ASSIGNMENT)
You will create a 12 to 15 minute presentation via a
PowerPoint® presentation that is set up for automatic
transitions of slides with voice narration or a Narrated Video
Presentation. You will present an overview of the project and
provides the project sponsor with an overall view of the project
plan. In some cases, the business sponsor/executive will not
have time to read the entire plan, so they would prefer a
presentation highlighting the key points of the project. You
should include the project baseline start and finish dates for the
project. You should also include a short table with the high-
level budget that indicates the baseline total planned budget
amount for the overall project within your presentation. The
following sections and information should also be included.
Section A: Summary
Part 1: Planning, Monitoring, and Execution
Part 2: Communication Plan
Part 3: Project Status including Quality and Performance Levels
Section B: Project Plan
Part 1: Milestones
Part 2: Review of MS Project® Schedule
Part 3: Review of MS Project® Resources
Part 4: Review of MS Project® Budget
Section C: Project Budget/Schedule Analysis
Comparison of Actual vs Budgeted Costs
Explanation of Cost Variances (EV)
Explanation of Schedule Variance (EV)
Section D: Project Overview
Needs Assessment and Business Strategy
Leadership & Management (Project Organization & Leadership
Style)
Section E: Conclusion
Section F: Lessons Learned Report
Please review the rubric for this presentation to ensure all
requirements are accomplished with your presentation. This
presentation will be submitted by the end of week 7.
You will automatically be assigned to two other presentations to
conduct your peer reviews that will be due by Saturday of Week
8.
Note!
The video or presentation will involve a process-orientated task
by analyzing the process of completing the project, analyzing
the results of the project, and evolving transformation of the
results and issues of the project into a summary of the project
along with a lessons-learned report (Processes). The collection
of data from performing the project would be conducted by the
student, which will be analyzed and synthesized. The student
through whatever means that is effective that can include
Excel® and/or Microsoft® Project® will transform this data
into a final management report (Data). After using tools such as
Excel® and/or Project®, the student will use a microphone to
create narration for a slide presentation via PowerPoint® with
automatic transitions, Movie Maker, PowerPoint® Video Tool,
or other such presentation/video tools available to the student.
Either the PowerPoint® or resulting MP4 video will be
embedded to a discussion thread for asynchronous discussion
activity (Devices). Finally, a peer review process will follow
the submission of the presentation that provides an integral
network of outsiders analyzing and evaluating the course
project summary and lessons learned provided (People).
RUBRIC
LMA: PROJ586.WK7.Rubric
LMA: PROJ586.WK7.RubricCriteriaRatingsPtsThis criterion is
linked to a Learning OutcomeSection A: Summary Part 1
Planning, Monitoring and Executiion
20.0
to >16.9
ptsExcellentStudent provided a full summary overview of
project description with a clear and consistent focus that
develops a strong central idea as it presents how the project
continues to be planned, monitored, and executed.16.9
to >14.9
ptsCompetentStudent generally provided a summary overview
of project description that focuses on the central idea of
addressing the topic but somewhat vaguely presents how the
project continues to be planned, monitored, and executed.14.9
to >10.9
ptsFairStudent partially provided a summary overview of
project description that somewhat distorts or neglect significant
issues as the student presents how the project continues to be
planned, monitored, and executed.10.9
to >0.9
ptsPoorStudent seems somewhat unaware as they provided the
summary overview of project description that presents little
evidence as to how the project continues to be planned,
monitored, and executed.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
20.0 pts
This criterion is linked to a Learning OutcomeSection A:
Summary Part 2 Communication Plan
10.0
to >8.9
ptsExcellentStudent provided a complete communication plan
that has a clear and consistent focus by providing stakeholders
with information that expound upon a strong presentation that
fully defines who should be given specific information, when
that information should be delivered, and what communication
channels will be used to deliver the information.8.9
to >7.9
ptsCompetentStudent generally provided a communication plan
that mostly provides stakeholders with information that expound
upon a presentation that mostly defines who should be given
specific information, when that information should be delivered,
and what communication channels will be used to deliver the
information.7.9
to >5.9
ptsFairStudent partially provided a communication plan
somewhat distorts or neglect significant issues as the student
presents who should be given specific information, when that
information should be delivered, and what communication
channels will be used to deliver the information.5.9
to >0.9
ptsPoorStudent seems somewhat unaware as they provided a
communication plan that presents little evidence who should be
given specific information, when that information should be
delivered, and what communication channels will be used to
deliver the information.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning OutcomeSection A:
Summary Part 3 Project Status, including Quality and
Performance Levels
18.0
to >16.0
ptsExcellentThe summary fully provides enough information to
present a clear picture of the project and the status including
project's quality and performance levels.information should be
delivered, and what communication channels will be used to
deliver the information.16.0
to >14.0
ptsCompetentThe summary generally provides enough
information to present a somewhat vague picture of the project
and the status including project's quality and performance
levels.14.0
to >11.0
ptsFairThe summary partially provides the necessary
information which somewhat distorts or neglect significant
issues of the project and the status including project’s quality
and performance levels.11.0
to >0.9
ptsPoorThe student seems somewhat unaware as they attempt to
provide the necessary information which presents little evidence
as to the project and the status including project’s quality and
performance levels.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
18.0 pts
This criterion is linked to a Learning OutcomeSection B:
Project Plan Part 1 Milestones
10.0
to >8.9
ptsExcellentThe milestones fully present a clear, concise, and
complete timeline with all major benchmark and deliverable
items identified and explained. The milestones presented were
logically organized and structured and strongly presents to mark
specific points along a project timeline.8.9
to >7.9
ptsCompetentThe milestones generally present a central idea of
the project timeline but at times, it is vague in some places with
respect to all major benchmark and deliverable items. The
milestones presented were overall organized and structured as it
presents specific points along a project timeline.7.9
to >5.9
ptsFairThe milestones partially presents the project timeline but
generates at times some distortion or may neglect significant
major benchmark and deliverable items. It may also be illogical,
reflects simplistic approach to milestones, or even omit some
important items.5.9
to >0.9
ptsPoorThe student appears to be unaware of purpose, audience,
or organization as they present the project milestones within the
project timeline. There is little evidence as to the presentation
of the specific points along a project timeline.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning OutcomeSection B:
Project Plan Part 2 Review of MS Project Schedule
10.0
to >8.9
ptsExcellentThe schedule on the MS Project file fully present a
clear, concise, and complete work breakdown structure (WBS)
that is well organized, structured, and logical to the order of
tasks which are at reflected in least three levels (Project, task,
sub-tasks). The start and finish dates, task description, duration,
and predecessors are reflected properly on the schedule. All
tasks appear to be fully identified within the WBS schedule.8.9
to >7.9
ptsCompetentThe schedule on the MS Project file generally
present most of the tasks on the work breakdown structure
(WBS) and is mostly well organized, structured, and logical to
the order of tasks which are at reflected in least three levels
(Project, task, sub-tasks). For the most part, the start and finish
dates, task description, duration, and predecessors are reflected
properly on the schedule. Most of the tasks appear to be
identified within the WBS schedule.7.9
to >5.9
ptsFairThe schedule on the MS Project file partially present the
tasks on the work breakdown structure (WBS) and is mostly
well organized, structured, and logical to the order of tasks. The
project schedule may be missing some of the start and finish
dates, task description, duration, and predecessors are reflected
properly on the schedule. Some important tasks may be missing
within the schedule.5.9
to >0.9
ptsPoorThe student appears to be unaware how to work with MS
Project as they present the schedule. There is little evidence as
to the presentation of the complete scheduled tasks required or
necessary for the project.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning OutcomeSection B:
