SlideShare a Scribd company logo
1 of 46
Download to read offline
November 2017 Corporate Presentation
2
Cautionary Notes
This presentation, the information contained herein, any other materials provided in connection with this presentation and any oral remarks accompanying this presentation (collectively, this “Presentation”) has been prepared by Alamos Gold Inc. (“Alamos”) solely
for information purposes concerning a potential transaction (a “Potential Transaction”) involving Alamos and Richmont Mines Inc. (“Richmont”). No Stock exchange, securities commission or other regulatory authority has approved or disapproved of the information
contained herein. This presentation does not constitute an offering of securities and the information contained herein is subject to the information contained in the Company’s continuous disclosure documents at www.sedar.com.
Cautionary Notes
Certain statements in this presentation are “forward-looking statements”, including within the meaning of applicable laws. All statements other than statements of historical fact included in this presentation, including, without limitation, statements regarding the
timing and closing of the Proposed Transaction, statements regarding synergies resulting from the Proposed Transaction, statements regarding the effect of the Proposed Transaction on Alamos’ net asset value, operating cash flow, free cash flow, forecast gold
production, reserves, resources, gold grades, recoveries, waste-to-ore ratios, total cash cost, all-in sustaining costs, debt levels and future plans and objectives of Alamos are forward-looking statements based on forecasts of future operational or financial results,
estimates of amounts not yet determinable and assumptions of management that involve various risks and uncertainties. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions
or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “estimates” or “intends”, or stating that certain actions, events or results “may”,
“could”, “would”, “might”, or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements.” Alamos cautions that forward-looking information involves known and unknown risks, uncertainties and other factors
that may cause Alamos’ actual results, performance or achievements to be materially different from those expressed or implied by such information, including, but not limited to, that the Proposed Transaction is completed on terms and timeframe contemplated;
failure to obtain shareholder approval of Alamos or Richmont; failure to obtain the necessary regulatory and other approvals; conditions to the Proposed Transaction may not be satisfied; anticipated synergies and other benefits of the Proposed Transaction may not
be realized; gold and silver price volatility; fluctuations in foreign exchange rates and interest rates; the impact of any hedging activities; discrepancies between actual and estimated production, between actual and estimated reserves and resources or between
actual and estimated metallurgical recoveries; costs of production; capital expenditure requirements; the costs and timing of construction and development of new deposits; and the success of exploration and permitting activities. In addition, the factors described
or referred to in the section entitled “Risk Factors” in Alamos’ Annual Information Form for the year ended December 31, 2016, which is available on the SEDAR website at www.sedar.com, should be reviewed in conjunction with the information found in this
presentation. Although Alamos has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in forward-looking information, there can be other factors that cause results,
performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management’s expectations or estimates of future developments, circumstances or results will
materialize. Accordingly, readers should not place undue reliance on forward-looking information.
Market data and other statistical information used throughout this Presentation are based on internal company research, independent industry publications, government publications, reports by market research firms or their published independent sources. Industry
publications, governmental publications, market research surveys and forecasts generally state that the information contained therein has been obtained from sources believed to be reliable. Although Alamos believes such information is accurate and reliable, it has
not independently verified any of the data from third party sources cited or used for our management’s industry estimates, nor has Alamos ascertained the underlying economic assumptions relied upon therein. While Alamos believes internal company estimates are
reliable, such estimates have not been verified by any independent sources, and Alamos makes no representations as to the accuracy of such estimates.
Note to U.S. Investors
Alamos prepares its disclosure in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Terms relating to mineral resources in this presentation are defined in accordance with National
Instrument 43 101 Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy, and Petroleum Standards on Mineral Resources and Mineral Reserves. The Unites States Securities and Exchange
Commission (the “SEC”) permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Alamos may use certain terms, such as “measured mineral resources”,
“indicated mineral resources”, “inferred mineral resources” and “probable mineral reserves” that the SEC does not recognize (these terms may be used in this presentation and are included in the public filings of Alamos, which have been filed with the SEC and the
securities commissions or similar authorities in Canada).
Cautionary non-GAAP Measures and Additional GAAP Measures
Note that for purposes of this section, GAAP refers to IFRS. The Company believes that investors use certain non-GAAP and additional GAAP measures as indicators to assess gold mining companies. They are intended to provide additional
information and should not be considered in isolation or as a substitute for measures of performance prepared with GAAP.
“Cash flow from operating activities before changes in non-cash working capital” is a non-GAAP performance measure that could provide an indication of the Company’s ability to generate cash flows from operations, and is calculated by adding
back the change in non-cash working capital to “Cash provided by (used in) operating activities” as presented on the Company’s consolidated statements of cash flows. “Free cash flow” is a non-GAAP performance measure that is calculated as
cash flows from operations net of cash flows invested in mineral property, plant and equipment and exploration and evaluation assets as presented on the Company’s consolidated statements of cash flows and that would provide an indication of
the Company’s ability to generate cash flows from its mineral projects. “Mine site free cash flow” is a non-GAAP measure which includes cash flow from operating activities at, less capital expenditures at each mine site. Return on Equity is
defined as Earnings from Continuing Operations divided by the average Total Equity for the current and previous year. “Mining cost per tonne of ore” and “Cost per tonne of ore” are non-GAAP performance measures that could provide an
indication of the mining and processing efficiency and effectiveness of the mine. These measures are calculated by dividing the relevant mining and processing costs and total costs by the tonnes of ore processed in the period. “Cost per tonne
of ore” is usually affected by operating efficiencies and waste-to-ore ratios in the period. “Total cash costs per ounce”, “all-in sustaining costs per ounce”, and “mine-site all-in sustaining costs” as used in this analysis are non-GAAP terms
typically used by gold mining companies to assess the level of gross margin available to the Company by subtracting these costs from the unit price realized during the period. These non-GAAP terms are also used to assess the ability of a
mining company to generate cash flow from operations. There may be some variation in the method of computation of these metrics as determined by the Company compared with other mining companies. In this context, “total cash costs”
reflects mining and processing costs allocated from in-process and dore inventory associated and associated royalties with ounces of gold sold in the period. Total cash costs per ounce are exclusive of exploration costs. “All-in sustaining costs
per ounce” include total cash costs, exploration, corporate and administrative, share based compensation and sustaining capital costs. “Mine-site all-in sustaining costs” include total cash costs, exploration, and sustaining capital costs for the
mine-site, but exclude an allocation of corporate and administrative and share based compensation.
Additional GAAP measures that are presented on the face of the Company’s consolidated statements of comprehensive income and are not meant to be a substitute for other subtotals or totals presented in accordance with IFRS, but rather
should be evaluated in conjunction with such IFRS measures. This includes “Earnings from operations”, which is intended to provide an indication of the Company’s operating performance, and represents the amount of earnings before net
finance income/expense, foreign exchange gain/loss, other income/loss, and income tax expense. Non-GAAP and additional GAAP measures do not have a standardized meaning prescribed under IFRS and therefore may not be comparable to
similar measures presented by other companies. A reconciliation of historical non-GAAP and additional GAAP measures are available at www.alamosgold.com.
Technical Information
Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this presentation. Chris Bostwick is a Qualified Person within the meaning of Canadian Securities
Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43-101 compliant mineral reserve and resource estimates are detailed in the tables in the appendix of this presentation.
All figures in US$ unless otherwise indicated.
3
1 Based on 2017 Guidance
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Includes cash, cash equivalents and equity securities as of September 30, 2017. Total liquidity also includes undrawn $400m credit facility.
Strong Platform for Delivering Long Term Value
Diversified gold production
400,000 – 430,000 oz from
three North American mines1
Expanding margins
$940/oz AISC,
7% improvement from 20161,2
Peer leading growth
Portfolio of 6 low-cost
development projects
Strong balance sheet
Debt free, $168m cash3 & $568m
total liquidity to support growth
Track record of
delivering
shareholder value
42015A 2016A 2017E
$1,091
$1,010
$940
2015A 2016A 2017E
2015A 2016A 2017E
$1,241
$1,103
$1,065
2015A 2016A 2017E
Growing Production, Declining Costs, Expanding Margins
Gold Production (000 oz) AISC1,2 (US$/oz)
-14%
Total Capital – Operating Mines (US$m)
$128m $105-122m
Cost of Sales3 (US$/oz)
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses.
3 Cost of sales includes mining and processing costs, royalties and amortization.
4 AISC Margin calculated as realized gold price less AISC. For 2017E this assumes a $1,250/oz gold price
5 Total capital spending for Alamos has been included for the periods prior to July 2, 2015 for comparative purposes only.
392
400 – 430
+6%
380
$167m5
$57
$229
$310
2015A 2016A 2017E
+35%
AISC Margin2,4 (US$/oz)
-14%
-32%
5
$315m
High yield notes retired in April 2017
Strong Balance Sheet – Debt Free
1 Unaudited management estimate as of September 30, 2017.
2 Cash, cash equivalents & equity securities.
3 Total liquidity includes cash, cash equivalents, equity securities and undrawn $400m credit facility
4As of November 2, 2017
Balance Sheet
Cash & Cash Eq.1,2 US$168 million
Total Liquidity3 US$568 million
Total Debt US$0
Capital Structure
Shares Outstanding 300.7 million
Warrants 12.4 million
Employee Options 8.2 million
Fully Diluted 324.2 million
Recent Share Price (TSX)4 C$8.23
Market Capitalization ~C$2.5 billion
$24m
Annual interest savings; $72m over remaining
term
$168m
$400m
$568m
As of September 30, 2017
Cash & Total Liquidity
Cash, cash equivalents & equity securitiesUndrawn Credit Facility
3
6
699%
7%
264%
-50%
450%
950%
1450%
1950%
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Alamos Gold Share Price (TSX)
S&P/TSX Global Gold Index
Gold (US$/oz)
$91
$511
$71
$10
$419
$400
$950
$1,129
$163
Track Record of Delivering Shareholder Value
1 Based on consensus analyst net asset value (NAV) estimates.
2 Cumulative free cash flow (FCF) generated to date. Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
15%
Annualized return
since 2003
$118m
Dividends paid to
date
Mulatos (US$m) Turkey (US$m)Young-Davidson (US$m) Lynn Lake (US$m)
Acquisition
Cost (2003)
Acquisition
Cost (2015)
Acquisition Cost (2010)
& Capital Invested
Acquisition Cost (2016)
& Capital Invested
Consensus NAV &
Cumulative FCF
Consensus NAV Consensus NAV
$20
$23
Consensus NAV &
Cumulative FCF
Capital Invested Consensus NAV1
Cumulative FCF2Acquisition Cost
7
Richmont Mines Acquisition Highlights
Acquisition of a high quality,
free cash flowing asset in a
world class jurisdiction
• Island Gold is a long-life, high-grade, low-cost underground gold mine located in Ontario, Canada
• Current expansion is anticipated to drive production higher, costs lower & further
free cash flow growth
• Significant exploration potential to extend mine life beyond current resource
Strengthens core portfolio;
solidifies intermediate
producer position
• Adds a third core, long-life producing asset to further diversify asset base
• De-risks portfolio & improves already low risk profile with increased exposure to Canada
Stronger cash flow generation
to support growth
• Immediate earnings & cash flow accretion; stronger operating & free cash flow profile
• Stronger balance sheet & financial flexibility with US$229 million cash1 & no debt
• Better positioned to internally fund portfolio of growth projects
Aligns well with Alamos’ core
competencies
• Synergies with a second underground gold mine in Ontario
Enhanced production growth
& cost profile
• Island Gold provides near term production growth while lowering the combined
cost profile
Increases scale and capital
markets profile
• Elevates Alamos to a >500 koz per year producer with a peer leading growth profile
• Establishes Alamos as top 10 Canadian and North American gold producer2
1 Cash balance shown as at June 30, 2017 and includes equity securities.
2 Based on Wood Mackenzie 2018E estimates for Island Gold and estimates of corporate production in Canada, the United States, and Mexico.
8
35
42
52
82
95
$1,452
$1,192
$1,136
$745 $723
2013A 2014A 2015A 2016A 2017E
Ounces Sold (koz) AISC (US$/oz)
Island Gold Mine Overview
Source: Company filings, SNL, street research
1 Ore processed averaged 933 tpd in H1 2017.
2 Expansion capital of C$28.2 mm converted at 0.80x US$ per C$.
• High grade underground gold mine located northeast of Wawa,
Ontario in a well established gold district
• Began commercial production in October 2007
• Ore currently processed at rate of ~930 tpd1
• Expansion underway to 1,100 tpd as detailed in May 2017 PEA
– Annual production expected to increase to average 125 koz at
mine-site AISC of US$550/oz for the period of 2019-2024
– Minimal incremental capital of US$23 mm2 with mill expansion
expected to be completed in latter part of 2018
• Upside potential reflecting inclusion of all mineral resources and
exploration potential laterally and at depth
Asset Description
Growing Production; Declining Costs
Highly Productive Gold Mining District
4
0 50 100km
Marathon
Wawa
Hearst
Timmins
Iroquois Falls
Smooth Rock Falls
Eagle River, Wesdome
Borden,Goldcorp
Island Gold,
Richmont
Magino, Argonaut
Cote, IAMGOLD
Black Fox, McEwen
Timmins West, Tahoe
Holloway, Kirkland Lake
Porcupine,Goldcorp
Bell Creek, Tahoe
Young Davidson, Alamos
Macassa, Kirkland Lake
Holt, Kirkland Lake
Lake Superior
ONTARIO
Hemlo, Barrick
144
101
17
17
11
101
Mine/
Project
City
Dome Mine, Goldcorp
Hoyle Pond, Goldcorp
Cochrane
Pamour (PJV), Goldcorp
Taylor,
Kirkland Lake
Detour Lake Mine, Detour Gold
Recent Operating Performance
Gold Reserves & Resources
Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Reserves 2,551 9.17 752
M&I Resources 479 5.94 91
Inferred Resources 3,042 10.18 996
Q1/17A Q2/17A Q3/17A
Q3 YTD
2017
2017E6
Gold Production (koz) 23.8 26.1 26.7 76.5 87-93
Total Cash Costs7 (US$/oz) $504 $431 $532 $487 $550-$590
Mine-site AISC7 (US$/oz) $640 $503 $725-$765
Sustaining Capital (US$ mm) $3.1 $2.1 $15-$17
Expansion Capital (US$ mm) $4.5 $4.4 $25-$27
Exploration (US$ mm) $2.8 $3.6 $11-$12
RIC Corporate FCF5 (US$ mm) $0.4 $14.3
3 Since 1985.
4 Based on analyst consensus estimates.
5 Richmont consolidated corporate OCF less capex.
6 Richmont 2017E guidance.
>25 Moz gold produced3
>35 Moz in defined reserves
7 Please refer to Cautionary Notes on non-GAAP Measures
and Additional GAAP Measures.
9
20.8
14.6
9.2 9.2 8.8 8.4 8.3
7.7 7.3
6.4 6.1
4.6 4.5 4.3 4.3 4.2
3.6
2.7
1.1 1.0
Macassa
Brucejack
IslandGold
EagleRiver
Westwood
Seabee
RedLake
HopeBay
Meliadine
Musselwhite
Eleonore
Lapa
LaRonde
CasaBerardi
BlackFox
BellCreek
TimminsWest
Young-Davidson
CanadianMalartic
DetourLake
$700
$713
$715
$720
$730
$775
$782
$787
$870
$980
$985
$1,050
$1,075
$1,113
$1,150
$1,200
$550
$735
IslandPEA2019-2024
Seabee
LaRonde
Musselwhite
Meliadine
CanadianMalartic
IslandGold
Young-Davidson
Lapa
Macassa
RedLake
Westwood
Eleonore
BellCreek
DetourLake
EagleRiver
CasaBerardi
BlackFox
Island Gold – High Grade, Low Cost, Canadian Asset
Island Gold is one of the highest quality producing assets in Canada,
and one of a few not in a senior portfolio
2017E All-in Sustaining Costs (US$/oz)Mineral Reserve Grade (g/t Au)
Source: Company filings
Note: AISC based on midpoint of 2017 guidance where available, otherwise 1H/17 metrics shown. Eagle River AISC shown is Wesdome consolidated. Bell Creek AISC shown consolidated with Timmins West. TMAC
AISC excluded due to recent guidance revisions. Island Gold based on PEA.
10
Island Gold PEA Highlights & Operating Profile
Source: Company disclosure, street research
1 The Expansion Case PEA assumes a spot gold price of C$1,700/oz and US$1,260/oz and a C$:US$ exchange rate of 1.35.
2 Excludes the 2017 and 2018 ramp-up period.
3 Project capital includes incremental expansion capital of C$28.2m and accelerated mine development/infrastructure capital of C$40m.
4 Net cash flow is undiscounted pre-tax cash flow after all operating costs, project and sustaining capital.
5 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
Expansion Case PEA Summary (1,100 tpd)1 Island Gold Operating Profile (PEA)
C$ US$
Targeted mill throughput run-rate year H2 2018 H2 2018
Avg annual production (koz): 2019 – 20242 125 koz 125 koz
Avg operating unit cost ($/t) $191 $141
Avg annual Cash Costs ($/oz): LOM 5 $652 $483
Avg annual AISC ($/oz): 2019 – 20242,5 $743 $550
Avg annual AIC ($/oz): LOM5 $910 $674
Sustaining capital ($m): LOM $168 $124
Project capital ($m)3: LOM $68 $50
Cumulative Net Cash Flow ($m)4 $749 $555
90 94
125
$735
