Island Team
Final Presentation
Team Members                                                         ARCH     SE         CM     MEP   LCFM
                                                 Seale Wong
                                                                        Ariel Bautista
                        Carl Fosholt
                        C l F h lt
                                                                                     Frank Musiol




                     Catherine
                    Boubekeur
                                                                               Rebecca Diaz

                              Derek Ouyang                           Katelin Crook
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                            1
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook         2
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook         3
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook         4
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook         5
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Puzzle



Site Conditions and Location




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook         6
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Site Views




               2.




               1.
               1
                                                        1.




    2.
Rebecca Diaz        Seale Wong     Frank Musiol     Katelin Crook         7
Derek Ouyang        Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Site Information



 Prevailing Winds: 
               NE Trade Winds
               NE Trade Winds
 Basic Design Wind Speed: 
               145 mph
 Seismic:
 Site Classification D
 Average Temp: 
               Max ‐ 89° F
               Min ‐ 71° F
 Average Sunlight: 
 Average Sunlight:
               8 hours/day
               1,466 BTU/ft2/day
     i i i       0 0”       ll
 Precipitation: 50‐70” annually

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook         8
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Winter Quarter Concepts




Hurricane Concept                                                     Puzzle Concept



 Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                          9
 Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Puzzle

                                                                     ARCH   SE   CM   MEP   LCFM

  Winter Design
             g
  Puzzle concept – integration of disciplines




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 10
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Decision Matrix

                                                                     ARCH   SE   CM   MEP   LCFM

  Reassessment


   Reevaluate
   Steel      Concrete




                                                                            4.   3.    2.    1.
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 11
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Shape and Integration

                                                                     ARCH




                                                         Grid & Modules




                                                   Cantilever & Open Spaces




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                  12
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Puzzle

                                                                     ARCH




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                13
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Site Plan

                                                                     ARCH



                              University Avenue




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                14
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Basement

                                                                     ARCH

                                                                            Core

                                                                            Auditorium

                                                                            Large 
                                                                            Large
                                                                            Classrooms

        100‘                                                                Café

                                                                            Server Room 

                                                                            Tech Support
                                                                                   pp



                                                     100‘
                                                     100

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                               15
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
First Floor

                                                                     ARCH

                                                                                     Core

                                                                                    Small 
                                                                              Classrooms

                                                                             Instructional 
                                                                                      Labs
           100’
                                                                            Double Height
                                                                            D bl H i h

                                                                            Seminar Room 

                                                                                Entrance 
                                                                                  Atrium
                                                 100’


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                            16
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Second Floor

                                                                     ARCH

                                                                                      Core

                                                                            Faculty Offices

                                                                            Administration

                                                                            Faculty Lounge
   100’
                                                                            Student Offices
                                                                            S d     Offi

                                                                                  Terraces 


                                                            100’



Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                             17
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Roof

                                                                     ARCH

                                                                                     Core

                                                                                PV Panels

                                                                            Elevator Shaft
                                                                            Elevator Shaft




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                            18
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
North-South Section

                                                                       ARCH
  ‐30’                        0’   10’                      40’                       70’                 93’  100’                      
 130’

                                                                                                                                                 30’

                                                                                                                                                 18’

                                                                                                                                                 6’

                                                                                                                                                 ‐6’

         S                                                                                                                  N



Rebecca Diaz   Seale Wong       Frank Musiol     Katelin Crook                                                                              19
Derek Ouyang   Carl Fosholt     Ariel Bautista   Catherine Boubekeur
Island Team

                                                                     ARCH   SE                 MEP

                                                                            Corridor Section




                Typical Concrete 
                Typical Concrete
                Texture Section                                                                 Typical Vertical 
                                                                                                Shades Texture




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                               20
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Floor Sandwich

                                                                       ARCH         SE         MEP

1. 
                                                                                           1. Solar Panels
                                                                                           1 S l P l
                                 2.                                    3. 
                                                                                     6.    2. Concrete Texture

                                                                              4.           3. Vertical Shades
                                                                              5. 
                                                                                           4. Operable Windows

                                                                                           5. Fixed Windows

                                                                                           6. Dropped Ceiling
                                                                                           6 Dropped Ceiling




  Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                               21
  Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Detailed Section – Floor Sandwich

                                                                      ARCH   SE         MEP
                                       5. 

                                                                                  1. Horizontal Shades
                                                                                  1 H i t l Sh d
                                                                4. 

                                       6.                                         2. Operable Windows
                                                                2.     1. 
                                                                                  3. Fixed Windows

                                                                3.                4. Beams

                                                                                  5. Solar Panels

                                                                                  6. MEP Ducts 
                                                                                  6 MEP Ducts




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                         22
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Island Team

                                                                     ARCH    SE   CM   MEP   LCFM

                                                                            Why Change
                                                                               y      g
                                                                            from Steel to
                                                                            Concrete?




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                  23
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Change to Concrete

                                                                     ARCH




                 Integration with Site
          Common material on Campus




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                24
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Change to Concrete

                                                                     SE

Why concrete structure instead of steel?
  y



                                                                     System Availability




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                               25
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Change to Concrete

                                                                       CM

Why concrete structure instead of steel?
  y




                                                Cost and availability of raw materials.




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                          26
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Change to Concrete

                                                                     MEP

Why concrete structure instead of steel?
  y

               Thermal mass of concrete better for cooling




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook               27
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Change to Concrete

                                                                                     LCFM

Why concrete structure instead of steel?
  y


                                                                     Decreased 80%
                                                                          20%  80%




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                          28
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
29
30
31
32
Social Puzzle

                                                                     ARCH   SE   CM   MEP   LCFM




     How can we foster collaboration in 2015?