Project Plan Part 3 Review of MS Project Resources
10.0
to >8.9
ptsExcellentThe resources have been identified in the MS
Project in a clear, concise, and complete manner and have been
properly assigned to the tasks in an orderly fashion. All tasks
requiring resources have resources assigned.8.9
to >7.9
ptsCompetentThe resource assignment page on the MS Project
file generally identify and present most of the resources
required for the project tasks identified on the work breakdown
structure (WBS). The resources have mostly been assigned to
the proper tasks.7.9
to >5.9
ptsFairThe resources are partially identified and generates at
times some distortion or may neglect resources necessary for
the project schedule. The tasks are only somewhat assigned to
the specific tasks.5.9
to >0.9
ptsPoorThe student appears to be unaware of purpose, audience,
or organization as they present the resources. There is little
evidence as the tasks being assigned to the resources for the
project.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning OutcomeSection B:
Project Plan Part 4 Review of MS Project Budget
10.0
to >8.9
ptsExcellentThe budget have been identified in the MS Project
in a clear, concise, and complete manner and have been properly
assigned to the tasks in an orderly fashion.8.9
to >7.9
ptsCompetentThe budget on the MS Project file have been
generally identified and presented and generally assigned to the
project tasks identified on the work breakdown structure
(WBS).7.9
to >5.9
ptsFairThe budget is partially identified and generates at times
some distortion or may neglect some costs necessary for the
project schedule.5.9
to >0.9
ptsPoorThe student appears to be unaware of purpose, audience,
or organization as they present the budget. There is little
evidence of the costs being assigned to the resources for the
project.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning
OutcomeKCL.PROJ586.CO-C.WBS-Schedule
view longer description
threshold: 3.0 pts
4.0
ptsExcellent: Develops a strong central idea and explores the
issues fully and insightfully the use of such tools to plan project
task, budget and resource requirements. It is logically organized
with concrete details that directly support major points in the
utilization of the two tools in the process of developing
precedence relationships among activities, a network diagram
and critical path, and schedule.3.0
ptsCompetent: Central idea addresses the topic but is vaguely
realized in places regarding the use of such tools to plan project
task, budget and resource requirements. Generally well
organized, with adequate support in the process of developing
precedence relationships among activities, a network diagram
and critical path, and schedule. However, there are some
misplaced details or logical inconsistencies.2.0
ptsFair: Development of central idea produces some distortion
or may neglect significant issues regarding the use of such tools
to plan project task, budget and resource requirements. The plan
of organization is undermined by omission of ideas and details,
and illogical or simplistic reasoning in the process of
developing precedence relationships among activities, a network
diagram and critical path, and schedule.1.0
ptsPoor: There is little evidence of a controlling idea. The
student fails to respond to the situation or explore the issues.0.0
ptsUnacceptable: Student deliverable did not meet the
requirements of the outcome
4.0 pts
This criterion is linked to a Learning OutcomeSection C:
Project Budget/ Schedule Analysis Part 1 A comparison of the
actual cost vs budgeted costs
10.0
to >8.9
ptsExcellentThe student fully presents how they developed the
project financial and performance objectives by presenting the
comparison of the actual cost vs budgeted costs.8.9
to >7.9
ptsCompetentThe student mostly presented how they developed
the project financial and performance objectives by presenting
the comparison of the actual cost vs budgeted costs.7.9
to >5.9
ptsFairThe student partially presented how they developed the
project financial and performance objectives by presenting the
comparison of the actual cost vs budgeted costs.5.9
to >0.9
ptsPoorThe student shows little evidence as to how they
developed the project financial and performance objectives by
presenting the comparison of the actual cost vs budgeted
costs.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning OutcomeSection C:
Project Budget/ Schedule Analysis Part 2 Explanation of the
Cost Variances
10.0
to >8.9
ptsExcellentThe student demonstrates the use of the Earned
Value methodology in fully presenting the explanation of the
schedule variances in a clear, concise manner.8.9
to >7.9
ptsCompetentThe student using Earned Value methodology by
generally presenting the explanation of the Schedule variances
but at times tends to be somewhat vague.7.9
to >5.9
ptsFairThe student using Earned Value methodology by
partially presenting the explanation of the schedule variances
but it appears the student is somewhat unaware as to the earned
value process regarding schedule variances.5.9
to >0.9
ptsPoorThe student appears to be unaware to the Earned Value
methodology by showing little or no evidence of presenting the
explanation of the schedule variances based upon earned value
concepts.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning OutcomeSection C:
Project Budget/ Schedule Analysis Part 3 Explanation of the
Schedule Variances
10.0
to >8.9
ptsExcellentDevelops a strong central idea and explores the
issues fully and insightfully as to how they developed and
communicated the project financial and performance objectives.
It is logically organized with concrete details that directly
support major points in the utilization of the two tools in the
process of developing precedence relationships among
activities, a network diagram and critical path, and schedule.
The distinctive voice of the students emerges through superior
command of language. Sources are used, if required, to support
and develop concepts and ideas, and are properly cited (in-text)
and documented (reference page or works cited). Exhibits
stylistic variety and energy. Essentially free from mechanical
errors.8.9
to >7.9
ptsCompetentCentral idea addresses the topic but is vaguely
realized in places regarding how they developed and
communicated the project financial and performance objectives.
Generally well organized, with adequate support in the process
of developing precedence relationships among activities, a
network diagram and critical path, and schedule. However, there
are some misplaced details or logical inconsistencies. The
students’ voice is apparent but occasionally inconsistent.
Demonstrates competent use of language and a workable style.
Mechanical errors do not significantly interfere with
meaning.7.9
to >5.9
ptsFairDevelopment of central idea produces some distortion or
may neglect significant issues regarding how they developed
and communicated the project financial and performance
objectives. The plan of organization is undermined by omission
of ideas and details, and illogical or simplistic reasoning in the
process of developing precedence relationships among
activities, a network diagram and critical path, and schedule.
Sources, if required, are used, but with frequent or pervasive
inconsistencies in support and/or format. The students’ voice is
weakly developed and use of language may be vague, imprecise,
or awkward. Style is repetitive or plodding. Mechanical errors
sometimes interfere with meaning.5.9
to >0.9
ptsPoorThere is little evidence of a controlling idea. The
students fail to respond to the situation or explore the issues.
The students’ voice is not recognizable due to inadequate
control of language. Style is undeveloped. Sources are required,
but are not used thus ideas require support or sources are not
cited or correctly documented throughout. Excessive
grammatical and mechanical errors block meaning.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning
OutcomeKCL.PROJ586.CO-F.Schedule-Cost-Communcation
view longer description
threshold: 3.0 pts
4.0
ptsExcellent: Develops a strong central idea and explores the
issues fully and insightfully as to how they developed and
communicated the project financial and performance objectives.
It is logically organized with concrete details that directly
support major points in the utilization of the two tools in the
process of developing precedence relationships among
activities, a network diagram and critical path, and schedule.3.0
ptsCompetent: Central idea addresses the topic but is vaguely
realized in places regarding how they developed and
communicated the project financial and performance objectives.
Generally well organized, with adequate support in the process
of developing precedence relationships among activities, a
network diagram and critical path, and schedule. However, there
are some misplaced details or logical inconsistencies.2.0
ptsFair: Development of central idea produces some distortion
or may neglect significant issues regarding how they developed
and communicated the project financial and performance
objectives. The plan of organization is undermined by omission
of ideas and details, and illogical or simplistic reasoning in the
process of developing precedence relationships among
activities, a network diagram and critical path, and schedule.1.0
ptsPoor: There is limited evidence of a controlling idea. The
student fail to respond to the situation or explore the issues.0.0
ptsUnacceptable: The student does not meet the expectations
4.0 pts
This criterion is linked to a Learning OutcomeSection D:
Project Overview Part 1 Needs Assessment and Business
Strategy
20.0
