SlideShare a Scribd company logo
1 of 6
AYAN SHUBHRO GANGULY
                             Email-id: ayanganguly86@yahoo.co.in
                                       ayanganguly2986@yahoo.com

                             Mobile: 08374236812

      Career Objective: To grow limitlessly in the field of ENERGY
      CONSERVATION in a reputed firm where in I could deliver my
      best applied engineering knowledge and management skills to
      pave the projects to success.

      Present Job Profile:
          •   Leaded team for energy audit.
          •   Preparation of check list for field visit.
          •   Give training to juniors for to enhance their Energy auditing skills.
          •   Ensuring measurement quality and its analysis.
          •   Complete client side handling.
          •   Draft report preparation, saving calculations and its feasibility.
          •   Communicating with the vendors for project proposals.
          •   Communicating with vendors for project implementation.

      Project Undertaken:
S.      Project          Sectors         Client       Location               Responsibilities
No      Details
 .
 1   Decentralized     Renewable       MeECL         Meghalaya      1. Check list preparation for field
     Distributed       energy                                          survey.
     Generation                                                     2. Assessment and monitoring
                                                                       the field study.
                                                                    3. Renewable energy feasibility
                                                                       study at the site.
                                                                    4. Potential assessment for
                                                                       energy availability from
                                                                       renewable sources.
                                                                    5. Feasibility of micro hydro
                                                                       power plant at the site.
2    Solar City        Application     MNRE            Hamirpur      1. Data verification and its
     (MNRE)            of                             (Himachal          analysis.
                       renewable                       Pradesh)      2. Identifying suitable
                       energy and                                        technology for the power
                       energy                                            generation from available
                       conservatio                                       renewable energy sources.
                       n in the                                      3. Communicating with the
                       Municipality                                      vendors for project
                                                                         proposals and its
                                                                         implementation.
                                                                     4. Complete project report
                                                                         preparation and costing.
                                                                     5. Presenting the proposal to
                                                                         the Himurja personals and
S.     Project     Sectors       Client      Location           Responsibilities
No     Details
 .
                                                             Hamirpur corporation heads
                                                             .




