TSE FPA REQUIREMENT
2022.12.02
This material constitutes confidential information of Toshiba TEC Singapore
Do not disclose or reproduce it without permission
2
© 2019 Toshiba Tec Corporation
Introduction
FPA is a critical process to ensure parts to be within drawing specification before mass
production.
TOSHIBA TEC SINGAPORE PTE LTD (TSE) relies on our Suppliers to deliver parts which meeting
drawing specification to satisfy our high performance standard while meeting and exceeding
customer expectation.
TSE FPA Requirement serves as guidelines for Suppliers to perform FPA so as to assure that
material with satisfactory properties and consistent quality can be purchased by TSE.
3
© 2019 Toshiba Tec Corporation
FPA Sample Preparation and Submission
Item Requirement
Sample Quantity 5 shots (5pcs for each cavity)
* Sample number and cavity number are required to be clearly indicated during sample submission.
Sample Label Information Sample label should include the following items:
- Supplier name
- Part Name
- Part Number
- FPA Trial level (T1,T2,T3,…)
- FPA Submission Reason
- FPA Submission Requestor
- Remark (additional information to TSE)
Sample Packaging Method Samples should be submitted with proper packaging method to ensure no
deformation/damage during transportation.
Sample Recipient All FPA samples should be delivered/attention to TSE/TIE Sourcing Buyer team.
* Sample produced in Batam to be delivered to TIE. Please confirm with respective buyer before
submission.
Supplier shall share a notification email to TSE/TIE buyer and Part Quality Team after sample
submission.
4
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission
All applicable FPA document shall be submitted to TSE together with FPA samples
submission or WITHIN 3 days after FPA samples submission through TSE website.
TSE Web Address:
http://www.tecsg.com.sg/Cardb.nsf/SupplierPortal?Openframeset
Suppliers are required to check the FPA documents based on the checklist provided
before submission
Important notes:
TSE reserves the right to impose a penalty charges of 100SGD to Suppliers who failed to comply TSE FPA
requirement (document submission).
Documents checklist & Posting Guideline 
5
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Parts delivered to TSE shall be complied with latest RoHS (Restriction of Hazardous Substances)
standard.
Suppliers are required to provide a compliance letter during FPA submission to declare the
compliancy of the parts submitted
Suppliers shall submit a third party Laboratory Report such as SGS Test Report to prove the
parts are within the RoHS Directives with no additional cost to TSE upon request.
Current latest RoHS compliance letter format:
Revision no.: TSS-Q-00-046 ATT-1 (ver1.9)
(Please approach TSE/TIE PIC for latest letter format)
6
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Suppliers are required to submit the official 2D drawing and/or other specification requested
by TSE.
Indicate
dimensions
inspected (by
numbering)
Check
drawing
revision no.
7
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Inspection numbering
indication in drawing is
required.
8
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Suppliers shall perform measurement to the FPA samples to ensure samples submitted are
meeting TSE requirement.
Inspection Criteria:
*Minimum 3 shots of measurement results to be submitted. However, Suppliers are encouraged to measure
more samples to get more precise results.
FPA T1 Inspection Sample Size and Criteria (Molding & Stamping)
New Part
Duplicate
Tooling
EC Change
Transfer
Tooling
Material
Change
Process
Change
Location
Change
Tooling Repair
Abbreviation
100%
Tol
Critical
EC
II
Repair
Important Notes:
1.0 All the cavity for molding and stamping parts need to be inspected unless otherwise stated.
2.0 For FPA T2 onward, inspection shall be done on NG dimensions, II dimensions and Critical dimensions
3.0 Cpk study(25X pcs) to be carried out based on customer requirement.
Toshiba Tec inspection instruction checking items
Repaired dimensions
FPA Inspection
Sample Size &
Criteria
FPA Submission Reason
3pcs II
+
(optional) Critical
3pcs (Repair +II)
+
(optional)
Critical
3pcs (EC + II)
+
(optional)
Critical
1pc 100%
+
2pcs Tol
All dimensions in 2D drawing (including geometrical dimensions and notes)
All dimensions with tolerance in 2D drawing (including geometrical dimensions and notes)
Critical dimensions related to 5M change/ tooling repair/ EC ( determined by vendor/specified by TSE engineer)
EC dimensions
9
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
The following information has to be included in the measurement result:
a) Part Number,
b) Part Name,
c) Equipment used,
d) Drawing EC Number,
e) Trial Level,
f) Cavity Number (if applicable)
g) Supplier’s Final judgement
Measurement results to be reviewed/verified by management before submission.
Suppliers are encouraged to submit inspection report in TSE format.
10
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Suppliers shall provide the raw material specification for the samples produced through
material certificate during FPA sample submission.
Material certificate must contain all the following information:
i. TSE Part Name and Part Number
ii. Raw Material Name / Code / Grade,
iii. Color,
iv. Manufacturer of Raw Material,
v. Shelf Life Guaranteed Period (If applicable),
vi. Others
All the raw material for the part should be declared in material certificate. This includes
material used in secondary process. For examples, ink for printing, coating, insert bits, etc.
Molding: Stamping:
11
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Molding Stamping
Material Trade Name Material Specification
Material Grade Material Thickness
Material Color Code Country of origin
Material Color Plating/Coating applied
Material Type Plating/Coating thickness
Material Thickness
(Part min wall thickness)
Hardness
Flamability Grade
Moulder UL File No.
Material Certificate
Supplier Name
Part Name
Part Number
Authorized signature