to >16.9
ptsExcellentThe student provides a full presentation of the
needs and benefits in a clear, concise manner that shows how
they are directly tied to the business strategic objectives of the
organization.16.9
to >14.9
ptsCompetentThe student generally provides a presentation of
the needs and benefits that focuses on the central idea of
addressing the topic but somewhat vaguely presents how they
are directly tied to the business strategic objectives of the
organization.14.9
to >10.9
ptsFairThe student provides a somewhat partial presentation of
the needs and benefits that in some manner distorts as to how
they are directly tied to the business strategic objectives of the
organization.10.9
to >0.9
ptsPoorThe student seems somewhat unaware as they provided a
presentation of the needs and benefits that presents little or no
evidence as to how they are directly tied to the business
strategic objectives of the organization.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
20.0 pts
This criterion is linked to a Learning OutcomeSection D:
Project Overview Part 2 Leadership & Management
10.0
to >8.9
ptsExcellentIn a motivational manner for promoting a positive
environment manner, the presentation fully clarifies and clearly
present an organizational management style utilized with
effective, positive leadership skills that will result at the
completion of this project.8.9
to >7.9
ptsCompetentIn a generally motivational manner for promoting
a positive environment manner, the presentation focuses on the
central idea of addressing the topic but somewhat vaguely
presents present an organizational management style utilized
with effective, positive leadership skills that will result at the
completion of this project.7.9
to >5.9
ptsFairIn a partially motivational manner for promoting a
positive environment manner, the presentation in some manner
distorts as to how their organizational management style
utilized will provide for an effective, positive leadership style
that will result at the completion of this project.5.9
to >0.9
ptsPoorThe student seems somewhat unaware as to the process
of promoting a positive environment manner, as they provide
little or no evidence as to how their organizational management
style utilized will provide for an effective, positive leadership
style that will result at the completion of this project.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning
OutcomeKCL.PROJ586.CO-E.Team-Management
view longer description
threshold: 3.0 pts
4.0
ptsExcellent: Develops a strong central idea and demonstrates
effective leadership skills for promoting a positive environment
that will help motivate team members and resolve conflicts.3.0
ptsCompetent: Central idea addresses the topic but is vaguely
realized in places regarding the demonstration of effective
leadership skills for promoting a positive environment that will
help motivate team members and resolve conflicts.2.0
ptsFair: Development of central idea produces some distortion
or may neglect significant issues regarding the demonstration of
effective leadership skills for promoting a positive environment
that will help motivate team members and resolve conflicts.1.0
ptsPoor: There is little evidence of a controlling idea. The
student fails to respond to the situation or explore the issues.0.0
ptsUnacceptable: Student deliverable did not meet the
requirements of the outcome
4.0 pts
This criterion is linked to a Learning OutcomeSection E:
Conclusion
10.0
to >8.9
ptsExcellentThe student provides a full conclusion that is clear,
concise, and to the point. The audience should have a deep
understanding as to the presenter’s conclusion and any
recommendations.8.9
to >7.9
ptsCompetentThe student generally provides a conclusion that is
strong but may be somewhat vague at times. The audience
should mostly have a general understanding as to the presenter’s
conclusion and any recommendations.7.9
to >5.9
ptsFairThe student partially provides a conclusion that but there
may be some distortion or may neglect significant issues as to
the conclusions. The audience should partially have some
understanding as to the presenter’s conclusion and any
recommendations.5.9
to >0.9
ptsPoorThe conclusion reflects that the student is unware as to
what the conclusion should be for the project presentation by
showing little or no evidence of any conclusion or
recommendations. The audience most likely will be confused as
to the presenter’s conclusion and any recommendations.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
10.0 pts
This criterion is linked to a Learning OutcomeSection F:
Lessons Learned
20.0
to >16.9
ptsExcellentThe lessons-learned report presented by the student
completely and effectively reflects strong project management
leadership skills that demonstrates a positive environment that
will help motivate team members and resolve conflicts in a
future project. The presentation contains a full description on
how these lessons will be implemented for the next project.16.9
to >14.9
ptsCompetentThe lessons-learned report presented by the
student completely and effectively reflects strong project
management leadership skills that demonstrates a positive
environment that will help motivate team members and resolve
conflicts in a future project. The presentation somewhat
contains a description on how these lessons will be implemented
for the next project.14.9
to >10.9
ptsFairThe lessons-learned report presented by the student
completely and effectively reflects strong project management
leadership skills that demonstrates a positive environment that
will help motivate team members and resolve conflicts in a
future project. However, the presentation does not contain a
description on how these lessons will be implemented for the
next project.10.9
to >0.9
ptsPoorThe lessons-learned report presented by the student only
somewhat reflects strong project management leadership skills
that demonstrates a positive environment that will help motivate
team members and resolve conflicts in a future project.0.9
to >0
ptsUnacceptableThe deliverable does not meet this requirement
20.0 pts
This criterion is linked to a Learning
OutcomeKCL.PROJ586.CO-G.Project-Closeout
view longer description
threshold: 3.0 pts
4.0
ptsExcellent: Develops a strong and complete closeout plan and
completely developes best practices and lessons learned.3.0
ptsCompetent: Develops a mostly complete closeout plan and
best practices and lessons learned.2.0
ptsFair: Develops a somewhat complete closeout plan with
limited best practices and lessons learned.1.0
ptsPoor: There is little evidence of a controlling idea. The
student fails to respond to the situation or explore the issues.0.0
ptsUnacceptable: Student deliverable did not meet the
requirements of the outcome
4.0 pts
This criterion is linked to a Learning OutcomeMechanics:
Narrated Presentation is well structured and organized with
recorded voice narration. Grammar, spelling, punctuation, etc.
8.0
to >6.9
ptsExcellentPowerPoint or Video Presentation created that
includes voice narrations where the voice automatically plays
with automatic transitions of slides or frames, along with being
structured well and very organized with virtually no errors
made.6.9
to >4.9
ptsCompetentPowerPoint or Video Presentation created that
includes voice narrations where the voice automatically plays
with automatic transitions of slides or frames, along with being
structured and organized with some minor errors made.4.9
to >3.9
ptsFairPowerPoint or Video Presentation created that includes
voice narrations but the voice does not automatically play with
automatic transitions of slides or frames, along with being
structured and organized with some minor errors made. Either
the slides are not automatic or the voice is not automatic, or
both.3.9
to >0.9
ptsPoorPowerPoint or Video Presentation does not include any
voice narration but still can be view self-sufficient without
voice narration; or the voice narration exists but there are
several errors or the presentation is poorly organized and
structured.0.9
to >0
ptsUnacceptableThe presentation does not meet the standards.
8.0 pts
This criterion is linked to a Learning OutcomeAPA Style: TThe
presentation includes at least two scholarly resources to validate
the presentation and presented all resources in a slide or frame
near the end of the presentation. This listing should be in APA
format.
8.0
to >6.9
ptsExcellentThis presentation includes a reference listing with
at least two scholarly resources that is peered reviewed and not
from the textbook. The listing of references are listed near the
end of the slide presentation and is in proper APA format.6.9
to >4.9
ptsCompetentThis presentation includes a reference listing with
at least two scholarly resources that is peered reviewed and not
from the textbook. The listing of references is not in proper
APA format and/or not located at the end of the presentation.4.9
to >3.9
ptsFairThis presentation includes a reference listing with at
least one scholarly resources that is peered reviewed and not
from the textbook. The listing of references The listing of
references may not in proper APA format and/or not located at
the end of the presentation.3.9
to >0.9
ptsPoorThis presentation includes a reference listing the
references do not reflect scholarly resources that is peered
reviewed and not from the textbook. The listing of references is
may not in proper APA format and/or not located at the end of
the presentation.0.9
to >0
ptsUnacceptableThere is not any reference listing.
8.0 pts
Total Points: 210.0
Previous
Next
FINAL COURSE PROJECT PRESENTATION (SIGNATURE ASSIGNMENT)You .docx