3    BEE SME     Sponge Iron   Bureau of     Rourkela  a. Check list preparation,
     Cluster                   Energy         (Orisa)  b. Field measurements for both
                               Efficiency              thermal and electrical utilities.
                                                       c. Collecting energy consumption
                                                       details (both thermal and
                                                       electrical)
                                                       d. Guiding Juniors}
                                                       e. Process mapping.
                                                       f. Energy and mass balancing.
                                                       g. Communicating with the unit
                                                       holder and association for
                                                       demonstrating the projects
                                                       benefits.
                                                       i. Data analysis and saving
                                                       calculations.
                                                       j. Draft report and bankable DPR
                                                       preparation.
                                                       k. Communicating with the
                                                       vendors for the project
                                                       implementation.
                                                       l. Arranging workshops for
                                                       demonstrating the project
                                                       findings.
4    BEE SME     Ice making    Bureau of    Bhimavaram 1. Sample Energy Audits.
     Cluster     Units         Energy           (A.P)      (a. Check list preparation,
                               Efficiency                   b. Field measurements both
                                                           thermal, electrical &
                                                           hydraulics.
                                                           c. Collecting energy
                                                           consumption details (both
                                                           thermal and electrical)
5    BEE SME     Refractory    Bureau of    East and       d. Guiding Juniors training
     Cluster     units         Energy       West           them for measurements )
                               Efficiency   Godavari       e. Process mapping
                                            (A.P)          f. Energy balancing.
                                                       2. Data analysis and feasibility
                                                           study.
                                                       3. Report and bankable DPR
                                                           preparation.
                                                       4. Communicating with the
                                                           vendors for the project
                                                           implementation.
S.      Project          Sectors         Client      Location              Responsibilities
No      Details
 .
 6   Decentralized     Villages        MPURJA       27 villages   1. Check list preparation for field
     Distributed       where                        in Balaghat       survey.
     Generation        power                        districts M.P 2. Assessment and monitoring
                       supply yet                                     the field study by the survey
                       not available                                  agency.
                       from central                               3. Available renewable energy
                       Grid                                           feasibility.
                                                                  4. Potential assessment for
                                                                      energy availability from
                                                                      available renewable sources.
                                                                  5. Report discussion with
                                                                      MPURJA and REC (Rural
                                                                      Electrification Corporation
                                                                      Ltd) executives.
7    Steel   rolling   Adarsh            UNDP             ----    Hourly monitoring the electricity
     mill      post    Ispath Bhilai                              and fuel consumption with the
     implementatio     ARS metals                                 production.
     n study           Gumalpindi                                 Finding the specific energy
                       Chennai                                    consumption after
                                                                  implementation
                                                                  Compare the specific energy
                                                                  consumption of the plant after
                                                                  implementation with the earlier
                                                                  specific energy consumption.
8    Investment        Municipal       Bureau of    1. Ujjain     Responsibility as team lead. And
     Grade Audit       Corporation     Energy       2. Ratmal     to complete the project of
     for Municipal                     Efficiency   3. Raipur     Municipal Demand side
     Demand Side                                    4. Bilaspur   Management of the given 9
     Management.                                    5. Bhilai     municipal corporation within a
                                                    6. Rewa       period of 1 year.
                                                    7. Trichur    Team: minimum of 12 diploma
                                                    8. Plakkad    staffs and 4 Engineers.
                                                    9. Allapy
                                                                  1. Demonstrating the project to
                                                                      the municipal corporation
                                                                      executive and commissioners
                                                                      in presentation form.
                                                                  2. Responsible for check list
                                                                      preparation and completing
                                                                      all field measurement and
                                                                      required data collection of
                                                                      water pumping, street lighting
                                                                      and building energy audit.
                                                                  3. Responsible for training the
                                                                      engineers and diploma staff
                                                                      for carrying of energy audit in
                                                                      building, street lights and
                                                                      pumping station.
                                                                  4. Successfully completed all
                                                                      the measurement and
                                                                      analysis of all the clear water,
S.      Project        Sectors       Client      Location              Responsibilities
No      Details
 .
                                                                   sewage water pumping sites,
                                                                   street lights and buildings as
                                                                   per BEE norms and methods.
                                                              5.   Energy bill analysis according
                                                                   to the tariff structure with
                                                                   saving calculation from tariff.
                                                              6.   Saving findings and their
                                                                   calculations with each
                                                                   project’s IRR.
                                                              7.   Complete report preparation
                                                                   with its business module and
                                                                   monitoring and verification
                                                                   protocol.
9    Thermal         Here we are able to monitor the real 1.       Guiding the software persons
     Monitoring      time temperature data of furans (Melting      for generating the required
     System for      & Reheating) set up with recuperation.        output.
     Regional        Thus we will be able to monitor the 2.        Dealing with the equipment
     Energy          performance for the furnace with and          suppliers for the required
     Efficiency      without recuperator.                          equipment.
     Center Lab @                                             3.   Installing the system at the
     SEE-Tech                                                      site and made the interface
     Solution Pvt.                                                 with the software.
     Ltd.                                                     4.   Made it run as per the
                                                                   requirement.
10   Pumping         Plastic       ABC plastic   Hingna       1.   Complete pumping network
     system study.   industry      Pvt. Ltd.     MIDC              mapping, measurement and
                                                 Nagpur            analysis.
                                                              2.    Discussion with clients and
                                                                   explaining the system
                                                                   performance.
                                                              3.   Identifying the energy saving
                                                                   areas.
                                                              4.   Report preparation.
11   Pumping         Municipal      Jewan        Gondia       1.    Total Pump analysis, guiding
     system study.   Cooperation   Pradhikara    MH                team at the site and off site
                     Gondia        n                               for proper execution of the
                                                                   field measurement for
                                                                   successful carrying out the
                                                                   energy audit.
                                                              2.   Preparation of pump curve for
                                                                   each pumps installed.
                                                              3.   Report Preparation.
12    Safety Audit   Refinery      HPCL          Mumbai       1.   Complete project
                                   Refinery                        management responsibility.
                                                              2.   Cost minimization.
                                                              3.   Controlling a team of 6
                                                                   diploma staffs at the sites for
                                                                   the proper and smooth
                                                                   execution of the projects.
                                                              4.   Report preparation and
                                                                   discussion with Sr. Executive
S.        Project           Sectors           Client    Location            Responsibilities
No        Details
 .
                                                                        and Chief engineer.

13     Safety Audit at   (project           HPCL        All over    1. Complete responsibility of
        petrol pumps     includes           Retail      India          project management.
                         1000 retail        Outlets                 2. Report checking, team
                         outlets all                                   management, training to team
                         over India)                                   members.
                                                                    3. Motivating team members.
                                                                    4. Complete client handling and
                                                                       billing responsibility/
                                                                    5. Clearing report related
                                                                       problem and quarries of the
                                                                       clients.
14     Energy Audit      CD making          Moserbaer   Greater     1. Field measurements.
                         industry           India ltd   Noida       2. Data collections.
                                                                    3. Identify measure energy
                                                                       guzzlers at the industry.
                                                                    4. Discursion with the engineers
                                                                       for process mapping.