Manufacturer of raw material
12
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
This is applicable to FPA sample submission of parts produced by molding process. (It includes
injection, compression, and any other type of molding process)
Molding parameters can be submitted in individual format but to ensure all the critical parameters
are included.
Important note:
Testing date and acknowledgement/verification stamp are compulsory information to be included in
Molding Parameters.
13
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Typical gate sealing graph pattern:
Holding time ≥ Gate sealing time
14
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
This is applicable to FPA sample submission for new parts produced by unique tooling.
(Molding tool, Stamping tool, etc.). Tooling information serves as a record for future
reference/traceability purpose for any tooling structure related concern.
Suppliers are required to provide this information through TSE format.
Approval from TSE is required if Suppliers would like to use their equivalent format.
TSE Format:
Molding
Stamping
15
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Suppliers shall ensure usage of an appropriate packaging method with aim to avoid transport
and handling damage and to support an optimized subsequent handling process.
Suppliers shall decide the packaging method with necessary test (such as drop test, vibration
test, etc.).
Part
16
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Suppliers shall submit the manufacturing process flow chart which starts from receiving of raw material until
delivery of part (finished goods). This including secondary process flow chart such as spray painting, printing,
etc.
Suppliers shall submit detail Process QA flow chart/Process Management Plan for review upon request.
For stamping parts with manual tooling, Suppliers shall attach sketch or photo of the part for each stage
tool.
For New Parts:
- Inspection instruction/guideline for individual part will be discussed during tooling/DFM discussion stage.
For MP/Current parts,
- Inspection instruction/guideline for individual part is available in Toshiba Website.
Supplier shall ensure all the checking items in TSE inspection instruction to be included in their outgoing
inspection check point on top of their manufacturing checking items.
17
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
This is applicable to the parts with printing process (logo/trade mark on part).
Printing artwork file with dimension and position on the part must be submitted for TSE review
before sample fabrication or submission.
Approved Artwork (endorsed by TOSHIBA TEC SINGAPORE PTE LTD design team) shall be
submitted for FPA review and approval.
18
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
To new part(TCGS Model) or upon TSE request : 25 shots
Suppliers are required to perform process improvement if
i) Cp < 2.0 or
ii) Cpk < 1.5 (1.33 for stamping parts)
Suppliers will be notified if higher Cp/Cpk value is required.
Suppliers are strongly encouraged to submit the study result based on TSE format.
TSE Format:
Cp/Cpk dimensions will be determined during DFM stage (New Part/Tooling) or to be informed
by TSE for other submission reason.
19
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Besides that, Suppliers are required to maintain the Base Cp of T1 and subsequent submission
include (T2, T3) within ±3δ
Example:
Drawing Spec: 223.39±0.6
Specification Range: 222.79 to 223.99
T1 Sample Cp study results as below
Average of 25pcs measurement results (X)  223.358
Sigma (δ): 0.016
Cp  12.866
Cpk  12.179
T2 / T3 sample submission, Base Cp should within below range.
X+3δ  223.406
X-3δ  223.310
20
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
The following information need to be included in the plating / coating declaration:
i. Type of plating/ coating
ii. Thickness or size of plating/ coating
iii. Color
iv. Applicable reliability test report (Eg. peeling test, cross cut test,..etc.)
v. Others necessary critical parameters.
21
© 2019 Toshiba Tec Corporation
FPA Document Requirement and Submission (cont.)
Unit Specification
Machine No.
Capacity (KVA)
Sqeeze Time (ms)
Weld Time (ms)
Current (A)
Cool Time (ms)
Holding Time (ms)
Air Pressure (Bar)
22
© 2019 Toshiba Tec Corporation
FPA Sample Re-submission
The approval or rejection of FPA is determined based on the results of the TSE/TIE FPA inspection.
In the event that a submission cannot be approved, the Supplier will be informed
of the concern(s) found and required to provide re-submission.
Re-submission has to be completed within 2 weeks or earlier from the date of
receiving official request from TSE.
Suppliers shall inform TSE on the re-submission date within 3 working days and
must contact TSE requestor to re-schedule a submission date with valid reason if
the initial target date cannot be achieved.
23
© 2019 Toshiba Tec Corporation
2.0 Sheet A
FPA Sample Re-submission (cont.)
1.0 Cover Page
Item detail
24
© 2019 Toshiba Tec Corporation
3.0 Sheet B 4.0 Sheet C
FPA Sample Re-submission (cont.)
Dimensional measurement result.
(includes geometrical dimensions)
Drawing notes
inspection result.
Disposition for the
inspection results
25
© 2019 Toshiba Tec Corporation
FPA for Supplier Internal Transfer (Sister Company Transfer)
It is mandatory for Suppliers to perform internal FPA for the business transfer to
sister companies.
For example, Company A and B under same parent company. Business transfer
from Company A to company B.
Company B is required to submit FPA to Company A for approval.
Company B shall only submit FPA to TSE once internal FPA approved by Company
A.
Ex-Suppliers (company A) are required to ensure no interruption to the part
delivery schedule during the transfer period and responsible to advise on the
technical concern(s) found during the trial after transfer.
A B
26
© 2019 Toshiba Tec Corporation
Attachment
Appendices FPA Requirement
FPA Related Doc
27
© 2019 Toshiba Tec Corporation
Thank you

