SlideShare a Scribd company logo
1 of 2
Download to read offline
Printed on September 02, 2015
Ruben Tiburcio Sepulveda
Estribo # 77 Hipico, Boca del Rio, Ver. Email: Ruben.Tiburcio@nov.com Cell (521) 229133-6883
EDUCATION
Veracruz University, Mexico
 Mechanical Electrical Engineering (2007 – 2011)
Spoken Languages
 Spanish (Native), Fluent English & Proficient
Portuguese
SUMMARY OF SKILLS
 Gained ability to analyze & design engineering systems, processes or components to meet required needs.
 Analytical thinking leads to identify, elaborate and solve hidden engineering problems.
 Ability to communicate effectively with technical and non-technical personnel.
 Knowledge of mechanical, electrical design; hydraulic, pneumatic systems & engineering theory.
 Reliable English- Spanish translator.
Software Skills
 AutoCAD & Sketchup
 Rslogix 500 - PLC Programming (ladder diagram)
 Matlab engineering application
 Simulink; PLC Coder; State flow
 Microsoft Office Products
 Atlassian Confluence & JIRA
 Video Editor Camtasia Studio
BUSINESS ANALYST I
National Oilwell Varco
June 2013 – Present (2 years 3 months) | Houston, TX, Veracruz,VER & Belice, CA
Developed a solid set of technical and project management skills, such as:
 Great collaboration and team working skills
 Coordinate, implement and update multiple business systems through WellSite Services Division
 Organization and ability to carry out several projects at once (proficient multi-tasking).
 Analytical planning with focus on details.
 Quickly ID and resolve issues
 Ability to develop detailed documentation such as implementation plans, user manuals and stakeholders notification memos.
 Ability to get results, create, review and analyze workflows showing flexibility and being successful in a high speed- high change
environment
 Technical knowledge and self-education ability.
HIGHLIGHTED PROJECTS
“Geoforce Implementation” USA & Canada
Tracking and maintenance System (Geoforce) implementation for Portable Power on the US & Canada. Over 1400 added assets
successfully on 14 different locations and 8 states on the US in less than 6 months. Development and Execution of the Implementation
Plan
“RFID Implementation” USA
Radio Frequency Identification System implementation for SolidsControl assets, integrated with the ERP Microsoft Dynamics AX2009, for a
quick transfer and receiving management between facilities and locations. Development and Execution of the Implementation Plan and
Tutorial documents and user manuals.
“Belize Project – Dewatering & Waste Management” Belize, Temash-2 Well
Solids Control & Waste Management supervisor on Temash-2 well located on Toledo district in Belize. Operator Hupecol / US Capital. Lab
tests, quality control, personnel management, operations (solids control, dewatering, water treatment, solids stabilization), direct service to
customer, government representatives, and executive managers. Effective management of the operations in conditions of H2S presence
complying with all safety and environmental regulations stablished by the customer and government agencies in Belize. Integrated services
supervision including drilling fluids and Portable Power equipment. Full Project development, from NOV WellSite Services presentation to
stakeholders at the pre-spud meeting to well RECAP delivery.
Printed on September 02, 2015
“Solids Control Mexico Training” Mexico
Solids Control training update. Info review, agenda restructuring, subjects and duration (5 days). Format, design and presentation update,
plus inclusion and expansion of new subjects such as dewatering and water treatment. Currently active Project.
“Installation Optimization Project” Mexico
Solids Control Equipment installation standardization in Mexico to reduce and optimize installation times and usage of human resources
and equipment. Using 3D design tools in real life scale regulations and rules are being stablished to deliver an installation schedule suitable
for all operations in Mexico. Currently active Project.
NEXT GENERATION LEADERSHIP PROGRAM
National Oilwell Varco
Junio 2012 – Mayo 2013 (1 año) | Locaciones varias
Rotation 1: Jun 25 ‐ Sept 21, 2012
“Well Site Services – Operations” Mexico-Veracruz
Development and Implementation of (AIMS) Asset Information Management System (Data gathering, field research, complete
documentation including Maintenance Manuals, procedures, records & training); Constant translation from English to Spanish
Rotation 2: Sept 24 ‐ Jan. 11, 2013
“Monoflo – Artificial Lift” Mexico – Veracruz - Poza Rica
Design and Construction of Hydraulic Pump Control (HPC) Simulator; ALS Products Technical presentation & NOV Monofloproducts
training, Field Visits and Troubleshooting (Vibration in hydraulicsystems)
Rotation 3: Jan. 14, 2013 ‐ Apr. 12, 2013 (Present)
“Tuboscope – Coating Engineering” US – Texas – Houston - Holmes Rd
Enhance Mechanical Engineering Design and Project Management Skills by improving Powder Coating Application Equipment
(Vacuum & Lance) using computerized systems (PLC). Programing, testing, document records and results; Powder conveying
research applied.
Rotation 4: Apr. 15, 2013 ‐ June 28, 2013 (Next)
“Asset Management – Corporate Development” US – Texas - PWCII
AIMS Implantation & Training through Latin America Facilities- Preventive Maintenance, Tracking Costs, Quality Calibration Reminder
& Document Storage. Constant English-Spanish translations and vice-versa, both oral and written (including Users Manuals)
PREVIOUS EXPERIENCE
2011 - 2012 – “Techint Engineering & Construction” Veracruz, Ver.
Internships and Fellowship Program, Operations Area and Heavy Cleaning
 Anticipate manager needs and resolved conflicts between operators.
 Effectively managed five operators squad to meet production goals and minimize man hours
2011 – “PROMEP: Design and Construction of Solar Dryer” Boca del Río, Ver.
R&D project and Thesis, Technological Development Dept., FIUV (Faculty of Engineering University of Veracruz)
 Planned, organize and coordinate workflow with excellent results
 Accurate project costs estimates and schedules
 Efficient Solar Dryer – awarded by Technological Development Dept.
2010 – “83/ Infantry Battalion” Veracruz, Ver.
Social Service Transmissions Platoon (Analysis of electrical wiring and mechanical installations).
 Good results working under pressure
 Ability to learn though observation
 Manual dexterity developed.