More Related Content

More from charlottej5

Final PaperOne reason that California have been known as the Gol.docx
Final PaperOne reason that California have been known as the Gol.docxFinal PaperOne reason that California have been known as the Gol.docx
Final PaperOne reason that California have been known as the Gol.docx
charlottej5
 
Final PaperIndia and China provide two fascinating country case st.docx
Final PaperIndia and China provide two fascinating country case st.docxFinal PaperIndia and China provide two fascinating country case st.docx
Final PaperIndia and China provide two fascinating country case st.docx
charlottej5
 
Final PaperMust begin with an introductory paragraph that has a .docx
Final PaperMust begin with an introductory paragraph that has a .docxFinal PaperMust begin with an introductory paragraph that has a .docx
Final PaperMust begin with an introductory paragraph that has a .docx
charlottej5
 
Final PaperFinal Paper SynopsisThe purpose of this paper .docx
Final PaperFinal Paper SynopsisThe purpose of this paper .docxFinal PaperFinal Paper SynopsisThe purpose of this paper .docx
Final PaperFinal Paper SynopsisThe purpose of this paper .docx
charlottej5
 
Final Paper, Essay Proposal, & Outline·The final essay should .docx
Final Paper, Essay Proposal, & Outline·The final essay should .docxFinal Paper, Essay Proposal, & Outline·The final essay should .docx
Final Paper, Essay Proposal, & Outline·The final essay should .docx
charlottej5
 
Final Paper  The summative assignment for this course is to write a .docx
Final Paper  The summative assignment for this course is to write a .docxFinal Paper  The summative assignment for this course is to write a .docx
Final Paper  The summative assignment for this course is to write a .docx
charlottej5
 
Final Essay Stage Two ah W334 A.docx
Final Essay Stage Two ah W334 A.docxFinal Essay Stage Two ah W334 A.docx
Final Essay Stage Two ah W334 A.docx
charlottej5
 
Final Digital Marketing PlanFinal Digital Marketing .docx
Final Digital Marketing PlanFinal Digital Marketing .docxFinal Digital Marketing PlanFinal Digital Marketing .docx
Final Digital Marketing PlanFinal Digital Marketing .docx
charlottej5
 
Final Course PaperWrite about the impacts of health informatic.docx
Final Course PaperWrite about the impacts of health informatic.docxFinal Course PaperWrite about the impacts of health informatic.docx
Final Course PaperWrite about the impacts of health informatic.docx
charlottej5
 
Final Communication ProjectNew Testament 1.) Pick a Scriptur.docx
Final Communication ProjectNew Testament 1.) Pick a Scriptur.docxFinal Communication ProjectNew Testament 1.) Pick a Scriptur.docx
Final Communication ProjectNew Testament 1.) Pick a Scriptur.docx
charlottej5
 
Final Case Study and Strategic PlanRead the Walt Disney Company .docx
Final Case Study and Strategic PlanRead the Walt Disney Company .docxFinal Case Study and Strategic PlanRead the Walt Disney Company .docx
Final Case Study and Strategic PlanRead the Walt Disney Company .docx
charlottej5
 
Fina Assessment Project The objective of this project is for stude.docx
Fina Assessment Project The objective of this project is for stude.docxFina Assessment Project The objective of this project is for stude.docx
Fina Assessment Project The objective of this project is for stude.docx
charlottej5
 
FIN 571 Final Exam Question 1 Which of the following is c.docx
FIN 571 Final Exam Question 1 Which of the following is c.docxFIN 571 Final Exam Question 1 Which of the following is c.docx
FIN 571 Final Exam Question 1 Which of the following is c.docx
charlottej5
 
FIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docx
FIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docxFIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docx
FIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docx
charlottej5
 
FIN 320 Final Project Guidelines and Rubric Final Pro.docx
FIN 320 Final Project Guidelines and Rubric  Final Pro.docxFIN 320 Final Project Guidelines and Rubric  Final Pro.docx
FIN 320 Final Project Guidelines and Rubric Final Pro.docx
charlottej5
 
Film Analysis AssignmentPurpose To encourage you to becom.docx
Film Analysis AssignmentPurpose To encourage you to becom.docxFilm Analysis AssignmentPurpose To encourage you to becom.docx
Film Analysis AssignmentPurpose To encourage you to becom.docx
charlottej5
 

More from charlottej5 (20)