More Related Content

Similar to TSE FPA REQUIREMENT.pptx

3 Sample Procedures
3 Sample Procedures3 Sample Procedures
3 Sample Procedures
Robert Klemm
 
Converge Short ECMP Sept 2015
Converge Short ECMP Sept 2015Converge Short ECMP Sept 2015
Converge Short ECMP Sept 2015
Jo_Vann
 

Similar to TSE FPA REQUIREMENT.pptx (20)

PCA2015EntryForm
PCA2015EntryFormPCA2015EntryForm
PCA2015EntryForm
 
Road to DMF Readiness 2.0 - 2018 update
Road to DMF Readiness 2.0 - 2018 updateRoad to DMF Readiness 2.0 - 2018 update
Road to DMF Readiness 2.0 - 2018 update
 
3 Sample Procedures
3 Sample Procedures3 Sample Procedures
3 Sample Procedures
 
Case study-sourcing of plastic injection in china
Case study-sourcing of plastic injection in chinaCase study-sourcing of plastic injection in china
Case study-sourcing of plastic injection in china
 
te article
te articlete article
te article
 
CNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyCNC Parts Sourcing Case Study
CNC Parts Sourcing Case Study
 
Triple Forward Camera from Tesla Model 3
 Triple Forward Camera from Tesla Model 3 Triple Forward Camera from Tesla Model 3
Triple Forward Camera from Tesla Model 3
 