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 33
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Integration Spaces

                                                                     ARCH   SE   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 34
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Integration Spaces

                                                                     ARCH   SE   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 35
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Integration Spaces

                                                                     ARCH   SE   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 36
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE   CM   MEP   LCFM

 Cost Reductions
 Concrete Vs Steel
 - Concrete: $6.8 M
               $
 - Steel:      $ 7.2 M

 Excavation Reduction:
 - Winter Cost: $560,000
 - Final Cost: $374,444

 Glass:
 - Winter Area: 10,000 ft2
 - Final Area: 5 100 ft2
                5,100
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 37
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Cost Reductions

                                                                     SE   CM   LCFMl

  Concrete




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                    38
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Cost Reductions

                                                                     CM

  Excavation




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              39
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Cost Reductions

                                                                     ARCH   CM   MEP   LCFM

Before reduction
 Glass
 floor plans

   Before (Screen 4)
   And After (Screen
   5)
      Concrete

      Glass


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                            40
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Cost Reductions

                                                                     ARCH   CM   MEP   LCFM

After




      Concrete

      Glass


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                            41
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
PV Panel Story

                                                                     ARCH       SE    CM      MEP    LCFM

                                                                MEP
                                                   Energy consumption
                                                           +

                      ARCH                         +             CM         +         LCFM
  Improve aesthetics light
          aesthetics,                                   Improve LEED             Achieve energy savings




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                              42
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
PV Panels

                                                                     MEP   LCFM

    Energy Consumption
        gy




    eQUEST Energy Analysis
    Total Energy Consumption: 551,440 kWh/yr
              gy       p         ,        y

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                43
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
O&M Cost Containment

                                                                     LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook          44
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
PV Panels

                                                                     ARCH   CM   MEP   LCFM




                                                                                  N




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                            45
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
PV Panels

                                                                     ARCH   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                            46
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
PV Panels

                                                                     ARCH   CM   MEP   LCFM

Calculations
               Total Area = 3,000 ft2

               Total Cost = $394,000

               Quantity = 427 panels, 3.9 ft x 1.8 ft ea

               Total output = 179,667kWh/yr


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                            47
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
PV Panels

                                                                                  LCFM

  Trade Off Analysis




                                               Break‐Even            Break‐Even
                                                  8 years             16 years




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                       48
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Native

                                                                     ARCH    SE      CM       MEP    LCFM

                              Atrium Shading                                      PV Panels

                                                                                                Shades



Integration Space
Integration Space
                                                                                                N
Transformable Wall

                  Terraces                                                                    Green Roof
                                                                     Entrance Planter

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                             49
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Cultural

                                                                     ARCH   SE   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 50
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social

                                                                     ARCH   SE   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 51
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Nature

                                                                     ARCH   SE   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 52
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Energy

                                                                     ARCH   SE   CM   MEP   LCFM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 53
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Atrium

                                                                     ARCH   MEP




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      54
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Atrium

                                                                     ARCH   SE




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     55
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     SE

  Social Puzzle: The Structural Evolution




                                                                          N

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                  56
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                             SE

  Design Loads on Structure
      g
                          Roof                    70        psf
                         Green
                Dead      Roof
                                                 120        psf
                          Floor                  120        psf
                          Roof                    20        psf      Basic Wind Speed    145 mph
                         Green                                       Base Shear          450 kip
                Live      Roof
                                                  20        psf
                                                                     Site Class
                                                                     Site Class            D 
                          Floor                   60        psf
                                                                     Ss=                  0.852
                       First Story                50        kip
                                                                     S1=                  0.279
               Seismic Second                    150        kip
                          Story
                          Roof                   300        kip
                       First Story                25        kip
                        Second
                Wind                              75        kip
                          Story
                          R f
                          Roof                    30        ki
                                                            kip


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                       57
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE

Foundation 3D




                                                                                 N

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                         58
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     SE

Foundation Plan
Spread Footings:
10' x 10' x 2'
     8’ x 8’ x 2’

Combined Footings:
8’ Wide
8’ id
    10’ Wide

Slab on Grade
   6”

Prefabricated Retaining Walls

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              59
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Load Path

                                                                     SE

  Force Flow: Gravity
                    y




               W                                                          E
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                  60
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE

  First Floor 3D




                                                                                 N

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                         61
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     SE

  First Floor
  Post-Tensioned Beams:
  24” x 36”
      20” x 30”
      12” x 18”
      12” x 24”

  Columns:
  16” x 16”
      14 x 14”
      14” x 14

  9” Post Tensioned Slabs


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              62
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                        SE

  First Floor




                                                                                             N

  Adapt Post-Tension Model
        Post Tension                                                 Max Deflection: 1.13”
                                                                                     1.13

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                     63
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE

  Second Floor 3D




                                                                                 N

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                         64
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     SE

  Second Floor

  Post-Tensioned Beams:
  16” x 30”
      12” x 18”

  Columns:
  C l
  16” x 16”
      14” x 14” 

  9” Post Tensioned Slabs



Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              65
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                        SE

  Second Floor




                                                                                             N

  ADAPT Post-Tension Model
        Post Tension                                                 Max Deflection: 1.21”
                                                                                     1.21

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                     66
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE

  Roof 3D




                                                                                 N
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                         67
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     SE

  Roof
  Post-Tensioned Beams:
  16” x 30”
      12” x 18”

  Columns:
  16” x 16”
   6” 6”
      14” x 14” 

  9
  9” Post Tensioned Slabs




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              68
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                       SE
   Roof




   Adapt Post-Tension Model                                          Max Deflection: 1.37”
                                                                                             N

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 69
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE

  Lateral System: Shear Walls 3D




                                                                                 N

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                         70
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE

  Lateral System
           y
  12” Shear Wall




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     71
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE

  Force Flow: Lateral




                 W                                                               E
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                         72
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                           SE

Analysis for Lateral Loading: ETABS
    y                      g




Dominate Period: 0.29                           sec                  Max Elastic:   0.4” IDR: 1.0%
                                                                                    0.4

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                         73
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                      SE

  Structural Analysis Summary
                 y          y

                      ADAPT                    Vertical Deflection Max Allowable Loading
                         Roof                            1.37 in      1.5 in      D+LL

                    2nd Floor                            1.21 in      1.25 in     D+LL

                     1st Floor                           1.13 in      1.25 in     D+LL

                      ETABS                    Code Amplified IDR Max Allowable
                        Total                               1%          2% 




Rebecca Diaz   Seale Wong     Frank Musiol      Katelin Crook                              74
Derek Ouyang   Carl Fosholt   Ariel Bautista    Catherine Boubekeur
Social Puzzle

                                                                       MEP

  Heat




                                                                     Team Decision:
                                                                     No Heating
                                                                     System
  Average Temperature Range: 76 83F
                             76-83F