Final PaperIt was a pleasure to be with you all and you made it fu.docx
Final PaperIt was a pleasure to be with you all and you made it fu.docxFinal PaperIt was a pleasure to be with you all and you made it fu.docx
Final PaperIt was a pleasure to be with you all and you made it fu.docx
 
Final PaperOne reason that California have been known as the Gol.docx
Final PaperOne reason that California have been known as the Gol.docxFinal PaperOne reason that California have been known as the Gol.docx
Final PaperOne reason that California have been known as the Gol.docx
 
Final PaperIndia and China provide two fascinating country case st.docx
Final PaperIndia and China provide two fascinating country case st.docxFinal PaperIndia and China provide two fascinating country case st.docx
Final PaperIndia and China provide two fascinating country case st.docx
 
Final PaperMust begin with an introductory paragraph that has a .docx
Final PaperMust begin with an introductory paragraph that has a .docxFinal PaperMust begin with an introductory paragraph that has a .docx
Final PaperMust begin with an introductory paragraph that has a .docx
 
Final PaperFinal Paper SynopsisThe purpose of this paper .docx
Final PaperFinal Paper SynopsisThe purpose of this paper .docxFinal PaperFinal Paper SynopsisThe purpose of this paper .docx
Final PaperFinal Paper SynopsisThe purpose of this paper .docx
 
Final Paper, Essay Proposal, & Outline·The final essay should .docx
Final Paper, Essay Proposal, & Outline·The final essay should .docxFinal Paper, Essay Proposal, & Outline·The final essay should .docx
Final Paper, Essay Proposal, & Outline·The final essay should .docx
 
Final Paper – Possible topics You propose the topic, b.docx
Final Paper – Possible topics   You propose the topic, b.docxFinal Paper – Possible topics   You propose the topic, b.docx
Final Paper – Possible topics You propose the topic, b.docx
 
Final Paper  The summative assignment for this course is to write a .docx
Final Paper  The summative assignment for this course is to write a .docxFinal Paper  The summative assignment for this course is to write a .docx
Final Paper  The summative assignment for this course is to write a .docx
 
Final Essay Stage Two ah W334 A.docx
Final Essay Stage Two ah W334 A.docxFinal Essay Stage Two ah W334 A.docx
Final Essay Stage Two ah W334 A.docx
 
final draft requires minimum of 5 pages in length, 12-point Times Ne.docx
final draft requires minimum of 5 pages in length, 12-point Times Ne.docxfinal draft requires minimum of 5 pages in length, 12-point Times Ne.docx
final draft requires minimum of 5 pages in length, 12-point Times Ne.docx
 
Final Draft should be based on the topic Decision MakingThe .docx
Final Draft should be based on the topic Decision MakingThe .docxFinal Draft should be based on the topic Decision MakingThe .docx
Final Draft should be based on the topic Decision MakingThe .docx
 
Final Digital Marketing PlanFinal Digital Marketing .docx
Final Digital Marketing PlanFinal Digital Marketing .docxFinal Digital Marketing PlanFinal Digital Marketing .docx
Final Digital Marketing PlanFinal Digital Marketing .docx
 
Final Course PaperWrite about the impacts of health informatic.docx
Final Course PaperWrite about the impacts of health informatic.docxFinal Course PaperWrite about the impacts of health informatic.docx
Final Course PaperWrite about the impacts of health informatic.docx
 
Final Communication ProjectNew Testament 1.) Pick a Scriptur.docx
Final Communication ProjectNew Testament 1.) Pick a Scriptur.docxFinal Communication ProjectNew Testament 1.) Pick a Scriptur.docx
Final Communication ProjectNew Testament 1.) Pick a Scriptur.docx
 
Final Case Study and Strategic PlanRead the Walt Disney Company .docx
Final Case Study and Strategic PlanRead the Walt Disney Company .docxFinal Case Study and Strategic PlanRead the Walt Disney Company .docx
Final Case Study and Strategic PlanRead the Walt Disney Company .docx
 
Fina Assessment Project The objective of this project is for stude.docx
Fina Assessment Project The objective of this project is for stude.docxFina Assessment Project The objective of this project is for stude.docx
Fina Assessment Project The objective of this project is for stude.docx
 
FIN 571 Final Exam Question 1 Which of the following is c.docx
FIN 571 Final Exam Question 1 Which of the following is c.docxFIN 571 Final Exam Question 1 Which of the following is c.docx
FIN 571 Final Exam Question 1 Which of the following is c.docx
 
FIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docx
FIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docxFIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docx
FIN 315 Fall 2018 Case Study Assignment due Dec 6 midnightNot .docx
 
FIN 320 Final Project Guidelines and Rubric Final Pro.docx
FIN 320 Final Project Guidelines and Rubric  Final Pro.docxFIN 320 Final Project Guidelines and Rubric  Final Pro.docx
FIN 320 Final Project Guidelines and Rubric Final Pro.docx
 
Film Analysis AssignmentPurpose To encourage you to becom.docx
Film Analysis AssignmentPurpose To encourage you to becom.docxFilm Analysis AssignmentPurpose To encourage you to becom.docx
Film Analysis AssignmentPurpose To encourage you to becom.docx
 

Recently uploaded

Recently uploaded (20)

COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

FINAL COURSE PROJECT PRESENTATION (SIGNATURE ASSIGNMENT)You .docx

  • 1. FINAL COURSE PROJECT PRESENTATION (SIGNATURE ASSIGNMENT) You will create a 12 to 15 minute presentation via a PowerPoint® presentation that is set up for automatic transitions of slides with voice narration or a Narrated Video Presentation. You will present an overview of the project and provides the project sponsor with an overall view of the project plan. In some cases, the business sponsor/executive will not have time to read the entire plan, so they would prefer a presentation highlighting the key points of the project. You should include the project baseline start and finish dates for the project. You should also include a short table with the high- level budget that indicates the baseline total planned budget amount for the overall project within your presentation. The following sections and information should also be included. Section A: Summary Part 1: Planning, Monitoring, and Execution Part 2: Communication Plan Part 3: Project Status including Quality and Performance Levels Section B: Project Plan Part 1: Milestones
  • 2. Part 2: Review of MS Project® Schedule Part 3: Review of MS Project® Resources Part 4: Review of MS Project® Budget Section C: Project Budget/Schedule Analysis Comparison of Actual vs Budgeted Costs Explanation of Cost Variances (EV) Explanation of Schedule Variance (EV) Section D: Project Overview Needs Assessment and Business Strategy Leadership & Management (Project Organization & Leadership Style) Section E: Conclusion Section F: Lessons Learned Report Please review the rubric for this presentation to ensure all
  • 3. requirements are accomplished with your presentation. This presentation will be submitted by the end of week 7. You will automatically be assigned to two other presentations to conduct your peer reviews that will be due by Saturday of Week 8. Note! The video or presentation will involve a process-orientated task by analyzing the process of completing the project, analyzing the results of the project, and evolving transformation of the results and issues of the project into a summary of the project along with a lessons-learned report (Processes). The collection of data from performing the project would be conducted by the student, which will be analyzed and synthesized. The student through whatever means that is effective that can include Excel® and/or Microsoft® Project® will transform this data into a final management report (Data). After using tools such as Excel® and/or Project®, the student will use a microphone to create narration for a slide presentation via PowerPoint® with automatic transitions, Movie Maker, PowerPoint® Video Tool, or other such presentation/video tools available to the student. Either the PowerPoint® or resulting MP4 video will be embedded to a discussion thread for asynchronous discussion activity (Devices). Finally, a peer review process will follow the submission of the presentation that provides an integral network of outsiders analyzing and evaluating the course project summary and lessons learned provided (People). RUBRIC LMA: PROJ586.WK7.Rubric LMA: PROJ586.WK7.RubricCriteriaRatingsPtsThis criterion is linked to a Learning OutcomeSection A: Summary Part 1 Planning, Monitoring and Executiion
  • 4. 20.0 to >16.9 ptsExcellentStudent provided a full summary overview of project description with a clear and consistent focus that develops a strong central idea as it presents how the project continues to be planned, monitored, and executed.16.9 to >14.9 ptsCompetentStudent generally provided a summary overview of project description that focuses on the central idea of addressing the topic but somewhat vaguely presents how the project continues to be planned, monitored, and executed.14.9 to >10.9 ptsFairStudent partially provided a summary overview of project description that somewhat distorts or neglect significant issues as the student presents how the project continues to be planned, monitored, and executed.10.9 to >0.9 ptsPoorStudent seems somewhat unaware as they provided the summary overview of project description that presents little evidence as to how the project continues to be planned, monitored, and executed.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 20.0 pts This criterion is linked to a Learning OutcomeSection A:
  • 5. Summary Part 2 Communication Plan 10.0 to >8.9 ptsExcellentStudent provided a complete communication plan that has a clear and consistent focus by providing stakeholders with information that expound upon a strong presentation that fully defines who should be given specific information, when that information should be delivered, and what communication channels will be used to deliver the information.8.9 to >7.9 ptsCompetentStudent generally provided a communication plan that mostly provides stakeholders with information that expound upon a presentation that mostly defines who should be given specific information, when that information should be delivered, and what communication channels will be used to deliver the information.7.9 to >5.9 ptsFairStudent partially provided a communication plan somewhat distorts or neglect significant issues as the student presents who should be given specific information, when that information should be delivered, and what communication channels will be used to deliver the information.5.9 to >0.9 ptsPoorStudent seems somewhat unaware as they provided a communication plan that presents little evidence who should be given specific information, when that information should be delivered, and what communication channels will be used to deliver the information.0.9
  • 6. to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeSection A: Summary Part 3 Project Status, including Quality and Performance Levels 18.0 to >16.0 ptsExcellentThe summary fully provides enough information to present a clear picture of the project and the status including project's quality and performance levels.information should be delivered, and what communication channels will be used to deliver the information.16.0 to >14.0 ptsCompetentThe summary generally provides enough information to present a somewhat vague picture of the project and the status including project's quality and performance levels.14.0 to >11.0 ptsFairThe summary partially provides the necessary information which somewhat distorts or neglect significant issues of the project and the status including project’s quality and performance levels.11.0 to >0.9 ptsPoorThe student seems somewhat unaware as they attempt to
  • 7. provide the necessary information which presents little evidence as to the project and the status including project’s quality and performance levels.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 18.0 pts This criterion is linked to a Learning OutcomeSection B: Project Plan Part 1 Milestones 10.0 to >8.9 ptsExcellentThe milestones fully present a clear, concise, and complete timeline with all major benchmark and deliverable items identified and explained. The milestones presented were logically organized and structured and strongly presents to mark specific points along a project timeline.8.9 to >7.9 ptsCompetentThe milestones generally present a central idea of the project timeline but at times, it is vague in some places with respect to all major benchmark and deliverable items. The milestones presented were overall organized and structured as it presents specific points along a project timeline.7.9 to >5.9 ptsFairThe milestones partially presents the project timeline but generates at times some distortion or may neglect significant major benchmark and deliverable items. It may also be illogical, reflects simplistic approach to milestones, or even omit some important items.5.9
  • 8. to >0.9 ptsPoorThe student appears to be unaware of purpose, audience, or organization as they present the project milestones within the project timeline. There is little evidence as to the presentation of the specific points along a project timeline.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeSection B: Project Plan Part 2 Review of MS Project Schedule 10.0 to >8.9 ptsExcellentThe schedule on the MS Project file fully present a clear, concise, and complete work breakdown structure (WBS) that is well organized, structured, and logical to the order of tasks which are at reflected in least three levels (Project, task, sub-tasks). The start and finish dates, task description, duration, and predecessors are reflected properly on the schedule. All tasks appear to be fully identified within the WBS schedule.8.9 to >7.9 ptsCompetentThe schedule on the MS Project file generally present most of the tasks on the work breakdown structure (WBS) and is mostly well organized, structured, and logical to the order of tasks which are at reflected in least three levels (Project, task, sub-tasks). For the most part, the start and finish dates, task description, duration, and predecessors are reflected properly on the schedule. Most of the tasks appear to be
  • 9. identified within the WBS schedule.7.9 to >5.9 ptsFairThe schedule on the MS Project file partially present the tasks on the work breakdown structure (WBS) and is mostly well organized, structured, and logical to the order of tasks. The project schedule may be missing some of the start and finish dates, task description, duration, and predecessors are reflected properly on the schedule. Some important tasks may be missing within the schedule.5.9 to >0.9 ptsPoorThe student appears to be unaware how to work with MS Project as they present the schedule. There is little evidence as to the presentation of the complete scheduled tasks required or necessary for the project.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeSection B: Project Plan Part 3 Review of MS Project Resources 10.0 to >8.9 ptsExcellentThe resources have been identified in the MS Project in a clear, concise, and complete manner and have been properly assigned to the tasks in an orderly fashion. All tasks requiring resources have resources assigned.8.9 to >7.9
