1. Curriculum Vitae
DAMIAN UDO NWAEZE
Personal Details
Current location: RIVERS STATE NIGERIA
Contact Details: 08035815124, 08079583546
E-mail: udnwaeze1@yahoo.com
Current Position: Senior Service Supervisor / Project Engineer. GPPS LTD
Area Of Interest Pipeline Pre-Commissioning Engineer / Project Engineer
COVER LETTER
Have (14years) experience in engineering and Pipeline precommissioning projects
for Agip; Exxon Mobil; Shell Petroleum Development Company (SPDC); Kaztec
Engineering Limited (KEL) for Addax Petroleum (NIG) Limited; Niger Delta
Petroleum Resources (NDPR); WEST AFRICAN VENTURES for Chevron Nigeriia
limited. Involved in pipeline pre-commissioning works including flooding,Flushing,
Chemical cleaning, gauging & intelligent pigging, hydro testing/leak testing,
dewatering, drying, and nitrogen purging and packing.
Expert in projects, with competent cross-functional skills and on time execution.
Exemplary relationship management, communication skills with the ability to network
with project members, Consultants, contractors, statutory agencies, clients and their
representatives.
Degree holder, Bachelor of Technology, Maritime Management Technology
EDUCATIONAL QUALIFICATIONS .
1. Bachelor of Technology, Maritime Management Techonoly. Federal
University of Technology Owerri, Imo State (2007), Second Class Upper.
2. Nsirimo Secondary School, Umuahia, Abia State, Senior Secondary School
Certificate Examination (SSCE / GCE) (1999)
Career History
Page 1 of 5
2. EMPLOYER: Global Process and Pipeline Services (GPPS) Limited
BASE: Port-Harcourt
POSITION: Senior Service Supervisor
DURATION: Febuary 2012 – Till Date
PROJECTS:
LEAK TESTING OF 24” X 34KM ALAKIRI – BONNY TERMINAL TRUCK LINE.
OIS/ Shell Petroleum Development Company. March / June 2012
PRE-COMMISSIONING AND COMMISSIONING OF 12” X 20KM NDPR
OGBELE-NLNG NODE RUMUJI GAS LINE.
Niger Delta Petroleum Resources (NDPR). October 2012
HYDROTEST ON ADRP1 TRIPOD AND TPU TOPSIDE: 4”-P6-353-D-80 ADPR1
TRIPOD-ADRP1 AND 10”-P6-(170 &171)-A-40 TPU –ADRP1.
Kaztec Engineering Limited / Addax Petroleum Nigeria Limited. June 2013
PRECOMMISSIONING OF 16’’ X 11KM ADRP 1-TMMP EXPORT LINE
Kaztec Engineering Limited / Addax Petroleum Nigeria Limited. June 2013
DEWATERING WITH MEG SWABBING AND NITROGEN PACKING: LINE 90
20” X 32.7KM AND LINE 90 8” X 123M OKAN WYE SST1-MEREN GGCP-MEREN
PP West African Ventures (Wav) / Chevron. October 2013
CRITIALl CRUDE PIPELINE REPLACEMENT PROJECT- USARI FR – FA 24”x
2km PIPELINE DE-OILING / FLUSHING
Exxon MobIle. December 2013
LEAK TEST ON 24” X 35.27KM EGP3A EXPOR GAS LINE, ESCRAVOS TO
CALM BUOY PLEM OFFSHORE.
West African Ventures (Wav) / Chevron. March 2014.
DE-OILING OF 12” X 7.9KM & 14”X 17.1 KM ETIM B – IDOHO IP PIPELINE.
Exxon MobIle. June 2014
DE-OILING OF 12” X 7.9KM ETIM LP TO INIM IP AND INIM IA / IP TOPSIDE.
Exxon MobIle. August 2014.
Employer: Poseidon Energy Services Limited Port Harcourt, Rivers State.
Position: Senior Service Supervisor / Pre-Commissioning Engineer
Duration May 2005 – January 2012.
PROJECTS:
LEAK DICTATION ON SBM FLOATING HOSE
Total Fso Unity. August 2005.
CHEMICAL CLEANING / HYDRO BLASTING OF HEAT EXCHANGERS
EPCL, Now INDORAMA. September 2006.