More Related Content

Similar to CV_Rubén_Tiburcio_09_2015_Septiembre_ENG

BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016Brian Hannigan
 
KHudson Resume
KHudson ResumeKHudson Resume
KHudson ResumeKen Hudson
 
Boris Bracho current cv 2021
Boris Bracho current cv 2021Boris Bracho current cv 2021
Boris Bracho current cv 2021BorisBracho
 
Boris Bracho current cv 2021
Boris Bracho current cv 2021Boris Bracho current cv 2021
Boris Bracho current cv 2021DianaLPrez
 
Delbert Aud Resume Work History
Delbert Aud Resume Work HistoryDelbert Aud Resume Work History
Delbert Aud Resume Work HistoryDelbert Aud
 
Project manager (best) CV template
Project manager (best) CV templateProject manager (best) CV template
Project manager (best) CV templateMina Gergis
 
BrodtKerry_122016
BrodtKerry_122016BrodtKerry_122016
BrodtKerry_122016Kerry Brodt
 
Resume Paul Ferrata 2018
Resume Paul Ferrata 2018Resume Paul Ferrata 2018
Resume Paul Ferrata 2018Paul D. Ferrata
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne PearceSuzanne Pearce
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael Jones
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin SummaryIlyas Ahsan
 
Resume Arelies - english
Resume Arelies - englishResume Arelies - english
Resume Arelies - englishArelies Rivera
 

Similar to CV_Rubén_Tiburcio_09_2015_Septiembre_ENG (20)

Breshears k 2017
Breshears k  2017Breshears k  2017
Breshears k 2017
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016
 