8D Catalog.pdf
8D Catalog.pdf8D Catalog.pdf
8D Catalog.pdf
 
PCA Specimen Entry Form
PCA Specimen Entry FormPCA Specimen Entry Form
PCA Specimen Entry Form
 
jabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdfjabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdf
 
Dpr
DprDpr
Dpr
 
Automotive industry & REACH
Automotive industry & REACHAutomotive industry & REACH
Automotive industry & REACH
 
Additive manufacturing metal
Additive manufacturing metalAdditive manufacturing metal
Additive manufacturing metal
 
Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
Machine toolindustry en
Machine toolindustry enMachine toolindustry en
Machine toolindustry en
 
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
 
Converge Short ECMP Sept 2015
Converge Short ECMP Sept 2015Converge Short ECMP Sept 2015
Converge Short ECMP Sept 2015
 
Bluestar profile 2013
Bluestar profile 2013Bluestar profile 2013
Bluestar profile 2013
 
Audi-Bosch FPK Generation 2 Instrument Cluster
Audi-Bosch FPK Generation 2 Instrument ClusterAudi-Bosch FPK Generation 2 Instrument Cluster
Audi-Bosch FPK Generation 2 Instrument Cluster
 
Investor Pitch Training
Investor Pitch TrainingInvestor Pitch Training
Investor Pitch Training
 

Recently uploaded

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableChandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableSolan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowSRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 

