SlideShare a Scribd company logo
1 of 2
ANTHONY CAYGILL
39 HOLLYBUSH AVENUE, INGLEBY BARWICK
MOBILE: 07813-306816 E-MAIL: THECAYGILLS@NTLWORLD.COM
OCCUPATION: PLATER, FABRICATOR
SUMMARY
I HAVE OVER THIRTY YEARS EXPERIENCE IN HEAVY INDUSTRY CONSTRUCTION WITHIN THE
STRUCTURAL AND PIPING DISCIPLINES RANGING FROM OFFSHORE FABRICATION,PAPER MILLS
STEEL MILLS AND POWER GENERATION FACILITIES THROUGHOUT EUROPE AND NORTH
AMERICA FROM GREEN FIELD BUILDS CAPITAL BROWN FIELD PLANT INVESTMENT BUILDS AND
OUTAGES
FEB 2014- DEC 2016 CAPE ENGINEERING SERVICES
BOILER MAINTANANCE INCLUDING ALL STRUCTUAL STEEL AND PIPEWORK DEVELOPMENT AND
REPLACEMENT USING STRUCTUAL WELDING AND RIGGING DISCIPLINES.
JAN 2013-DEC 2014 CB&I
FABRICATION AND INSTALLATION OF ALL STRUCTUAL STEEL WORK ON TURBINE AND BOILER
ON A BIOFUELS PROJECT
MAY 2012- DEC 2012 WILTON ENGINEERING
HEAVY STRUCTUAL STEEL WORK ON SUB SEA 7 PLATFORMS AND STRUCTURES.
AUG 2011-MAY 2012 FABRICOM
STRUCTURAL STEEL WORK REPLACEMENT AND HEAVY DUTY CLADDING ON REDCAR BLAST
FURNACE.
JUNE 2010-AUG 2011 MARSKE SITE SERVICES
DESIGN AND FABRICATE ALL STRUCTURAL AND PIPE WORK ON MAINTANANCE CONTRACT AT
ROLLING PIPE MILL
JAN 2009-JAN 2010 FABRICOM
FABRICATION AND INSTALLATION OF PIPE SUPPORTS AND SRUCTURAL STEEL WORK ON A
BIOFUELS PROJECT
ANTHONY CAYGILL
JUN 2006 -OCT 2008 SHAWS
DESIGN, FABRICATE AND INSTALL STEELWORK ON A WOOD BURNING POWERSTATION.
JUN 2005- JANUARY 2006 CIANBRO-USA
ALL ASPECTS OF STRUCTURAL AND PIPEWORK FABRICATION ON GAS TURBINE POWER
STATION.
JAN 2004-DEC 2004 MORSON INTERNATIONAL, CULHAM SCIENCE CENTER.
NUCLEAR FUSION PROJECT SHUTDOWN. PRESSURE SUITWORK. ALL ASPECTS OF
FABRICATION,STRUCTURAL AND PIPE REPLACEMENT.
JAN 2003-DEC 2003 CRAFTFORCE, USA
ALL ASPECTS OF FABRICATION STRUCTURAL STEEL WORK ,OVERHAUL AND REPLACEMENT ON
AN OIL RIG
JAN 2002-DEC 2002 KVAERNER OFFSHORE, USA
FABRICATION AND FIRE PROTECTION SYSTEM INSTALLATION PROJECT, WORKING WITH
STAINLESS AND CARBON PIPEWORK, SUPPORTS FABRICATED.
FEB 2001-OCT 2001 AMEC, BRITISH CHROME
DESIGN AND FABRICATE ALL ASPECTS OF STRUCTURAL STEELWORK FOR NEW EXTENSION ON
EXISTING CHROME PLANT
SEPT 2000- DEC 2000 MES, USA
VERY FINE TOLLERANCE FABRICATION PROJECT FOR INGERSOL-RAND GM.HIGH PRESSURE
TESTING AND COMMISIONING ON A PRODUCTION LINE FOR V8 ENGINE DEVELOPMENT
AUG 1998-SEPT 1999 HARLAND & WOLFE SHIPYARD, IRELAND
CONVERSION OF A SHIP TO ADD A DRILLING PLATFORM
MAR 1988- JUL 1998 KVAERNER OFFSHORE, CLEVELAND OFFHORE
OFFSHORE MODULES FOR SHELL, PHILLIPS, BP, SABLE AND BITANIA OIL FIELDS, FPSO TRITON
(SUPERTANKER), OFFSHORE PROJECTS, STRUCTUAL FABRICATION AND INSTALLATION.
SEPT 1978-JAN 1988 BRITISH STEEL CHEMICALS
APPRENTICE BOILERSMITH AND TRADESMAN.
OCT 1978-JUL 1982 STOCKTON BILLINGHAM TECH COLLEGE. WELDING CRAFT STUDIES

