Content
1. Introduction
2. Toyota Principles Concept
3. Adopting Toyota way Principles
4. References
Introduction
• The Cmk Construct Pvt is a private construction company which constructs residential and
Commercial Building Projects.
• Lean production is used to improve product quality and value by developing systems and
minimizing waste throughout the process. (Koskela, et al. 2002).
• Lean production implemented by toyota production system had 14 principles which were
described by liker (j. Liker, 2014).
Toyota Principles Concept
• In Toyota way had 14 principles which are divided into 4 P’s (J. Liker, 2014)
1. Philosophy [long-term thinking]
2. Process [value to each customer and waste elimination]
3. People & partners [respect, challenge and grow]
4. Problem-solving [constant learning and improvement]
Adopting Principles
• PROBLEMS
1. Since the previous 2 projects, we realized that projects exceeded the deadlines.
2. Moreover, a lot of extra effort and time we required to invest for redone things again.
3. Due to the errors in construction disrupts the flow of work.
4. Ultimately due to these reasons losses increased, for instance exceeding deadlines penalties
and delays due to the start of a new project.
• ADOPTING TOYOTA WAY-
Principle 2: Continuous flow
• SOLUTIONS
1. Standardize work processes: by standardizing work processes, construction teams can
eliminate unnecessary steps and ensure that each task is completed efficiently.
2. Minimize inventory: excess inventory can lead to wasted time, space, and materials. Reducing
the amount of inventory on-site, so it reduces waste and improves efficiency.
3. Focus on continuous improvement: this principle we analyzing each step of the building
process to identify areas for improvement and implementing changes to streamline work
processes.
• PROBLEMS
1. While the designer and engineer are working on a project, we recognize that lack of
collaboration between them, can lead to delays, cost overruns, and other problems.
2. We have characterized that poor communication between network partners (sub-contractor,
contractors and engineers), which can lead to misunderstandings, errors, and rework.
3. Due to lack of trust can lead to disputes, delays, and other problems. Unfortunately, trust is
often lacking happened between construction network partners, which can lead to a breakdown
in relationships, and they were not ready to work together.
4. We rectify that the quality of construction is compromised, and construction work is not
meeting the required quality standards.
• ADOPTING TOYOTA WAY
Principle 6 : work with standards
Principle 11 : respect your network partners
• SOLUTION
1. Quality of design: The building quality starts with the design process. By specifying the
use of high-quality materials and incorporating quality control measures.
2. Quality assurance and control: We implement regular inspections by the designers and
senior engineers on-site, testing of material, and quality control checks can be used to
ensure that construction work is meeting the required quality standards and ensuring that
all work is performed as per specifications.
3. Delivering the projects defects-free, perfect quality the first time.
1. Establish open communication channels: effective communication is critical to building
strong relationships with network partners. We should be planning to establish open lines of
communication with their partners to encourage collaboration and ensure that everyone is on
the same page.
2. Foster a culture of trust: Trust is essential So, build trust with our network partners by
following through on commitments, being transparent about project progress, and resolving
issues in a timely and respectful manner.
3. For communication and updates about the site we introducing a new software called the
Microsoft team platform where architects, engineers, contractors, electric, mechanical, and
plumbing stay updated about the site.
4. Encourage innovation and continuous improvement: we should encourage our MEP
engineers, designers, and managers to share ideas and best practices to promote innovation
and continuous improvement. This can be achieved through regular meetings, workshops,
and other collaborative initiatives.
References
• (J. Liker, 2014) Lean Production is used to improve product quality and value by developing
systems and minimizing waste throughout the process. (Koskela, et al. 2002).
• Lean production implemented by Toyota Production System had 14 principles which were
described by Liker.

More Related Content

Similar to Lean Construction and integrated Project delivery

Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016Derek Swift
 
COVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated ProjecCOVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated ProjecCruzIbarra161
 
Lean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. SubmittedLean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. SubmittedOlufemi Isaac Akinjiyan
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016Aconex
 
Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction ProjectDr. Firdaus Basbeth
 
Boosting Field Efficiency with advanced Construction Field Productivity Softw...
Boosting Field Efficiency with advanced Construction Field Productivity Softw...Boosting Field Efficiency with advanced Construction Field Productivity Softw...
Boosting Field Efficiency with advanced Construction Field Productivity Softw...iFieldsmart Technologies
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studiesmeritweb
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxsherni1
 
EPA Presentation - Andy Smith
EPA Presentation - Andy SmithEPA Presentation - Andy Smith
EPA Presentation - Andy SmithAndy Smith
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectivessombat nirund
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1suzzanekan
 
Unit1 Web Technology UPTU UNIT 1
Unit1 Web Technology UPTU UNIT 1 Unit1 Web Technology UPTU UNIT 1
Unit1 Web Technology UPTU UNIT 1 Abhishek Kesharwani
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project managementprakashnachnani
 

Similar to Lean Construction and integrated Project delivery (20)

Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
COVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated ProjecCOVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated Projec
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Lean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. SubmittedLean Principles and Project Mapping Application to Project Processes. Submitted
Lean Principles and Project Mapping Application to Project Processes. Submitted
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
 