     Conferences and Workshop Attended:-

             1.   Solar training program in by SEMI at Jaipur.
             2.   Indo-Japan conference at Delhi organized by Teri, BEE and NEDO.
             3.   Demand Side Management work shop at Bhopal by MPUVN and MPERC.
             4.   Municipal Demand Side Management conference at Bhopal by BEE both (I
                  and II).

     Work Experience:
             1. Presently working as a Consultant in APITCO ltd. Hyderabad. (A.P). 18th
                  Oct 2010 to still date.
             2. Worked as Sr. Consulting Engineer in SEE TECH Solution PVT. Ltd.
                  Nagpur (M.H) from 15th May 2008 to 16th Oct 2010




     Educational Qualification:
            Examination                     College        University      Year         Percentage
         BEE Energy Auditor                   ---            BEE           2010       Paper cleared for
            Certification                                                (October)      EA- 1,3, & 4
        M.Tech (Energy              School of Energy     DAVV Indore       2012        Result Awaited
        Management Distance         and Environment      University
        Learning )                  Studies
BE (Electrical               KDK College of      Nagpur            2008             64%
  Engineering)                 Engineering         University
                               Nagpur,
  H.S.C.                       Kendriya Vidalaya   C.B.S.E           2004             60%
                               Ballygunge
  S.S.C.                       Kendriya Vidalaya   C.B.S.E           2002             66%
                               BALCO Korba



Training:
1. Training in PLC & SCADA from KRISH ENGINEERING.
2. Robo-TRIX workshop.




Extra-Curricular Activities:
1. Silver medal in hockey (regional level at K.V 1 STC Jabalpur)
2. Played inter college football tournaments.
3. Participated in Techno Trucks inter college robotic competition with (project GRIPO-
ROBOT).
4. Winner of Navomesh two consecutive times (college level Drama completion).



  Personal Details:

  Date of Birth                 : 29th April 1986
  Sex                           : Male
  Marital status                : Single
  Nationality                   : Indian
  Passport status               : Valid
  Languages Known               : English, Hindi and Bengali
  Father’s Name                 : Mr. Amit Kumar Ganguly
  Occupation                    : Private Service
  Permanent Address             : 31E, Harisadhan Patoari Road, Eastern Park,
                                  First Road, Santoshpur, Kolkata – 700 075

More Related Content

Similar to Cv Ayan Ganguly

How to find a professional local partner in Ukraine
How to find a professional local partner in UkraineHow to find a professional local partner in Ukraine
How to find a professional local partner in Ukraine
Dmitry Lukomskiy
 
Enel's CCS Project Current Status Overview
Enel's CCS Project Current Status OverviewEnel's CCS Project Current Status Overview
Enel's CCS Project Current Status Overview
canaleenergia
 

Similar to Cv Ayan Ganguly (20)

Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
 
Development of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
Development of 'State-of-Art' Building Energy Dashboard: The C3 DashboardDevelopment of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
Development of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
 
Agneya Clientele
Agneya ClienteleAgneya Clientele
Agneya Clientele
 
Ambicales Energy Audit
Ambicales Energy AuditAmbicales Energy Audit
Ambicales Energy Audit
 
Tg science q2 efficient energy transfer
Tg science q2   efficient energy transferTg science q2   efficient energy transfer
Tg science q2 efficient energy transfer
 
Sim Energy Brochure Carbon Management
Sim Energy Brochure   Carbon ManagementSim Energy Brochure   Carbon Management
Sim Energy Brochure Carbon Management
 
Environ arc energy audit report 2 with appendices
Environ arc energy audit report 2 with appendicesEnviron arc energy audit report 2 with appendices
Environ arc energy audit report 2 with appendices
 
CCSE Conference Plenary Presentation
CCSE Conference Plenary PresentationCCSE Conference Plenary Presentation
CCSE Conference Plenary Presentation
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
ANIL_UPDATED_RESUME
ANIL_UPDATED_RESUMEANIL_UPDATED_RESUME
ANIL_UPDATED_RESUME
 
50 MW solar-thermal-dpr
50 MW solar-thermal-dpr50 MW solar-thermal-dpr
50 MW solar-thermal-dpr
 
IBM smarter energy
IBM smarter energyIBM smarter energy
IBM smarter energy
 
Global Solar Summit
Global Solar SummitGlobal Solar Summit
Global Solar Summit
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power RisksSmall and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
 