More Related Content

Similar to New Plater A Caygill

Embrace the Brace - NASCC 2014
Embrace the Brace - NASCC 2014Embrace the Brace - NASCC 2014
Embrace the Brace - NASCC 2014Terri Meyer Boake
 
VIZAG STEEL KCB REPORT
VIZAG STEEL KCB REPORTVIZAG STEEL KCB REPORT
VIZAG STEEL KCB REPORTNIT Rourkela
 
my resume Feb- 10th-2017
my resume  Feb- 10th-2017my resume  Feb- 10th-2017
my resume Feb- 10th-2017Randy Orum
 
Chenab Railway Bridge PPT.pptx
Chenab Railway Bridge PPT.pptxChenab Railway Bridge PPT.pptx
Chenab Railway Bridge PPT.pptxDronaDarkHearted
 
construction and demolition waste (steel)
construction and demolition waste (steel)construction and demolition waste (steel)
construction and demolition waste (steel)mahakgupta42
 
Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Graham Chambers
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015john kinds
 
PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copyanil prashanth
 
MICHAEL UJVARY - CV
MICHAEL UJVARY - CVMICHAEL UJVARY - CV
MICHAEL UJVARY - CVmike ujvary
 
Abtrex field installations and repairs on site
Abtrex field installations and repairs on siteAbtrex field installations and repairs on site
Abtrex field installations and repairs on siteAbtrex Inc
 
INTRODUCTION TO STEEL.pptx
INTRODUCTION TO STEEL.pptxINTRODUCTION TO STEEL.pptx
INTRODUCTION TO STEEL.pptxAnamikaPatil3
 
design-capacity-tables-for-structural-steel-hollow-sections.pdf
design-capacity-tables-for-structural-steel-hollow-sections.pdfdesign-capacity-tables-for-structural-steel-hollow-sections.pdf
design-capacity-tables-for-structural-steel-hollow-sections.pdfPrakash Paudel
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSpArpit Dubey
 

Similar to New Plater A Caygill (20)

A CLARK 16
A CLARK 16A CLARK 16
A CLARK 16
 
2015
20152015
2015
 
Embrace the Brace - NASCC 2014
Embrace the Brace - NASCC 2014Embrace the Brace - NASCC 2014
Embrace the Brace - NASCC 2014
 
VIZAG STEEL KCB REPORT
VIZAG STEEL KCB REPORTVIZAG STEEL KCB REPORT
VIZAG STEEL KCB REPORT
 
my resume Feb- 10th-2017
my resume  Feb- 10th-2017my resume  Feb- 10th-2017
my resume Feb- 10th-2017
 
Chenab Railway Bridge PPT.pptx
Chenab Railway Bridge PPT.pptxChenab Railway Bridge PPT.pptx
Chenab Railway Bridge PPT.pptx
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
construction and demolition waste (steel)
construction and demolition waste (steel)construction and demolition waste (steel)
construction and demolition waste (steel)
 
072014_Bunker Mentality
072014_Bunker Mentality072014_Bunker Mentality
072014_Bunker Mentality
 
Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015
 
PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copy
 
CVAQ5
CVAQ5CVAQ5
CVAQ5
 
MICHAEL UJVARY - CV
MICHAEL UJVARY - CVMICHAEL UJVARY - CV
MICHAEL UJVARY - CV
 
Abtrex field installations and repairs on site
Abtrex field installations and repairs on siteAbtrex field installations and repairs on site
Abtrex field installations and repairs on site
 
CAWI resumee
CAWI resumeeCAWI resumee
CAWI resumee
 
INTRODUCTION TO STEEL.pptx
INTRODUCTION TO STEEL.pptxINTRODUCTION TO STEEL.pptx
INTRODUCTION TO STEEL.pptx
 
Metals in motion
Metals in motionMetals in motion
Metals in motion
 
design-capacity-tables-for-structural-steel-hollow-sections.pdf
design-capacity-tables-for-structural-steel-hollow-sections.pdfdesign-capacity-tables-for-structural-steel-hollow-sections.pdf
design-capacity-tables-for-structural-steel-hollow-sections.pdf
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSp
 