  • 10. ptsCompetentThe resource assignment page on the MS Project file generally identify and present most of the resources required for the project tasks identified on the work breakdown structure (WBS). The resources have mostly been assigned to the proper tasks.7.9 to >5.9 ptsFairThe resources are partially identified and generates at times some distortion or may neglect resources necessary for the project schedule. The tasks are only somewhat assigned to the specific tasks.5.9 to >0.9 ptsPoorThe student appears to be unaware of purpose, audience, or organization as they present the resources. There is little evidence as the tasks being assigned to the resources for the project.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeSection B: Project Plan Part 4 Review of MS Project Budget 10.0 to >8.9 ptsExcellentThe budget have been identified in the MS Project in a clear, concise, and complete manner and have been properly assigned to the tasks in an orderly fashion.8.9
  • 11. to >7.9 ptsCompetentThe budget on the MS Project file have been generally identified and presented and generally assigned to the project tasks identified on the work breakdown structure (WBS).7.9 to >5.9 ptsFairThe budget is partially identified and generates at times some distortion or may neglect some costs necessary for the project schedule.5.9 to >0.9 ptsPoorThe student appears to be unaware of purpose, audience, or organization as they present the budget. There is little evidence of the costs being assigned to the resources for the project.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeKCL.PROJ586.CO-C.WBS-Schedule view longer description threshold: 3.0 pts 4.0 ptsExcellent: Develops a strong central idea and explores the issues fully and insightfully the use of such tools to plan project task, budget and resource requirements. It is logically organized with concrete details that directly support major points in the utilization of the two tools in the process of developing
  • 12. precedence relationships among activities, a network diagram and critical path, and schedule.3.0 ptsCompetent: Central idea addresses the topic but is vaguely realized in places regarding the use of such tools to plan project task, budget and resource requirements. Generally well organized, with adequate support in the process of developing precedence relationships among activities, a network diagram and critical path, and schedule. However, there are some misplaced details or logical inconsistencies.2.0 ptsFair: Development of central idea produces some distortion or may neglect significant issues regarding the use of such tools to plan project task, budget and resource requirements. The plan of organization is undermined by omission of ideas and details, and illogical or simplistic reasoning in the process of developing precedence relationships among activities, a network diagram and critical path, and schedule.1.0 ptsPoor: There is little evidence of a controlling idea. The student fails to respond to the situation or explore the issues.0.0 ptsUnacceptable: Student deliverable did not meet the requirements of the outcome 4.0 pts This criterion is linked to a Learning OutcomeSection C: Project Budget/ Schedule Analysis Part 1 A comparison of the actual cost vs budgeted costs 10.0 to >8.9 ptsExcellentThe student fully presents how they developed the project financial and performance objectives by presenting the comparison of the actual cost vs budgeted costs.8.9
  • 13. to >7.9 ptsCompetentThe student mostly presented how they developed the project financial and performance objectives by presenting the comparison of the actual cost vs budgeted costs.7.9 to >5.9 ptsFairThe student partially presented how they developed the project financial and performance objectives by presenting the comparison of the actual cost vs budgeted costs.5.9 to >0.9 ptsPoorThe student shows little evidence as to how they developed the project financial and performance objectives by presenting the comparison of the actual cost vs budgeted costs.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeSection C: Project Budget/ Schedule Analysis Part 2 Explanation of the Cost Variances 10.0 to >8.9 ptsExcellentThe student demonstrates the use of the Earned Value methodology in fully presenting the explanation of the schedule variances in a clear, concise manner.8.9
  • 14. to >7.9 ptsCompetentThe student using Earned Value methodology by generally presenting the explanation of the Schedule variances but at times tends to be somewhat vague.7.9 to >5.9 ptsFairThe student using Earned Value methodology by partially presenting the explanation of the schedule variances but it appears the student is somewhat unaware as to the earned value process regarding schedule variances.5.9 to >0.9 ptsPoorThe student appears to be unaware to the Earned Value methodology by showing little or no evidence of presenting the explanation of the schedule variances based upon earned value concepts.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeSection C: Project Budget/ Schedule Analysis Part 3 Explanation of the Schedule Variances 10.0 to >8.9 ptsExcellentDevelops a strong central idea and explores the issues fully and insightfully as to how they developed and communicated the project financial and performance objectives. It is logically organized with concrete details that directly
  • 15. support major points in the utilization of the two tools in the process of developing precedence relationships among activities, a network diagram and critical path, and schedule. The distinctive voice of the students emerges through superior command of language. Sources are used, if required, to support and develop concepts and ideas, and are properly cited (in-text) and documented (reference page or works cited). Exhibits stylistic variety and energy. Essentially free from mechanical errors.8.9 to >7.9 ptsCompetentCentral idea addresses the topic but is vaguely realized in places regarding how they developed and communicated the project financial and performance objectives. Generally well organized, with adequate support in the process of developing precedence relationships among activities, a network diagram and critical path, and schedule. However, there are some misplaced details or logical inconsistencies. The students’ voice is apparent but occasionally inconsistent. Demonstrates competent use of language and a workable style. Mechanical errors do not significantly interfere with meaning.7.9 to >5.9 ptsFairDevelopment of central idea produces some distortion or may neglect significant issues regarding how they developed and communicated the project financial and performance objectives. The plan of organization is undermined by omission of ideas and details, and illogical or simplistic reasoning in the process of developing precedence relationships among activities, a network diagram and critical path, and schedule. Sources, if required, are used, but with frequent or pervasive inconsistencies in support and/or format. The students’ voice is weakly developed and use of language may be vague, imprecise,
  • 16. or awkward. Style is repetitive or plodding. Mechanical errors sometimes interfere with meaning.5.9 to >0.9 ptsPoorThere is little evidence of a controlling idea. The students fail to respond to the situation or explore the issues. The students’ voice is not recognizable due to inadequate control of language. Style is undeveloped. Sources are required, but are not used thus ideas require support or sources are not cited or correctly documented throughout. Excessive grammatical and mechanical errors block meaning.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeKCL.PROJ586.CO-F.Schedule-Cost-Communcation view longer description threshold: 3.0 pts 4.0 ptsExcellent: Develops a strong central idea and explores the issues fully and insightfully as to how they developed and communicated the project financial and performance objectives. It is logically organized with concrete details that directly support major points in the utilization of the two tools in the process of developing precedence relationships among activities, a network diagram and critical path, and schedule.3.0 ptsCompetent: Central idea addresses the topic but is vaguely realized in places regarding how they developed and communicated the project financial and performance objectives. Generally well organized, with adequate support in the process
  • 17. of developing precedence relationships among activities, a network diagram and critical path, and schedule. However, there are some misplaced details or logical inconsistencies.2.0 ptsFair: Development of central idea produces some distortion or may neglect significant issues regarding how they developed and communicated the project financial and performance objectives. The plan of organization is undermined by omission of ideas and details, and illogical or simplistic reasoning in the process of developing precedence relationships among activities, a network diagram and critical path, and schedule.1.0 ptsPoor: There is limited evidence of a controlling idea. The student fail to respond to the situation or explore the issues.0.0 ptsUnacceptable: The student does not meet the expectations 4.0 pts This criterion is linked to a Learning OutcomeSection D: Project Overview Part 1 Needs Assessment and Business Strategy 20.0 to >16.9 ptsExcellentThe student provides a full presentation of the needs and benefits in a clear, concise manner that shows how they are directly tied to the business strategic objectives of the organization.16.9 to >14.9 ptsCompetentThe student generally provides a presentation of the needs and benefits that focuses on the central idea of addressing the topic but somewhat vaguely presents how they are directly tied to the business strategic objectives of the