How to find a professional local partner in Ukraine
How to find a professional local partner in UkraineHow to find a professional local partner in Ukraine
How to find a professional local partner in Ukraine
 
Enel's CCS Project Current Status Overview
Enel's CCS Project Current Status OverviewEnel's CCS Project Current Status Overview
Enel's CCS Project Current Status Overview
 
Gvt 02
Gvt 02Gvt 02
Gvt 02
 
Kammen
KammenKammen
Kammen
 

Cv Ayan Ganguly

  • 1. AYAN SHUBHRO GANGULY Email-id: ayanganguly86@yahoo.co.in ayanganguly2986@yahoo.com Mobile: 08374236812 Career Objective: To grow limitlessly in the field of ENERGY CONSERVATION in a reputed firm where in I could deliver my best applied engineering knowledge and management skills to pave the projects to success. Present Job Profile: • Leaded team for energy audit. • Preparation of check list for field visit. • Give training to juniors for to enhance their Energy auditing skills. • Ensuring measurement quality and its analysis. • Complete client side handling. • Draft report preparation, saving calculations and its feasibility. • Communicating with the vendors for project proposals. • Communicating with vendors for project implementation. Project Undertaken: S. Project Sectors Client Location Responsibilities No Details . 1 Decentralized Renewable MeECL Meghalaya 1. Check list preparation for field Distributed energy survey. Generation 2. Assessment and monitoring the field study. 3. Renewable energy feasibility study at the site. 4. Potential assessment for energy availability from renewable sources. 5. Feasibility of micro hydro power plant at the site. 2 Solar City Application MNRE Hamirpur 1. Data verification and its (MNRE) of (Himachal analysis. renewable Pradesh) 2. Identifying suitable energy and technology for the power energy generation from available conservatio renewable energy sources. n in the 3. Communicating with the Municipality vendors for project proposals and its implementation. 4. Complete project report preparation and costing. 5. Presenting the proposal to the Himurja personals and
  • 2. S. Project Sectors Client Location Responsibilities No Details . Hamirpur corporation heads . 3 BEE SME Sponge Iron Bureau of Rourkela a. Check list preparation, Cluster Energy (Orisa) b. Field measurements for both Efficiency thermal and electrical utilities. c. Collecting energy consumption details (both thermal and electrical) d. Guiding Juniors} e. Process mapping. f. Energy and mass balancing. g. Communicating with the unit holder and association for demonstrating the projects benefits. i. Data analysis and saving calculations. j. Draft report and bankable DPR preparation. k. Communicating with the vendors for the project implementation. l. Arranging workshops for demonstrating the project findings. 4 BEE SME Ice making Bureau of Bhimavaram 1. Sample Energy Audits. Cluster Units Energy (A.P) (a. Check list preparation, Efficiency b. Field measurements both thermal, electrical & hydraulics. c. Collecting energy consumption details (both thermal and electrical) 5 BEE SME Refractory Bureau of East and d. Guiding Juniors training Cluster units Energy West them for measurements ) Efficiency Godavari e. Process mapping (A.P) f. Energy balancing. 2. Data analysis and feasibility study. 3. Report and bankable DPR preparation. 4. Communicating with the vendors for the project implementation.
  • 3. S. Project Sectors Client Location Responsibilities No Details . 6 Decentralized Villages MPURJA 27 villages 1. Check list preparation for field Distributed where in Balaghat survey. Generation power districts M.P 2. Assessment and monitoring supply yet the field study by the survey not available agency. from central 3. Available renewable energy Grid feasibility. 4. Potential assessment for energy availability from available renewable sources. 5. Report discussion with MPURJA and REC (Rural Electrification Corporation Ltd) executives. 7 Steel rolling Adarsh UNDP ---- Hourly monitoring the electricity mill post Ispath Bhilai and fuel consumption with the implementatio ARS metals production. n study Gumalpindi Finding the specific energy Chennai consumption after implementation Compare the specific energy consumption of the plant after implementation with the earlier specific energy consumption. 8 Investment Municipal Bureau of 1. Ujjain Responsibility as team lead. And Grade Audit Corporation Energy 2. Ratmal to complete the project of for Municipal Efficiency 3. Raipur Municipal Demand side Demand Side 4. Bilaspur Management of the given 9 Management. 5. Bhilai municipal corporation within a 6. Rewa period of 1 year. 7. Trichur Team: minimum of 12 diploma 8. Plakkad staffs and 4 Engineers. 9. Allapy 1. Demonstrating the project to the municipal corporation executive and commissioners in presentation form. 2. Responsible for check list preparation and completing all field measurement and required data collection of water pumping, street lighting and building energy audit. 3. Responsible for training the engineers and diploma staff for carrying of energy audit in building, street lights and pumping station. 4. Successfully completed all the measurement and analysis of all the clear water,