New Plater A Caygill

  • 1. ANTHONY CAYGILL 39 HOLLYBUSH AVENUE, INGLEBY BARWICK MOBILE: 07813-306816 E-MAIL: THECAYGILLS@NTLWORLD.COM OCCUPATION: PLATER, FABRICATOR SUMMARY I HAVE OVER THIRTY YEARS EXPERIENCE IN HEAVY INDUSTRY CONSTRUCTION WITHIN THE STRUCTURAL AND PIPING DISCIPLINES RANGING FROM OFFSHORE FABRICATION,PAPER MILLS STEEL MILLS AND POWER GENERATION FACILITIES THROUGHOUT EUROPE AND NORTH AMERICA FROM GREEN FIELD BUILDS CAPITAL BROWN FIELD PLANT INVESTMENT BUILDS AND OUTAGES FEB 2014- DEC 2016 CAPE ENGINEERING SERVICES BOILER MAINTANANCE INCLUDING ALL STRUCTUAL STEEL AND PIPEWORK DEVELOPMENT AND REPLACEMENT USING STRUCTUAL WELDING AND RIGGING DISCIPLINES. JAN 2013-DEC 2014 CB&I FABRICATION AND INSTALLATION OF ALL STRUCTUAL STEEL WORK ON TURBINE AND BOILER ON A BIOFUELS PROJECT MAY 2012- DEC 2012 WILTON ENGINEERING HEAVY STRUCTUAL STEEL WORK ON SUB SEA 7 PLATFORMS AND STRUCTURES. AUG 2011-MAY 2012 FABRICOM STRUCTURAL STEEL WORK REPLACEMENT AND HEAVY DUTY CLADDING ON REDCAR BLAST FURNACE. JUNE 2010-AUG 2011 MARSKE SITE SERVICES DESIGN AND FABRICATE ALL STRUCTURAL AND PIPE WORK ON MAINTANANCE CONTRACT AT ROLLING PIPE MILL JAN 2009-JAN 2010 FABRICOM FABRICATION AND INSTALLATION OF PIPE SUPPORTS AND SRUCTURAL STEEL WORK ON A BIOFUELS PROJECT ANTHONY CAYGILL
  • 2. JUN 2006 -OCT 2008 SHAWS DESIGN, FABRICATE AND INSTALL STEELWORK ON A WOOD BURNING POWERSTATION. JUN 2005- JANUARY 2006 CIANBRO-USA ALL ASPECTS OF STRUCTURAL AND PIPEWORK FABRICATION ON GAS TURBINE POWER STATION. JAN 2004-DEC 2004 MORSON INTERNATIONAL, CULHAM SCIENCE CENTER. NUCLEAR FUSION PROJECT SHUTDOWN. PRESSURE SUITWORK. ALL ASPECTS OF FABRICATION,STRUCTURAL AND PIPE REPLACEMENT. JAN 2003-DEC 2003 CRAFTFORCE, USA ALL ASPECTS OF FABRICATION STRUCTURAL STEEL WORK ,OVERHAUL AND REPLACEMENT ON AN OIL RIG JAN 2002-DEC 2002 KVAERNER OFFSHORE, USA FABRICATION AND FIRE PROTECTION SYSTEM INSTALLATION PROJECT, WORKING WITH STAINLESS AND CARBON PIPEWORK, SUPPORTS FABRICATED. FEB 2001-OCT 2001 AMEC, BRITISH CHROME DESIGN AND FABRICATE ALL ASPECTS OF STRUCTURAL STEELWORK FOR NEW EXTENSION ON EXISTING CHROME PLANT SEPT 2000- DEC 2000 MES, USA VERY FINE TOLLERANCE FABRICATION PROJECT FOR INGERSOL-RAND GM.HIGH PRESSURE TESTING AND COMMISIONING ON A PRODUCTION LINE FOR V8 ENGINE DEVELOPMENT AUG 1998-SEPT 1999 HARLAND & WOLFE SHIPYARD, IRELAND CONVERSION OF A SHIP TO ADD A DRILLING PLATFORM MAR 1988- JUL 1998 KVAERNER OFFSHORE, CLEVELAND OFFHORE OFFSHORE MODULES FOR SHELL, PHILLIPS, BP, SABLE AND BITANIA OIL FIELDS, FPSO TRITON (SUPERTANKER), OFFSHORE PROJECTS, STRUCTUAL FABRICATION AND INSTALLATION. SEPT 1978-JAN 1988 BRITISH STEEL CHEMICALS APPRENTICE BOILERSMITH AND TRADESMAN. OCT 1978-JUL 1982 STOCKTON BILLINGHAM TECH COLLEGE. WELDING CRAFT STUDIES