2. S P M A C T I V I T I E S
The feasibility study-Meaning of the word ‘feasibility’ is 'capable of being dealt with success’-That is A series
of projects is planned as a programme of development
Planning-Formulating the Outline project with detailed first stage
Project execution-Project deals with Project life Cycle
3. equirement analysis-Details of User requirements
Design-Specification DrawnUp
Coding-Writing code in a procedural language
Verification/validation-Testing
Implementation/istallation-Practioner Training
Manual writing
Maintenance and support-Continuous need for correction
6. objectiveS:
Questions based on How does the proposed system contribute to organization
objectives
-IS-How does the proposed system fit in to the IS plan
-Organization Structure-Effect of new system
7. MIS
Complete Enhancement System
Personal-Proposed system Benefits(eg:Employee Skill)
Image-Others Attitude towards the organization
8. TECHNICAL ASSESSMENT
-Cost benefit analysis:
Direct and Indirect Benefits
-Cash Flow Forecasting:
Calculation pf Expenditure,Income,Time
Cost benefit evaluation technique:
Net profit
Payback Period
Return on Investment
Net present Value
Internal Rate of Return