TSE FPA REQUIREMENT.pptx

  • 1. © 2019 Toshiba Tec Corporation TSE FPA REQUIREMENT 2022.12.02 This material constitutes confidential information of Toshiba TEC Singapore Do not disclose or reproduce it without permission
  • 2. 2 © 2019 Toshiba Tec Corporation Introduction FPA is a critical process to ensure parts to be within drawing specification before mass production. TOSHIBA TEC SINGAPORE PTE LTD (TSE) relies on our Suppliers to deliver parts which meeting drawing specification to satisfy our high performance standard while meeting and exceeding customer expectation. TSE FPA Requirement serves as guidelines for Suppliers to perform FPA so as to assure that material with satisfactory properties and consistent quality can be purchased by TSE.
  • 3. 3 © 2019 Toshiba Tec Corporation FPA Sample Preparation and Submission Item Requirement Sample Quantity 5 shots (5pcs for each cavity) * Sample number and cavity number are required to be clearly indicated during sample submission. Sample Label Information Sample label should include the following items: - Supplier name - Part Name - Part Number - FPA Trial level (T1,T2,T3,…) - FPA Submission Reason - FPA Submission Requestor - Remark (additional information to TSE) Sample Packaging Method Samples should be submitted with proper packaging method to ensure no deformation/damage during transportation. Sample Recipient All FPA samples should be delivered/attention to TSE/TIE Sourcing Buyer team. * Sample produced in Batam to be delivered to TIE. Please confirm with respective buyer before submission. Supplier shall share a notification email to TSE/TIE buyer and Part Quality Team after sample submission.
  • 4. 4 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission All applicable FPA document shall be submitted to TSE together with FPA samples submission or WITHIN 3 days after FPA samples submission through TSE website. TSE Web Address: http://www.tecsg.com.sg/Cardb.nsf/SupplierPortal?Openframeset Suppliers are required to check the FPA documents based on the checklist provided before submission Important notes: TSE reserves the right to impose a penalty charges of 100SGD to Suppliers who failed to comply TSE FPA requirement (document submission). Documents checklist & Posting Guideline 
  • 5. 5 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Parts delivered to TSE shall be complied with latest RoHS (Restriction of Hazardous Substances) standard. Suppliers are required to provide a compliance letter during FPA submission to declare the compliancy of the parts submitted Suppliers shall submit a third party Laboratory Report such as SGS Test Report to prove the parts are within the RoHS Directives with no additional cost to TSE upon request. Current latest RoHS compliance letter format: Revision no.: TSS-Q-00-046 ATT-1 (ver1.9) (Please approach TSE/TIE PIC for latest letter format)
  • 6. 6 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Suppliers are required to submit the official 2D drawing and/or other specification requested by TSE. Indicate dimensions inspected (by numbering) Check drawing revision no.
  • 7. 7 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Inspection numbering indication in drawing is required.
  • 8. 8 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Suppliers shall perform measurement to the FPA samples to ensure samples submitted are meeting TSE requirement. Inspection Criteria: *Minimum 3 shots of measurement results to be submitted. However, Suppliers are encouraged to measure more samples to get more precise results. FPA T1 Inspection Sample Size and Criteria (Molding & Stamping) New Part Duplicate Tooling EC Change Transfer Tooling Material Change Process Change Location Change Tooling Repair Abbreviation 100% Tol Critical EC II Repair Important Notes: 1.0 All the cavity for molding and stamping parts need to be inspected unless otherwise stated. 2.0 For FPA T2 onward, inspection shall be done on NG dimensions, II dimensions and Critical dimensions 3.0 Cpk study(25X pcs) to be carried out based on customer requirement. Toshiba Tec inspection instruction checking items Repaired dimensions FPA Inspection Sample Size & Criteria FPA Submission Reason 3pcs II + (optional) Critical 3pcs (Repair +II) + (optional) Critical 3pcs (EC + II) + (optional) Critical 1pc 100% + 2pcs Tol All dimensions in 2D drawing (including geometrical dimensions and notes) All dimensions with tolerance in 2D drawing (including geometrical dimensions and notes) Critical dimensions related to 5M change/ tooling repair/ EC ( determined by vendor/specified by TSE engineer) EC dimensions
  • 9. 9 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) The following information has to be included in the measurement result: a) Part Number, b) Part Name, c) Equipment used, d) Drawing EC Number, e) Trial Level, f) Cavity Number (if applicable) g) Supplier’s Final judgement Measurement results to be reviewed/verified by management before submission. Suppliers are encouraged to submit inspection report in TSE format.
  • 10. 10 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Suppliers shall provide the raw material specification for the samples produced through material certificate during FPA sample submission. Material certificate must contain all the following information: i. TSE Part Name and Part Number ii. Raw Material Name / Code / Grade, iii. Color, iv. Manufacturer of Raw Material, v. Shelf Life Guaranteed Period (If applicable), vi. Others All the raw material for the part should be declared in material certificate. This includes material used in secondary process. For examples, ink for printing, coating, insert bits, etc. Molding: Stamping:
  • 11. 11 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Molding Stamping Material Trade Name Material Specification Material Grade Material Thickness Material Color Code Country of origin Material Color Plating/Coating applied Material Type Plating/Coating thickness Material Thickness (Part min wall thickness) Hardness Flamability Grade Moulder UL File No. Material Certificate Supplier Name Part Name Part Number Authorized signature Manufacturer of raw material