AMENAM ANNULUS TOP-UP / INJECTIVITY TEST
ELF petroleum Nig Ltd. October 2006
MISCELLANEOUS PUMPING SERVICES
BJ Services / Shell Terminal Bonny. November 2006
Page 2 of 5
3. HYDRO-TEST OF FABRICATED GAS PLANT SPOONS / PIPES
Orbital & Oranges / Bergesen. May 2007
ROUTINE PIGGING OF 10” X 4.6KM EGBEMA WEST TO EGBEMA MANIFOLD
Helman And Cross / Spdc. Fabuary 2008
LEAK-TEST OF 10” CONDENSATE EXPORT LINE, 18” GAS LINE SOKU,
BUGUMA TO ALAKERI
SPDC. March 2008
DE-OILING OF 24” LINE AND LEAK TEST, USARI TO IDOHO
BJ Services / Exxon Mobil. April 2008
DE-OILING AND FLUSHING OF 12” X 11KM CRUDE LINE ADIBAWA FS TO
OKORDIA MANIFOLD
DEC Oil and GAS / SPDC. May 2008
FLUSHING AND HYDRO-TEST OF 24!” GAS LINE FROM TIBEDABA TO
SAGANA MANIFOLD.
Dewoo / Agip July 2008.
.
HYDRO-TEST OF AIR CYLINDER AT JASCON 2 ANDTEMPORARY BARREL
AND RECEIVERS
WAV Onne January 2009.
PRECOMMISSIONING (PIGGING, GAUGING AND HYDRO-TEST) OF 24”
PIPELINE OGBOMBIRI TO BRASS.
Deawoo / Agip. June 2009
PRECOMMISSIONING OF 30”X46KM NEMBE-CAWTHRONE CHANNEL T/L.
For NCTL Saipem / Shell Petroleum Development Company East Swamp. August
2010
MISCELLANEOUS PUMPING FOR DE-SCALING OF 20” X 19 KM OPOKUSHI
TO BRASS CREEK.
SPDC. December 2010
PRECOMMISSIONING OF 18” X 128KM UNICEM GAS TRANSMISSION GAS
PIPELINE. FROM AKWA IBOM GAS PLANT TO CALABAR UNICEM PLANT
Eastern Horizon Gas Company Limited. Land & Swam. March 2011
PUMPING FOR PIGGING CAMPAIGN OPERATION ON 12”X 4KM NEMBE1
TO 2, 12”X 5KM NEMBE 2 - 3, 24” X 5KM NEMBE 2 - 4, 24” X 21KM NEMBE
4 - SANTABABARA, 28” X 19KM SANTABABARA TO SOKU.
SPDC. August 2011.
Employer: Golden Metro Nigeria limited Port Harcourt, Rivers State.
Position: Service Supervisor
Duration October 2000 – April 2005
PROJECTS:
Page 3 of 5
4. CLEANSING /FLUSHING OF RISERS IN RISER REPAIR PROJECT
For (AluSteel / Exxon Mobil Offshore). ( project 2001-2003)
PIGGING/ DECOMMISSIONING OF 20” X 27KM EKPE - USARI – IDOHO
PIPELINE
Exxon Mobil. May 2002
CRUDE TRANSFER FROM PRODUCTION TEST SURGE TANK TO AGIP
FLOW STATION NIMBE
Geo-Services/ Agip. May 2003
ACID PICKLING AND PASSIVATION PROCESS PIPE LINE OF AGIP
GAS PLANT, KWALE.
Deawoo / Agip. May 2004.
PRECOMMOSSIONING OF (1) 18” X 14KM AND (2) 4”X 14KM KWALE IPP
GAS LINE.
Acon / Agip.December 2004
Employer: KADUNA Refinery (KRPC)
Position: Assist. Account Officer (Contract Staff)
Duration August 1996 – December 1998
PROJECTS:
Analyzing Material Receive Voucher and
Material Issue Voucher
PROFESSIONAL TRAINING
Safety ,loss prevention Exxon Mobil Nigeria
Safety professional Halliburton Energy Nigeria
BOSIET & HUET Tolman Allied services co. Ltd.
Project Mgt. Professional(Preparatory Course) Project Mgt. Institute
PERSONNAL ATTRIBUTES
Computer literacy
High sense of dedication with good analytical mind
The character and ability to work effectively with others in a diverse team
Enthusiasm resilience and confidence
Excellence writing and communication skills.
REFEREES
1. Dr Chris Ikeogu
Page 4 of 5
5. Lecturer School Of Management And Technology
Federal University of Technoloy Owerri (FUTO).
08037273187.
2. Engr. Obinna Uchendu
MD Poseidon Energy Services Limited
Port-Harcourt.
08033130495.
.
Page 5 of 5
6. Lecturer School Of Management And Technology
Federal University of Technoloy Owerri (FUTO).
08037273187.
2. Engr. Obinna Uchendu
MD Poseidon Energy Services Limited
Port-Harcourt.
08033130495.
.
Page 5 of 5