALS THAT
WERE SUPPOSED TO BE USED IN THE PROJECTS ARE VANDALISED. • EXTRA COST OF REVIVAL OF PROJECT • RE-AWARDING THE AWARD OF CONTRACT • JOBLESS OR CHANGE OF FIELD
7.
INDIVIDUALS • EMPLOYMENT (General
workers, construction workers) • ECONOMIC MELTDOWN • Purchaser have to cover for the approved loan
8.
INVESTORS • MONEY INVESTED
IS LOST • DISPUTES AMONGTS PROJECTS PARTICIPANTS • LEADS TO COURT
9.
PUBLIC • SPENDING POWER
REDUCED • EMPLOYMENT RATE DECREASE • ABANDONED PROJECT = ILLEGAL IMMEGRANTS ATTRACTIONS • SURROUNDING RESIDENTIAL ISNT SAFE
10.
COUNTRY • BAD REPUTATION
TO NATION WIDE