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     75
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                  MEP

  Humidity
         y

                                                                     Indoor Air Quality Goal
                                                                                      y
                                                                     Temperature: 77F
                                                                     Relative Humidity: 60%




Average Relative Humidity Range: 60-90%
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                             76
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   MEP

  Green Roof and Cool Roof


                        Green Roof
                                                                              24’
                        Cool Roof
                                                                                    60’




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                          77
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   MEP

  Green Roof and Cool Roof




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      78
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   MEP

  Façade Horizontal Shading
    ç                     g




                                                    North Façade


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      79
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH      MEP

  Façade Vertical Shading
    ç                   g




                                                                 East Façade


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                         80
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                       CM   MEP


      Exposed concrete façade




                                                                     Façade Attachment


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                        81
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                             CM    MEP


                                                                     Stainless Steel Ducts
                                                                     To Prevent Rust




 Double pane, Low-e coating
 glass with metal frame
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 82
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     MEP

  HVAC System
        y




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook               83
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                            MEP

  Chilled Water                                                        Chillers




                                                                     Site

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      84
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH         MEP

  Air Handling Units
             g




                                                                            Basement Floor
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 85
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                             MEP

  Ventilation Requirements
                q
  (CA Title 24)


                                                                     >L
                                                                      Larger of 2
                                                                              f

    + 30% (LEED) =



Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                        86
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                            MEP

  Air Conditioning Requirements
                 g   q
  (ASHRAE)




  Internal Heat                                                External Heat
  •Lighting
   Lighting                                                    •Solar radiation (windows)
  •Plugs                                                       •Conduction (windows)
  •Occupants                                                   •Conduction (façade)


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                      87
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     MEP

  Ductwork




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook               88
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   MEP

  Ventilation




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      89
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   MEP

  Basement



                                                                                  N




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                          90
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   MEP

  1st Floor


               Supply

               Return




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                       Stanford University
                                                                                              91
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur           Computer Integrated A/E/C
Social Puzzle

                                                                     ARCH   MEP

  2nd Floor




                                                   N



Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      92
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Island Team
Final Presentation
MEP                                                                  ARCH   MEP

  South Elevation




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      93
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Island Team
Final Presentation
MEP                                                                  MEP

                          Energy Star Rating
                              gy           g
                          Total Energy Consumption: 551,440 kWh/yr




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook               94
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                            CM

                                                                     Site




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     95
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     CM

                              Existing Site Conditions
                                     g




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              96
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   CM

                         Trees to Protect/Relocate




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     97
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     CM
                                         Construction Site




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              98
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     CM

                                                     Site Layout




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              99
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     CM

                                   Pedestrian Protection




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              100
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                  CM
                                                Equipment Selection
                     Mobile Crane
                     Mobile Crane                                          Excavator
                                                                           E     t




         Lift Capacity: 18 tons                          Komatsu
         Reach: 160 ft.                                                                                                 
                                                         Max. Digging Depth: 21’‐9”

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                                 101
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                         CM
                                      Estimates Comparison

  $9,000,000
  $8,000,000                                                                              Square Foot Estimate
  $7,000,000
  $6,000,000                                                                              Reference Building 
  $5,000,000                                                                              Estimate
  $4,000,000
  $4 000 000                                                                              Manual Base Estimate
                                                                                          Manual Base Estimate
  $3,000,000
  $2,000,000                                                                              Model Base Estimate
  $1,000,000
           $0
                   Square Foot            Reference         Manual Base    Model Base 
                    Estimate               Building          Estimate       Estimate
                                           Estimate


Rebecca Diaz    Seale Wong     Frank Musiol     Katelin Crook                                              102
Derek Ouyang    Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                               CM
                                                  Manual Estimate
System                          Cost/ SF
                                Cost/ SF            Total Cost
                                                    Total Cost
Substructure                         $15.00           $569,920.00
Superstructure                       $34.00         $1,328,595.00
Exterior Enclosure                   $20.00           $791,168.00
Interiors                            $16.00           $620,810.00
Mechanical                           $41.00
                                     $41 00         $1,628,057.00
                                                    $1 628 057 00
Electrical                           $17.00           $650,679.00
Plumbing                               $3.00          $115,196.00
Site Work                            $23.00           $909,532.00
Equipment & Furnishing               $10.00           $394,872.00
Special Construction & Demolitio
Special Construction & Demolitio       $0.18            $7,253.20
Subtotal                            $179.00         $7,016,080.00
Contractor Fees (10%)                $18.00           $701,608.00
Architectural Fees (7%)              $12.00           $491,126.00
Contigencies (5%)                      $9.00          $350,804.00
Total Building Cost
Total Building Cost                 $218.00         $8,559,617.00

   Construction Cost = $7.01 M                                       Annual Inflation Rate of 2%
                                                                     over 4 Years
   Cost per SQ. FT = $218.71                                         2015 Cost (W/O&P) = $9.3 MM
                                                                               (       )


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                       103
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                          ARCH                CM
                                                   Model Base Estimate
 System
  y                                  Cost/ SF
                                            /               Total Cost
 Substructure                         $           
                                                 34.00      $          1,345,000.00
 Superstructure                       $           
                                                 30.00      $          1,191,000.00
 Exterior Enclosure                   $           
                                                 10.00      $              
                                                                          398,110.00
 Interiors                            $           
                                                 17.00      $              
                                                                          649,770.00
 Mechanical                           $           
                                                 54.00      $          2,125,000.00
 Electrical                           $           
                                                 16.00      $              
                                                                          646,000.00
 Plumbing                             $             3.00    $              
                                                                          121,000.00
 Site Work                            $           
                                                 14.00      $              
                                                                          568,000.00
 Equipment & Furnishing               $           
                                                 11.00      $              
                                                                          426,000.00
 Special Construction & Demolition    $             0.20    $                  7,850.00
 Subtotal                             $        191.00       $          7,477,730.00
 Contractor Fees (10%)                $           
                                                 19.00      $              
                                                                          747,773.00
 Architectural Fees (7%)              $           
                                                 13.00      $              
                                                                          523,441.10
 Contigencies (5%)                    $           
                                                 10.00      $              
                                                                          373,886.50
 Total Building Cost                  $        232.00       $          9,122,830.60