$881
$550
2017E 2018E 2019E - 2024E Average
Gold Production (koz) AISC (US$/oz)
39% Growth
39%
projected
production growth
C$28.2 mm
Low incremental
expansion capital
-25%
expected decrease
in LOM AISC
Significant upside potential
>750 koz of Inferred resources not factored
into mine plan + ongoing exploration potential
11
Island Gold Mineral Reserve & Resource Growth
67
564
1,037 1,003
768
996
154
111
233
219
72
91
172
141
144 184
562
752
2007-2011 2012 2013 2014 2015 2016
Inf. Resources M&I Resources Reserves Cumulative Ounces Sold
179
221 256
298
351
433
Source: Company disclosure
1 Cumulative ounces of gold sold since 2007.
Mineral Reserves and Resources Over Time (koz)
1
+34%
Increase in 2016 year end mineral
reserves
Strong track record of mineral reserve & resource growth
~$35/oz
Low discovery costs
+30%
Increase in 2016 year end inferred
mineral resource; 20% increase in grade
+44%
Mineral reserve grade increase since
2014
12
Island Gold Exploration Potential
Source: Company disclosure
Significant Exploration Potential at Depth and to the East
Recent results highlight significant
potential for resource growth at
depth & to the east including
• 19.85 g/t over 8.4m
Less than 15% of land package
drilled
Potential for mineralization to
extend to at least 2km depth
Early results from delineation
drilling demonstrate ability to
potentially expand reserves at
higher average grades
13
AĞI DAĞI (TURKEY)
Stage Permitting
2P Au Reserves 1.2 Moz (54.4 mt @ 0.67 g/t)
Total Au M&I Resources 0.5 Moz (34.9 mt @ 0.46 g/t)
Total Au Inf. Resources 0.2 Moz (16.8mt @ 0.46 g/t)
KIRAZLI (TURKEY)
Stage Permitting
2P Au Reserves 0.7 Moz (26.1mt @ 0.79 g/t)
Total Au M&I Resources 0.1 Moz (6.0mt @ 0.43 g/t)
Total Au Inf. Resources 0.1 Moz (5.7mt @ 0.59 g/t)
ÇAMYURT (TURKEY)
Stage Resource Dev.
Total Au M&I Resources 0.5 Moz (17.7mt @ 0.89 g/t)
Total Au Inf. Resources 0.1 Moz (2.8mt @0.95 g/t)
Top 10 North American Producer; Leading Growth
MULATOS (SONORA, MEXICO)
2017E Au Production 150-160 koz
2017E Au Total Cash Costs US$815/oz
2P Au Reserves 1.9 Moz (50.0mt @ 1.17 g/t)
Total Au M&I Resources 2.8 Moz (76.1mt @ 1.14 g/t)
Total Au Inf. Resources 0.3 Moz (10.3mt @ 0.98 g/t)
EL CHANATE (SONORA, MEXICO)
2017E Au Production 50-60 koz
2017E Au Total Cash Costs US$1,200/oz
2P Au Reserves 0.3 Moz (10.8mt @ 0.56g/t)
Total Au M&I Resources 0.1 Moz (4.4mt @ 0.66 g/t)
YOUNG-DAVIDSON (ONTARIO, CANADA)
2017E Au Production 200-210 koz
2017E Au Total Cash Costs US$625/oz
2P Au Reserves 3.7 Moz (43.2mt @ 2.65 g/t)
Total Au M&I Resources 1.2 Moz (12.5mt @ 3.09 g/t)
Total Au Inf. Resources 0.3 Moz (3.6mt @ 2.75g/t)
Producing Assets
Exploration / Development Assets
1 Source: Select street research
Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
Note: Mineral resources are exclusive of mineral reserves. See mineral reserve and resource estimates and associated footnotes in appendix.
ISLAND GOLD (ONTARIO, CANADA)
2017E Au Production 87-93 koz
2017E Au Total Cash Costs US$550-590/oz
2P Au Reserves 0.8 Moz (2.5mt @ 9.17 g/t)
Total Au M&I Resources 0.1 Moz (0.5mt @ 5.94 g/t)
Total Au Inf. Resources 1.0 Moz (3.0mt @ 10.18 g/t)
QUARTZ MOUNTAIN (OREGON, USA)
Stage Advanced Exploration
Total Au M&I Resources 0.3 Moz (12.2mt @ 0.87 g/t)
Total Au Inf. Resources 1.1 Moz (39.2mt @0.91 g/t)
ESPERANZA (MORELOS, MEXICO)
Stage Permitting
Total Au M&I Resources 1.1 Moz (34.4mt @ 0.98 g/t)
LYNN LAKE (MANITOBA, CANADA)
Stage Feasibility
Total Au M&I Resources 2.6 Moz (40.3mt @ 2.03 g/t)
Total Au Inf. Resources 2.1 Moz (50.7mt @ 1.28 g/t)
Asset NPV by Geography1
Asset NPV by Stage1
Canada
57%
Mexico
23%
Turkey
20%
Production
72%
Development
28%
14
$174
$195
$216
$308
$65
$60
$103
$68
$239
$255
$319
$377
2017E 2018E 2019E 2020E
AGI OCF (US$ mm) RIC OCF (US$ mm)
Enhances Production Profile & Cash Flow Generation
Pro Forma Operating Profile (consensus) Pro Forma Operating Cash Flow Profile (consensus)
418 421
429
513
95 95
138
108513 516
567
622$912
$946
$847
$862
2017E 2018E 2019E 2020E
RIC Gold Production (koz) AGI Gold Production (koz)
PF AGI AISC (US$/oz)
Island Gold increases production
by an average of +25%
Island Gold increases cash flow
by an average of +34%
Source: Select street research
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 RIC OCF based on consensus Island Gold cash operating margin and adjusted for tax.
Island Gold delivers meaningful production growth and superior cash flow generation
2
1
15
Mulatos District
• La Yaqui Grande – significant mineral reserve and resource growth since 2015 discovery
• Multiple targets in large underexplored land package; >70% past drilling focused near mine
Quartz Mountain
• Located in Oregon on the northern extension of prolific Basin & Range Province of Nevada
• Low strip, favourable metallurgy
Island Gold
• Resource growth potential laterally to the east and at depth
• Less than 15% of the land package drilled
Aği Daği2 Production: 178 koz
Mine-site AISC1: $411/oz
• Low cost, open pit, heap leach project
• 39% after-tax IRR outlined in 2017 feasibility study
Çamyurt2 Production: 93 koz
Mine-site AISC1: $645/oz
• 253% after-tax IRR outlined in 2017 PEA
• Minimal initial capital; shared Aği Daği infrastructure
Lynn Lake
Feasibility Study
Q4 2017
• High grade, open pit
• Feasibility study expected Q4 2017
Kirazlı2 Production: 104 koz
Mine-site AISC1: $373/oz
• Low cost, open pit, heap leach project
• 44% after-tax IRR outlined in 2017 feasibility study
Esperanza • Average annual production potential >100,000 oz; excellent infrastructure; low technical risk
~500 koz
Stable long-term annual
production base
Diversified Production; Disciplined, Multi-stage Growth
>400 koz
Combined annual
production growth potential
Young-Davidson
2017E Production: 200-210 koz
2017E Mine-site AISC1: $775/oz
• 15 year mineral reserve life
• One of Canada’s largest underground gold mines
North American Production
Permitting / Development
Ongoing Exploration
Mulatos
2017E Production: 150-160 koz
2017E Mine-site AISC1: $890/oz
• 5-year reserve life within main open pit
• Significant mine life extension potential through La Yaqui & other nearby deposits
El Chanate
2017E Production: 50-60 koz
2017E Mine-site AISC1: $1,200/oz
• Mature operation; significant free cash flow expected at the end of
mine life through residual leaching
Island Gold
2017E Production: 87-93 koz
2017E Mine-site AISC1: $745/oz
• One of Canada’s highest grade underground mines
• 8-year mine life based on PEA; significant upside potential incorporating
existing resources
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 Average annual production and mine-site AISC as detailed in the 2017 Kirazlı & Aği Daği feasibility studies & Çamyurt preliminary economic assessment. Please refer to press releases dated February 15 and 22, 2017 for more detail.
16
Operations – Diversified North American Production
Long life reserve base
Declining costs & capital
Growing free cash flow
Growing production
17
Q3 2017 Results – Record Quarter
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses. For the purposes of calculating all-in sustaining costs at individual mine sites, the Company does not include corporate and
administrative and share based compensation expenses.
3 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
4 Includes capitalized exploration
5 2017 guidance excludes revised capital budget for Turkish projects approved in April 2017
8%
Production
growth from Q3
2016; record
quarter
-10%
Decrease in all-in
sustaining costs
from Q3 2016
11%
Increase in
operating cash
flow before changes in
working capital
$21m
mine-site free
cash flow3
On track to achieve 2017
production & cost guidance
Q3 2017 Q3 2016
Q3 YTD
2017
2017E
Gold production (000 ounces) 107 99 309 400-430
Gold sales (ounces) 101 95 303 -
Average realized gold price
(US$/oz)
$1,281 $1,325 $1,256 -
Cost of sales (US$/oz, includes
amortization)1
$1,000 $1,078 $1,056 $1,065
All-in sustaining costs (US$/oz)2,3 $884 $979 $946 $940
Capital Expenditures (US$M)
Sustaining3 $10.8 $12.5 $31.2 $40-47
Growth3,4,5 $27.4 $24.7 $92.1 $100-110
Operating revenues (US$M) $128.8 $125.6 $381.1 -
Cash provided by operations
before changes in working capital (US$M)3
$51.3 $46.1 $130.6 -
Net earnings (US$M) $28.8 $4.8 $31.3 -
Earnings per share (basic) $0.10 $0.02 $0.11 -
Cash, cash equivalents & equity
securities (US$M)
$168 $287 $168 -
Total debt (US$/M) $0 $315 $0 -
18
La Yaqui Phase I
Q4 2017 Outlook – On Track to Achieve Full Year Guidance
La Yaqui initial production
early September ahead of
schedule
Kirazlı site development
underway
Lynn Lake feasibility study
Q4 2017
Young-Davidson
MCM waste pass & pebble
crusher completed
19
Young-Davidson – Flagship, Long-Life Production
2015A 2016A 2017E Q3/17A YTD 2017
Gold Production (k oz) 160.4 170.0 200-210 55.8 143.5
Cost of Sales1 (US$/oz) $1,162 $1,087 $1,050 $966 $1,068
Total Cash Costs2,3 (US$/oz) $683 $657 $625 $572 $647
Mine-site AISC2,3 (US$/oz) $986 $897 $775 $744 $824
Total Capital (US$m) $108 $95 $70-80 $22 $63
Mine-site FCF2 (US$m) ($23) $4 - $13 $18
• One of Canada’s largest underground gold mines
• 15 year mine life based on YE 2016 mineral reserves
• Large resource base & exploration potential to support
mine life extension
• Significant Canadian dollar exposure; ~95% of costs
Location: Ontario, Canada Stage: Producing
Ownership: 100% interest Operation: Underground
Gold Reserves & Resources4 Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Underground Reserves 42,054 2.70 3,653
M&I Underground Resources 10,792 3.39 1,177
Inferred Underground Resources 3,524 2.76 313
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation.
4 See mineral reserve and resource estimates and associated footnotes in appendix.
20
160
170
200-210
2015A 2016A 2017E
Gold Production (000 oz)
$1,162
$1,087
$1,050
2015A 2016A 2017E
Cost of Sales2 (US$/oz)
$986
$897
$775
2015A 2016A 2017E
Mine-site AISC1 (US$/oz)
$108
$95
$70-80
2015A 2016A 2017E
-31%
Growing production; declining
costs; declining capital intensity
Young-Davidson – Ramp up of Underground Mining
-21%+28%
6,900 tpd
underground mining rate average in Sept. 2017
-10%
6,000 tpd
average underground mining rate in 2016
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 Cost of sales includes mining and processing costs, royalties and amortization
Total Capital Spending (US$m)
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Q1/13
Q2/13
Q3/13
Q4/13
Q1/14
Q2/14
Q3/14
Q4/14
Q1/15
Q2/15
Q3/15
Q4/15
Q1/16
Q2/16
Q3/16
Q4/16
Q1/17
Q2/17
Q3/17
Underground TPD Mill TPD Processed Grade (g/t Au)
Tonnesperday
g/tAu
21
Mulatos – Our Founding Operation
• Initial production 2005
• ~$400m of free cash flow1 generated to date
• Declining cost profile; 5% NSR royalty nearing completion
• Large underexplored land package (28,773 ha)
Location: Sonora, Mexico Stage: Producing
Ownership: 100% interest
Operation: Open pit, heap leach
& high grade mill
2015A 2016A 2017E Q3/17A YTD 2017
Gold Production (k oz) 140.3 154.0 150-160 36.3 117.3
Cost of Sales1 (US$/oz) $1,128 $1,088 $1,015 $956 $964
Total Cash Costs2 (US$/oz) $869 $838 $815 $785 $782
Mine-site AISC2 (US$/oz) $1,047 $916 $890 $864 $852
Total Capital3 (US$m) $45 $33 $33-40 $7 $22
Mine-site FCF2,4 (US$m) ($19) $27 - $6 $20
Gold Reserves & Resources5 Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Reserves 49,995 1.17 1,885
M&I Resources 76,084 1.14 2,798
Inferred Resources 10,280 0.98 325
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Capital spending guidance for 2016 and 2017 excludes capitalized exploration. 2017 guidance includes La Yaqui Phase I development capital
4 Excluding LY Phase I capital expenditures.
5 See mineral reserve and resource estimates and associated footnotes in appendix.
22
La Yaqui & Cerro Pelon
Mulatos – District Exploration Potential
1 See mineral reserve and resource estimates and associated footnotes in appendix.
2 Includes Proven & Probable reserves of 608,000 oz (13.5 mt at 1.40 g/t Au), Measured & Indicated resources of 68,000 oz (1.1 mt at 1.91 g/t Au) & Inferred resources of 8,000 oz (0.2 mt at 1.39 g/t Au) for La Yaqui and Proven & Probable
reserves of 170,000 oz (3.3 mt at 1.63 g/t Au), Measured & Indicated resources of 47,000 oz (0.6 mt at 2.56 g/t Au) & Inferred resources of 4,000 oz (0.1 mt at 1.23 g/t Au) for Cerro Pelon.
District potential
Large underexplored land package; >70% of past drilling
focused near Mulatos mine
Mulatos District
Mulatos mine
220 259
778
47
115
236
0
100
200
300
400
500
600
700
800
900
1000
2014 2015 2016
Ounces(000Au)
Proven & Probable Mineral Reserves
Inferred Mineral Resources
Measured & Indicated Mineral Resources
1,2
La Yaqui Phase I
La Yaqui Grande
778k oz
Combined mineral reserves1,2 at La Yaqui & Cerro Pelon,
a 254% increase since 2014
23
El Chanate – Consistent Gold Producer
• $3m site free cash flow2 generated in Q3 2017 YTD
• $1,270/oz minimum realized gold price in 2018 with
production hedged5
• Significant free cash flow at end of mine life through residual
leaching
Location: Sonora, Mexico Stage: Producing
Ownership: 100% interest Operation: Open pit, heap leach
Gold Reserves & Resources4 Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Reserves – Open Pit 10,812 0.56 193
P&P Reserves – Leach Pad Inventory - - 100
M&I Resources 4,415 0.66 93
2015A 2016A 2017E Q3/17A YTD 2017
Gold Production (k oz) 79.3 68.0 50-60 14.9 48.3
Cost of Sales1 (US$/oz) $1,504 $1,177 $1,265 $1,217 $1,226
Total Cash Costs2,3 (US$/oz) $808 $1,052 $1,200 $1,137 $1,156
Mine-site AISC2,3 (US$/oz) $978 $1,069 $1,200 $1,164 $1,187
Total Capital (US$m) $14 $1 $2 $0.3 $1
Mine-site FCF2 (US$m) $3 $5 - $2 $3
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation.
4 See mineral reserve and resource estimates and associated footnotes in appendix.
5 El Chanate’s 2017 and 2018 production has been hedged through gold collar contracts which ensure a minimum gold price of $1,270 per ounce and participation up to $1,444 per ounce in 2018.
24
Proven & Probable Mineral Reserves
Long Life Mineral Reserve Base
Operating Reserve Life Index (years)3
1 For more information, see press release dated February 23, 2017 “Alamos Reports Mineral Reserves and Resources for the Year-Ended 2016” and mineral reserve and resource estimates and associated footnotes in appendix.
2 Year end 2016 Proven & Probable mineral reserves total 7.7 million ounces of gold (184.5 mt at 1.30 g/t Au).
3 Source: TD Securities. 2016 Y/E operating gold reserves/2018E gold production.
5.9
7.7
0
2
4
6
8
10
2015 2016
+31%
OuncesAu(Millions)
1,2
+31%
Increase in Proven & Probable mineral reserves1
2.4m oz
Mineral reserves added at La Yaqui Grande,
Kirazlı & Ağı Dağı1
26.2
14.7
13.5 13.5 13.5
11.3 11.2 10.2 9.8 9.8 9.2 8.5
6.4
3.4
0
5
10
15
20
25
DGC GUY ELD NEM AGI ABX AUY NGD AEM KGC IMG SMF RIC P
Reservelifeindex(years)
25
Development – Peer Leading Growth Profile
Low cost, low capital
intensity growth
Capacity to double
current rate of production
6 development projects
26
Development: Kirazlı, Ağı Dağı & Çamyurt
Location: Turkey Stage: Development
Ownership: 100% interest Operation: Open pit, heap leach
• Kirazlı & Ağı Dağı EIA’s approved
• Kirazlı Forestry Permits granted January 2017
• Kirazlı & Ağı Dağı feasibility studies completed February
20171 outlining 185% increase in combined after-tax NPV8%
• Tax incentives & mining law supportive of industry
Kirazlı2
Tonnes Grade Contained Ounces
(000) (g/t Au) (g/t Ag) (000 Au) (000 Ag)
Proven & Probable 26,104 0.79 12.01 665 10,078
Measured & Indicated 5,966 0.43 2.18 82 418
Inferred 5,689 0.59 8.96 108 1,638
Ağı Dağı2
Proven & Probable 54,361 0.67 5.41 1,166 9,459
Measured & Indicated 34,887 0.46 2.18 518 2,445
Inferred 16,760 0.46 2.85 245 1,534
Çamyurt2
Measured & Indicated 17,721 0.89 6.14 508 3,497
Inferred 2,791 0.95 5.77 85 518
1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi feasibility studies & Camyurt preliminary economic assessment. The 185% increase is compared to the 2012 pre-feasibility study
2 See mineral reserve and resource estimates and associated footnotes in appendix
27
Development: Kirazlı, Ağı Dağı & Çamyurt Economic Studies
After-taxNPV8%(US$m)
$82m
$187m
$88m
$298m
$86m
$0
$100
$200
$300
$400
$500
$600
2012 2017
Kirazlı Ağı Dağı Çamyurt
+236%
1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi Feasibility studies & Camyurt PEA. After-tax NPV8% in 2012 prefeasibility study and after-tax NPV8% and IRR in 2017 feasibility studies and PEA
assume gold and silver prices of $1,250 and $16 per ounce, respectively
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures
11
2017 Positive Economic Studies1
Kirazlı
Feasibility
Study
Ağı Dağı
Feasibility
Study
Çamyurt
PEA
Mine Life Years 5 6 4
Average Annual Production
oz Au 104,000 177,600 93,200
oz Ag 617,300 444,200 403,000
Average grade g/t Au 0.79 0.67 0.92
Mine-site AISC2
US$m $373 $411 $645
Initial Capex US$m $152 $250 $10
Total Capex US$m $180 $313 $26
After-tax NPV5%
US$m $223 $360 $111
After-tax NPV8%
US$m $187 $298 $86
After-tax IRR % 44% 39% 253%
Gold Price Assumption US$/oz $1,250 $1,250 $1,250
>39%
After-tax IRR for each of Kirazlı, Ağı Dağı & Çamyurt1
Low cost, high return growth
28
Quartz Mountain
Location: Oregon, United States
Ownership: Right to earn a 100% interest4
Stage: Advanced Exploration
Esperanza
Location: Morelos State, Mexico
Ownership: 100% interest
Stage: Development
Operation: Open pit, heap leach
Development: Lynn Lake, Esperanza & Quartz Mountain
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 Historic column recovery tests for gold at Quartz Mountain varied between 74% and 88% for the felsic rock hosted mineralization; see Orsa Ventures press release dated February 12, 2013
3 See mineral reserve and resource estimates and associated footnotes in appendix.
4 Additional C$3m due on completion of feasibility study & C$15m or 2% NSR upon successful permitting
Lynn Lake
Location: Manitoba, Canada
Ownership: 100% interest
Stage: Feasibility
Operation: Open pit
Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
M&I Resources3
40,303 2.03 2,629
Inferred Resources 50,704 1.28 2,089
• Located in highly-prospective Lynn Lake
Mining District
• High grade, open pit with significant
exploration potential
• Existing infrastructure in place
• Low cost hydroelectric power
• Feasibility study expected Q4 2017
Tonnes Grade Oz Au
(000) (g/t Au) (g/t Ag) (000 Au) (000 Ag)
M&I3
Resources 34,352 0.98 8.09 1,083 8,936
Inf. Resources 718 0.80 15.04 18 347
Tonnes Grade Oz Au
(000) (g/t Au) (000 Au)
M&I Resources3
12,156 0.87 339
Inferred Resources 39,205 0.91 1,147
• Excellent infrastructure; low technical
risk
• Low capital intensity & operating costs
• Average annual production potential >
100k oz
• AISC expected to be lowest quartile1
• Located on northern extension of
prolific Basin & Range Province of
Nevada
• Low strip ratio, favourable metallurgy2
• Acquisition cost $3.5m
29
Alamos – Investment Case
Catalysts
Diversified intermediate gold producer Low-cost growth profile
Strong balance sheet to support
growth
Long term track record of delivering
shareholder value
✓ Q4 2016: Met consolidated 2016 production guidance
✓ Q1 2017: Received Forestry Permits for Kirazlı project