Operations class project
Operations class projectOperations class project
Operations class project
 
Project Delivery Method Selection Tool
Project Delivery Method Selection ToolProject Delivery Method Selection Tool
Project Delivery Method Selection Tool
 
Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction Project
 
Boosting Field Efficiency with advanced Construction Field Productivity Softw...
Boosting Field Efficiency with advanced Construction Field Productivity Softw...Boosting Field Efficiency with advanced Construction Field Productivity Softw...
Boosting Field Efficiency with advanced Construction Field Productivity Softw...
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
 
Project background
Project backgroundProject background
Project background
 
EPA Presentation - Andy Smith
EPA Presentation - Andy SmithEPA Presentation - Andy Smith
EPA Presentation - Andy Smith
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
 
COLT.pptx
COLT.pptxCOLT.pptx
COLT.pptx
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
Unit1 Web Technology UPTU UNIT 1
Unit1 Web Technology UPTU UNIT 1 Unit1 Web Technology UPTU UNIT 1
Unit1 Web Technology UPTU UNIT 1
 
Unit1 2
Unit1 2 Unit1 2
Unit1 2
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project management
 

Recently uploaded

NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 

Recently uploaded (20)

NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

Lean Construction and integrated Project delivery

  • 1. Cmk Construct Ltd. M A K IN G Y O U R V IS IO N B E C O M E A R E A LIT Y B Y- C H A ITA N YA K A B A D I
  • 2. Content 1. Introduction 2. Toyota Principles Concept 3. Adopting Toyota way Principles 4. References
  • 3. Introduction • The Cmk Construct Pvt is a private construction company which constructs residential and Commercial Building Projects. • Lean production is used to improve product quality and value by developing systems and minimizing waste throughout the process. (Koskela, et al. 2002). • Lean production implemented by toyota production system had 14 principles which were described by liker (j. Liker, 2014).
  • 4. Toyota Principles Concept • In Toyota way had 14 principles which are divided into 4 P’s (J. Liker, 2014) 1. Philosophy [long-term thinking] 2. Process [value to each customer and waste elimination] 3. People & partners [respect, challenge and grow] 4. Problem-solving [constant learning and improvement]
  • 5. Adopting Principles • PROBLEMS 1. Since the previous 2 projects, we realized that projects exceeded the deadlines. 2. Moreover, a lot of extra effort and time we required to invest for redone things again. 3. Due to the errors in construction disrupts the flow of work. 4. Ultimately due to these reasons losses increased, for instance exceeding deadlines penalties and delays due to the start of a new project.
  • 6. • ADOPTING TOYOTA WAY- Principle 2: Continuous flow • SOLUTIONS 1. Standardize work processes: by standardizing work processes, construction teams can eliminate unnecessary steps and ensure that each task is completed efficiently. 2. Minimize inventory: excess inventory can lead to wasted time, space, and materials. Reducing the amount of inventory on-site, so it reduces waste and improves efficiency. 3. Focus on continuous improvement: this principle we analyzing each step of the building process to identify areas for improvement and implementing changes to streamline work processes.
  • 7. • PROBLEMS 1. While the designer and engineer are working on a project, we recognize that lack of collaboration between them, can lead to delays, cost overruns, and other problems. 2. We have characterized that poor communication between network partners (sub-contractor, contractors and engineers), which can lead to misunderstandings, errors, and rework. 3. Due to lack of trust can lead to disputes, delays, and other problems. Unfortunately, trust is often lacking happened between construction network partners, which can lead to a breakdown in relationships, and they were not ready to work together. 4. We rectify that the quality of construction is compromised, and construction work is not meeting the required quality standards.
  • 8. • ADOPTING TOYOTA WAY Principle 6 : work with standards Principle 11 : respect your network partners • SOLUTION 1. Quality of design: The building quality starts with the design process. By specifying the use of high-quality materials and incorporating quality control measures. 2. Quality assurance and control: We implement regular inspections by the designers and senior engineers on-site, testing of material, and quality control checks can be used to ensure that construction work is meeting the required quality standards and ensuring that all work is performed as per specifications. 3. Delivering the projects defects-free, perfect quality the first time.
  • 9. 1. Establish open communication channels: effective communication is critical to building strong relationships with network partners. We should be planning to establish open lines of communication with their partners to encourage collaboration and ensure that everyone is on the same page. 2. Foster a culture of trust: Trust is essential So, build trust with our network partners by following through on commitments, being transparent about project progress, and resolving issues in a timely and respectful manner. 3. For communication and updates about the site we introducing a new software called the Microsoft team platform where architects, engineers, contractors, electric, mechanical, and plumbing stay updated about the site. 4. Encourage innovation and continuous improvement: we should encourage our MEP engineers, designers, and managers to share ideas and best practices to promote innovation and continuous improvement. This can be achieved through regular meetings, workshops, and other collaborative initiatives.
  • 10. References • (J. Liker, 2014) Lean Production is used to improve product quality and value by developing systems and minimizing waste throughout the process. (Koskela, et al. 2002). • Lean production implemented by Toyota Production System had 14 principles which were described by Liker.