   Construction Cost = $ 7.48 M                                                                  Annual Inflation Rate of 2% over 4 
                                                                                                 Years
   Cost per SQ. FT = $ 232
   Cost per SQ. FT  $ 232                                                                        2015 Cost (W/O&P) = $ 9.8MM
                                                                                                           (        )


Rebecca Diaz    Seale Wong     Frank Musiol                Katelin Crook                                                           104
Derek Ouyang    Carl Fosholt   Ariel Bautista              Catherine Boubekeur
Social Puzzle

                                                                        CM
                                               Actual Cost vs. Budget




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                 105
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                       CM

                                                         Target Cost

               System                   Actual Cost    Budget Cost
               Substructure                $570,000.00 $573,750.00
                                           $570 000 00 $573 750 00
               Superstructure            $1,329,000.00 $1,350,000.00
               Exterior Enclosure          $791,500.00 $825,000.00
               Interiors                   $620,800.00 $
                                           $             $675,000.00
               Mechanical                $1,630,000.00 $1,714,500.00
               Electrical                  $ ,
                                           $650,680.00 $900,000.00
                                                         $ ,
               Plumbing                    $115,196.00 $825,000.00
               Site Work                   $909,532.00 $956,300.00
               Equipment & Furnishment
               E i        t&F     i h t    $395,000.00 $416,300.00
                                           $395 000 00 $416 300 00
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                106
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   CM

                 Exterior Enclosure Challenge
                                           g

                      Preliminary Total Glass Area (Sq. Ft)) Cost
                         li i         l l          (
      Glass                          10555                  $ ,
                                                            $854,000.00
      Glass Reduction                 2445                  $293,000.00
  • Reduction in Cost allowed for the implementation of
    PV Panels and 2 AHU.

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     107
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH    SE      CM      MEP

  BIM Modeling
             g                                                              Modeling:
                                                                                   g
                                                                               - Quantities from model

                                                                            Estimating:
                                                                               - A i C t and P d ti
                                                                                 Assign Cost d Production
                                                                                   Rates to activities
                                                                                      g
                                                                            Scheduling:
                                                                              - Obtain Durations With
                                                                                   Production Rates

                                                                            4D Simulation:
                                                                              - Link Elements and
                                                                                    Sequencing Activities


Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                             108
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE    CM   MEP

                Basement                                                         First Floor




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                   109
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                      ARCH   SE   CM   MEP

               Second Floor                                                        Roof




Rebecca Diaz    Seale Wong     Frank Musiol     Katelin Crook                                110
Derek Ouyang    Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Schedule

                                                                     CM

                                                       Flow Line




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              111
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Schedule

                                                                               CM

                                                     Resources


                                                             Schedule JPEG 2




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                        112
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   CM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     113
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   CM




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                     114
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     SE

  Connection Details




  Beam/Column Connection
  Beam/Column Connection
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              115
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Connections

                                                                      SE




                              Typical Beam/Slab Connection
Rebecca Diaz   Seale Wong      Frank Musiol     Katelin Crook              116
Derek Ouyang   Carl Fosholt    Ariel Bautista   Catherine Boubekeur
Connections

                                                                     SE

                                               4D Simulation




                                               Anchorage of Tendons
Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook              117
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                                                LCFM
                                                                                      • Roof Covering
                                                                                      • Electrical Equipment
  Replacement Intervals
    p                                                                                 • Monitoring System
                                                                                                    g y
                                                                                      • Fire Installations
                                                                                      • Doors              • Ceilings
                                                                                                          • Doors (outside)
                                                                • Interior fittings
                                                                                 g
                                                                • Fixtures




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                                       118
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                                           LCFM

  Idea
                            From certain Costs                                          Uncertain costs




                                                                                         20%     80%
                       od




                                                                                   od
               Likelihoo




                                       10$                            $    Likelihoo       10 ‐ 15$  80%   $
                                       100%                                                 8 ‐10$  20%


Rebecca Diaz         Seale Wong     Frank Musiol     Katelin Crook                                          119
Derek Ouyang         Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                LCFM
          Calculate Risks with @risk


     Building Phase:                                                 Operation Phase
                                                                        (yearly):
        $180,000 
        $180 000
 (    50 % depends on                                                      $20,497 
      Concrete Price)                                                80%




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      120
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                                 LCFM

  Project Cash Flow of Operation Phase




                                                                                     20%   80%
               BuildingCosts




Rebecca Diaz                   Seale Wong     Frank Musiol     Katelin Crook                      121
Derek Ouyang                   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                          LCFM

  Accumulated Property Cashflow


                                                                 Break Even
                                                                   ea    e


                                                                              20%   80%




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                               122
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                                       LCFM
DSCR(>1,15) for Annuity Loan                                                    Return on equity:
                                                                             Annuity  L.
                                                                             A   it L          :  10.8%
                                                                                                  10 8%

        1,15                                                                 Installment L. :  8.7%

                                                                             Final Mat.        :   ‐
                                                                             Fi l M t


                                                                       20%      80%
LLCR(>1,25) for Annuity Loan
    ( , )             y



          1,25




Rebecca Diaz     Seale Wong     Frank Musiol     Katelin Crook                                          123
Derek Ouyang     Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                                 LCFM

  Sensitivity Analysis
            y     y


                                                                     20%   80%




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                      124
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                        ARCH        SE      CM        MEP        LCFM

  LEED: Sustainability Review
                     y
                                 Maximum
                                          Actual
          Category               Possible
                                          Points
                                  points
Sutainable Sites                      26          17
Water Efficiency                      10          5
Energy and Atmosphere                 35          21
Materials and Resources               14          9
Indoor Environmental Quality          15          13
Innovation in design                   6          4
Regional Priority                      4          3
Total LEED points                     110         72
    PV Panels                            Construction Waste Management Plan                      Regional Materials
               Passive Design Strategies                                            Energy Performance

   Reduction of CO2 Emissions
   Reduction of CO2 Emissions                                          Green Roof
                                                                       Green Roof          Water Efficient Fixtures
                                                                                           Water Efficient Fixtures

Rebecca Diaz     Seale Wong     Frank Musiol     Katelin Crook                                                        125
Derek Ouyang     Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH    SE   CM   MEP   LCFM

