The TheodoliteCivil Engineer Sergio Andres Gonzalez Barrera    Section “M”         ID: 201114078 TechnicalEnglish
The importance of the theodolite The importance of the theodolite is that is necessary use  this instrument to determine angles, distances, depths, etc. To know how the ground is  and how to construct there.
What is it? The theodolite is an useful tool by the surveys. The instrument is capable of finding both vertical and horizontal angles, and when is combined with technical studies also can determinate horizontal distances and a differentiation elevations.
Setup of the theodolite! First, the survey team puts a mark in the floor, this point will be the vertex of the angle that will be determined and this point will be the station “A”. Then, the survey team places the tripod over the station “A”, opening the feet and secure them.
Setup of the theodolite! Next, the survey team takes out the theodolite of its case and adapts it over the tripod with the screw and then elevates the theodolite up to survey’s eyes.  The theodolite has to stay exactly over the mark of the floor; this can be possible putting a plumb tied with a fine wire below the theodolite and stays on the point.
The survey must observe through the optical plummet to make sure the mark is centered. To end the leveling of the theodolite is necessary to be leveled the tree bubble levels with the level’s screws. Setup of the theodolite!
 Turning on! First put the batteries in its place, then turn on the theodolite and last, take the cover of the lens.
Make a survey  First, measure the height between the floor and the mark that is in one side of the theodolite with a rod or a tape measure. This point will be a reference to the other stations.      Next, place a person with the rod at the station “B” to determine the angle. This take place when the surveyor moves the theodolite horizontally and the vertical axis, for lower movements is necessary to use the vertical tangent screw and the horizontal tangent screw.
Make a survey Then, when the angle appears in the screen write the number, then press the button         twice and the screen will show 0’00’00’’. Note: write the upper stadia and the lower stadia to make studies latter.
This will be our initial point, and then the survey determinates point “C” in the same way, moving the axis focusing the point in the rod. And in the screen will appear the horizontal angle “B”A”C”.      Finally, proceed to turn the vertical and horizontal axis 180 ͦ and make the process again in the points “B” and “C”.   Make a survey
This is the process to determine the horizontal angle. Angles:
The parts of the theodolite ,[object Object]
Vertical Clamp: is used when measuring vertical angles.

More Related Content

What's hot (20)

Describing object theodolite
Describing object theodoliteDescribing object theodolite
Describing object theodolite
 
Orthographic projection
Orthographic projectionOrthographic projection
Orthographic projection
 
Plans and elevations
Plans and elevationsPlans and elevations
Plans and elevations
 
Theodolite surveying part1
Theodolite surveying part1Theodolite surveying part1
Theodolite surveying part1
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)
 
Surface Development
Surface Development Surface Development
Surface Development
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
Isometric projections
Isometric projectionsIsometric projections
Isometric projections
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Method Of Chaining On Sloping Ground
Method Of Chaining On Sloping GroundMethod Of Chaining On Sloping Ground
Method Of Chaining On Sloping Ground
 
Projections of solids
Projections of solidsProjections of solids
Projections of solids
 
Projection of points
Projection of pointsProjection of points
Projection of points
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
Development of surfaces of solids -ENGINEERING DRAWING - RGPV,BHOPAL
Development of surfaces of solids -ENGINEERING DRAWING - RGPV,BHOPALDevelopment of surfaces of solids -ENGINEERING DRAWING - RGPV,BHOPAL
Development of surfaces of solids -ENGINEERING DRAWING - RGPV,BHOPAL
 
Circular slabs
Circular slabs Circular slabs
Circular slabs
 
Perspective projection
Perspective projectionPerspective projection
Perspective projection
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Total station survey
Total station surveyTotal station survey
Total station survey
 

Similar to The theodolite

Surveying and leveling-2
Surveying and leveling-2Surveying and leveling-2
Surveying and leveling-2Gulfam Akram
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7Arun Kama
 
Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work bookTalha Hussain
 
ASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptRESHMAFEGADE
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 
Lecture 7 topographic related documents Survey
Lecture 7 topographic related documents  SurveyLecture 7 topographic related documents  Survey
Lecture 7 topographic related documents Survey40023ce
 
Guide about Theodolite Calibration Service which used in Surveying
Guide  about Theodolite Calibration Service which used in SurveyingGuide  about Theodolite Calibration Service which used in Surveying
Guide about Theodolite Calibration Service which used in SurveyingFalcon Geomatics LLC
 
