1. AYAN SHUBHRO GANGULY
Email-id: ayanganguly86@yahoo.co.in
ayanganguly2986@yahoo.com
Mobile: 08374236812
Career Objective: To grow limitlessly in the field of ENERGY
CONSERVATION in a reputed firm where in I could deliver my
best applied engineering knowledge and management skills to
pave the projects to success.
Present Job Profile:
• Leaded team for energy audit.
• Preparation of check list for field visit.
• Give training to juniors for to enhance their Energy auditing skills.
• Ensuring measurement quality and its analysis.
• Complete client side handling.
• Draft report preparation, saving calculations and its feasibility.
• Communicating with the vendors for project proposals.
• Communicating with vendors for project implementation.
Project Undertaken:
S. Project Sectors Client Location Responsibilities
No Details
.
1 Decentralized Renewable MeECL Meghalaya 1. Check list preparation for field
Distributed energy survey.
Generation 2. Assessment and monitoring
the field study.
3. Renewable energy feasibility
study at the site.
4. Potential assessment for
energy availability from
renewable sources.
5. Feasibility of micro hydro
power plant at the site.
2 Solar City Application MNRE Hamirpur 1. Data verification and its
(MNRE) of (Himachal analysis.
renewable Pradesh) 2. Identifying suitable
energy and technology for the power
energy generation from available
conservatio renewable energy sources.
n in the 3. Communicating with the
Municipality vendors for project
proposals and its
implementation.
4. Complete project report
preparation and costing.
5. Presenting the proposal to
the Himurja personals and
2. S. Project Sectors Client Location Responsibilities
No Details
.
Hamirpur corporation heads
.
3 BEE SME Sponge Iron Bureau of Rourkela a. Check list preparation,
Cluster Energy (Orisa) b. Field measurements for both
Efficiency thermal and electrical utilities.
c. Collecting energy consumption
details (both thermal and
electrical)
d. Guiding Juniors}
e. Process mapping.
f. Energy and mass balancing.
g. Communicating with the unit
holder and association for
demonstrating the projects
benefits.
i. Data analysis and saving
calculations.
j. Draft report and bankable DPR
preparation.
k. Communicating with the
vendors for the project
implementation.
l. Arranging workshops for
demonstrating the project
findings.
4 BEE SME Ice making Bureau of Bhimavaram 1. Sample Energy Audits.
Cluster Units Energy (A.P) (a. Check list preparation,
Efficiency b. Field measurements both
thermal, electrical &
hydraulics.
c. Collecting energy
consumption details (both
thermal and electrical)
5 BEE SME Refractory Bureau of East and d. Guiding Juniors training
Cluster units Energy West them for measurements )
Efficiency Godavari e. Process mapping
(A.P) f. Energy balancing.
2. Data analysis and feasibility
study.
3. Report and bankable DPR
preparation.
4. Communicating with the
vendors for the project
implementation.
3. S. Project Sectors Client Location Responsibilities
No Details
.
6 Decentralized Villages MPURJA 27 villages 1. Check list preparation for field
Distributed where in Balaghat survey.
Generation power districts M.P 2. Assessment and monitoring
supply yet the field study by the survey
not available agency.
from central 3. Available renewable energy
Grid feasibility.
4. Potential assessment for
energy availability from
available renewable sources.
5. Report discussion with
MPURJA and REC (Rural
Electrification Corporation
Ltd) executives.
7 Steel rolling Adarsh UNDP ---- Hourly monitoring the electricity
mill post Ispath Bhilai and fuel consumption with the
implementatio ARS metals production.
n study Gumalpindi Finding the specific energy
Chennai consumption after
implementation
Compare the specific energy
consumption of the plant after
implementation with the earlier
specific energy consumption.
8 Investment Municipal Bureau of 1. Ujjain Responsibility as team lead. And
Grade Audit Corporation Energy 2. Ratmal to complete the project of
for Municipal Efficiency 3. Raipur Municipal Demand side
Demand Side 4. Bilaspur Management of the given 9
Management. 5. Bhilai municipal corporation within a
6. Rewa period of 1 year.
7. Trichur Team: minimum of 12 diploma
8. Plakkad staffs and 4 Engineers.
9. Allapy
1. Demonstrating the project to
the municipal corporation
executive and commissioners
in presentation form.
2. Responsible for check list
preparation and completing
all field measurement and
required data collection of
water pumping, street lighting
and building energy audit.
3. Responsible for training the
engineers and diploma staff
for carrying of energy audit in
building, street lights and
pumping station.