✓ Q1 2017: Positive Kirazlı & Ağı Dağı feasibility studies & Çamyurt PEA
✓ Q1 2017: 31% increase in combined mineral reserves
✓ Q3 2017: Initial production at La Yaqui
Q4 2017: Closing of Richmont acquisition
Q4 2017: Lynn Lake feasibility study
2017: Ongoing exploration at Mulatos
2017: Receipt of GSM permit for Kirazlı
30
Appendices
31
Board of Directors and Executive and Management Team
Board of Directors
Executive and Management Team
Paul J. Murphy
John A.
McCluskey
Mark J. Daniel
Patrick D.
Downey
David Fleck David Gower
Claire M. C.
Kennedy
Ronald E. Smith Kenneth Stowe
Chairman Director Director Director Director Director Director Director Director
John A. McCluskey Jamie Porter Peter MacPhail Christine Barwell Chris Bostwick Luis Chavez
President and CEO Chief Financial Officer Chief Operating Officer VP, Human Resources VP, Technical Services Senior VP, Mexico
Andrew Cormier Nils Engelstad Greg Fisher Aoife McGrath Scott Parsons Colin Webster
VP, Development & Construction VP, General Counsel VP, Finance VP, Exploration VP, Investor Relations VP Sustainability & External Affairs
32
Sustainability
• Our Objectives
• As we pursue further growth, we will continue to measure our success as an
organization by our performance in achievement of our sustainability objectives:
• Protecting the health and well-being of our employees
• Creating shared value with our host communities and countries
• Ensuring that our operations are net-positive for the environment
• Over the years, Alamos has been recognized for its achievements in these areas:
Clean Industry Certification from PROFEPA
• Alamos was certified as an Industria Limpia (clean industry)
in recognition of the excellence of environmental management
at Mulatos
CSR Award from Mexican Center for Philanthropy (CEMEFI)
• Signifies exceptional record of CSR performance;
• 2016 marked the 8th consecutive year for Alamos
33
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 Excludes capitalized exploration.
3 For the purposes of calculating mine-site all-in sustaining costs at individual mine sites, the Company does not include an allocation of corporate and administrative and share based compensation expenses to the mine sites.
4 Cost of sales includes mining and processing costs, royalties, and amortization expense
2017 Guidance – Alamos
2017 Guidance 2016 Actuals
Young-Davidson Mulatos El Chanate Total Total
Gold production (000’s ounces) 200-210 150-160 50-60 400-430 392
Cost of Sales (in millions) (4) $215 $157 $70 $442 $429
Cost of Sales ($/oz)(4) $1,050 $1,015 $1,265 $1,065 $1,103
Total cash costs ($/oz)(1) $625 $815 $1,200 $765 $797
All-in sustaining costs ($/oz)(1) $940 $1,010
Mine-site all-in sustaining costs ($/oz) (1),(3) $775 $890 $1,200 -
Capital expenditures (in millions)
Sustaining capital(1) $30-35 $8-10 $2 $40-47 $49
Growth capital(1) $40-45 $25-30 (2) - $65-75 $97
Total – Operating Mines(1) $70-80 $33-40 $2 $105-122 $128
Total – Development Projects $35-61 $18
Total Consolidated Budget $140-183 $147
Corporate & Administrative (in millions) $16 $16
34
Young-Davidson – Increasing Grade & Productivity
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation.
4 Excludes hydro rebate not attributable to Q4/15
Underground ramp up driving production higher and unit costs lower
Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17
Gold ounces produced 28,281 29,252 30,099 33,106 35,104 40,166 40,538 40,945 38,098 39,365 38,201 44,694 39,065 42,644 43,629 44,662 40,400 47,300 55,800
Cost of sales1 (US$/oz) Pre-commercial production $1,677 $1,625 $1,370 $1,211 $1,216 $1,298 $1,165 $986 $1,058 $1,182 $1,032 $1,077 $1,148 $1,113 $966
Total cash costs per oz.(2,3)
$694 $716 $666 $850 $1,009 $871 $723 $719 $745 $697 $681 $617 $616 $738 $607 $667 $710 $677 $572
Mine-site AISC per oz.(2,3)
$1,059 $1,254 $1,357 $1,270 $1,315 $1,144 $959 $912 $987 $1,008 $979 $980 $846 $965 $849 $926 $851 $895 $ 744
Underground mine
Tonnes mined per day 1,130 1,611 1,417 2,590 2,611 3,595 3,753 4,140 4,130 5,149 5,081 5,911 5,776 6,123 5,467 6,675 6,400 6,377 6,544
Grades (g/t) 2.7 2.5 2.8 3.1 2.8 3.3 3.1 3.0 3.0 2.6 2.6 2.6 2.6 2.4 2.8 2.4 2.6 2.6 2.9
Development metres 1,941 2,445 2,620 2,986 3,772 3,545 3,269 3,438 3,409 3,789 3,619 3,769 3,490 3,168 2,677 3,044 3,242 3,425 3,344
Unit UG mining costs (US$)
Pre-commercial production
$46 $45 $41 $39 $39 $33 $32 $294 $31 $34 $34 $32 $36 $33 $34
Unit UG mining costs (CAD$) $51 $49 $45 $44 $48 $41 $41 $384 $42 $44 $45 $42 $47 $44 $43
Mill processing facility
Tonnes processed per day 6,466 7,017 6,747 6,969 7,163 8,230 7,670 7,757 7,186 7,677 7,680 7,630 7,342 7,006 6,833 7,552 7,718 6,917 7,553
Grades (inc. OP stockpile) 1.8 1.7 1.7 2.0 1.8 2.2 1.9 2.0 2.0 2.0 1.9 2.2 2.1 2.1 2.4 2.2 2.2 2.5 2.7
Recoveries (%) 86% 85% 89% 88% 87% 88% 90% 88% 86% 88% 92% 91% 90% 92% 93% 90% 89% 92% 93%
$20
$25
$30
$35
$40
$45
$50
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17
Underground tonnes mined per day Unit UG mining costs (US$/t)
UndergroundTPD
UnitUGminingcosts(US$/t)
35
2016 2017 2018 2019
✓ Commissioning of MCM shaft
✓ Transition to 100% owner
development
✓ Ramp up to 7,000 tpd
✓ Raise boring of lower NG shaft
✓ Completion of MCM waste pass
• Shaft bottom infrastructure
• Northgate shaft hoisting from
8900L
Young-Davidson – Development Schedule
Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
Declining capital intensity
36
Young-Davidson – Long Section
Productivity improvements &
declining costs
Developing the underground to support ramp up of underground mining
Milled grade higher
Declining capital intensity
Higher underground mining
rates driving:
Production growth
37
Mulatos District
38
Zone 3
Zone 2
Zone 1
Zones 1 & 2 YE2016
Reserve Pits
ZONE 3 INTERCEPTS
17YAQ053 - 18.00 m at 3.52 g/t Au (107-125m)
17YAQ055 - 7.20 m at 9.21 g/t Au (133-140m)
17YAQ048 - 33.50 m at 2.12 g/t Au (73-107m)
17YAQ065 - 23.10 m at 2.81 g/t Au (90-113m)
17YAQ012 - 39.60 m at 1.54 g/t Au (83-122m)
17YAQ016 - 25.00 m at 1.71 g/t Au (92-117m)
16YAQ123 – 11.9m @ 2.725 g/t Au (178-190m)
16YAQ126 – 17.1m @ 2.873 g/t Au ( 131-148m)
16YAQ203 – 14m @ 2.464 g/t Au (159-173m)
16YAQ204 – 13m@ 6.906 g/t Au (123-136m)
16YAQ230 – 17.7m @ 3.03 g/t Au (77-95m)
ZONE 2 INTERCEPTS
16YAQ125 – 88.4m @ 2.769 g/t Au (99-188m)
16YAQ129 – 76.8M @ 3.168 g/t Au (110-187m)
16YAQ135 – 76m @ 4.374 g/t Au (60-136m)
16YAQ156 – 41.4m @ 2.348 g/t Au (97-138m)
16YAQ158 – 53.9m @ 1.245 g/t Au (121-175m)
16YAQ228 – 32.6m @ 7.587 g/t Au (106-138m)
ZONE 1 INTERCEPTS
16YAQ027 - 30.9m @ 2.201 g/t Au (59-90m)
16YAQ035 - 78.4m @ 1.20 g/t Au (140-220m)
16YAQ045 - 36.5m @ 1.677 g/t Au (70-106m)
16YAQ106 - 36.2m @ 4.332 g/t Au (99-135m)
16YAQ062 - 48.8m @ 2.22 g/t Au (137-186m)
Yaqui Phase 1 Reserve pit
For more information, see press releases dated February 23, 2017, August 3, 2017 and mineral reserve and resource estimates and associated footnotes in appendix.
39
Strong Portfolio of Development Projects
NORTH AMERICA
STAGE CANADA UNITED STATES MEXICO TURKEY
Construction La Yaqui Phase I
Permitting/
Feasibility
Lynn Lake
Kirazlı
Aği Daği
Çamyurt
Advanced
Exploration/
Development
Quartz Mountain
Cerro Pelon
La Yaqui Grande
Esperanza
Other
Exploration
Opportunities
Lynn Lake Regional
Quartz Mountain
Targets
Los Bajios
San Carlos Far East
El Refugio
El Carricito
Çamyurt
Expansion
Kirazlı Zones
40
Kirazlı, Ağı Dağı & Çamyurt Economic Studies – 2017
Feasibility Study - 2017 Preliminary Economic Assessment - 2017
Kirazlı Ağı Dağı Çamyurt
Production
Mine life (years) 5 6 4
Total gold production (ounces) 540,000 937,300 373,200
Total silver production (ounces) 3,141,000 2,365,200 1,612,600
Average annual production (ounces)1
Gold 104,000 177,600 93,200
Silver 617,300 444,200 403,000
Total ore mined (tonnes) 26,100,000 54,361,000 16,580,000
Total waste mined (tonnes) 37,900,000 55,893,000 30,874,000
Total material mined (tonnes) 64,000,000 110,254,000 47,454,000
Waste-to-ore ratio2
1.45 1.03 1.86
Average grade (grams per tonne)
Gold 0.79 0.67 0.92
Silver 12.0 5.4 6.3
Recovery (%)
Gold 81% 80% 76%
Silver 31% 25% 48%
Average throughput (tpd) 15,000 30,000 15,000
Operating Costs
Total cost per tonne of ore3
$8.49 $6.46 $14.03
Total cash cost (per ounce sold)4
$339 $374 $604
Mine-site all-in sustaining cost (per ounce sold)4
$373 $411 $645
Capital Costs (millions)
Pre-production capital expenditure $151.9 $250.3 $10.2
Sustaining capital expenditure $18.1 $33.9 $9.4
Reclamation costs (net of salvage value) $9.9 $28.8 $5.9
Total capital expenditure $179.8 $312.9 $25.5
Economic Analysis
IRR (after-tax) 44.3% 38.7% 253.0%
NPV @ 0% discount rate (after-tax, millions) $299.3 $492.8 $173.8
NPV @ 5% discount rate (after-tax millions) $222.9 $360.2 $111.4
NPV @ 8% discount rate (after-tax, millions) $186.5 $297.6 $86.2
Gold price assumption (average, per ounce sold) $1,250 $1,250 $1,250
Silver price assumption (average, per ounce sold) $16.00 $16.00 $16.00
Exchange Rate (Turkish Lira/US Dollar) 2.90:1 2.90:1 2.90:1
1 Average annual production is based on five full years of production for Kirazlı and Ağı Dağı and excludes pre-commercial production
2 Reported waste-to-ore ratio is over the life of mine. The waste-to-ore ratio during commercial production is 0.70:1 for Ağı Dağı and 1.19:1 for Kirazlı in the 2017 feasibility study
3 Total unit cost per tonne of ore excludes silver as a by-product credit
4 Total cash costs and mine-site all-in sustaining costs include silver as a by-product credit
41
2016 Proven and Probable Mineral Reserves
PROVEN AND PROBABLE GOLD RESERVES (as at December 31, 2016)
Proven Reserves Probable Reserves Total Proven and Probable
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's)
Young-Davidson - Surface 1,165 0.91 34 - - - 1,165 0.91 34
Young-Davidson - Underground 14,851 2.80 1,336 27,203 2.65 2,317 42,054 2.70 3,653
Total Young-Davidson 16,016 2.66 1,370 27,203 2.65 2,317 43,220 2.65 3,687
Mulatos Main Pits 4,173 1.02 137 21,847 0.87 613 26,020 0.90 750
San Carlos Underground 72 13.06 30 34 8.64 9 106 11.65 40
Stockpiles 7,129 1.38 317 - - - 7,129 1.38 317
La Yaqui 470 1.48 22 1,469 1.37 65 1,939 1.40 87
La Yaqui Grande - - - 11,548 1.40 521 11,548 1.40 521
Cerro Pelon 960 1.70 53 2,293 1.59 117 3,253 1.63 170
Total Mulatos 12,804 1.36 559 37,191 1.11 1,325 49,995 1.17 1,885
El Chanate - Open Pit 7,008 0.51 114 3,804 0.65 79 10,812 0.56 193
El Chanate - Leach Pad Inv. - - 100 - - - - - 100
Total El Chanate 7,008 0.95 214 3,804 0.65 79 10,812 0.84 293
Agi Dagi 1,450 0.76 36 52,911 0.66 1,130 54,361 0.67 1,166
Kirazli 700 1.25 28 25,404 0.78 637 26,104 0.79 665
Total Turkey 2,150 0.93 64 78,315 0.70 1,767 80,465 0.71 1,831
Alamos - Total 37,979 1.81 2,208 146,513 1.17 5,488 184,492 1.30 7,696
PROVEN AND PROBABLE SILVER MINERAL RESERVES (as at December 31, 2016)
Proven Reserves Probable Reserves Total Proven and Probable
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's)
La Yaqui 470 7.40 112 1,469 7.19 340 1,939 7.25 452
La Yaqui Grande - - - 11,548 19.94 7,403 11,548 19.94 7,403
Ağı Dağı 1,450 6.22 290 52,911 5.39 9,169 54,361 5.41 9,459
Kirazli 700 15.90 358 25,404 11.90 9,720 26,104 12.01 10,078
Alamos - Total 2,620 9.02 760 91,332 9.07 26,632 93,952 9.07 27,392
42
2016 Total Measured and Indicated Mineral Resources
MEASURED AND INDICATED GOLD MINERAL RESOURCES (as at December 31, 2016)
Measured Resources Indicated Resources Total Measured and Indicated
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's)
Young-Davidson - Surface 496 1.13 18 1,242 1.28 51 1,739 1.24 69
Young-Davidson - Underground 5,876 3.33 629 4,916 3.47 548 10,792 3.39 1,177
Total Young-Davidson 6,373 3.16 647 6,158 3.03 599 12,531 3.09 1,246
Mulatos 8,270 1.24 330 64,221 1.08 2,224 72,491 1.10 2,554
San Carlos UG 196 6.11 39 362 4.70 55 558 5.20 93
La Yaqui - - - 1,108 1.91 68 1,108 1.91 68
Cerro Pelon 117 2.75 10 455 2.52 37 572 2.56 47
Carricito 58 0.82 2 1,297 0.82 34 1,355 0.83 36
Total Mulatos 8,641 1.37 381 67,443 1.12 2,418 76,084 1.14 2,798
El Chanate 1,092 0.55 19 3,323 0.69 74 4,415 0.66 93
MacLellan 15,010 1.99 960 17,374 1.75 976 32,384 1.86 1,936
Gordon - - - 5,914 3.21 610 5,914 3.21 610
Burnt Timber - - - 1,021 1.40 46 1,021 1.40 46
Linkwood - - - 984 1.16 37 984 1.17 37
Total Lynn Lake 15,010 1.99 960 25,293 2.05 1,669 40,303 2.03 2,629
Esperanza 19,226 1.01 622 15,126 0.95 462 34,352 0.98 1,083
Ağı Dağı 553 0.44 8 34,334 0.46 510 34,887 0.46 518
Kirazli 118 0.50 2 5,848 0.43 80 5,966 0.43 82
Çamyurt 513 1.00 16 17,208 0.89 492 17,721 0.89 508
Total Turkey 1,184 0.68 26 57,390 0.59 1,082 58,574 0.59 1,108
Quartz Mountain 214 0.95 7 11,942 0.87 333 12,156 0.87 339
Alamos - Total 51,740 1.60 2,661 186,675 1.11 6,637 238,415 1.21 9,298
MEASURED AND INDICATED SILVER MINERAL RESOURCES (as at December 31, 2016)
Measured Resources Indicated Resources Total Measured and Indicated
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's)
La Yaqui Grande - - - 1,108 15 523 1,108 15 523
Esperanza 19,226 7.25 4,482 15,126 9.16 4,455 34,352 8.09 8,936
Ağı Dağı 553 1.59 28 34,334 2.19 2,417 34,887 2.18 2,445
Kirazli 118 2.73 10 5,848 2.17 408 5,966 2.18 418
Çamyurt 513 5.63 93 17,208 6.15 3,404 17,721 6.14 3,497
Alamos - Total 20,410 7.03 4,613 73,624 4.73 11,207 94,034 5.23 15,819
43
2016 Total Inferred Mineral Resources
INFERRED GOLD MINERAL RESOURCES
(as at December 31, 2016)
Tonnes Grade Ounces
(000's) (g/t Au) (000's)
Young-Davidson - Surface 31 0.99 1
Young-Davidson - Underground 3,524 2.76 313
Total Young-Davidson 3,555 2.75 314
Mulatos 8,935 0.92 265
San Carlos UG 162 4.93 26
La Yaqui 174 1.39 8
Cerro Pelon 109 1.23 4
Carricito 900 0.74 22
Total Mulatos 10,280 0.98 325
El Chanate 112 0.71 3
MacLellan 1,898 2.01 123
Gordon 4,364 2.87 403
Burnt Timber 23,438 1.04 781
Linkwood 21,004 1.16 783
Total Lynn Lake 50,704 1.28 2,089
Esperanza 718 0.80 18
Ağı Dağı 16,760 0.46 245
Kirazli 5,689 0.59 108
Çamyurt 2,791 0.95 85
Total Turkey 25,240 0.54 438
Quartz Mountain 39,205 0.91 1,147
Alamos - Total 129,815 1.04 4,334
INFERRED SILVER MINERAL RESOURCES
(as at December 31, 2016)
Tonnes Grade Ounces
(000's) (g/t Ag) (000's)
La Yaqui Grande 174 5.55 31
Esperanza 718 15.04 347
Ağı Dağı 16,760 2.85 1,534
Kirazli 5,689 8.96 1,638
Çamyurt 2,791 5.77 518
Alamos - Total 26,132 4.84 4,068
44
Notes to Mineral Reserve and Resource Estimates
Notes to Mineral Reserve and Resource Tables:
• The Company’s Mineral Reserves and Mineral Resource as at December 31, 2016 are classified in accordance with the Canadian Institute of Mining Metallurgy and Petroleum’s “CIM Standards on Mineral
Resources and Reserves, Definition and Guidelines” as per Canadian Securities Administrator’s NI 43-101 requirements.
• Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
• Mineral Resources are exclusive of Mineral Reserves.
• Mineral Reserve cut-off grade for the Mulatos Mine, the Cerro Pelon Pit, the La Yaqui Pit, the Kirazlı Pit and the Ağı Dağı Pit are determined as a net of process value of $0.10 per tonne for each model
block
• All Measured, Indicated and Inferred Mineral Resources are pit constrained with the exception of those outside the Mulatos Main Pits on the Mulatos property which have no economic restrictions and
are tabulated by gold cut-off grade.
• Mineral Reserve estimates assumed a gold price of $1,250 per ounce and Mineral Resource estimates assumed a gold price of $1,400 per ounce, except as follows: Lynn Lake Mineral Resources assumed a
gold price of $1,550 per ounce with an assumption of the Canadian dollar at parity with the United States dollar. Metal prices, cutoff grades and metallurgical recoveries are set out in the table below.
• El Chanate reserve ounces include a December 31, 2016 inventory 99,900 recoverable ounces in the heap leach pad
Qualified Persons:
Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this news release. Chris Bostwick is a Qualified
Person within the meaning of Canadian Securities Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43-101 compliant mineral reserve and resource
estimates are detailed in the following table.
Mineral Resources
Jeffrey Volk, CPG, FAusIMM Director - Reserves and Resource,
Alamos Gold Inc.
Young-Davidson, El Chanate, San Carlos U/G, Lynn Lake
Marc Jutras, P.Eng Principal, Ginto Consulting Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Carricito, Esperanza, Ağı Dağı,
Kirazlı, Çamyurt, Quartz Mountain
Mineral Reserves
Chris Bostwick, FAusIMM VP Technical Services, Alamos Gold Inc. Young-Davidson, El Chanate,
San Carlos Underground
Herb Welhener, SME-QP VP, Independent Mining Consultants Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Ağı Dağı, Kirazlı
Resources Reserves
Gold Price Cutoff Gold Price Cutoff Met Recovery
Mulatos:
Mulatos Main Open Pit $1,400 0.5 $1,250 see notes >50%
San Carlos Underground $1,400 2.5 $1,250 3.27 70%
Cerro Pelon $1,400 0.5 $1,250 see notes 75%
La Yaqui $1,400 0.5 $1,250 see notes 75%
Carricito $1,400 0.3 n/a n/a >50%
Young-Davidson - Surface $1,400 0.5 $1,250 0.5 91%
Young-Davidson - Underground $1,400 1.3 $1,250 1.9 91%
El Chanate $1,400 0.15 $1,250 0.15 30-65%
Lynn Lake $1,555 0.4 n/a n/a 89-92%
Esperanza $1,400 0.4 n/a n/a 60-72%
Ağı Dağı $1,400 0.2 $1,250 see notes 80%
Kirazlı $1,400 0.2 $1,250 see notes 81%
Çamyurt $1,400 0.2 n/a n/a 78%
Quartz Mountain $1,400 0.21 Oxide, 0.6 Sulfide n/a n/a 65-80%
45
2016 Mineral Reserves & Resources – Island Gold Mine
PROVEN AND PROBABLE GOLD RESERVES (as at December 31, 2016)
Proven Reserves Probable Reserves Total Proven and Probable
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's)
Island Gold 573.05 8.68 159.8 1,978.0 9.31 592.4 2,551 9.17 752.2
MEASURED AND INDICATED GOLD RESOURCES (as at December 31, 2016)1
Measured Resources Indicated Resources Total Measured and Indicated
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's)
Island Gold 33.5 4.94 5.4 445.5 6.01 86.1 479.0 5.94 91.5
INFERRED GOLD RESOURCES (as at December 31, 2016)
Inferred Resources
Tonnes Grade Ounces
(000's) (g/t Au) (000's)
Island Gold 3,042.0 10.18 995.7
Source: Company disclosure
Notes to Mineral Reserve and Resource Tables:
1. Mineral Resources presented are exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability
2. In 2016, based on a gold price of CAN$1,500/oz; in 2015, based on a gold price of US$1,080/oz and an exchange rate of CAN$1.2037 = US$1.00.
Qualified Persons
The Mineral Reserve and Resource estimates as of December 31, 2016 and December 31, 2015 were performed by qualified persons as defined by NI 43-101 and were supervised by Mr. Daniel Adam, Geo.,
Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc. Please refer to the SEDAR website (www.sedar.com) for full reports and additional corporate documentation.
The Island Gold Mine Reserve and Resource estimate as of December 31, 2016 was performed by M. Raynald Vincent P.Eng. M.P.M., Chief Geologist, and M. Léon Grondin Leblanc, P.Eng., Chief Engineer, both
employees of Richmont Mines Inc., and Qualified Persons as defined by NI 43-101. A NI 43-101 technical report has been completed for the Island Gold Mine as of December 31, 2016, and filed on SEDAR.
46
Scott K. Parsons, CFA
VP, Investor Relations
416.368.9932 x 5439
sparsons@alamosgold.com