KHudson Resume
KHudson ResumeKHudson Resume
KHudson Resume
 
Boris Bracho current cv 2021
Boris Bracho current cv 2021Boris Bracho current cv 2021
Boris Bracho current cv 2021
 
Boris Bracho current cv 2021
Boris Bracho current cv 2021Boris Bracho current cv 2021
Boris Bracho current cv 2021
 
Delbert Aud Resume Work History
Delbert Aud Resume Work HistoryDelbert Aud Resume Work History
Delbert Aud Resume Work History
 
Project manager (best) CV template
Project manager (best) CV templateProject manager (best) CV template
Project manager (best) CV template
 
BrodtKerry_122016
BrodtKerry_122016BrodtKerry_122016
BrodtKerry_122016
 
Resume Paul Ferrata 2018
Resume Paul Ferrata 2018Resume Paul Ferrata 2018
Resume Paul Ferrata 2018
 
Allan Andrew Abundo
Allan Andrew AbundoAllan Andrew Abundo
Allan Andrew Abundo
 
Jaskirat SinghCV
Jaskirat SinghCVJaskirat SinghCV
Jaskirat SinghCV
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
Rich Assad Resume
Rich Assad ResumeRich Assad Resume
Rich Assad Resume
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15New
 
Project Management - Ghayal Resume -1
Project Management - Ghayal Resume -1Project Management - Ghayal Resume -1
Project Management - Ghayal Resume -1
 
Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
 
jmstrang01
jmstrang01jmstrang01
jmstrang01
 
Long Le Resume 2
Long Le Resume 2Long Le Resume 2
Long Le Resume 2
 
Resume Arelies - english
Resume Arelies - englishResume Arelies - english
Resume Arelies - english
 