  • 12. 12 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) This is applicable to FPA sample submission of parts produced by molding process. (It includes injection, compression, and any other type of molding process) Molding parameters can be submitted in individual format but to ensure all the critical parameters are included. Important note: Testing date and acknowledgement/verification stamp are compulsory information to be included in Molding Parameters.
  • 13. 13 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Typical gate sealing graph pattern: Holding time ≥ Gate sealing time
  • 14. 14 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) This is applicable to FPA sample submission for new parts produced by unique tooling. (Molding tool, Stamping tool, etc.). Tooling information serves as a record for future reference/traceability purpose for any tooling structure related concern. Suppliers are required to provide this information through TSE format. Approval from TSE is required if Suppliers would like to use their equivalent format. TSE Format: Molding Stamping
  • 15. 15 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Suppliers shall ensure usage of an appropriate packaging method with aim to avoid transport and handling damage and to support an optimized subsequent handling process. Suppliers shall decide the packaging method with necessary test (such as drop test, vibration test, etc.). Part
  • 16. 16 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Suppliers shall submit the manufacturing process flow chart which starts from receiving of raw material until delivery of part (finished goods). This including secondary process flow chart such as spray painting, printing, etc. Suppliers shall submit detail Process QA flow chart/Process Management Plan for review upon request. For stamping parts with manual tooling, Suppliers shall attach sketch or photo of the part for each stage tool. For New Parts: - Inspection instruction/guideline for individual part will be discussed during tooling/DFM discussion stage. For MP/Current parts, - Inspection instruction/guideline for individual part is available in Toshiba Website. Supplier shall ensure all the checking items in TSE inspection instruction to be included in their outgoing inspection check point on top of their manufacturing checking items.
  • 17. 17 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) This is applicable to the parts with printing process (logo/trade mark on part). Printing artwork file with dimension and position on the part must be submitted for TSE review before sample fabrication or submission. Approved Artwork (endorsed by TOSHIBA TEC SINGAPORE PTE LTD design team) shall be submitted for FPA review and approval.
  • 18. 18 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) To new part(TCGS Model) or upon TSE request : 25 shots Suppliers are required to perform process improvement if i) Cp < 2.0 or ii) Cpk < 1.5 (1.33 for stamping parts) Suppliers will be notified if higher Cp/Cpk value is required. Suppliers are strongly encouraged to submit the study result based on TSE format. TSE Format: Cp/Cpk dimensions will be determined during DFM stage (New Part/Tooling) or to be informed by TSE for other submission reason.
  • 19. 19 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Besides that, Suppliers are required to maintain the Base Cp of T1 and subsequent submission include (T2, T3) within ±3δ Example: Drawing Spec: 223.39±0.6 Specification Range: 222.79 to 223.99 T1 Sample Cp study results as below Average of 25pcs measurement results (X)  223.358 Sigma (δ): 0.016 Cp  12.866 Cpk  12.179 T2 / T3 sample submission, Base Cp should within below range. X+3δ  223.406 X-3δ  223.310
  • 20. 20 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) The following information need to be included in the plating / coating declaration: i. Type of plating/ coating ii. Thickness or size of plating/ coating iii. Color iv. Applicable reliability test report (Eg. peeling test, cross cut test,..etc.) v. Others necessary critical parameters.
  • 21. 21 © 2019 Toshiba Tec Corporation FPA Document Requirement and Submission (cont.) Unit Specification Machine No. Capacity (KVA) Sqeeze Time (ms) Weld Time (ms) Current (A) Cool Time (ms) Holding Time (ms) Air Pressure (Bar)
  • 22. 22 © 2019 Toshiba Tec Corporation FPA Sample Re-submission The approval or rejection of FPA is determined based on the results of the TSE/TIE FPA inspection. In the event that a submission cannot be approved, the Supplier will be informed of the concern(s) found and required to provide re-submission. Re-submission has to be completed within 2 weeks or earlier from the date of receiving official request from TSE. Suppliers shall inform TSE on the re-submission date within 3 working days and must contact TSE requestor to re-schedule a submission date with valid reason if the initial target date cannot be achieved.
  • 23. 23 © 2019 Toshiba Tec Corporation 2.0 Sheet A FPA Sample Re-submission (cont.) 1.0 Cover Page Item detail
  • 24. 24 © 2019 Toshiba Tec Corporation 3.0 Sheet B 4.0 Sheet C FPA Sample Re-submission (cont.) Dimensional measurement result. (includes geometrical dimensions) Drawing notes inspection result. Disposition for the inspection results
  • 25. 25 © 2019 Toshiba Tec Corporation FPA for Supplier Internal Transfer (Sister Company Transfer) It is mandatory for Suppliers to perform internal FPA for the business transfer to sister companies. For example, Company A and B under same parent company. Business transfer from Company A to company B. Company B is required to submit FPA to Company A for approval. Company B shall only submit FPA to TSE once internal FPA approved by Company A. Ex-Suppliers (company A) are required to ensure no interruption to the part delivery schedule during the transfer period and responsible to advise on the technical concern(s) found during the trial after transfer. A B
  • 26. 26 © 2019 Toshiba Tec Corporation Attachment Appendices FPA Requirement FPA Related Doc
  • 27. 27 © 2019 Toshiba Tec Corporation Thank you