Integration


                                                                     SE     ARCH MEP
       SE         ARCH


                                                                                               SE


                                                LCFM MEP                    CM

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                  126
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE   CM   MEP   LCFM

  Teleplace
      p




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 127
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Social Puzzle

                                                                     ARCH   SE    CM      MEP           LCFM

  Task List




                                                                             Successfully completed
                                                                             our Winter Quarter Goal



Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                      Stanford128
                                                                                                            University
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur                          Computer Integrated A/E/C
Social Puzzle

                                                                     ARCH    SE     CM      MEP     LCFM

  Google Wave
     g                                                                 Total number of messages:   3200




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                         129
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Skype & Webinar

                                                                     ARCH   SE   CM   MEP      LCFM

  Skype & GoToMeeting
    yp              g

                                                                                  Interdisciplinary
                                                                                  Co-located
                                                                                  Mentor meetings




Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                    130
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
As a design team            Having excellent 
   we provide a 
       p                 communication meant 
service as well as a    that our productivity rate 
product. The team        was the same when we 
  collaboration is      were in many locations as 
 just as important 
 j t i         t t        it was when we were 
                          it      h
as the final design.            together.




                                                131
Social Puzzle

                                                                     ARCH   SE   CM   MEP   LCFM

                                          Lessons Learned
  Ariel: Organization determines the flow of the process.
  Derek: Before anything: honesty, humility, and humor.
  Seale: Don’t assume that basic interdisciplinary knowledge is properly 
  communicated. 
  Rebecca: Communicating our process rather than our final decisions is
  the key to a good design. 
                                                              Communicating our 
  Katelin: Having excellent communication meant that our productivity rate was 
      Before anything: 
                                                              process rather than 
  the same when we were in many locations as it was when we were together
          honesty, 
                                                             our final decisions is
                                                             our final decisions is
  Frank: Different time zones can be difficult for productivity, but we overcame!
  Frank: Different time zones can be difficult for productivity but we overcame!
        humility, and 
                                                               the key to a good 
  Carl: As a design team we provide a service as well as a product. The team 
           humor.
  collaboration is just as important as the final design.            design.
  Catherine: Don t leave work until the last minute!
  Catherine: Don’t leave work until the last minute!

Rebecca Diaz   Seale Wong     Frank Musiol     Katelin Crook                                 132
Derek Ouyang   Carl Fosholt   Ariel Bautista   Catherine Boubekeur
Organization 
Organization
determines 
                  Don’t leave 
 the flow of 
the process.
the process     work until the 
                 last minute!


                              133
Don’t assume that 
       basic 
       b i            Different time zones can 
                      Diff    t ti
 interdisciplinary         be difficult for 
   knowledge is         productivity, but we 
     p p y
     properly                overcame!
 communicated.




                                             134
Social Puzzle

                                                                       ARCH        SE       CM       MEP       LCFM

                                                      Thank You!
                                                                       Matthias Ehrlich
                                            Humberto Cavallín
         David Bendet
                                                                                          Björn Wündsch
                                                                 Renate Fruchter
                                Erik Kneer
                                                                                             Hossein Nasseri
               Greg Luth
               G L h                                  Florian Aalami
                                                                                   Dustin Rothwell
                                                       Dennis Kwan
               John Nelson
                                            Eric Borchers                      Glenn Katz




Rebecca Diaz     Seale Wong     Frank Musiol     Katelin Crook                                                  135
Derek Ouyang     Carl Fosholt   Ariel Bautista   Catherine Boubekeur
136
137
138
Pictures of US at teleplace or
                      p
         whatever ☺




                                 139
140
141

More Related Content

Featured

AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 

Featured (20)

AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 

Island Team 2011 Final Presentation

  • 1. Island Team Final Presentation Team Members ARCH SE CM MEP LCFM Seale Wong Ariel Bautista Carl Fosholt C l F h lt Frank Musiol Catherine Boubekeur Rebecca Diaz Derek Ouyang Katelin Crook Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 1 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 2. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 2 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 3. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 3 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 4. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 4 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 5. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 5 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 6. Puzzle Site Conditions and Location Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 6 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 7. Site Views 2. 1. 1 1. 2. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 7 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 8. Site Information Prevailing Winds:  NE Trade Winds NE Trade Winds Basic Design Wind Speed:  145 mph Seismic: Site Classification D Average Temp:  Max ‐ 89° F Min ‐ 71° F Average Sunlight:  Average Sunlight: 8 hours/day 1,466 BTU/ft2/day i i i 0 0” ll Precipitation: 50‐70” annually Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 8 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 9. Winter Quarter Concepts Hurricane Concept Puzzle Concept Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 9 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 10. Puzzle ARCH SE CM MEP LCFM Winter Design g Puzzle concept – integration of disciplines Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 10 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 11. Decision Matrix ARCH SE CM MEP LCFM Reassessment Reevaluate Steel  Concrete 4. 3. 2. 1. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 11 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 12. Shape and Integration ARCH Grid & Modules Cantilever & Open Spaces Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 12 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 13. Puzzle ARCH Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 13 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 14. Site Plan ARCH University Avenue Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 14 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 15. Basement ARCH Core Auditorium Large  Large Classrooms 100‘ Café Server Room  Tech Support pp 100‘ 100 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 15 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 16. First Floor ARCH Core Small  Classrooms Instructional  Labs 100’ Double Height D bl H i h Seminar Room  Entrance  Atrium 100’ Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 16 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 17. Second Floor ARCH Core Faculty Offices Administration Faculty Lounge 100’ Student Offices S d Offi Terraces  100’ Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 17 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 18. Roof ARCH Core PV Panels Elevator Shaft Elevator Shaft Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 18 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 19. North-South Section ARCH ‐30’   0’   10’      40’                       70’                 93’  100’                       130’ 30’ 18’ 6’ ‐6’ S N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 19 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 20. Island Team ARCH SE MEP Corridor Section Typical Concrete  Typical Concrete Texture Section Typical Vertical  Shades Texture Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 20 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 21. Floor Sandwich ARCH SE MEP 1.  1. Solar Panels 1 S l P l 2.  3.  6.  2. Concrete Texture 4.  3. Vertical Shades 5.  4. Operable Windows 5. Fixed Windows 6. Dropped Ceiling 6 Dropped Ceiling Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 21 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 22. Detailed Section – Floor Sandwich ARCH SE MEP 5.  1. Horizontal Shades 1 H i t l Sh d 4.  6.  2. Operable Windows 2.  1.  3. Fixed Windows 3.  4. Beams 5. Solar Panels 6. MEP Ducts  6 MEP Ducts Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 22 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 23. Island Team ARCH SE CM MEP LCFM Why Change y g from Steel to Concrete? Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 23 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 24. Change to Concrete ARCH Integration with Site Common material on Campus Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 24 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 25. Change to Concrete SE Why concrete structure instead of steel? y System Availability Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 25 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 26. Change to Concrete CM Why concrete structure instead of steel? y Cost and availability of raw materials. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 26 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 27. Change to Concrete MEP Why concrete structure instead of steel? y Thermal mass of concrete better for cooling Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 27 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 28. Change to Concrete LCFM Why concrete structure instead of steel? y Decreased 80% 20% 80% Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 28 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 29. 29
  • 30. 30
  • 31. 31
  • 32. 32
  • 33. Social Puzzle ARCH SE CM MEP LCFM How can we foster collaboration in 2015? Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 33 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 34. Integration Spaces ARCH SE CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 34 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 35. Integration Spaces ARCH SE CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 35 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 36. Integration Spaces ARCH SE CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 36 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 37. Social Puzzle ARCH SE CM MEP LCFM Cost Reductions Concrete Vs Steel - Concrete: $6.8 M $ - Steel: $ 7.2 M Excavation Reduction: - Winter Cost: $560,000 - Final Cost: $374,444 Glass: - Winter Area: 10,000 ft2 - Final Area: 5 100 ft2 5,100 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 37 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 38. Cost Reductions SE CM LCFMl Concrete Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 38 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 39. Cost Reductions CM Excavation Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 39 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 40. Cost Reductions ARCH CM MEP LCFM Before reduction Glass floor plans Before (Screen 4) And After (Screen 5) Concrete Glass Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 40 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 41. Cost Reductions ARCH CM MEP LCFM After Concrete Glass Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 41 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 42. PV Panel Story ARCH SE CM MEP LCFM MEP Energy consumption + ARCH + CM + LCFM Improve aesthetics light aesthetics, Improve LEED Achieve energy savings Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 42 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 43. PV Panels MEP LCFM Energy Consumption gy eQUEST Energy Analysis Total Energy Consumption: 551,440 kWh/yr gy p , y Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 43 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 44. O&M Cost Containment LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 44 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 45. PV Panels ARCH CM MEP LCFM N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 45 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 46. PV Panels ARCH CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 46 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 47. PV Panels ARCH CM MEP LCFM Calculations Total Area = 3,000 ft2 Total Cost = $394,000 Quantity = 427 panels, 3.9 ft x 1.8 ft ea Total output = 179,667kWh/yr Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 47 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 48. PV Panels LCFM Trade Off Analysis Break‐Even Break‐Even 8 years 16 years Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 48 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 49. Native ARCH SE CM MEP LCFM Atrium Shading PV Panels Shades Integration Space Integration Space N Transformable Wall Terraces Green Roof Entrance Planter Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 49 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 50. Cultural ARCH SE CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 50 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 51. Social ARCH SE CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 51 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 52. Nature ARCH SE CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 52 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 53. Energy ARCH SE CM MEP LCFM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 53 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 54. Atrium ARCH MEP Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 54 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 55. Atrium ARCH SE Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 55 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 56. Social Puzzle SE Social Puzzle: The Structural Evolution N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 56 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 57. Social Puzzle SE Design Loads on Structure g Roof 70 