More Related Content

What's hot

Q1 17 investor presentation april 21 final
Q1 17 investor presentation april 21 finalQ1 17 investor presentation april 21 final
Q1 17 investor presentation april 21 finalkirklandlakegoldinc
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcastDetourGold
 
Kirkland lake gold investor presentation jan 2017
Kirkland lake gold investor presentation jan 2017Kirkland lake gold investor presentation jan 2017
Kirkland lake gold investor presentation jan 2017kirklandlakegoldinc
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017yamanagold2016
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentationguygold2016
 
Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentationDetourGold
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDetourGold
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDetourGold
 
Q3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf callQ3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf callAmélie Laliberté
 
Raymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference OrlandoRaymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference OrlandoAgnico Eagle Mines
 
Alamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 finalAlamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 finalalamosgoldinc
 
Alamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 finalAlamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 finalalamosgoldinc
 
Kirkland lake gold investor presentation feb bmo conference final
Kirkland lake gold investor presentation feb bmo conference finalKirkland lake gold investor presentation feb bmo conference final
Kirkland lake gold investor presentation feb bmo conference finalkirklandlakegoldinc
 

What's hot (20)

Td presentation klgoldjan172018
Td presentation klgoldjan172018Td presentation klgoldjan172018
Td presentation klgoldjan172018
 
Cibc conference january242018
Cibc conference january242018Cibc conference january242018
Cibc conference january242018
 
Egf april2018
Egf april2018Egf april2018
Egf april2018
 
Pms september152017v3
Pms september152017v3Pms september152017v3
Pms september152017v3
 
Pms september152017v2
Pms september152017v2Pms september152017v2
Pms september152017v2
 
Q1 17 investor presentation april 21 final
Q1 17 investor presentation april 21 finalQ1 17 investor presentation april 21 final
Q1 17 investor presentation april 21 final
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
 
Kirkland lake gold investor presentation jan 2017
Kirkland lake gold investor presentation jan 2017Kirkland lake gold investor presentation jan 2017
Kirkland lake gold investor presentation jan 2017
 
European Gold Forum 2017
European Gold Forum 2017European Gold Forum 2017
European Gold Forum 2017
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentation
 
Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentation
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentation
 
Marketing september72017
Marketing september72017Marketing september72017
Marketing september72017
 
Corporate Update - June 2013
Corporate Update - June 2013Corporate Update - June 2013
Corporate Update - June 2013
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_final
 
Q3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf callQ3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf call
 
Raymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference OrlandoRaymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference Orlando
 
Alamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 finalAlamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 final
 
Alamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 finalAlamos corporate presentation june 9 2016 final
Alamos corporate presentation june 9 2016 final
 
Kirkland lake gold investor presentation feb bmo conference final
Kirkland lake gold investor presentation feb bmo conference finalKirkland lake gold investor presentation feb bmo conference final
Kirkland lake gold investor presentation feb bmo conference final
 

Viewers also liked

Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont Mining Corporation
 
08 09-16 montreal-marketing
08 09-16 montreal-marketing08 09-16 montreal-marketing
08 09-16 montreal-marketingRichmontIR
 
17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentationrichmontminesinc2016
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conferencerichmontminesinc2016
 
Island Gold Mine Technical Session Presentation
Island Gold Mine Technical Session PresentationIsland Gold Mine Technical Session Presentation
Island Gold Mine Technical Session Presentationrichmontminesinc2016
 

Viewers also liked (20)

Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation final
 
08 09-16 montreal-marketing
08 09-16 montreal-marketing08 09-16 montreal-marketing
08 09-16 montreal-marketing
 
CIBC Conference Presentation
CIBC Conference PresentationCIBC Conference Presentation
CIBC Conference Presentation
 
Richmont Island Gold Site Tour
Richmont Island Gold Site TourRichmont Island Gold Site Tour
Richmont Island Gold Site Tour
 
NA Marketing Presentation
NA Marketing PresentationNA Marketing Presentation
NA Marketing Presentation
 
denver gold forum
denver gold forumdenver gold forum
denver gold forum
 
17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation
 
Texas Marketing
Texas MarketingTexas Marketing
Texas Marketing
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
Denver Gold Presentation 2013
Denver Gold Presentation 2013Denver Gold Presentation 2013
Denver Gold Presentation 2013
 
17 06 07 nbf conference - toronto
17 06 07   nbf conference - toronto17 06 07   nbf conference - toronto
17 06 07 nbf conference - toronto
 
Vancouver Marketing
Vancouver MarketingVancouver Marketing
Vancouver Marketing
 
June 2015 Presentation
June 2015 PresentationJune 2015 Presentation
June 2015 Presentation
 
January 2015 Presentation
January 2015 PresentationJanuary 2015 Presentation
January 2015 Presentation
 
Denver Gold Presentation 2012
Denver Gold Presentation 2012Denver Gold Presentation 2012
Denver Gold Presentation 2012
 
Canaccord Technical Session
Canaccord Technical SessionCanaccord Technical Session
Canaccord Technical Session
 
Island Gold Mine Technical Session Presentation
Island Gold Mine Technical Session PresentationIsland Gold Mine Technical Session Presentation
Island Gold Mine Technical Session Presentation
 
Montreal and New York Marketing
Montreal and New York MarketingMontreal and New York Marketing
Montreal and New York Marketing
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
10 18-16 new york marketing.pptx
10 18-16 new york marketing.pptx10 18-16 new york marketing.pptx
10 18-16 new york marketing.pptx
 

Similar to Alamos corp presentation nov 3 2017 final (1)

Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalalamosgoldinc
 
Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalrichmontminesinc2016
 
Alamos corp presentation jan 17 2018 final
Alamos corp presentation jan 17 2018 finalAlamos corp presentation jan 17 2018 final
Alamos corp presentation jan 17 2018 finalalamosgoldinc
 
Alamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 finalAlamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 finalalamosgoldinc
 
Alamos corp presentation mar 1 2018 final
Alamos corp presentation mar 1 2018 finalAlamos corp presentation mar 1 2018 final
Alamos corp presentation mar 1 2018 finalalamosgoldinc
 
Alamos gold corporate presentation september 06 2018 final
Alamos gold corporate presentation   september 06 2018 finalAlamos gold corporate presentation   september 06 2018 final
Alamos gold corporate presentation september 06 2018 finalalamosgoldinc
 
Alamos gold corporate presentation September 18 2018 final
Alamos gold corporate presentation   September 18 2018 finalAlamos gold corporate presentation   September 18 2018 final
Alamos gold corporate presentation September 18 2018 finalalamosgoldinc
 
Alamos corp presentation dec 4 2017 final
Alamos corp presentation dec 4 2017  finalAlamos corp presentation dec 4 2017  final
Alamos corp presentation dec 4 2017 finalalamosgoldinc
 
Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019alamosgoldinc
 
Alamos corporate presentation june 5 2015 final
Alamos corporate presentation   june 5 2015 finalAlamos corporate presentation   june 5 2015 final
Alamos corporate presentation june 5 2015 finalalamosgoldinc
 
Alamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 finalAlamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 finalalamosgoldinc
 
Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016alamosgoldinc
 
Alamos corporate presentation aug 19 2015 final
Alamos corporate presentation   aug 19 2015 finalAlamos corporate presentation   aug 19 2015 final
Alamos corporate presentation aug 19 2015 finalalamosgoldinc
 
Alamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 FinalAlamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 Finalalamosgoldinc
 
Alamos corporate presentation nov 16 2015 final
Alamos corporate presentation   nov 16 2015 finalAlamos corporate presentation   nov 16 2015 final
Alamos corporate presentation nov 16 2015 finalalamosgoldinc
 
Alamos corporate presentation dec 14 2015 final
Alamos corporate presentation   dec 14 2015 finalAlamos corporate presentation   dec 14 2015 final
Alamos corporate presentation dec 14 2015 finalalamosgoldinc
 
Alamos corporate presentation july 21 2015 final
Alamos corporate presentation   july 21 2015 finalAlamos corporate presentation   july 21 2015 final
Alamos corporate presentation july 21 2015 finalalamosgoldinc
 
Alamos corporate-presentation-july-8-2015 final
Alamos corporate-presentation-july-8-2015 finalAlamos corporate-presentation-july-8-2015 final
Alamos corporate-presentation-july-8-2015 finalalamosgoldinc
 
Alamos Corporate Presentation - September 2015
 Alamos Corporate Presentation - September 2015 Alamos Corporate Presentation - September 2015
Alamos Corporate Presentation - September 2015alamosgoldinc
 
Alamos corporate presentation sept 10 2015 final
Alamos corporate presentation   sept 10 2015 finalAlamos corporate presentation   sept 10 2015 final
Alamos corporate presentation sept 10 2015 finalalamosgoldinc
 

Similar to Alamos corp presentation nov 3 2017 final (1) (20)

Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation final
 
Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation final
 
Alamos corp presentation jan 17 2018 final
Alamos corp presentation jan 17 2018 finalAlamos corp presentation jan 17 2018 final
Alamos corp presentation jan 17 2018 final
 
Alamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 finalAlamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 final
 
Alamos corp presentation mar 1 2018 final
Alamos corp presentation mar 1 2018 finalAlamos corp presentation mar 1 2018 final
Alamos corp presentation mar 1 2018 final
 
Alamos gold corporate presentation september 06 2018 final
Alamos gold corporate presentation   september 06 2018 finalAlamos gold corporate presentation   september 06 2018 final
Alamos gold corporate presentation september 06 2018 final
 
Alamos gold corporate presentation September 18 2018 final
Alamos gold corporate presentation   September 18 2018 finalAlamos gold corporate presentation   September 18 2018 final
Alamos gold corporate presentation September 18 2018 final
 
Alamos corp presentation dec 4 2017 final
Alamos corp presentation dec 4 2017  finalAlamos corp presentation dec 4 2017  final
Alamos corp presentation dec 4 2017 final
 
Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019
 
Alamos corporate presentation june 5 2015 final
Alamos corporate presentation   june 5 2015 finalAlamos corporate presentation   june 5 2015 final
Alamos corporate presentation june 5 2015 final
 
Alamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 finalAlamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 final
 
Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016
 
Alamos corporate presentation aug 19 2015 final
Alamos corporate presentation   aug 19 2015 finalAlamos corporate presentation   aug 19 2015 final
Alamos corporate presentation aug 19 2015 final
 
Alamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 FinalAlamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 Final
 
Alamos corporate presentation nov 16 2015 final
Alamos corporate presentation   nov 16 2015 finalAlamos corporate presentation   nov 16 2015 final
Alamos corporate presentation nov 16 2015 final
 
Alamos corporate presentation dec 14 2015 final
Alamos corporate presentation   dec 14 2015 finalAlamos corporate presentation   dec 14 2015 final
Alamos corporate presentation dec 14 2015 final
 
Alamos corporate presentation july 21 2015 final
Alamos corporate presentation   july 21 2015 finalAlamos corporate presentation   july 21 2015 final
Alamos corporate presentation july 21 2015 final
 
Alamos corporate-presentation-july-8-2015 final
Alamos corporate-presentation-july-8-2015 finalAlamos corporate-presentation-july-8-2015 final
Alamos corporate-presentation-july-8-2015 final
 
Alamos Corporate Presentation - September 2015
 Alamos Corporate Presentation - September 2015 Alamos Corporate Presentation - September 2015
Alamos Corporate Presentation - September 2015
 
Alamos corporate presentation sept 10 2015 final
Alamos corporate presentation   sept 10 2015 finalAlamos corporate presentation   sept 10 2015 final
Alamos corporate presentation sept 10 2015 final
 

More from alamosgoldinc

Alamos gold corporate presentation may 14 2018 final
Alamos gold corporate presentation   may 14 2018 finalAlamos gold corporate presentation   may 14 2018 final
Alamos gold corporate presentation may 14 2018 finalalamosgoldinc
 
Alamos gold corporate presentation may 1 2018 final
Alamos gold corporate presentation   may 1 2018 finalAlamos gold corporate presentation   may 1 2018 final
Alamos gold corporate presentation may 1 2018 finalalamosgoldinc
 
Alamos gold corporate presentation april 12 2018
Alamos gold corporate presentation   april 12 2018Alamos gold corporate presentation   april 12 2018
Alamos gold corporate presentation april 12 2018alamosgoldinc
 
Alamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 finalAlamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 finalalamosgoldinc
 
Alamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalAlamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalalamosgoldinc
 
Alamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalAlamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalalamosgoldinc
 
Alamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 finalAlamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 finalalamosgoldinc
 
Alamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALAlamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALalamosgoldinc
 
Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017alamosgoldinc
 
Alamos corp presentation March 2017
Alamos corp presentation March 2017Alamos corp presentation March 2017
Alamos corp presentation March 2017alamosgoldinc
 
Alamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 finalAlamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 finalalamosgoldinc
 
Alamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 finalAlamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 finalalamosgoldinc
 
Alamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 finalAlamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 finalalamosgoldinc
 
Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016alamosgoldinc
 
Alamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 finalAlamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 finalalamosgoldinc
 
Alamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 finalAlamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 finalalamosgoldinc
 
Alamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 finalAlamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 finalalamosgoldinc
 
Alamos corporate presentation - September
Alamos corporate presentation - SeptemberAlamos corporate presentation - September
Alamos corporate presentation - Septemberalamosgoldinc
 
Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016alamosgoldinc
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalalamosgoldinc
 

More from alamosgoldinc (20)

Alamos gold corporate presentation may 14 2018 final
Alamos gold corporate presentation   may 14 2018 finalAlamos gold corporate presentation   may 14 2018 final
Alamos gold corporate presentation may 14 2018 final
 
Alamos gold corporate presentation may 1 2018 final
Alamos gold corporate presentation   may 1 2018 finalAlamos gold corporate presentation   may 1 2018 final
Alamos gold corporate presentation may 1 2018 final
 
Alamos gold corporate presentation april 12 2018
Alamos gold corporate presentation   april 12 2018Alamos gold corporate presentation   april 12 2018
Alamos gold corporate presentation april 12 2018
 
Alamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 finalAlamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 final
 
Alamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalAlamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-final
 
Alamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalAlamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 final
 
Alamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 finalAlamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 final
 
Alamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALAlamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINAL
 
Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017
 
Alamos corp presentation March 2017
Alamos corp presentation March 2017Alamos corp presentation March 2017
Alamos corp presentation March 2017
 
Alamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 finalAlamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 final
 
Alamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 finalAlamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 final
 
Alamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 finalAlamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 final
 
Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016
 
Alamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 finalAlamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 final
 
Alamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 finalAlamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 final
 
Alamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 finalAlamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 final
 
Alamos corporate presentation - September
Alamos corporate presentation - SeptemberAlamos corporate presentation - September
Alamos corporate presentation - September
 
Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 final
 

Recently uploaded

Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 

Recently uploaded (20)

Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 

Alamos corp presentation nov 3 2017 final (1)

