SlideShare a Scribd company logo
1 of 1
Download to read offline
Project: Creation of Elective Admissions Lounge
                                                       Project Officer: Mr D. Dawkins

                                                       This successful project involved the conversion of the
                                                       existing dormitory rooms into two on the day
                                                       admission unit. This Admission Lounge consists
                                                       separate male and female waiting areas, WCs,
                                                       changing areas, consulting rooms, reception area
                                                       and high quality bespoke joinery along with a
                                                       connecting link to the main hospital.
                              BASILDON & THURROCK
                              UNIVERSITY HOSPITAL
                                                       We completed in time and on budget and achieved a
                              VALUE: £114, 000
                                                       beautiful finish. The client remains happy with the
                              NHS
                                                       finished project and is available for reference.


                                                             HOMERTON HOSPITAL
                                                             VALUE: £56, 000
                                                             NHS




                            OPRINGTON HOSPITAL
                            VALUE: £80, 000
                            NHS


Project: Privacy/Dignity Scheme: The Alan               Project: Board Room Fit-Out
Cummings Day Surgery Unit Relocation of
Dermatology Offices                                     This project comprised the complete strip out and re-
Contract Administrator: Mr. Warren Peacock -            fit of the hospital board room. Various designs were
01689 865416 Ext: 65416                                 presented to the client who eventually chose oak, as
                                                        the base timber for the project.
This scheme involved the division of the male and
                                                        Walls were clad from floor to ceiling with matching
female areas of the Day Surgery Unit of Orpington.
                                                        oak veneer boards to give a modern and expensive
Time was essential as valuable revenue would have
                                                        feel. Lighting was housed in an overhead oak pelmet
been lost should the scheme be completed late.
                                                        arrangement in the same shape as the table,
Working around the clock, Carmelcrest completed
                                                        suspended from the ceiling on fine wire cables. The
on time and on budget and achieved a beautiful
                                                        bespoke boardroom table was designed to
finish.
                                                        complement the wall panelling and the room was
The client was very happy with the result and has       finished with traditional French polishing. The project
given his approval to be contacted for a reference.     was completed within two weeks and the client is
                                                        very happy.




                           363 Ripple Road, Essex. IG1 19PN Tel: 020 8594 2594 Fax: 020 8591 1213
                                       Email: info@carmelcrest.co.uk Website: www.carmelcrest.co.uk

More Related Content

Similar to Project summary health

Carmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board RoomCarmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board RoomCarmelcrest
 
Pedder and Scampton Mini Brochure Domestic 23.03.09
Pedder and Scampton  Mini Brochure Domestic 23.03.09Pedder and Scampton  Mini Brochure Domestic 23.03.09
Pedder and Scampton Mini Brochure Domestic 23.03.09Gill_Scampton
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae Alan Watson
 
Office Refurbishment and Laboratory Installation Project
Office Refurbishment and Laboratory Installation ProjectOffice Refurbishment and Laboratory Installation Project
Office Refurbishment and Laboratory Installation ProjectNeil Emmott
 
John Flynn Private Hospital
John Flynn Private Hospital John Flynn Private Hospital
John Flynn Private Hospital Od Solutions
 
London Residential | Case Study
London Residential | Case Study London Residential | Case Study
London Residential | Case Study 33 London Limited
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CVDave Arkell
 
Uponor Corporate Brochure
Uponor Corporate BrochureUponor Corporate Brochure
Uponor Corporate Brochuredavidapark
 
Uponor Corporate Brochure
Uponor Corporate BrochureUponor Corporate Brochure
Uponor Corporate Brochuredavidapark
 
Take a look at some of our recent projects
Take a look at some of our recent projectsTake a look at some of our recent projects
Take a look at some of our recent projectsKatie Hayes
 
Healthcare projects 2013
Healthcare projects 2013Healthcare projects 2013
Healthcare projects 2013roger_lawson
 
Case study orpington hospital
Case study orpington hospitalCase study orpington hospital
Case study orpington hospitalCarmelcrest
 
Case Study Orpington Hospital
Case Study Orpington HospitalCase Study Orpington Hospital
Case Study Orpington HospitalCarmelcrest
 
High-end refurbishment contractor in London.
High-end refurbishment contractor in London.High-end refurbishment contractor in London.
High-end refurbishment contractor in London.Mariusz Gawecki
 
Green Unit Brochure
Green Unit Brochure Green Unit Brochure
Green Unit Brochure stuartmchale
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Outlukebraithwaite
 

Similar to Project summary health (20)

Carmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board RoomCarmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board Room
 
Pedder and Scampton Mini Brochure Domestic 23.03.09
Pedder and Scampton  Mini Brochure Domestic 23.03.09Pedder and Scampton  Mini Brochure Domestic 23.03.09
Pedder and Scampton Mini Brochure Domestic 23.03.09
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
Office Refurbishment and Laboratory Installation Project
Office Refurbishment and Laboratory Installation ProjectOffice Refurbishment and Laboratory Installation Project
Office Refurbishment and Laboratory Installation Project
 
John Flynn Private Hospital
John Flynn Private Hospital John Flynn Private Hospital
John Flynn Private Hospital
 