psf Green Dead Roof 120 psf Floor 120 psf Roof 20 psf Basic Wind Speed  145 mph Green Base Shear  450 kip Live Roof 20 psf Site Class Site Class  D  Floor 60 psf Ss=  0.852 First Story 50 kip S1=  0.279 Seismic Second 150 kip Story Roof 300 kip First Story 25 kip Second Wind 75 kip Story R f Roof 30 ki kip Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 57 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 58. Social Puzzle ARCH SE Foundation 3D N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 58 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 59. Social Puzzle SE Foundation Plan Spread Footings: 10' x 10' x 2' 8’ x 8’ x 2’ Combined Footings: 8’ Wide 8’ id 10’ Wide Slab on Grade 6” Prefabricated Retaining Walls Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 59 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 60. Load Path SE Force Flow: Gravity y W E Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 60 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 61. Social Puzzle ARCH SE First Floor 3D N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 61 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 62. Social Puzzle SE First Floor Post-Tensioned Beams: 24” x 36” 20” x 30” 12” x 18” 12” x 24” Columns: 16” x 16” 14 x 14” 14” x 14 9” Post Tensioned Slabs Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 62 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 63. Social Puzzle SE First Floor N Adapt Post-Tension Model Post Tension Max Deflection: 1.13” 1.13 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 63 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 64. Social Puzzle ARCH SE Second Floor 3D N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 64 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 65. Social Puzzle SE Second Floor Post-Tensioned Beams: 16” x 30” 12” x 18” Columns: C l 16” x 16” 14” x 14”  9” Post Tensioned Slabs Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 65 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 66. Social Puzzle SE Second Floor N ADAPT Post-Tension Model Post Tension Max Deflection: 1.21” 1.21 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 66 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 67. Social Puzzle ARCH SE Roof 3D N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 67 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 68. Social Puzzle SE Roof Post-Tensioned Beams: 16” x 30” 12” x 18” Columns: 16” x 16” 6” 6” 14” x 14”  9 9” Post Tensioned Slabs Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 68 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 69. Social Puzzle SE Roof Adapt Post-Tension Model Max Deflection: 1.37” N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 69 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 70. Social Puzzle ARCH SE Lateral System: Shear Walls 3D N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 70 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 71. Social Puzzle ARCH SE Lateral System y 12” Shear Wall Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 71 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 72. Social Puzzle ARCH SE Force Flow: Lateral W E Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 72 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 73. Social Puzzle SE Analysis for Lateral Loading: ETABS y g Dominate Period: 0.29 sec Max Elastic: 0.4” IDR: 1.0% 0.4 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 73 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 74. Social Puzzle SE Structural Analysis Summary y y ADAPT Vertical Deflection Max Allowable Loading Roof 1.37 in 1.5 in  D+LL 2nd Floor 1.21 in  1.25 in  D+LL 1st Floor 1.13 in  1.25 in  D+LL ETABS Code Amplified IDR Max Allowable Total 1% 2%  Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 74 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 75. Social Puzzle MEP Heat Team Decision: No Heating System Average Temperature Range: 76 83F 76-83F Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 75 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 76. Social Puzzle MEP Humidity y Indoor Air Quality Goal y Temperature: 77F Relative Humidity: 60% Average Relative Humidity Range: 60-90% Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 76 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 77. Social Puzzle ARCH MEP Green Roof and Cool Roof Green Roof 24’ Cool Roof 60’ Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 77 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 78. Social Puzzle ARCH MEP Green Roof and Cool Roof Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 78 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 79. Social Puzzle ARCH MEP Façade Horizontal Shading ç g North Façade Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 79 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 80. Social Puzzle ARCH MEP Façade Vertical Shading ç g East Façade Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 80 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 81. Social Puzzle CM MEP Exposed concrete façade Façade Attachment Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 81 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 82. Social Puzzle CM MEP Stainless Steel Ducts To Prevent Rust Double pane, Low-e coating glass with metal frame Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 82 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 83. Social Puzzle MEP HVAC System y Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 83 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 84. Social Puzzle MEP Chilled Water Chillers Site Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 84 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 85. Social Puzzle ARCH MEP Air Handling Units g Basement Floor Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 85 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 86. Social Puzzle MEP Ventilation Requirements q (CA Title 24) >L Larger of 2 f + 30% (LEED) = Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 86 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 87. Social Puzzle MEP Air Conditioning Requirements g q (ASHRAE) Internal Heat External Heat •Lighting Lighting •Solar radiation (windows) •Plugs •Conduction (windows) •Occupants •Conduction (façade) Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 87 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 88. Social Puzzle MEP Ductwork Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 88 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 89. Social Puzzle ARCH MEP Ventilation Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 89 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 90. Social Puzzle ARCH MEP Basement N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 90 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 91. Social Puzzle ARCH MEP 1st Floor Supply Return Rebecca Diaz Seale Wong Frank Musiol Katelin Crook Stanford University 91 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur Computer Integrated A/E/C
  • 92. Social Puzzle ARCH MEP 2nd Floor N Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 92 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 93. Island Team Final Presentation MEP ARCH MEP South Elevation Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 93 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 94. Island Team Final Presentation MEP MEP Energy Star Rating gy g Total Energy Consumption: 551,440 kWh/yr Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 94 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 95. Social Puzzle CM Site Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 95 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 96. Social Puzzle CM Existing Site Conditions g Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 96 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 97. Social Puzzle ARCH CM Trees to Protect/Relocate Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 97 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 98. Social Puzzle CM Construction Site Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 98 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 99. Social Puzzle CM Site Layout Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 99 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 100. Social Puzzle CM Pedestrian Protection Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 100 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 101. Social Puzzle CM Equipment Selection Mobile Crane Mobile Crane Excavator E t Lift Capacity: 18 tons Komatsu Reach: 160 ft.                                                                                                  