999saeed
999saeed999saeed
999saeed
 

CV_Rubén_Tiburcio_09_2015_Septiembre_ENG

  • 1. Printed on September 02, 2015 Ruben Tiburcio Sepulveda Estribo # 77 Hipico, Boca del Rio, Ver. Email: Ruben.Tiburcio@nov.com Cell (521) 229133-6883 EDUCATION Veracruz University, Mexico  Mechanical Electrical Engineering (2007 – 2011) Spoken Languages  Spanish (Native), Fluent English & Proficient Portuguese SUMMARY OF SKILLS  Gained ability to analyze & design engineering systems, processes or components to meet required needs.  Analytical thinking leads to identify, elaborate and solve hidden engineering problems.  Ability to communicate effectively with technical and non-technical personnel.  Knowledge of mechanical, electrical design; hydraulic, pneumatic systems & engineering theory.  Reliable English- Spanish translator. Software Skills  AutoCAD & Sketchup  Rslogix 500 - PLC Programming (ladder diagram)  Matlab engineering application  Simulink; PLC Coder; State flow  Microsoft Office Products  Atlassian Confluence & JIRA  Video Editor Camtasia Studio BUSINESS ANALYST I National Oilwell Varco June 2013 – Present (2 years 3 months) | Houston, TX, Veracruz,VER & Belice, CA Developed a solid set of technical and project management skills, such as:  Great collaboration and team working skills  Coordinate, implement and update multiple business systems through WellSite Services Division  Organization and ability to carry out several projects at once (proficient multi-tasking).  Analytical planning with focus on details.  Quickly ID and resolve issues  Ability to develop detailed documentation such as implementation plans, user manuals and stakeholders notification memos.  Ability to get results, create, review and analyze workflows showing flexibility and being successful in a high speed- high change environment  Technical knowledge and self-education ability. HIGHLIGHTED PROJECTS “Geoforce Implementation” USA & Canada Tracking and maintenance System (Geoforce) implementation for Portable Power on the US & Canada. Over 1400 added assets successfully on 14 different locations and 8 states on the US in less than 6 months. Development and Execution of the Implementation Plan “RFID Implementation” USA Radio Frequency Identification System implementation for SolidsControl assets, integrated with the ERP Microsoft Dynamics AX2009, for a quick transfer and receiving management between facilities and locations. Development and Execution of the Implementation Plan and Tutorial documents and user manuals. “Belize Project – Dewatering & Waste Management” Belize, Temash-2 Well Solids Control & Waste Management supervisor on Temash-2 well located on Toledo district in Belize. Operator Hupecol / US Capital. Lab tests, quality control, personnel management, operations (solids control, dewatering, water treatment, solids stabilization), direct service to customer, government representatives, and executive managers. Effective management of the operations in conditions of H2S presence complying with all safety and environmental regulations stablished by the customer and government agencies in Belize. Integrated services supervision including drilling fluids and Portable Power equipment. Full Project development, from NOV WellSite Services presentation to stakeholders at the pre-spud meeting to well RECAP delivery.
  • 2. Printed on September 02, 2015 “Solids Control Mexico Training” Mexico Solids Control training update. Info review, agenda restructuring, subjects and duration (5 days). Format, design and presentation update, plus inclusion and expansion of new subjects such as dewatering and water treatment. Currently active Project. “Installation Optimization Project” Mexico Solids Control Equipment installation standardization in Mexico to reduce and optimize installation times and usage of human resources and equipment. Using 3D design tools in real life scale regulations and rules are being stablished to deliver an installation schedule suitable for all operations in Mexico. Currently active Project. NEXT GENERATION LEADERSHIP PROGRAM National Oilwell Varco Junio 2012 – Mayo 2013 (1 año) | Locaciones varias Rotation 1: Jun 25 ‐ Sept 21, 2012 “Well Site Services – Operations” Mexico-Veracruz Development and Implementation of (AIMS) Asset Information Management System (Data gathering, field research, complete documentation including Maintenance Manuals, procedures, records & training); Constant translation from English to Spanish Rotation 2: Sept 24 ‐ Jan. 11, 2013 “Monoflo – Artificial Lift” Mexico – Veracruz - Poza Rica Design and Construction of Hydraulic Pump Control (HPC) Simulator; ALS Products Technical presentation & NOV Monofloproducts training, Field Visits and Troubleshooting (Vibration in hydraulicsystems) Rotation 3: Jan. 14, 2013 ‐ Apr. 12, 2013 (Present) “Tuboscope – Coating Engineering” US – Texas – Houston - Holmes Rd Enhance Mechanical Engineering Design and Project Management Skills by improving Powder Coating Application Equipment (Vacuum & Lance) using computerized systems (PLC). Programing, testing, document records and results; Powder conveying research applied. Rotation 4: Apr. 15, 2013 ‐ June 28, 2013 (Next) “Asset Management – Corporate Development” US – Texas - PWCII AIMS Implantation & Training through Latin America Facilities- Preventive Maintenance, Tracking Costs, Quality Calibration Reminder & Document Storage. Constant English-Spanish translations and vice-versa, both oral and written (including Users Manuals) PREVIOUS EXPERIENCE 2011 - 2012 – “Techint Engineering & Construction” Veracruz, Ver. Internships and Fellowship Program, Operations Area and Heavy Cleaning  Anticipate manager needs and resolved conflicts between operators.  Effectively managed five operators squad to meet production goals and minimize man hours 2011 – “PROMEP: Design and Construction of Solar Dryer” Boca del Río, Ver. R&D project and Thesis, Technological Development Dept., FIUV (Faculty of Engineering University of Veracruz)  Planned, organize and coordinate workflow with excellent results  Accurate project costs estimates and schedules  Efficient Solar Dryer – awarded by Technological Development Dept. 2010 – “83/ Infantry Battalion” Veracruz, Ver. Social Service Transmissions Platoon (Analysis of electrical wiring and mechanical installations).  Good results working under pressure  Ability to learn though observation  Manual dexterity developed.