  • 4. S. Project Sectors Client Location Responsibilities No Details . sewage water pumping sites, street lights and buildings as per BEE norms and methods. 5. Energy bill analysis according to the tariff structure with saving calculation from tariff. 6. Saving findings and their calculations with each project’s IRR. 7. Complete report preparation with its business module and monitoring and verification protocol. 9 Thermal Here we are able to monitor the real 1. Guiding the software persons Monitoring time temperature data of furans (Melting for generating the required System for & Reheating) set up with recuperation. output. Regional Thus we will be able to monitor the 2. Dealing with the equipment Energy performance for the furnace with and suppliers for the required Efficiency without recuperator. equipment. Center Lab @ 3. Installing the system at the SEE-Tech site and made the interface Solution Pvt. with the software. Ltd. 4. Made it run as per the requirement. 10 Pumping Plastic ABC plastic Hingna 1. Complete pumping network system study. industry Pvt. Ltd. MIDC mapping, measurement and Nagpur analysis. 2. Discussion with clients and explaining the system performance. 3. Identifying the energy saving areas. 4. Report preparation. 11 Pumping Municipal Jewan Gondia 1. Total Pump analysis, guiding system study. Cooperation Pradhikara MH team at the site and off site Gondia n for proper execution of the field measurement for successful carrying out the energy audit. 2. Preparation of pump curve for each pumps installed. 3. Report Preparation. 12 Safety Audit Refinery HPCL Mumbai 1. Complete project Refinery management responsibility. 2. Cost minimization. 3. Controlling a team of 6 diploma staffs at the sites for the proper and smooth execution of the projects. 4. Report preparation and discussion with Sr. Executive
  • 5. S. Project Sectors Client Location Responsibilities No Details . and Chief engineer. 13 Safety Audit at (project HPCL All over 1. Complete responsibility of petrol pumps includes Retail India project management. 1000 retail Outlets 2. Report checking, team outlets all management, training to team over India) members. 3. Motivating team members. 4. Complete client handling and billing responsibility/ 5. Clearing report related problem and quarries of the clients. 14 Energy Audit CD making Moserbaer Greater 1. Field measurements. industry India ltd Noida 2. Data collections. 3. Identify measure energy guzzlers at the industry. 4. Discursion with the engineers for process mapping. Conferences and Workshop Attended:- 1. Solar training program in by SEMI at Jaipur. 2. Indo-Japan conference at Delhi organized by Teri, BEE and NEDO. 3. Demand Side Management work shop at Bhopal by MPUVN and MPERC. 4. Municipal Demand Side Management conference at Bhopal by BEE both (I and II). Work Experience: 1. Presently working as a Consultant in APITCO ltd. Hyderabad. (A.P). 18th Oct 2010 to still date. 2. Worked as Sr. Consulting Engineer in SEE TECH Solution PVT. Ltd. Nagpur (M.H) from 15th May 2008 to 16th Oct 2010 Educational Qualification: Examination College University Year Percentage BEE Energy Auditor --- BEE 2010 Paper cleared for Certification (October) EA- 1,3, & 4 M.Tech (Energy School of Energy DAVV Indore 2012 Result Awaited Management Distance and Environment University Learning ) Studies
  • 6. BE (Electrical KDK College of Nagpur 2008 64% Engineering) Engineering University Nagpur, H.S.C. Kendriya Vidalaya C.B.S.E 2004 60% Ballygunge S.S.C. Kendriya Vidalaya C.B.S.E 2002 66% BALCO Korba Training: 1. Training in PLC & SCADA from KRISH ENGINEERING. 2. Robo-TRIX workshop. Extra-Curricular Activities: 1. Silver medal in hockey (regional level at K.V 1 STC Jabalpur) 2. Played inter college football tournaments. 3. Participated in Techno Trucks inter college robotic competition with (project GRIPO- ROBOT). 4. Winner of Navomesh two consecutive times (college level Drama completion). Personal Details: Date of Birth : 29th April 1986 Sex : Male Marital status : Single Nationality : Indian Passport status : Valid Languages Known : English, Hindi and Bengali Father’s Name : Mr. Amit Kumar Ganguly Occupation : Private Service Permanent Address : 31E, Harisadhan Patoari Road, Eastern Park, First Road, Santoshpur, Kolkata – 700 075