Max. Digging Depth: 21’‐9” Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 101 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 102. Social Puzzle CM Estimates Comparison $9,000,000 $8,000,000 Square Foot Estimate $7,000,000 $6,000,000 Reference Building  $5,000,000 Estimate $4,000,000 $4 000 000 Manual Base Estimate Manual Base Estimate $3,000,000 $2,000,000 Model Base Estimate $1,000,000 $0 Square Foot  Reference  Manual Base  Model Base  Estimate Building  Estimate Estimate Estimate Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 102 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 103. Social Puzzle CM Manual Estimate System Cost/ SF Cost/ SF Total Cost Total Cost Substructure $15.00 $569,920.00 Superstructure $34.00 $1,328,595.00 Exterior Enclosure $20.00 $791,168.00 Interiors $16.00 $620,810.00 Mechanical $41.00 $41 00 $1,628,057.00 $1 628 057 00 Electrical  $17.00 $650,679.00 Plumbing $3.00 $115,196.00 Site Work $23.00 $909,532.00 Equipment & Furnishing $10.00 $394,872.00 Special Construction & Demolitio Special Construction & Demolitio $0.18 $7,253.20 Subtotal $179.00 $7,016,080.00 Contractor Fees (10%) $18.00 $701,608.00 Architectural Fees (7%) $12.00 $491,126.00 Contigencies (5%) $9.00 $350,804.00 Total Building Cost Total Building Cost $218.00 $8,559,617.00 Construction Cost = $7.01 M Annual Inflation Rate of 2% over 4 Years Cost per SQ. FT = $218.71 2015 Cost (W/O&P) = $9.3 MM ( ) Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 103 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 104. Social Puzzle ARCH CM Model Base Estimate System y Cost/ SF / Total Cost Substructure $            34.00 $          1,345,000.00 Superstructure $            30.00 $          1,191,000.00 Exterior Enclosure $            10.00 $               398,110.00 Interiors $            17.00 $               649,770.00 Mechanical $            54.00 $          2,125,000.00 Electrical  $            16.00 $               646,000.00 Plumbing $             3.00 $               121,000.00 Site Work $            14.00 $               568,000.00 Equipment & Furnishing $            11.00 $               426,000.00 Special Construction & Demolition $             0.20 $                  7,850.00 Subtotal $        191.00 $          7,477,730.00 Contractor Fees (10%) $            19.00 $               747,773.00 Architectural Fees (7%) $            13.00 $               523,441.10 Contigencies (5%) $            10.00 $               373,886.50 Total Building Cost $        232.00 $          9,122,830.60 Construction Cost = $ 7.48 M Annual Inflation Rate of 2% over 4  Years Cost per SQ. FT = $ 232 Cost per SQ. FT  $ 232 2015 Cost (W/O&P) = $ 9.8MM ( ) Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 104 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 105. Social Puzzle CM Actual Cost vs. Budget Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 105 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 106. Social Puzzle CM Target Cost System Actual Cost Budget Cost Substructure $570,000.00 $573,750.00 $570 000 00 $573 750 00 Superstructure $1,329,000.00 $1,350,000.00 Exterior Enclosure $791,500.00 $825,000.00 Interiors $620,800.00 $ $ $675,000.00 Mechanical $1,630,000.00 $1,714,500.00 Electrical $ , $650,680.00 $900,000.00 $ , Plumbing $115,196.00 $825,000.00 Site Work $909,532.00 $956,300.00 Equipment & Furnishment E i t&F i h t $395,000.00 $416,300.00 $395 000 00 $416 300 00 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 106 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 107. Social Puzzle ARCH CM Exterior Enclosure Challenge g Preliminary Total Glass Area (Sq. Ft)) Cost li i l l ( Glass 10555 $ , $854,000.00 Glass Reduction 2445 $293,000.00 • Reduction in Cost allowed for the implementation of PV Panels and 2 AHU. Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 107 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 108. Social Puzzle ARCH SE CM MEP BIM Modeling g Modeling: g - Quantities from model Estimating: - A i C t and P d ti Assign Cost d Production Rates to activities g Scheduling: - Obtain Durations With Production Rates 4D Simulation: - Link Elements and Sequencing Activities Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 108 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 109. Social Puzzle ARCH SE CM MEP Basement First Floor Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 109 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 110. Social Puzzle ARCH SE CM MEP Second Floor Roof Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 110 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 111. Schedule CM Flow Line Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 111 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 112. Schedule CM Resources Schedule JPEG 2 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 112 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 113. Social Puzzle ARCH CM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 113 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 114. Social Puzzle ARCH CM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 114 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 115. Social Puzzle SE Connection Details Beam/Column Connection Beam/Column Connection Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 115 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 116. Connections SE Typical Beam/Slab Connection Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 116 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 117. Connections SE 4D Simulation Anchorage of Tendons Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 117 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 118. Social Puzzle LCFM • Roof Covering • Electrical Equipment Replacement Intervals p • Monitoring System g y • Fire Installations • Doors • Ceilings • Doors (outside) • Interior fittings g • Fixtures Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 118 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 119. Social Puzzle LCFM Idea From certain Costs  Uncertain costs 20% 80% od od Likelihoo 10$  $ Likelihoo 10 ‐ 15$  80% $ 100% 8 ‐10$  20% Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 119 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 120. Social Puzzle LCFM Calculate Risks with @risk Building Phase: Operation Phase (yearly): $180,000  $180 000 ( 50 % depends on $20,497  Concrete Price) 80% Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 120 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 121. Social Puzzle LCFM Project Cash Flow of Operation Phase 20% 80% BuildingCosts Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 121 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 122. Social Puzzle LCFM Accumulated Property Cashflow Break Even ea e 20% 80% Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 122 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 123. Social Puzzle LCFM DSCR(>1,15) for Annuity Loan Return on equity: Annuity  L. A it L :  10.8% 10 8% 1,15 Installment L. :  8.7% Final Mat.        :   ‐ Fi l M t 20% 80% LLCR(>1,25) for Annuity Loan ( , ) y 1,25 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 123 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 124. Social Puzzle LCFM Sensitivity Analysis y y 20% 80% Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 124 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 125. Social Puzzle ARCH SE CM MEP LCFM LEED: Sustainability Review y Maximum Actual Category Possible Points points Sutainable Sites 26 17 Water Efficiency 10 5 Energy and Atmosphere 35 21 Materials and Resources 14 9 Indoor Environmental Quality 15 13 Innovation in design 6 4 Regional Priority 4 3 Total LEED points 110 72 PV Panels Construction Waste Management Plan Regional Materials Passive Design Strategies Energy Performance Reduction of CO2 Emissions Reduction of CO2 Emissions Green Roof Green Roof Water Efficient Fixtures Water Efficient Fixtures Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 125 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 126. Social Puzzle ARCH SE CM MEP LCFM Integration SE ARCH MEP SE ARCH SE LCFM MEP CM Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 126 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 127. Social Puzzle ARCH SE CM MEP LCFM Teleplace p Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 127 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 128. Social Puzzle ARCH SE CM MEP LCFM Task List Successfully completed our Winter Quarter Goal Rebecca Diaz Seale Wong Frank Musiol Katelin Crook Stanford128 University Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur Computer Integrated A/E/C
  • 129. Social Puzzle ARCH SE CM MEP LCFM Google Wave g Total number of messages: 3200 Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 129 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 130. Skype & Webinar ARCH SE CM MEP LCFM Skype & GoToMeeting yp g Interdisciplinary Co-located Mentor meetings Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 130 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 131. As a design team  Having excellent  we provide a  p communication meant  service as well as a  that our productivity rate  product. The team  was the same when we  collaboration is  were in many locations as  just as important  j t i t t it was when we were  it h as the final design. together. 131
  • 132. Social Puzzle ARCH SE CM MEP LCFM Lessons Learned Ariel: Organization determines the flow of the process. Derek: Before anything: honesty, humility, and humor. Seale: Don’t assume that basic interdisciplinary knowledge is properly  communicated.  Rebecca: Communicating our process rather than our final decisions is the key to a good design.  Communicating our  Katelin: Having excellent communication meant that our productivity rate was  Before anything:  process rather than  the same when we were in many locations as it was when we were together honesty,  our final decisions is our final decisions is Frank: Different time zones can be difficult for productivity, but we overcame! Frank: Different time zones can be difficult for productivity but we overcame! humility, and  the key to a good  Carl: As a design team we provide a service as well as a product. The team  humor. collaboration is just as important as the final design. design. Catherine: Don t leave work until the last minute! Catherine: Don’t leave work until the last minute! Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 132 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 133. Organization  Organization determines  Don’t leave  the flow of  the process. the process work until the  last minute! 133
  • 134. Don’t assume that  basic  b i Different time zones can  Diff t ti interdisciplinary  be difficult for  knowledge is  productivity, but we  p p y properly  overcame! communicated. 134
  • 135. Social Puzzle ARCH SE CM MEP LCFM Thank You! Matthias Ehrlich Humberto Cavallín David Bendet Björn Wündsch Renate Fruchter Erik Kneer Hossein Nasseri Greg Luth G L h Florian Aalami Dustin Rothwell Dennis Kwan John Nelson Eric Borchers Glenn Katz Rebecca Diaz Seale Wong Frank Musiol Katelin Crook 135 Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur
  • 136. 136
  • 137. 137
  • 138. 138
  • 139. Pictures of US at teleplace or p whatever ☺ 139
  • 140. 140
  • 141. 141