  • 1. November 2017 Corporate Presentation
  • 2. 2 Cautionary Notes This presentation, the information contained herein, any other materials provided in connection with this presentation and any oral remarks accompanying this presentation (collectively, this “Presentation”) has been prepared by Alamos Gold Inc. (“Alamos”) solely for information purposes concerning a potential transaction (a “Potential Transaction”) involving Alamos and Richmont Mines Inc. (“Richmont”). No Stock exchange, securities commission or other regulatory authority has approved or disapproved of the information contained herein. This presentation does not constitute an offering of securities and the information contained herein is subject to the information contained in the Company’s continuous disclosure documents at www.sedar.com. Cautionary Notes Certain statements in this presentation are “forward-looking statements”, including within the meaning of applicable laws. All statements other than statements of historical fact included in this presentation, including, without limitation, statements regarding the timing and closing of the Proposed Transaction, statements regarding synergies resulting from the Proposed Transaction, statements regarding the effect of the Proposed Transaction on Alamos’ net asset value, operating cash flow, free cash flow, forecast gold production, reserves, resources, gold grades, recoveries, waste-to-ore ratios, total cash cost, all-in sustaining costs, debt levels and future plans and objectives of Alamos are forward-looking statements based on forecasts of future operational or financial results, estimates of amounts not yet determinable and assumptions of management that involve various risks and uncertainties. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “estimates” or “intends”, or stating that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements.” Alamos cautions that forward-looking information involves known and unknown risks, uncertainties and other factors that may cause Alamos’ actual results, performance or achievements to be materially different from those expressed or implied by such information, including, but not limited to, that the Proposed Transaction is completed on terms and timeframe contemplated; failure to obtain shareholder approval of Alamos or Richmont; failure to obtain the necessary regulatory and other approvals; conditions to the Proposed Transaction may not be satisfied; anticipated synergies and other benefits of the Proposed Transaction may not be realized; gold and silver price volatility; fluctuations in foreign exchange rates and interest rates; the impact of any hedging activities; discrepancies between actual and estimated production, between actual and estimated reserves and resources or between actual and estimated metallurgical recoveries; costs of production; capital expenditure requirements; the costs and timing of construction and development of new deposits; and the success of exploration and permitting activities. In addition, the factors described or referred to in the section entitled “Risk Factors” in Alamos’ Annual Information Form for the year ended December 31, 2016, which is available on the SEDAR website at www.sedar.com, should be reviewed in conjunction with the information found in this presentation. Although Alamos has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in forward-looking information, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management’s expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking information. Market data and other statistical information used throughout this Presentation are based on internal company research, independent industry publications, government publications, reports by market research firms or their published independent sources. Industry publications, governmental publications, market research surveys and forecasts generally state that the information contained therein has been obtained from sources believed to be reliable. Although Alamos believes such information is accurate and reliable, it has not independently verified any of the data from third party sources cited or used for our management’s industry estimates, nor has Alamos ascertained the underlying economic assumptions relied upon therein. While Alamos believes internal company estimates are reliable, such estimates have not been verified by any independent sources, and Alamos makes no representations as to the accuracy of such estimates. Note to U.S. Investors Alamos prepares its disclosure in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Terms relating to mineral resources in this presentation are defined in accordance with National Instrument 43 101 Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy, and Petroleum Standards on Mineral Resources and Mineral Reserves. The Unites States Securities and Exchange Commission (the “SEC”) permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Alamos may use certain terms, such as “measured mineral resources”, “indicated mineral resources”, “inferred mineral resources” and “probable mineral reserves” that the SEC does not recognize (these terms may be used in this presentation and are included in the public filings of Alamos, which have been filed with the SEC and the securities commissions or similar authorities in Canada). Cautionary non-GAAP Measures and Additional GAAP Measures Note that for purposes of this section, GAAP refers to IFRS. The Company believes that investors use certain non-GAAP and additional GAAP measures as indicators to assess gold mining companies. They are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared with GAAP. “Cash flow from operating activities before changes in non-cash working capital” is a non-GAAP performance measure that could provide an indication of the Company’s ability to generate cash flows from operations, and is calculated by adding back the change in non-cash working capital to “Cash provided by (used in) operating activities” as presented on the Company’s consolidated statements of cash flows. “Free cash flow” is a non-GAAP performance measure that is calculated as cash flows from operations net of cash flows invested in mineral property, plant and equipment and exploration and evaluation assets as presented on the Company’s consolidated statements of cash flows and that would provide an indication of the Company’s ability to generate cash flows from its mineral projects. “Mine site free cash flow” is a non-GAAP measure which includes cash flow from operating activities at, less capital expenditures at each mine site. Return on Equity is defined as Earnings from Continuing Operations divided by the average Total Equity for the current and previous year. “Mining cost per tonne of ore” and “Cost per tonne of ore” are non-GAAP performance measures that could provide an indication of the mining and processing efficiency and effectiveness of the mine. These measures are calculated by dividing the relevant mining and processing costs and total costs by the tonnes of ore processed in the period. “Cost per tonne of ore” is usually affected by operating efficiencies and waste-to-ore ratios in the period. “Total cash costs per ounce”, “all-in sustaining costs per ounce”, and “mine-site all-in sustaining costs” as used in this analysis are non-GAAP terms typically used by gold mining companies to assess the level of gross margin available to the Company by subtracting these costs from the unit price realized during the period. These non-GAAP terms are also used to assess the ability of a mining company to generate cash flow from operations. There may be some variation in the method of computation of these metrics as determined by the Company compared with other mining companies. In this context, “total cash costs” reflects mining and processing costs allocated from in-process and dore inventory associated and associated royalties with ounces of gold sold in the period. Total cash costs per ounce are exclusive of exploration costs. “All-in sustaining costs per ounce” include total cash costs, exploration, corporate and administrative, share based compensation and sustaining capital costs. “Mine-site all-in sustaining costs” include total cash costs, exploration, and sustaining capital costs for the mine-site, but exclude an allocation of corporate and administrative and share based compensation. Additional GAAP measures that are presented on the face of the Company’s consolidated statements of comprehensive income and are not meant to be a substitute for other subtotals or totals presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. This includes “Earnings from operations”, which is intended to provide an indication of the Company’s operating performance, and represents the amount of earnings before net finance income/expense, foreign exchange gain/loss, other income/loss, and income tax expense. Non-GAAP and additional GAAP measures do not have a standardized meaning prescribed under IFRS and therefore may not be comparable to similar measures presented by other companies. A reconciliation of historical non-GAAP and additional GAAP measures are available at www.alamosgold.com. Technical Information Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this presentation. Chris Bostwick is a Qualified Person within the meaning of Canadian Securities Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43-101 compliant mineral reserve and resource estimates are detailed in the tables in the appendix of this presentation. All figures in US$ unless otherwise indicated.
  • 3. 3 1 Based on 2017 Guidance 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Includes cash, cash equivalents and equity securities as of September 30, 2017. Total liquidity also includes undrawn $400m credit facility. Strong Platform for Delivering Long Term Value Diversified gold production 400,000 – 430,000 oz from three North American mines1 Expanding margins $940/oz AISC, 7% improvement from 20161,2 Peer leading growth Portfolio of 6 low-cost development projects Strong balance sheet Debt free, $168m cash3 & $568m total liquidity to support growth Track record of delivering shareholder value
  • 4. 42015A 2016A 2017E $1,091 $1,010 $940 2015A 2016A 2017E 2015A 2016A 2017E $1,241 $1,103 $1,065 2015A 2016A 2017E Growing Production, Declining Costs, Expanding Margins Gold Production (000 oz) AISC1,2 (US$/oz) -14% Total Capital – Operating Mines (US$m) $128m $105-122m Cost of Sales3 (US$/oz) 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses. 3 Cost of sales includes mining and processing costs, royalties and amortization. 4 AISC Margin calculated as realized gold price less AISC. For 2017E this assumes a $1,250/oz gold price 5 Total capital spending for Alamos has been included for the periods prior to July 2, 2015 for comparative purposes only. 392 400 – 430 +6% 380 $167m5 $57 $229 $310 2015A 2016A 2017E +35% AISC Margin2,4 (US$/oz) -14% -32%
  • 5. 5 $315m High yield notes retired in April 2017 Strong Balance Sheet – Debt Free 1 Unaudited management estimate as of September 30, 2017. 2 Cash, cash equivalents & equity securities. 3 Total liquidity includes cash, cash equivalents, equity securities and undrawn $400m credit facility 4As of November 2, 2017 Balance Sheet Cash & Cash Eq.1,2 US$168 million Total Liquidity3 US$568 million Total Debt US$0 Capital Structure Shares Outstanding 300.7 million Warrants 12.4 million Employee Options 8.2 million Fully Diluted 324.2 million Recent Share Price (TSX)4 C$8.23 Market Capitalization ~C$2.5 billion $24m Annual interest savings; $72m over remaining term $168m $400m $568m As of September 30, 2017 Cash & Total Liquidity Cash, cash equivalents & equity securitiesUndrawn Credit Facility 3
  • 6. 6 699% 7% 264% -50% 450% 950% 1450% 1950% 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Alamos Gold Share Price (TSX) S&P/TSX Global Gold Index Gold (US$/oz) $91 $511 $71 $10 $419 $400 $950 $1,129 $163 Track Record of Delivering Shareholder Value 1 Based on consensus analyst net asset value (NAV) estimates. 2 Cumulative free cash flow (FCF) generated to date. Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 15% Annualized return since 2003 $118m Dividends paid to date Mulatos (US$m) Turkey (US$m)Young-Davidson (US$m) Lynn Lake (US$m) Acquisition Cost (2003) Acquisition Cost (2015) Acquisition Cost (2010) & Capital Invested Acquisition Cost (2016) & Capital Invested Consensus NAV & Cumulative FCF Consensus NAV Consensus NAV $20 $23 Consensus NAV & Cumulative FCF Capital Invested Consensus NAV1 Cumulative FCF2Acquisition Cost
  • 7. 7 Richmont Mines Acquisition Highlights Acquisition of a high quality, free cash flowing asset in a world class jurisdiction • Island Gold is a long-life, high-grade, low-cost underground gold mine located in Ontario, Canada • Current expansion is anticipated to drive production higher, costs lower & further free cash flow growth • Significant exploration potential to extend mine life beyond current resource Strengthens core portfolio; solidifies intermediate producer position • Adds a third core, long-life producing asset to further diversify asset base • De-risks portfolio & improves already low risk profile with increased exposure to Canada Stronger cash flow generation to support growth • Immediate earnings & cash flow accretion; stronger operating & free cash flow profile • Stronger balance sheet & financial flexibility with US$229 million cash1 & no debt • Better positioned to internally fund portfolio of growth projects Aligns well with Alamos’ core competencies • Synergies with a second underground gold mine in Ontario Enhanced production growth & cost profile • Island Gold provides near term production growth while lowering the combined cost profile Increases scale and capital markets profile • Elevates Alamos to a >500 koz per year producer with a peer leading growth profile • Establishes Alamos as top 10 Canadian and North American gold producer2 1 Cash balance shown as at June 30, 2017 and includes equity securities. 2 Based on Wood Mackenzie 2018E estimates for Island Gold and estimates of corporate production in Canada, the United States, and Mexico.
  • 8. 8 35 42 52 82 95 $1,452 $1,192 $1,136 $745 $723 2013A 2014A 2015A 2016A 2017E Ounces Sold (koz) AISC (US$/oz) Island Gold Mine Overview Source: Company filings, SNL, street research 1 Ore processed averaged 933 tpd in H1 2017. 2 Expansion capital of C$28.2 mm converted at 0.80x US$ per C$. • High grade underground gold mine located northeast of Wawa, Ontario in a well established gold district • Began commercial production in October 2007 • Ore currently processed at rate of ~930 tpd1 • Expansion underway to 1,100 tpd as detailed in May 2017 PEA – Annual production expected to increase to average 125 koz at mine-site AISC of US$550/oz for the period of 2019-2024 – Minimal incremental capital of US$23 mm2 with mill expansion expected to be completed in latter part of 2018 • Upside potential reflecting inclusion of all mineral resources and exploration potential laterally and at depth Asset Description Growing Production; Declining Costs Highly Productive Gold Mining District 4 0 50 100km Marathon Wawa Hearst Timmins Iroquois Falls Smooth Rock Falls Eagle River, Wesdome Borden,Goldcorp Island Gold, Richmont Magino, Argonaut Cote, IAMGOLD Black Fox, McEwen Timmins West, Tahoe Holloway, Kirkland Lake Porcupine,Goldcorp Bell Creek, Tahoe Young Davidson, Alamos Macassa, Kirkland Lake Holt, Kirkland Lake Lake Superior ONTARIO Hemlo, Barrick 144 101 17 17 11 101 Mine/ Project City Dome Mine, Goldcorp Hoyle Pond, Goldcorp Cochrane Pamour (PJV), Goldcorp Taylor, Kirkland Lake Detour Lake Mine, Detour Gold Recent Operating Performance Gold Reserves & Resources Tonnes (000) Grade (g/t Au) oz Au (000) P&P Reserves 2,551 9.17 752 M&I Resources 479 5.94 91 Inferred Resources 3,042 10.18 996 Q1/17A Q2/17A Q3/17A Q3 YTD 2017 2017E6 Gold Production (koz) 23.8 26.1 26.7 76.5 87-93 Total Cash Costs7 (US$/oz) $504 $431 $532 $487 $550-$590 Mine-site AISC7 (US$/oz) $640 $503 $725-$765 Sustaining Capital (US$ mm) $3.1 $2.1 $15-$17 Expansion Capital (US$ mm) $4.5 $4.4 $25-$27 Exploration (US$ mm) $2.8 $3.6 $11-$12 RIC Corporate FCF5 (US$ mm) $0.4 $14.3 3 Since 1985. 4 Based on analyst consensus estimates. 5 Richmont consolidated corporate OCF less capex. 6 Richmont 2017E guidance. >25 Moz gold produced3 >35 Moz in defined reserves 7 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
  • 9. 9 20.8 14.6 9.2 9.2 8.8 8.4 8.3 7.7 7.3 6.4 6.1 4.6 4.5 4.3 4.3 4.2 3.6 2.7 1.1 1.0 Macassa Brucejack IslandGold EagleRiver Westwood Seabee RedLake HopeBay Meliadine Musselwhite Eleonore Lapa LaRonde CasaBerardi BlackFox BellCreek TimminsWest Young-Davidson CanadianMalartic DetourLake $700 $713 $715 $720 $730 $775 $782 $787 $870 $980 $985 $1,050 $1,075 $1,113 $1,150 $1,200 $550 $735 IslandPEA2019-2024 Seabee LaRonde Musselwhite Meliadine CanadianMalartic IslandGold Young-Davidson Lapa Macassa RedLake Westwood Eleonore BellCreek DetourLake EagleRiver CasaBerardi BlackFox Island Gold – High Grade, Low Cost, Canadian Asset Island Gold is one of the highest quality producing assets in Canada, and one of a few not in a senior portfolio 2017E All-in Sustaining Costs (US$/oz)Mineral Reserve Grade (g/t Au) Source: Company filings Note: AISC based on midpoint of 2017 guidance where available, otherwise 1H/17 metrics shown. Eagle River AISC shown is Wesdome consolidated. Bell Creek AISC shown consolidated with Timmins West. TMAC AISC excluded due to recent guidance revisions. Island Gold based on PEA.
  • 10. 10 Island Gold PEA Highlights & Operating Profile Source: Company disclosure, street research 1 The Expansion Case PEA assumes a spot gold price of C$1,700/oz and US$1,260/oz and a C$:US$ exchange rate of 1.35. 2 Excludes the 2017 and 2018 ramp-up period. 3 Project capital includes incremental expansion capital of C$28.2m and accelerated mine development/infrastructure capital of C$40m. 4 Net cash flow is undiscounted pre-tax cash flow after all operating costs, project and sustaining capital. 5 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. Expansion Case PEA Summary (1,100 tpd)1 Island Gold Operating Profile (PEA) C$ US$ Targeted mill throughput run-rate year H2 2018 H2 2018 Avg annual production (koz): 2019 – 20242 125 koz 125 koz Avg operating unit cost ($/t) $191 $141 Avg annual Cash Costs ($/oz): LOM 5 $652 $483 Avg annual AISC ($/oz): 2019 – 20242,5 $743 $550 Avg annual AIC ($/oz): LOM5 $910 $674 Sustaining capital ($m): LOM $168 $124 Project capital ($m)3: LOM $68 $50 Cumulative Net Cash Flow ($m)4 $749 $555 90 94 125 $735 $881 $550 2017E 2018E 2019E - 2024E Average Gold Production (koz) AISC (US$/oz) 39% Growth 39% projected production growth C$28.2 mm Low incremental expansion capital -25% expected decrease in LOM AISC Significant upside potential >750 koz of Inferred resources not factored into mine plan + ongoing exploration potential