London Residential | Case Study
London Residential | Case Study London Residential | Case Study
London Residential | Case Study
 
fscbs overview
fscbs overview fscbs overview
fscbs overview
 
Cpl Interiors Plc
Cpl Interiors PlcCpl Interiors Plc
Cpl Interiors Plc
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
 
Uponor Corporate Brochure
Uponor Corporate BrochureUponor Corporate Brochure
Uponor Corporate Brochure
 
Uponor Corporate Brochure
Uponor Corporate BrochureUponor Corporate Brochure
Uponor Corporate Brochure
 
Take a look at some of our recent projects
Take a look at some of our recent projectsTake a look at some of our recent projects
Take a look at some of our recent projects
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
Healthcare projects 2013
Healthcare projects 2013Healthcare projects 2013
Healthcare projects 2013
 
Case study orpington hospital
Case study orpington hospitalCase study orpington hospital
Case study orpington hospital
 
Case Study Orpington Hospital
Case Study Orpington HospitalCase Study Orpington Hospital
Case Study Orpington Hospital
 
High-end refurbishment contractor in London.
High-end refurbishment contractor in London.High-end refurbishment contractor in London.
High-end refurbishment contractor in London.
 
South Wales Architect
South Wales ArchitectSouth Wales Architect
South Wales Architect
 
Green Unit Brochure
Green Unit Brochure Green Unit Brochure
Green Unit Brochure
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Out
 

More from Carmelcrest

Project summary education
Project summary educationProject summary education
Project summary educationCarmelcrest
 
Sector summary social
Sector summary socialSector summary social
Sector summary socialCarmelcrest
 
Sector summary education
Sector summary educationSector summary education
Sector summary educationCarmelcrest
 
Elmhurst Primary School: Refurbishment of School toilets
Elmhurst Primary School: Refurbishment of School toiletsElmhurst Primary School: Refurbishment of School toilets
Elmhurst Primary School: Refurbishment of School toiletsCarmelcrest
 
Refurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker RoomRefurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker RoomCarmelcrest
 
Case Study Maryland
Case Study MarylandCase Study Maryland
Case Study MarylandCarmelcrest
 
Case Study Ronald Openshaw3
Case Study Ronald Openshaw3Case Study Ronald Openshaw3
Case Study Ronald Openshaw3Carmelcrest
 

More from Carmelcrest (8)

Project summary education
Project summary educationProject summary education
Project summary education
 
Sector summary social
Sector summary socialSector summary social
Sector summary social
 
Sector summary education
Sector summary educationSector summary education
Sector summary education
 
Get modern
Get modernGet modern
Get modern
 
Elmhurst Primary School: Refurbishment of School toilets
Elmhurst Primary School: Refurbishment of School toiletsElmhurst Primary School: Refurbishment of School toilets
Elmhurst Primary School: Refurbishment of School toilets
 
Refurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker RoomRefurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker Room
 
Case Study Maryland
Case Study MarylandCase Study Maryland
Case Study Maryland
 
Case Study Ronald Openshaw3
Case Study Ronald Openshaw3Case Study Ronald Openshaw3
Case Study Ronald Openshaw3
 

Project summary health

  • 1. Project: Creation of Elective Admissions Lounge Project Officer: Mr D. Dawkins This successful project involved the conversion of the existing dormitory rooms into two on the day admission unit. This Admission Lounge consists separate male and female waiting areas, WCs, changing areas, consulting rooms, reception area and high quality bespoke joinery along with a connecting link to the main hospital. BASILDON & THURROCK UNIVERSITY HOSPITAL We completed in time and on budget and achieved a VALUE: £114, 000 beautiful finish. The client remains happy with the NHS finished project and is available for reference. HOMERTON HOSPITAL VALUE: £56, 000 NHS OPRINGTON HOSPITAL VALUE: £80, 000 NHS Project: Privacy/Dignity Scheme: The Alan Project: Board Room Fit-Out Cummings Day Surgery Unit Relocation of Dermatology Offices This project comprised the complete strip out and re- Contract Administrator: Mr. Warren Peacock - fit of the hospital board room. Various designs were 01689 865416 Ext: 65416 presented to the client who eventually chose oak, as the base timber for the project. This scheme involved the division of the male and Walls were clad from floor to ceiling with matching female areas of the Day Surgery Unit of Orpington. oak veneer boards to give a modern and expensive Time was essential as valuable revenue would have feel. Lighting was housed in an overhead oak pelmet been lost should the scheme be completed late. arrangement in the same shape as the table, Working around the clock, Carmelcrest completed suspended from the ceiling on fine wire cables. The on time and on budget and achieved a beautiful bespoke boardroom table was designed to finish. complement the wall panelling and the room was The client was very happy with the result and has finished with traditional French polishing. The project given his approval to be contacted for a reference. was completed within two weeks and the client is very happy. 363 Ripple Road, Essex. IG1 19PN Tel: 020 8594 2594 Fax: 020 8591 1213 Email: info@carmelcrest.co.uk Website: www.carmelcrest.co.uk