2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptx2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptxaashrayKawalkar
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGpwhite91
 
2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptx2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptxaashrayKawalkar
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.pptsivaganesan23
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of anglesRajendra Prasad
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptxADCET, Ashta
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptUjasPandya2
 
Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Bahzad5
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 

Similar to The theodolite (20)

Surveying and leveling-2
Surveying and leveling-2Surveying and leveling-2
Surveying and leveling-2
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
 
Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work book
 
Theodolite
TheodoliteTheodolite
Theodolite
 
ADS .pptx
ADS .pptxADS .pptx
ADS .pptx
 
ASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).ppt
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Lecture 7 topographic related documents Survey
Lecture 7 topographic related documents  SurveyLecture 7 topographic related documents  Survey
Lecture 7 topographic related documents Survey
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
Guide about Theodolite Calibration Service which used in Surveying
Guide  about Theodolite Calibration Service which used in SurveyingGuide  about Theodolite Calibration Service which used in Surveying
Guide about Theodolite Calibration Service which used in Surveying
 
2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptx2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptx
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYING
 
2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptx2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptx
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.ppt
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of angles
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptx
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.ppt
 
Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 

The theodolite

  • 1. The TheodoliteCivil Engineer Sergio Andres Gonzalez Barrera Section “M” ID: 201114078 TechnicalEnglish
  • 2. The importance of the theodolite The importance of the theodolite is that is necessary use this instrument to determine angles, distances, depths, etc. To know how the ground is and how to construct there.
  • 3. What is it? The theodolite is an useful tool by the surveys. The instrument is capable of finding both vertical and horizontal angles, and when is combined with technical studies also can determinate horizontal distances and a differentiation elevations.
  • 4. Setup of the theodolite! First, the survey team puts a mark in the floor, this point will be the vertex of the angle that will be determined and this point will be the station “A”. Then, the survey team places the tripod over the station “A”, opening the feet and secure them.
  • 5. Setup of the theodolite! Next, the survey team takes out the theodolite of its case and adapts it over the tripod with the screw and then elevates the theodolite up to survey’s eyes. The theodolite has to stay exactly over the mark of the floor; this can be possible putting a plumb tied with a fine wire below the theodolite and stays on the point.
  • 6. The survey must observe through the optical plummet to make sure the mark is centered. To end the leveling of the theodolite is necessary to be leveled the tree bubble levels with the level’s screws. Setup of the theodolite!
  • 7.  Turning on! First put the batteries in its place, then turn on the theodolite and last, take the cover of the lens.
  • 8. Make a survey First, measure the height between the floor and the mark that is in one side of the theodolite with a rod or a tape measure. This point will be a reference to the other stations. Next, place a person with the rod at the station “B” to determine the angle. This take place when the surveyor moves the theodolite horizontally and the vertical axis, for lower movements is necessary to use the vertical tangent screw and the horizontal tangent screw.
  • 9. Make a survey Then, when the angle appears in the screen write the number, then press the button twice and the screen will show 0’00’00’’. Note: write the upper stadia and the lower stadia to make studies latter.
  • 10. This will be our initial point, and then the survey determinates point “C” in the same way, moving the axis focusing the point in the rod. And in the screen will appear the horizontal angle “B”A”C”. Finally, proceed to turn the vertical and horizontal axis 180 ͦ and make the process again in the points “B” and “C”.   Make a survey
  • 11. This is the process to determine the horizontal angle. Angles:
  • 12.
  • 13. Vertical Clamp: is used when measuring vertical angles.
  • 14. Optical Sight: is used to observe a particular point.
  • 15. Vertical Tangent screw: is used to make very slow movements in the vertical circle.
  • 16. Internal Switch Port: is used to add a particular piece of the theodolite.
  • 17.
  • 18. Power Switch: is used to turn on the theodolite.
  • 19. Plate Level: is used: the purpose of the plate level adjustment is to make the vertical axis of the theodolite truly vertical when the bubble of the plate level is centered in the vial.
  • 20. Horizontal Tangent screw: is used to make very slow movements in the horizontal circle.
  • 21. Leveling Screws: are used in the leveling of the plate level.
  • 22. Base Plate: is where the theodolite is adapted with the tripod.