  • 11. 11 Island Gold Mineral Reserve & Resource Growth 67 564 1,037 1,003 768 996 154 111 233 219 72 91 172 141 144 184 562 752 2007-2011 2012 2013 2014 2015 2016 Inf. Resources M&I Resources Reserves Cumulative Ounces Sold 179 221 256 298 351 433 Source: Company disclosure 1 Cumulative ounces of gold sold since 2007. Mineral Reserves and Resources Over Time (koz) 1 +34% Increase in 2016 year end mineral reserves Strong track record of mineral reserve & resource growth ~$35/oz Low discovery costs +30% Increase in 2016 year end inferred mineral resource; 20% increase in grade +44% Mineral reserve grade increase since 2014
  • 12. 12 Island Gold Exploration Potential Source: Company disclosure Significant Exploration Potential at Depth and to the East Recent results highlight significant potential for resource growth at depth & to the east including • 19.85 g/t over 8.4m Less than 15% of land package drilled Potential for mineralization to extend to at least 2km depth Early results from delineation drilling demonstrate ability to potentially expand reserves at higher average grades
  • 13. 13 AĞI DAĞI (TURKEY) Stage Permitting 2P Au Reserves 1.2 Moz (54.4 mt @ 0.67 g/t) Total Au M&I Resources 0.5 Moz (34.9 mt @ 0.46 g/t) Total Au Inf. Resources 0.2 Moz (16.8mt @ 0.46 g/t) KIRAZLI (TURKEY) Stage Permitting 2P Au Reserves 0.7 Moz (26.1mt @ 0.79 g/t) Total Au M&I Resources 0.1 Moz (6.0mt @ 0.43 g/t) Total Au Inf. Resources 0.1 Moz (5.7mt @ 0.59 g/t) ÇAMYURT (TURKEY) Stage Resource Dev. Total Au M&I Resources 0.5 Moz (17.7mt @ 0.89 g/t) Total Au Inf. Resources 0.1 Moz (2.8mt @0.95 g/t) Top 10 North American Producer; Leading Growth MULATOS (SONORA, MEXICO) 2017E Au Production 150-160 koz 2017E Au Total Cash Costs US$815/oz 2P Au Reserves 1.9 Moz (50.0mt @ 1.17 g/t) Total Au M&I Resources 2.8 Moz (76.1mt @ 1.14 g/t) Total Au Inf. Resources 0.3 Moz (10.3mt @ 0.98 g/t) EL CHANATE (SONORA, MEXICO) 2017E Au Production 50-60 koz 2017E Au Total Cash Costs US$1,200/oz 2P Au Reserves 0.3 Moz (10.8mt @ 0.56g/t) Total Au M&I Resources 0.1 Moz (4.4mt @ 0.66 g/t) YOUNG-DAVIDSON (ONTARIO, CANADA) 2017E Au Production 200-210 koz 2017E Au Total Cash Costs US$625/oz 2P Au Reserves 3.7 Moz (43.2mt @ 2.65 g/t) Total Au M&I Resources 1.2 Moz (12.5mt @ 3.09 g/t) Total Au Inf. Resources 0.3 Moz (3.6mt @ 2.75g/t) Producing Assets Exploration / Development Assets 1 Source: Select street research Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. Note: Mineral resources are exclusive of mineral reserves. See mineral reserve and resource estimates and associated footnotes in appendix. ISLAND GOLD (ONTARIO, CANADA) 2017E Au Production 87-93 koz 2017E Au Total Cash Costs US$550-590/oz 2P Au Reserves 0.8 Moz (2.5mt @ 9.17 g/t) Total Au M&I Resources 0.1 Moz (0.5mt @ 5.94 g/t) Total Au Inf. Resources 1.0 Moz (3.0mt @ 10.18 g/t) QUARTZ MOUNTAIN (OREGON, USA) Stage Advanced Exploration Total Au M&I Resources 0.3 Moz (12.2mt @ 0.87 g/t) Total Au Inf. Resources 1.1 Moz (39.2mt @0.91 g/t) ESPERANZA (MORELOS, MEXICO) Stage Permitting Total Au M&I Resources 1.1 Moz (34.4mt @ 0.98 g/t) LYNN LAKE (MANITOBA, CANADA) Stage Feasibility Total Au M&I Resources 2.6 Moz (40.3mt @ 2.03 g/t) Total Au Inf. Resources 2.1 Moz (50.7mt @ 1.28 g/t) Asset NPV by Geography1 Asset NPV by Stage1 Canada 57% Mexico 23% Turkey 20% Production 72% Development 28%
  • 14. 14 $174 $195 $216 $308 $65 $60 $103 $68 $239 $255 $319 $377 2017E 2018E 2019E 2020E AGI OCF (US$ mm) RIC OCF (US$ mm) Enhances Production Profile & Cash Flow Generation Pro Forma Operating Profile (consensus) Pro Forma Operating Cash Flow Profile (consensus) 418 421 429 513 95 95 138 108513 516 567 622$912 $946 $847 $862 2017E 2018E 2019E 2020E RIC Gold Production (koz) AGI Gold Production (koz) PF AGI AISC (US$/oz) Island Gold increases production by an average of +25% Island Gold increases cash flow by an average of +34% Source: Select street research 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 RIC OCF based on consensus Island Gold cash operating margin and adjusted for tax. Island Gold delivers meaningful production growth and superior cash flow generation 2 1
  • 15. 15 Mulatos District • La Yaqui Grande – significant mineral reserve and resource growth since 2015 discovery • Multiple targets in large underexplored land package; >70% past drilling focused near mine Quartz Mountain • Located in Oregon on the northern extension of prolific Basin & Range Province of Nevada • Low strip, favourable metallurgy Island Gold • Resource growth potential laterally to the east and at depth • Less than 15% of the land package drilled Aği Daği2 Production: 178 koz Mine-site AISC1: $411/oz • Low cost, open pit, heap leach project • 39% after-tax IRR outlined in 2017 feasibility study Çamyurt2 Production: 93 koz Mine-site AISC1: $645/oz • 253% after-tax IRR outlined in 2017 PEA • Minimal initial capital; shared Aği Daği infrastructure Lynn Lake Feasibility Study Q4 2017 • High grade, open pit • Feasibility study expected Q4 2017 Kirazlı2 Production: 104 koz Mine-site AISC1: $373/oz • Low cost, open pit, heap leach project • 44% after-tax IRR outlined in 2017 feasibility study Esperanza • Average annual production potential >100,000 oz; excellent infrastructure; low technical risk ~500 koz Stable long-term annual production base Diversified Production; Disciplined, Multi-stage Growth >400 koz Combined annual production growth potential Young-Davidson 2017E Production: 200-210 koz 2017E Mine-site AISC1: $775/oz • 15 year mineral reserve life • One of Canada’s largest underground gold mines North American Production Permitting / Development Ongoing Exploration Mulatos 2017E Production: 150-160 koz 2017E Mine-site AISC1: $890/oz • 5-year reserve life within main open pit • Significant mine life extension potential through La Yaqui & other nearby deposits El Chanate 2017E Production: 50-60 koz 2017E Mine-site AISC1: $1,200/oz • Mature operation; significant free cash flow expected at the end of mine life through residual leaching Island Gold 2017E Production: 87-93 koz 2017E Mine-site AISC1: $745/oz • One of Canada’s highest grade underground mines • 8-year mine life based on PEA; significant upside potential incorporating existing resources 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 Average annual production and mine-site AISC as detailed in the 2017 Kirazlı & Aği Daği feasibility studies & Çamyurt preliminary economic assessment. Please refer to press releases dated February 15 and 22, 2017 for more detail.
  • 16. 16 Operations – Diversified North American Production Long life reserve base Declining costs & capital Growing free cash flow Growing production
  • 17. 17 Q3 2017 Results – Record Quarter 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses. For the purposes of calculating all-in sustaining costs at individual mine sites, the Company does not include corporate and administrative and share based compensation expenses. 3 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 4 Includes capitalized exploration 5 2017 guidance excludes revised capital budget for Turkish projects approved in April 2017 8% Production growth from Q3 2016; record quarter -10% Decrease in all-in sustaining costs from Q3 2016 11% Increase in operating cash flow before changes in working capital $21m mine-site free cash flow3 On track to achieve 2017 production & cost guidance Q3 2017 Q3 2016 Q3 YTD 2017 2017E Gold production (000 ounces) 107 99 309 400-430 Gold sales (ounces) 101 95 303 - Average realized gold price (US$/oz) $1,281 $1,325 $1,256 - Cost of sales (US$/oz, includes amortization)1 $1,000 $1,078 $1,056 $1,065 All-in sustaining costs (US$/oz)2,3 $884 $979 $946 $940 Capital Expenditures (US$M) Sustaining3 $10.8 $12.5 $31.2 $40-47 Growth3,4,5 $27.4 $24.7 $92.1 $100-110 Operating revenues (US$M) $128.8 $125.6 $381.1 - Cash provided by operations before changes in working capital (US$M)3 $51.3 $46.1 $130.6 - Net earnings (US$M) $28.8 $4.8 $31.3 - Earnings per share (basic) $0.10 $0.02 $0.11 - Cash, cash equivalents & equity securities (US$M) $168 $287 $168 - Total debt (US$/M) $0 $315 $0 -
  • 18. 18 La Yaqui Phase I Q4 2017 Outlook – On Track to Achieve Full Year Guidance La Yaqui initial production early September ahead of schedule Kirazlı site development underway Lynn Lake feasibility study Q4 2017 Young-Davidson MCM waste pass & pebble crusher completed
  • 19. 19 Young-Davidson – Flagship, Long-Life Production 2015A 2016A 2017E Q3/17A YTD 2017 Gold Production (k oz) 160.4 170.0 200-210 55.8 143.5 Cost of Sales1 (US$/oz) $1,162 $1,087 $1,050 $966 $1,068 Total Cash Costs2,3 (US$/oz) $683 $657 $625 $572 $647 Mine-site AISC2,3 (US$/oz) $986 $897 $775 $744 $824 Total Capital (US$m) $108 $95 $70-80 $22 $63 Mine-site FCF2 (US$m) ($23) $4 - $13 $18 • One of Canada’s largest underground gold mines • 15 year mine life based on YE 2016 mineral reserves • Large resource base & exploration potential to support mine life extension • Significant Canadian dollar exposure; ~95% of costs Location: Ontario, Canada Stage: Producing Ownership: 100% interest Operation: Underground Gold Reserves & Resources4 Tonnes (000) Grade (g/t Au) oz Au (000) P&P Underground Reserves 42,054 2.70 3,653 M&I Underground Resources 10,792 3.39 1,177 Inferred Underground Resources 3,524 2.76 313 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation. 4 See mineral reserve and resource estimates and associated footnotes in appendix.
  • 20. 20 160 170 200-210 2015A 2016A 2017E Gold Production (000 oz) $1,162 $1,087 $1,050 2015A 2016A 2017E Cost of Sales2 (US$/oz) $986 $897 $775 2015A 2016A 2017E Mine-site AISC1 (US$/oz) $108 $95 $70-80 2015A 2016A 2017E -31% Growing production; declining costs; declining capital intensity Young-Davidson – Ramp up of Underground Mining -21%+28% 6,900 tpd underground mining rate average in Sept. 2017 -10% 6,000 tpd average underground mining rate in 2016 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 Cost of sales includes mining and processing costs, royalties and amortization Total Capital Spending (US$m) 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6 2.8 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Underground TPD Mill TPD Processed Grade (g/t Au) Tonnesperday g/tAu
  • 21. 21 Mulatos – Our Founding Operation • Initial production 2005 • ~$400m of free cash flow1 generated to date • Declining cost profile; 5% NSR royalty nearing completion • Large underexplored land package (28,773 ha) Location: Sonora, Mexico Stage: Producing Ownership: 100% interest Operation: Open pit, heap leach & high grade mill 2015A 2016A 2017E Q3/17A YTD 2017 Gold Production (k oz) 140.3 154.0 150-160 36.3 117.3 Cost of Sales1 (US$/oz) $1,128 $1,088 $1,015 $956 $964 Total Cash Costs2 (US$/oz) $869 $838 $815 $785 $782 Mine-site AISC2 (US$/oz) $1,047 $916 $890 $864 $852 Total Capital3 (US$m) $45 $33 $33-40 $7 $22 Mine-site FCF2,4 (US$m) ($19) $27 - $6 $20 Gold Reserves & Resources5 Tonnes (000) Grade (g/t Au) oz Au (000) P&P Reserves 49,995 1.17 1,885 M&I Resources 76,084 1.14 2,798 Inferred Resources 10,280 0.98 325 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Capital spending guidance for 2016 and 2017 excludes capitalized exploration. 2017 guidance includes La Yaqui Phase I development capital 4 Excluding LY Phase I capital expenditures. 5 See mineral reserve and resource estimates and associated footnotes in appendix.
  • 22. 22 La Yaqui & Cerro Pelon Mulatos – District Exploration Potential 1 See mineral reserve and resource estimates and associated footnotes in appendix. 2 Includes Proven & Probable reserves of 608,000 oz (13.5 mt at 1.40 g/t Au), Measured & Indicated resources of 68,000 oz (1.1 mt at 1.91 g/t Au) & Inferred resources of 8,000 oz (0.2 mt at 1.39 g/t Au) for La Yaqui and Proven & Probable reserves of 170,000 oz (3.3 mt at 1.63 g/t Au), Measured & Indicated resources of 47,000 oz (0.6 mt at 2.56 g/t Au) & Inferred resources of 4,000 oz (0.1 mt at 1.23 g/t Au) for Cerro Pelon. District potential Large underexplored land package; >70% of past drilling focused near Mulatos mine Mulatos District Mulatos mine 220 259 778 47 115 236 0 100 200 300 400 500 600 700 800 900 1000 2014 2015 2016 Ounces(000Au) Proven & Probable Mineral Reserves Inferred Mineral Resources Measured & Indicated Mineral Resources 1,2 La Yaqui Phase I La Yaqui Grande 778k oz Combined mineral reserves1,2 at La Yaqui & Cerro Pelon, a 254% increase since 2014
  • 23. 23 El Chanate – Consistent Gold Producer • $3m site free cash flow2 generated in Q3 2017 YTD • $1,270/oz minimum realized gold price in 2018 with production hedged5 • Significant free cash flow at end of mine life through residual leaching Location: Sonora, Mexico Stage: Producing Ownership: 100% interest Operation: Open pit, heap leach Gold Reserves & Resources4 Tonnes (000) Grade (g/t Au) oz Au (000) P&P Reserves – Open Pit 10,812 0.56 193 P&P Reserves – Leach Pad Inventory - - 100 M&I Resources 4,415 0.66 93 2015A 2016A 2017E Q3/17A YTD 2017 Gold Production (k oz) 79.3 68.0 50-60 14.9 48.3 Cost of Sales1 (US$/oz) $1,504 $1,177 $1,265 $1,217 $1,226 Total Cash Costs2,3 (US$/oz) $808 $1,052 $1,200 $1,137 $1,156 Mine-site AISC2,3 (US$/oz) $978 $1,069 $1,200 $1,164 $1,187 Total Capital (US$m) $14 $1 $2 $0.3 $1 Mine-site FCF2 (US$m) $3 $5 - $2 $3 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation. 4 See mineral reserve and resource estimates and associated footnotes in appendix. 5 El Chanate’s 2017 and 2018 production has been hedged through gold collar contracts which ensure a minimum gold price of $1,270 per ounce and participation up to $1,444 per ounce in 2018.
  • 24. 24 Proven & Probable Mineral Reserves Long Life Mineral Reserve Base Operating Reserve Life Index (years)3 1 For more information, see press release dated February 23, 2017 “Alamos Reports Mineral Reserves and Resources for the Year-Ended 2016” and mineral reserve and resource estimates and associated footnotes in appendix. 2 Year end 2016 Proven & Probable mineral reserves total 7.7 million ounces of gold (184.5 mt at 1.30 g/t Au). 3 Source: TD Securities. 2016 Y/E operating gold reserves/2018E gold production. 5.9 7.7 0 2 4 6 8 10 2015 2016 +31% OuncesAu(Millions) 1,2 +31% Increase in Proven & Probable mineral reserves1 2.4m oz Mineral reserves added at La Yaqui Grande, Kirazlı & Ağı Dağı1 26.2 14.7 13.5 13.5 13.5 11.3 11.2 10.2 9.8 9.8 9.2 8.5 6.4 3.4 0 5 10 15 20 25 DGC GUY ELD NEM AGI ABX AUY NGD AEM KGC IMG SMF RIC P Reservelifeindex(years)
  • 25. 25 Development – Peer Leading Growth Profile Low cost, low capital intensity growth Capacity to double current rate of production 6 development projects
  • 26. 26 Development: Kirazlı, Ağı Dağı & Çamyurt Location: Turkey Stage: Development Ownership: 100% interest Operation: Open pit, heap leach • Kirazlı & Ağı Dağı EIA’s approved • Kirazlı Forestry Permits granted January 2017 • Kirazlı & Ağı Dağı feasibility studies completed February 20171 outlining 185% increase in combined after-tax NPV8% • Tax incentives & mining law supportive of industry Kirazlı2 Tonnes Grade Contained Ounces (000) (g/t Au) (g/t Ag) (000 Au) (000 Ag) Proven & Probable 26,104 0.79 12.01 665 10,078 Measured & Indicated 5,966 0.43 2.18 82 418 Inferred 5,689 0.59 8.96 108 1,638 Ağı Dağı2 Proven & Probable 54,361 0.67 5.41 1,166 9,459 Measured & Indicated 34,887 0.46 2.18 518 2,445 Inferred 16,760 0.46 2.85 245 1,534 Çamyurt2 Measured & Indicated 17,721 0.89 6.14 508 3,497 Inferred 2,791 0.95 5.77 85 518 1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi feasibility studies & Camyurt preliminary economic assessment. The 185% increase is compared to the 2012 pre-feasibility study 2 See mineral reserve and resource estimates and associated footnotes in appendix
  • 27. 27 Development: Kirazlı, Ağı Dağı & Çamyurt Economic Studies After-taxNPV8%(US$m) $82m $187m $88m $298m $86m $0 $100 $200 $300 $400 $500 $600 2012 2017 Kirazlı Ağı Dağı Çamyurt +236% 1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi Feasibility studies & Camyurt PEA. After-tax NPV8% in 2012 prefeasibility study and after-tax NPV8% and IRR in 2017 feasibility studies and PEA assume gold and silver prices of $1,250 and $16 per ounce, respectively 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures 11 2017 Positive Economic Studies1 Kirazlı Feasibility Study Ağı Dağı Feasibility Study Çamyurt PEA Mine Life Years 5 6 4 Average Annual Production oz Au 104,000 177,600 93,200 oz Ag 617,300 444,200 403,000 Average grade g/t Au 0.79 0.67 0.92 Mine-site AISC2 US$m $373 $411 $645 Initial Capex US$m $152 $250 $10 Total Capex US$m $180 $313 $26 After-tax NPV5% US$m $223 $360 $111 After-tax NPV8% US$m $187 $298 $86 After-tax IRR % 44% 39% 253% Gold Price Assumption US$/oz $1,250 $1,250 $1,250 >39% After-tax IRR for each of Kirazlı, Ağı Dağı & Çamyurt1 Low cost, high return growth
  • 28. 28 Quartz Mountain Location: Oregon, United States Ownership: Right to earn a 100% interest4 Stage: Advanced Exploration Esperanza Location: Morelos State, Mexico Ownership: 100% interest Stage: Development Operation: Open pit, heap leach Development: Lynn Lake, Esperanza & Quartz Mountain 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 Historic column recovery tests for gold at Quartz Mountain varied between 74% and 88% for the felsic rock hosted mineralization; see Orsa Ventures press release dated February 12, 2013 3 See mineral reserve and resource estimates and associated footnotes in appendix. 4 Additional C$3m due on completion of feasibility study & C$15m or 2% NSR upon successful permitting Lynn Lake Location: Manitoba, Canada Ownership: 100% interest Stage: Feasibility Operation: Open pit Tonnes (000) Grade (g/t Au) oz Au (000) M&I Resources3 40,303 2.03 2,629 Inferred Resources 50,704 1.28 2,089 • Located in highly-prospective Lynn Lake Mining District • High grade, open pit with significant exploration potential • Existing infrastructure in place • Low cost hydroelectric power • Feasibility study expected Q4 2017 Tonnes Grade Oz Au (000) (g/t Au) (g/t Ag) (000 Au) (000 Ag) M&I3 Resources 34,352 0.98 8.09 1,083 8,936 Inf. Resources 718 0.80 15.04 18 347 Tonnes Grade Oz Au (000) (g/t Au) (000 Au) M&I Resources3 12,156 0.87 339 Inferred Resources 39,205 0.91 1,147 • Excellent infrastructure; low technical risk • Low capital intensity & operating costs • Average annual production potential > 100k oz • AISC expected to be lowest quartile1 • Located on northern extension of prolific Basin & Range Province of Nevada • Low strip ratio, favourable metallurgy2 • Acquisition cost $3.5m
  • 29. 29 Alamos – Investment Case Catalysts Diversified intermediate gold producer Low-cost growth profile Strong balance sheet to support growth Long term track record of delivering shareholder value ✓ Q4 2016: Met consolidated 2016 production guidance ✓ Q1 2017: Received Forestry Permits for Kirazlı project ✓ Q1 2017: Positive Kirazlı & Ağı Dağı feasibility studies & Çamyurt PEA ✓ Q1 2017: 31% increase in combined mineral reserves ✓ Q3 2017: Initial production at La Yaqui Q4 2017: Closing of Richmont acquisition Q4 2017: Lynn Lake feasibility study 2017: Ongoing exploration at Mulatos 2017: Receipt of GSM permit for Kirazlı