4. Successfully completed all
the measurement and
analysis of all the clear water,
4. S. Project Sectors Client Location Responsibilities
No Details
.
sewage water pumping sites,
street lights and buildings as
per BEE norms and methods.
5. Energy bill analysis according
to the tariff structure with
saving calculation from tariff.
6. Saving findings and their
calculations with each
project’s IRR.
7. Complete report preparation
with its business module and
monitoring and verification
protocol.
9 Thermal Here we are able to monitor the real 1. Guiding the software persons
Monitoring time temperature data of furans (Melting for generating the required
System for & Reheating) set up with recuperation. output.
Regional Thus we will be able to monitor the 2. Dealing with the equipment
Energy performance for the furnace with and suppliers for the required
Efficiency without recuperator. equipment.
Center Lab @ 3. Installing the system at the
SEE-Tech site and made the interface
Solution Pvt. with the software.
Ltd. 4. Made it run as per the
requirement.
10 Pumping Plastic ABC plastic Hingna 1. Complete pumping network
system study. industry Pvt. Ltd. MIDC mapping, measurement and
Nagpur analysis.
2. Discussion with clients and
explaining the system
performance.
3. Identifying the energy saving
areas.
4. Report preparation.
11 Pumping Municipal Jewan Gondia 1. Total Pump analysis, guiding
system study. Cooperation Pradhikara MH team at the site and off site
Gondia n for proper execution of the
field measurement for
successful carrying out the
energy audit.
2. Preparation of pump curve for
each pumps installed.
3. Report Preparation.
12 Safety Audit Refinery HPCL Mumbai 1. Complete project
Refinery management responsibility.
2. Cost minimization.
3. Controlling a team of 6
diploma staffs at the sites for
the proper and smooth
execution of the projects.
4. Report preparation and
discussion with Sr. Executive
5. S. Project Sectors Client Location Responsibilities
No Details
.
and Chief engineer.
13 Safety Audit at (project HPCL All over 1. Complete responsibility of
petrol pumps includes Retail India project management.
1000 retail Outlets 2. Report checking, team
outlets all management, training to team
over India) members.
3. Motivating team members.
4. Complete client handling and
billing responsibility/
5. Clearing report related
problem and quarries of the
clients.
14 Energy Audit CD making Moserbaer Greater 1. Field measurements.
industry India ltd Noida 2. Data collections.
3. Identify measure energy
guzzlers at the industry.
4. Discursion with the engineers
for process mapping.
Conferences and Workshop Attended:-
1. Solar training program in by SEMI at Jaipur.
2. Indo-Japan conference at Delhi organized by Teri, BEE and NEDO.
3. Demand Side Management work shop at Bhopal by MPUVN and MPERC.
4. Municipal Demand Side Management conference at Bhopal by BEE both (I
and II).
Work Experience:
1. Presently working as a Consultant in APITCO ltd. Hyderabad. (A.P). 18th
Oct 2010 to still date.
2. Worked as Sr. Consulting Engineer in SEE TECH Solution PVT. Ltd.
Nagpur (M.H) from 15th May 2008 to 16th Oct 2010
Educational Qualification:
Examination College University Year Percentage
BEE Energy Auditor --- BEE 2010 Paper cleared for
Certification (October) EA- 1,3, & 4
M.Tech (Energy School of Energy DAVV Indore 2012 Result Awaited
Management Distance and Environment University
Learning ) Studies
6. BE (Electrical KDK College of Nagpur 2008 64%
Engineering) Engineering University
Nagpur,
H.S.C. Kendriya Vidalaya C.B.S.E 2004 60%
Ballygunge
S.S.C. Kendriya Vidalaya C.B.S.E 2002 66%
BALCO Korba
Training:
1. Training in PLC & SCADA from KRISH ENGINEERING.
2. Robo-TRIX workshop.
Extra-Curricular Activities:
1. Silver medal in hockey (regional level at K.V 1 STC Jabalpur)
2. Played inter college football tournaments.
3. Participated in Techno Trucks inter college robotic competition with (project GRIPO-
ROBOT).
4. Winner of Navomesh two consecutive times (college level Drama completion).
Personal Details:
Date of Birth : 29th April 1986
Sex : Male
Marital status : Single
Nationality : Indian
Passport status : Valid
Languages Known : English, Hindi and Bengali
Father’s Name : Mr. Amit Kumar Ganguly
Occupation : Private Service
Permanent Address : 31E, Harisadhan Patoari Road, Eastern Park,
First Road, Santoshpur, Kolkata – 700 075