  • 18. organization.14.9 to >10.9 ptsFairThe student provides a somewhat partial presentation of the needs and benefits that in some manner distorts as to how they are directly tied to the business strategic objectives of the organization.10.9 to >0.9 ptsPoorThe student seems somewhat unaware as they provided a presentation of the needs and benefits that presents little or no evidence as to how they are directly tied to the business strategic objectives of the organization.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 20.0 pts This criterion is linked to a Learning OutcomeSection D: Project Overview Part 2 Leadership & Management 10.0 to >8.9 ptsExcellentIn a motivational manner for promoting a positive environment manner, the presentation fully clarifies and clearly present an organizational management style utilized with effective, positive leadership skills that will result at the completion of this project.8.9 to >7.9 ptsCompetentIn a generally motivational manner for promoting
  • 19. a positive environment manner, the presentation focuses on the central idea of addressing the topic but somewhat vaguely presents present an organizational management style utilized with effective, positive leadership skills that will result at the completion of this project.7.9 to >5.9 ptsFairIn a partially motivational manner for promoting a positive environment manner, the presentation in some manner distorts as to how their organizational management style utilized will provide for an effective, positive leadership style that will result at the completion of this project.5.9 to >0.9 ptsPoorThe student seems somewhat unaware as to the process of promoting a positive environment manner, as they provide little or no evidence as to how their organizational management style utilized will provide for an effective, positive leadership style that will result at the completion of this project.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeKCL.PROJ586.CO-E.Team-Management view longer description threshold: 3.0 pts 4.0 ptsExcellent: Develops a strong central idea and demonstrates effective leadership skills for promoting a positive environment that will help motivate team members and resolve conflicts.3.0
  • 20. ptsCompetent: Central idea addresses the topic but is vaguely realized in places regarding the demonstration of effective leadership skills for promoting a positive environment that will help motivate team members and resolve conflicts.2.0 ptsFair: Development of central idea produces some distortion or may neglect significant issues regarding the demonstration of effective leadership skills for promoting a positive environment that will help motivate team members and resolve conflicts.1.0 ptsPoor: There is little evidence of a controlling idea. The student fails to respond to the situation or explore the issues.0.0 ptsUnacceptable: Student deliverable did not meet the requirements of the outcome 4.0 pts This criterion is linked to a Learning OutcomeSection E: Conclusion 10.0 to >8.9 ptsExcellentThe student provides a full conclusion that is clear, concise, and to the point. The audience should have a deep understanding as to the presenter’s conclusion and any recommendations.8.9 to >7.9 ptsCompetentThe student generally provides a conclusion that is strong but may be somewhat vague at times. The audience should mostly have a general understanding as to the presenter’s conclusion and any recommendations.7.9
  • 21. to >5.9 ptsFairThe student partially provides a conclusion that but there may be some distortion or may neglect significant issues as to the conclusions. The audience should partially have some understanding as to the presenter’s conclusion and any recommendations.5.9 to >0.9 ptsPoorThe conclusion reflects that the student is unware as to what the conclusion should be for the project presentation by showing little or no evidence of any conclusion or recommendations. The audience most likely will be confused as to the presenter’s conclusion and any recommendations.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 10.0 pts This criterion is linked to a Learning OutcomeSection F: Lessons Learned 20.0 to >16.9 ptsExcellentThe lessons-learned report presented by the student completely and effectively reflects strong project management leadership skills that demonstrates a positive environment that will help motivate team members and resolve conflicts in a future project. The presentation contains a full description on how these lessons will be implemented for the next project.16.9 to >14.9
  • 22. ptsCompetentThe lessons-learned report presented by the student completely and effectively reflects strong project management leadership skills that demonstrates a positive environment that will help motivate team members and resolve conflicts in a future project. The presentation somewhat contains a description on how these lessons will be implemented for the next project.14.9 to >10.9 ptsFairThe lessons-learned report presented by the student completely and effectively reflects strong project management leadership skills that demonstrates a positive environment that will help motivate team members and resolve conflicts in a future project. However, the presentation does not contain a description on how these lessons will be implemented for the next project.10.9 to >0.9 ptsPoorThe lessons-learned report presented by the student only somewhat reflects strong project management leadership skills that demonstrates a positive environment that will help motivate team members and resolve conflicts in a future project.0.9 to >0 ptsUnacceptableThe deliverable does not meet this requirement 20.0 pts This criterion is linked to a Learning OutcomeKCL.PROJ586.CO-G.Project-Closeout view longer description threshold: 3.0 pts 4.0
  • 23. ptsExcellent: Develops a strong and complete closeout plan and completely developes best practices and lessons learned.3.0 ptsCompetent: Develops a mostly complete closeout plan and best practices and lessons learned.2.0 ptsFair: Develops a somewhat complete closeout plan with limited best practices and lessons learned.1.0 ptsPoor: There is little evidence of a controlling idea. The student fails to respond to the situation or explore the issues.0.0 ptsUnacceptable: Student deliverable did not meet the requirements of the outcome 4.0 pts This criterion is linked to a Learning OutcomeMechanics: Narrated Presentation is well structured and organized with recorded voice narration. Grammar, spelling, punctuation, etc. 8.0 to >6.9 ptsExcellentPowerPoint or Video Presentation created that includes voice narrations where the voice automatically plays with automatic transitions of slides or frames, along with being structured well and very organized with virtually no errors made.6.9 to >4.9 ptsCompetentPowerPoint or Video Presentation created that includes voice narrations where the voice automatically plays with automatic transitions of slides or frames, along with being structured and organized with some minor errors made.4.9
  • 24. to >3.9 ptsFairPowerPoint or Video Presentation created that includes voice narrations but the voice does not automatically play with automatic transitions of slides or frames, along with being structured and organized with some minor errors made. Either the slides are not automatic or the voice is not automatic, or both.3.9 to >0.9 ptsPoorPowerPoint or Video Presentation does not include any voice narration but still can be view self-sufficient without voice narration; or the voice narration exists but there are several errors or the presentation is poorly organized and structured.0.9 to >0 ptsUnacceptableThe presentation does not meet the standards. 8.0 pts This criterion is linked to a Learning OutcomeAPA Style: TThe presentation includes at least two scholarly resources to validate the presentation and presented all resources in a slide or frame near the end of the presentation. This listing should be in APA format. 8.0 to >6.9 ptsExcellentThis presentation includes a reference listing with at least two scholarly resources that is peered reviewed and not from the textbook. The listing of references are listed near the end of the slide presentation and is in proper APA format.6.9
  • 25. to >4.9 ptsCompetentThis presentation includes a reference listing with at least two scholarly resources that is peered reviewed and not from the textbook. The listing of references is not in proper APA format and/or not located at the end of the presentation.4.9 to >3.9 ptsFairThis presentation includes a reference listing with at least one scholarly resources that is peered reviewed and not from the textbook. The listing of references The listing of references may not in proper APA format and/or not located at the end of the presentation.3.9 to >0.9 ptsPoorThis presentation includes a reference listing the references do not reflect scholarly resources that is peered reviewed and not from the textbook. The listing of references is may not in proper APA format and/or not located at the end of the presentation.0.9 to >0 ptsUnacceptableThere is not any reference listing. 8.0 pts Total Points: 210.0 Previous Next