  • 31. 31 Board of Directors and Executive and Management Team Board of Directors Executive and Management Team Paul J. Murphy John A. McCluskey Mark J. Daniel Patrick D. Downey David Fleck David Gower Claire M. C. Kennedy Ronald E. Smith Kenneth Stowe Chairman Director Director Director Director Director Director Director Director John A. McCluskey Jamie Porter Peter MacPhail Christine Barwell Chris Bostwick Luis Chavez President and CEO Chief Financial Officer Chief Operating Officer VP, Human Resources VP, Technical Services Senior VP, Mexico Andrew Cormier Nils Engelstad Greg Fisher Aoife McGrath Scott Parsons Colin Webster VP, Development & Construction VP, General Counsel VP, Finance VP, Exploration VP, Investor Relations VP Sustainability & External Affairs
  • 32. 32 Sustainability • Our Objectives • As we pursue further growth, we will continue to measure our success as an organization by our performance in achievement of our sustainability objectives: • Protecting the health and well-being of our employees • Creating shared value with our host communities and countries • Ensuring that our operations are net-positive for the environment • Over the years, Alamos has been recognized for its achievements in these areas: Clean Industry Certification from PROFEPA • Alamos was certified as an Industria Limpia (clean industry) in recognition of the excellence of environmental management at Mulatos CSR Award from Mexican Center for Philanthropy (CEMEFI) • Signifies exceptional record of CSR performance; • 2016 marked the 8th consecutive year for Alamos
  • 33. 33 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 Excludes capitalized exploration. 3 For the purposes of calculating mine-site all-in sustaining costs at individual mine sites, the Company does not include an allocation of corporate and administrative and share based compensation expenses to the mine sites. 4 Cost of sales includes mining and processing costs, royalties, and amortization expense 2017 Guidance – Alamos 2017 Guidance 2016 Actuals Young-Davidson Mulatos El Chanate Total Total Gold production (000’s ounces) 200-210 150-160 50-60 400-430 392 Cost of Sales (in millions) (4) $215 $157 $70 $442 $429 Cost of Sales ($/oz)(4) $1,050 $1,015 $1,265 $1,065 $1,103 Total cash costs ($/oz)(1) $625 $815 $1,200 $765 $797 All-in sustaining costs ($/oz)(1) $940 $1,010 Mine-site all-in sustaining costs ($/oz) (1),(3) $775 $890 $1,200 - Capital expenditures (in millions) Sustaining capital(1) $30-35 $8-10 $2 $40-47 $49 Growth capital(1) $40-45 $25-30 (2) - $65-75 $97 Total – Operating Mines(1) $70-80 $33-40 $2 $105-122 $128 Total – Development Projects $35-61 $18 Total Consolidated Budget $140-183 $147 Corporate & Administrative (in millions) $16 $16
  • 34. 34 Young-Davidson – Increasing Grade & Productivity 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation. 4 Excludes hydro rebate not attributable to Q4/15 Underground ramp up driving production higher and unit costs lower Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Gold ounces produced 28,281 29,252 30,099 33,106 35,104 40,166 40,538 40,945 38,098 39,365 38,201 44,694 39,065 42,644 43,629 44,662 40,400 47,300 55,800 Cost of sales1 (US$/oz) Pre-commercial production $1,677 $1,625 $1,370 $1,211 $1,216 $1,298 $1,165 $986 $1,058 $1,182 $1,032 $1,077 $1,148 $1,113 $966 Total cash costs per oz.(2,3) $694 $716 $666 $850 $1,009 $871 $723 $719 $745 $697 $681 $617 $616 $738 $607 $667 $710 $677 $572 Mine-site AISC per oz.(2,3) $1,059 $1,254 $1,357 $1,270 $1,315 $1,144 $959 $912 $987 $1,008 $979 $980 $846 $965 $849 $926 $851 $895 $ 744 Underground mine Tonnes mined per day 1,130 1,611 1,417 2,590 2,611 3,595 3,753 4,140 4,130 5,149 5,081 5,911 5,776 6,123 5,467 6,675 6,400 6,377 6,544 Grades (g/t) 2.7 2.5 2.8 3.1 2.8 3.3 3.1 3.0 3.0 2.6 2.6 2.6 2.6 2.4 2.8 2.4 2.6 2.6 2.9 Development metres 1,941 2,445 2,620 2,986 3,772 3,545 3,269 3,438 3,409 3,789 3,619 3,769 3,490 3,168 2,677 3,044 3,242 3,425 3,344 Unit UG mining costs (US$) Pre-commercial production $46 $45 $41 $39 $39 $33 $32 $294 $31 $34 $34 $32 $36 $33 $34 Unit UG mining costs (CAD$) $51 $49 $45 $44 $48 $41 $41 $384 $42 $44 $45 $42 $47 $44 $43 Mill processing facility Tonnes processed per day 6,466 7,017 6,747 6,969 7,163 8,230 7,670 7,757 7,186 7,677 7,680 7,630 7,342 7,006 6,833 7,552 7,718 6,917 7,553 Grades (inc. OP stockpile) 1.8 1.7 1.7 2.0 1.8 2.2 1.9 2.0 2.0 2.0 1.9 2.2 2.1 2.1 2.4 2.2 2.2 2.5 2.7 Recoveries (%) 86% 85% 89% 88% 87% 88% 90% 88% 86% 88% 92% 91% 90% 92% 93% 90% 89% 92% 93% $20 $25 $30 $35 $40 $45 $50 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Underground tonnes mined per day Unit UG mining costs (US$/t) UndergroundTPD UnitUGminingcosts(US$/t)
  • 35. 35 2016 2017 2018 2019 ✓ Commissioning of MCM shaft ✓ Transition to 100% owner development ✓ Ramp up to 7,000 tpd ✓ Raise boring of lower NG shaft ✓ Completion of MCM waste pass • Shaft bottom infrastructure • Northgate shaft hoisting from 8900L Young-Davidson – Development Schedule Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. Declining capital intensity
  • 36. 36 Young-Davidson – Long Section Productivity improvements & declining costs Developing the underground to support ramp up of underground mining Milled grade higher Declining capital intensity Higher underground mining rates driving: Production growth
  • 38. 38 Zone 3 Zone 2 Zone 1 Zones 1 & 2 YE2016 Reserve Pits ZONE 3 INTERCEPTS 17YAQ053 - 18.00 m at 3.52 g/t Au (107-125m) 17YAQ055 - 7.20 m at 9.21 g/t Au (133-140m) 17YAQ048 - 33.50 m at 2.12 g/t Au (73-107m) 17YAQ065 - 23.10 m at 2.81 g/t Au (90-113m) 17YAQ012 - 39.60 m at 1.54 g/t Au (83-122m) 17YAQ016 - 25.00 m at 1.71 g/t Au (92-117m) 16YAQ123 – 11.9m @ 2.725 g/t Au (178-190m) 16YAQ126 – 17.1m @ 2.873 g/t Au ( 131-148m) 16YAQ203 – 14m @ 2.464 g/t Au (159-173m) 16YAQ204 – 13m@ 6.906 g/t Au (123-136m) 16YAQ230 – 17.7m @ 3.03 g/t Au (77-95m) ZONE 2 INTERCEPTS 16YAQ125 – 88.4m @ 2.769 g/t Au (99-188m) 16YAQ129 – 76.8M @ 3.168 g/t Au (110-187m) 16YAQ135 – 76m @ 4.374 g/t Au (60-136m) 16YAQ156 – 41.4m @ 2.348 g/t Au (97-138m) 16YAQ158 – 53.9m @ 1.245 g/t Au (121-175m) 16YAQ228 – 32.6m @ 7.587 g/t Au (106-138m) ZONE 1 INTERCEPTS 16YAQ027 - 30.9m @ 2.201 g/t Au (59-90m) 16YAQ035 - 78.4m @ 1.20 g/t Au (140-220m) 16YAQ045 - 36.5m @ 1.677 g/t Au (70-106m) 16YAQ106 - 36.2m @ 4.332 g/t Au (99-135m) 16YAQ062 - 48.8m @ 2.22 g/t Au (137-186m) Yaqui Phase 1 Reserve pit For more information, see press releases dated February 23, 2017, August 3, 2017 and mineral reserve and resource estimates and associated footnotes in appendix.
  • 39. 39 Strong Portfolio of Development Projects NORTH AMERICA STAGE CANADA UNITED STATES MEXICO TURKEY Construction La Yaqui Phase I Permitting/ Feasibility Lynn Lake Kirazlı Aği Daği Çamyurt Advanced Exploration/ Development Quartz Mountain Cerro Pelon La Yaqui Grande Esperanza Other Exploration Opportunities Lynn Lake Regional Quartz Mountain Targets Los Bajios San Carlos Far East El Refugio El Carricito Çamyurt Expansion Kirazlı Zones
  • 40. 40 Kirazlı, Ağı Dağı & Çamyurt Economic Studies – 2017 Feasibility Study - 2017 Preliminary Economic Assessment - 2017 Kirazlı Ağı Dağı Çamyurt Production Mine life (years) 5 6 4 Total gold production (ounces) 540,000 937,300 373,200 Total silver production (ounces) 3,141,000 2,365,200 1,612,600 Average annual production (ounces)1 Gold 104,000 177,600 93,200 Silver 617,300 444,200 403,000 Total ore mined (tonnes) 26,100,000 54,361,000 16,580,000 Total waste mined (tonnes) 37,900,000 55,893,000 30,874,000 Total material mined (tonnes) 64,000,000 110,254,000 47,454,000 Waste-to-ore ratio2 1.45 1.03 1.86 Average grade (grams per tonne) Gold 0.79 0.67 0.92 Silver 12.0 5.4 6.3 Recovery (%) Gold 81% 80% 76% Silver 31% 25% 48% Average throughput (tpd) 15,000 30,000 15,000 Operating Costs Total cost per tonne of ore3 $8.49 $6.46 $14.03 Total cash cost (per ounce sold)4 $339 $374 $604 Mine-site all-in sustaining cost (per ounce sold)4 $373 $411 $645 Capital Costs (millions) Pre-production capital expenditure $151.9 $250.3 $10.2 Sustaining capital expenditure $18.1 $33.9 $9.4 Reclamation costs (net of salvage value) $9.9 $28.8 $5.9 Total capital expenditure $179.8 $312.9 $25.5 Economic Analysis IRR (after-tax) 44.3% 38.7% 253.0% NPV @ 0% discount rate (after-tax, millions) $299.3 $492.8 $173.8 NPV @ 5% discount rate (after-tax millions) $222.9 $360.2 $111.4 NPV @ 8% discount rate (after-tax, millions) $186.5 $297.6 $86.2 Gold price assumption (average, per ounce sold) $1,250 $1,250 $1,250 Silver price assumption (average, per ounce sold) $16.00 $16.00 $16.00 Exchange Rate (Turkish Lira/US Dollar) 2.90:1 2.90:1 2.90:1 1 Average annual production is based on five full years of production for Kirazlı and Ağı Dağı and excludes pre-commercial production 2 Reported waste-to-ore ratio is over the life of mine. The waste-to-ore ratio during commercial production is 0.70:1 for Ağı Dağı and 1.19:1 for Kirazlı in the 2017 feasibility study 3 Total unit cost per tonne of ore excludes silver as a by-product credit 4 Total cash costs and mine-site all-in sustaining costs include silver as a by-product credit
  • 41. 41 2016 Proven and Probable Mineral Reserves PROVEN AND PROBABLE GOLD RESERVES (as at December 31, 2016) Proven Reserves Probable Reserves Total Proven and Probable Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) Young-Davidson - Surface 1,165 0.91 34 - - - 1,165 0.91 34 Young-Davidson - Underground 14,851 2.80 1,336 27,203 2.65 2,317 42,054 2.70 3,653 Total Young-Davidson 16,016 2.66 1,370 27,203 2.65 2,317 43,220 2.65 3,687 Mulatos Main Pits 4,173 1.02 137 21,847 0.87 613 26,020 0.90 750 San Carlos Underground 72 13.06 30 34 8.64 9 106 11.65 40 Stockpiles 7,129 1.38 317 - - - 7,129 1.38 317 La Yaqui 470 1.48 22 1,469 1.37 65 1,939 1.40 87 La Yaqui Grande - - - 11,548 1.40 521 11,548 1.40 521 Cerro Pelon 960 1.70 53 2,293 1.59 117 3,253 1.63 170 Total Mulatos 12,804 1.36 559 37,191 1.11 1,325 49,995 1.17 1,885 El Chanate - Open Pit 7,008 0.51 114 3,804 0.65 79 10,812 0.56 193 El Chanate - Leach Pad Inv. - - 100 - - - - - 100 Total El Chanate 7,008 0.95 214 3,804 0.65 79 10,812 0.84 293 Agi Dagi 1,450 0.76 36 52,911 0.66 1,130 54,361 0.67 1,166 Kirazli 700 1.25 28 25,404 0.78 637 26,104 0.79 665 Total Turkey 2,150 0.93 64 78,315 0.70 1,767 80,465 0.71 1,831 Alamos - Total 37,979 1.81 2,208 146,513 1.17 5,488 184,492 1.30 7,696 PROVEN AND PROBABLE SILVER MINERAL RESERVES (as at December 31, 2016) Proven Reserves Probable Reserves Total Proven and Probable Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) La Yaqui 470 7.40 112 1,469 7.19 340 1,939 7.25 452 La Yaqui Grande - - - 11,548 19.94 7,403 11,548 19.94 7,403 Ağı Dağı 1,450 6.22 290 52,911 5.39 9,169 54,361 5.41 9,459 Kirazli 700 15.90 358 25,404 11.90 9,720 26,104 12.01 10,078 Alamos - Total 2,620 9.02 760 91,332 9.07 26,632 93,952 9.07 27,392
  • 42. 42 2016 Total Measured and Indicated Mineral Resources MEASURED AND INDICATED GOLD MINERAL RESOURCES (as at December 31, 2016) Measured Resources Indicated Resources Total Measured and Indicated Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) Young-Davidson - Surface 496 1.13 18 1,242 1.28 51 1,739 1.24 69 Young-Davidson - Underground 5,876 3.33 629 4,916 3.47 548 10,792 3.39 1,177 Total Young-Davidson 6,373 3.16 647 6,158 3.03 599 12,531 3.09 1,246 Mulatos 8,270 1.24 330 64,221 1.08 2,224 72,491 1.10 2,554 San Carlos UG 196 6.11 39 362 4.70 55 558 5.20 93 La Yaqui - - - 1,108 1.91 68 1,108 1.91 68 Cerro Pelon 117 2.75 10 455 2.52 37 572 2.56 47 Carricito 58 0.82 2 1,297 0.82 34 1,355 0.83 36 Total Mulatos 8,641 1.37 381 67,443 1.12 2,418 76,084 1.14 2,798 El Chanate 1,092 0.55 19 3,323 0.69 74 4,415 0.66 93 MacLellan 15,010 1.99 960 17,374 1.75 976 32,384 1.86 1,936 Gordon - - - 5,914 3.21 610 5,914 3.21 610 Burnt Timber - - - 1,021 1.40 46 1,021 1.40 46 Linkwood - - - 984 1.16 37 984 1.17 37 Total Lynn Lake 15,010 1.99 960 25,293 2.05 1,669 40,303 2.03 2,629 Esperanza 19,226 1.01 622 15,126 0.95 462 34,352 0.98 1,083 Ağı Dağı 553 0.44 8 34,334 0.46 510 34,887 0.46 518 Kirazli 118 0.50 2 5,848 0.43 80 5,966 0.43 82 Çamyurt 513 1.00 16 17,208 0.89 492 17,721 0.89 508 Total Turkey 1,184 0.68 26 57,390 0.59 1,082 58,574 0.59 1,108 Quartz Mountain 214 0.95 7 11,942 0.87 333 12,156 0.87 339 Alamos - Total 51,740 1.60 2,661 186,675 1.11 6,637 238,415 1.21 9,298 MEASURED AND INDICATED SILVER MINERAL RESOURCES (as at December 31, 2016) Measured Resources Indicated Resources Total Measured and Indicated Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) La Yaqui Grande - - - 1,108 15 523 1,108 15 523 Esperanza 19,226 7.25 4,482 15,126 9.16 4,455 34,352 8.09 8,936 Ağı Dağı 553 1.59 28 34,334 2.19 2,417 34,887 2.18 2,445 Kirazli 118 2.73 10 5,848 2.17 408 5,966 2.18 418 Çamyurt 513 5.63 93 17,208 6.15 3,404 17,721 6.14 3,497 Alamos - Total 20,410 7.03 4,613 73,624 4.73 11,207 94,034 5.23 15,819
  • 43. 43 2016 Total Inferred Mineral Resources INFERRED GOLD MINERAL RESOURCES (as at December 31, 2016) Tonnes Grade Ounces (000's) (g/t Au) (000's) Young-Davidson - Surface 31 0.99 1 Young-Davidson - Underground 3,524 2.76 313 Total Young-Davidson 3,555 2.75 314 Mulatos 8,935 0.92 265 San Carlos UG 162 4.93 26 La Yaqui 174 1.39 8 Cerro Pelon 109 1.23 4 Carricito 900 0.74 22 Total Mulatos 10,280 0.98 325 El Chanate 112 0.71 3 MacLellan 1,898 2.01 123 Gordon 4,364 2.87 403 Burnt Timber 23,438 1.04 781 Linkwood 21,004 1.16 783 Total Lynn Lake 50,704 1.28 2,089 Esperanza 718 0.80 18 Ağı Dağı 16,760 0.46 245 Kirazli 5,689 0.59 108 Çamyurt 2,791 0.95 85 Total Turkey 25,240 0.54 438 Quartz Mountain 39,205 0.91 1,147 Alamos - Total 129,815 1.04 4,334 INFERRED SILVER MINERAL RESOURCES (as at December 31, 2016) Tonnes Grade Ounces (000's) (g/t Ag) (000's) La Yaqui Grande 174 5.55 31 Esperanza 718 15.04 347 Ağı Dağı 16,760 2.85 1,534 Kirazli 5,689 8.96 1,638 Çamyurt 2,791 5.77 518 Alamos - Total 26,132 4.84 4,068
  • 44. 44 Notes to Mineral Reserve and Resource Estimates Notes to Mineral Reserve and Resource Tables: • The Company’s Mineral Reserves and Mineral Resource as at December 31, 2016 are classified in accordance with the Canadian Institute of Mining Metallurgy and Petroleum’s “CIM Standards on Mineral Resources and Reserves, Definition and Guidelines” as per Canadian Securities Administrator’s NI 43-101 requirements. • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. • Mineral Resources are exclusive of Mineral Reserves. • Mineral Reserve cut-off grade for the Mulatos Mine, the Cerro Pelon Pit, the La Yaqui Pit, the Kirazlı Pit and the Ağı Dağı Pit are determined as a net of process value of $0.10 per tonne for each model block • All Measured, Indicated and Inferred Mineral Resources are pit constrained with the exception of those outside the Mulatos Main Pits on the Mulatos property which have no economic restrictions and are tabulated by gold cut-off grade. • Mineral Reserve estimates assumed a gold price of $1,250 per ounce and Mineral Resource estimates assumed a gold price of $1,400 per ounce, except as follows: Lynn Lake Mineral Resources assumed a gold price of $1,550 per ounce with an assumption of the Canadian dollar at parity with the United States dollar. Metal prices, cutoff grades and metallurgical recoveries are set out in the table below. • El Chanate reserve ounces include a December 31, 2016 inventory 99,900 recoverable ounces in the heap leach pad Qualified Persons: Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this news release. Chris Bostwick is a Qualified Person within the meaning of Canadian Securities Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43-101 compliant mineral reserve and resource estimates are detailed in the following table. Mineral Resources Jeffrey Volk, CPG, FAusIMM Director - Reserves and Resource, Alamos Gold Inc. Young-Davidson, El Chanate, San Carlos U/G, Lynn Lake Marc Jutras, P.Eng Principal, Ginto Consulting Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Carricito, Esperanza, Ağı Dağı, Kirazlı, Çamyurt, Quartz Mountain Mineral Reserves Chris Bostwick, FAusIMM VP Technical Services, Alamos Gold Inc. Young-Davidson, El Chanate, San Carlos Underground Herb Welhener, SME-QP VP, Independent Mining Consultants Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Ağı Dağı, Kirazlı Resources Reserves Gold Price Cutoff Gold Price Cutoff Met Recovery Mulatos: Mulatos Main Open Pit $1,400 0.5 $1,250 see notes >50% San Carlos Underground $1,400 2.5 $1,250 3.27 70% Cerro Pelon $1,400 0.5 $1,250 see notes 75% La Yaqui $1,400 0.5 $1,250 see notes 75% Carricito $1,400 0.3 n/a n/a >50% Young-Davidson - Surface $1,400 0.5 $1,250 0.5 91% Young-Davidson - Underground $1,400 1.3 $1,250 1.9 91% El Chanate $1,400 0.15 $1,250 0.15 30-65% Lynn Lake $1,555 0.4 n/a n/a 89-92% Esperanza $1,400 0.4 n/a n/a 60-72% Ağı Dağı $1,400 0.2 $1,250 see notes 80% Kirazlı $1,400 0.2 $1,250 see notes 81% Çamyurt $1,400 0.2 n/a n/a 78% Quartz Mountain $1,400 0.21 Oxide, 0.6 Sulfide n/a n/a 65-80%
  • 45. 45 2016 Mineral Reserves & Resources – Island Gold Mine PROVEN AND PROBABLE GOLD RESERVES (as at December 31, 2016) Proven Reserves Probable Reserves Total Proven and Probable Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) Island Gold 573.05 8.68 159.8 1,978.0 9.31 592.4 2,551 9.17 752.2 MEASURED AND INDICATED GOLD RESOURCES (as at December 31, 2016)1 Measured Resources Indicated Resources Total Measured and Indicated Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) Island Gold 33.5 4.94 5.4 445.5 6.01 86.1 479.0 5.94 91.5 INFERRED GOLD RESOURCES (as at December 31, 2016) Inferred Resources Tonnes Grade Ounces (000's) (g/t Au) (000's) Island Gold 3,042.0 10.18 995.7 Source: Company disclosure Notes to Mineral Reserve and Resource Tables: 1. Mineral Resources presented are exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability 2. In 2016, based on a gold price of CAN$1,500/oz; in 2015, based on a gold price of US$1,080/oz and an exchange rate of CAN$1.2037 = US$1.00. Qualified Persons The Mineral Reserve and Resource estimates as of December 31, 2016 and December 31, 2015 were performed by qualified persons as defined by NI 43-101 and were supervised by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc. Please refer to the SEDAR website (www.sedar.com) for full reports and additional corporate documentation. The Island Gold Mine Reserve and Resource estimate as of December 31, 2016 was performed by M. Raynald Vincent P.Eng. M.P.M., Chief Geologist, and M. Léon Grondin Leblanc, P.Eng., Chief Engineer, both employees of Richmont Mines Inc., and Qualified Persons as defined by NI 43-101. A NI 43-101 technical report has been completed for the Island Gold Mine as of December 31, 2016, and filed on SEDAR.
  • 46. 46 Scott K. Parsons, CFA VP, Investor Relations 416.368.9932 x 5439 sparsons@alamosgold.com