SlideShare a Scribd company logo
1 of 44
Download to read offline
January 2018 Corporate Presentation
2
Cautionary Notes
This presentation, the information contained herein, any other materials provided in connection with this presentation and any oral remarks accompanying this presentation (collectively, this “Presentation”) has been prepared by Alamos Gold Inc. (“Alamos”) solely
for information purposes. No Stock exchange, securities commission or other regulatory authority has approved or disapproved of the information contained herein. This presentation does not constitute an offering of securities and the information contained herein is
subject to the information contained in the Company’s continuous disclosure documents at www.sedar.com.
Cautionary Notes
Certain statements in this presentation are “forward-looking statements”, including within the meaning of applicable laws. All statements other than statements of historical fact included in this presentation, including, without limitation, statements Alamos’ net asset
value, operating cash flow, free cash flow, forecast gold production, Mineral Reserves, Mineral Resources, exploration potential, gold grades, recoveries, waste-to-ore ratios, total cash cost, all-in sustaining costs, debt levels and future plans and objectives of Alamos
are forward-looking statements based on forecasts of future operational or financial results, estimates of amounts not yet determinable and assumptions of management that involve various risks and uncertainties. Any statements that express or involve discussions
with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate”,
“plans”, “estimates” or “intends”, or stating that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements.” Alamos cautions that
forward-looking information involves known and unknown risks, uncertainties and other factors that may cause Alamos’ actual results, performance or achievements to be materially different from those expressed or implied by such information, including, but not
limited to, gold and silver price volatility; fluctuations in foreign exchange rates and interest rates; the impact of any hedging activities; discrepancies between actual and estimated production, between actual and estimated Mineral Reserves and Mineral Resources or
between actual and estimated metallurgical recoveries; costs of production; capital expenditure requirements; the costs and timing of construction and development of new deposits; and the success of exploration and permitting activities. In addition, the factors
described or referred to in the section entitled “Risk Factors” in Alamos’ Annual Information Form for the year ended December 31, 2016, which along with other documents setting out risk factors affecting the Company is available on the SEDAR website at
www.sedar.com, should be reviewed in conjunction with the information found in this presentation. Although Alamos has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained
in forward-looking information, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management’s
expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking information.
Market data and other statistical information used throughout this Presentation are based on internal company research, independent industry publications, government publications, reports by market research firms or their published independent sources. Industry
publications, governmental publications, market research surveys and forecasts generally state that the information contained therein has been obtained from sources believed to be reliable. Although Alamos believes such information is accurate and reliable, it has
not independently verified any of the data from third party sources cited or used for our management’s industry estimates, nor has Alamos ascertained the underlying economic assumptions relied upon therein. While Alamos believes internal company estimates are
reliable, such estimates have not been verified by any independent sources, and Alamos makes no representations as to the accuracy of such estimates.
Note to U.S. Investors
Alamos prepares its disclosure in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Terms relating to Mineral Resources in this presentation are defined in accordance with National
Instrument 43-101 Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy, and Petroleum Standards on Mineral Resources and Mineral Reserves. The Unites States Securities and Exchange Commission
(the “SEC”) permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Alamos may use certain terms, such as “Measured Mineral Resources”, “Indicated Mineral
Resources”, “Inferred Mineral Resources” and “Probable Mineral Reserves” that the SEC does not recognize (these terms may be used in this presentation and are included in the public filings of Alamos, which have been filed with the SEC and the securities
commissions or similar authorities in Canada).
Cautionary non-GAAP Measures and Additional GAAP Measures
Note that for purposes of this section, GAAP refers to IFRS. The Company believes that investors use certain non-GAAP and additional GAAP measures as indicators to assess gold mining companies. They are intended to provide additional information and should not
be considered in isolation or as a substitute for measures of performance prepared with GAAP.
“Cash flow from operating activities before changes in non-cash working capital” is a non-GAAP performance measure that could provide an indication of the Company’s ability to generate cash flows from operations, and is calculated by adding back the change in
non-cash working capital to “Cash provided by (used in) operating activities” as presented on the Company’s consolidated statements of cash flows. “Free cash flow” is a non-GAAP performance measure that is calculated as cash flows from operations net of cash
flows invested in mineral property, plant and equipment and exploration and evaluation assets as presented on the Company’s consolidated statements of cash flows and that would provide an indication of the Company’s ability to generate cash flows from its
mineral projects. “Mine site free cash flow” is a non-GAAP measure which includes cash flow from operating activities at, less capital expenditures at each mine site. Return on Equity is defined as Earnings from Continuing Operations divided by the average Total
Equity for the current and previous year. “Mining cost per tonne of ore” and “Cost per tonne of ore” are non-GAAP performance measures that could provide an indication of the mining and processing efficiency and effectiveness of the mine. These measures are
calculated by dividing the relevant mining and processing costs and total costs by the tonnes of ore processed in the period. “Cost per tonne of ore” is usually affected by operating efficiencies and waste-to-ore ratios in the period. “Total cash costs per ounce”, “all-in
sustaining costs per ounce”, and “mine-site all-in sustaining costs” as used in this analysis are non-GAAP terms typically used by gold mining companies to assess the level of gross margin available to the Company by subtracting these costs from the unit price realized
during the period. These non-GAAP terms are also used to assess the ability of a mining company to generate cash flow from operations. There may be some variation in the method of computation of these metrics as determined by the Company compared with
other mining companies. In this context, “total cash costs” reflects mining and processing costs allocated from in-process and dore inventory associated and associated royalties with ounces of gold sold in the period. Total cash costs per ounce are exclusive of
exploration costs. “All-in sustaining costs per ounce” include total cash costs, exploration, corporate and administrative, share based compensation and sustaining capital costs. “Mine-site all-in sustaining costs” include total cash costs, exploration, and sustaining
capital costs for the mine-site, but exclude an allocation of corporate and administrative and share based compensation.
Additional GAAP measures that are presented on the face of the Company’s consolidated statements of comprehensive income and are not meant to be a substitute for other subtotals or totals presented in accordance with IFRS, but rather should be evaluated in
conjunction with such IFRS measures. This includes “Earnings from operations”, which is intended to provide an indication of the Company’s operating performance, and represents the amount of earnings before net finance income/expense, foreign exchange
gain/loss, other income/loss, and income tax expense. Non-GAAP and additional GAAP measures do not have a standardized meaning prescribed under IFRS and therefore may not be comparable to similar measures presented by other companies. A reconciliation of
historical non-GAAP and additional GAAP measures are available at www.alamosgold.com.
Technical Information
Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this presentation. Chris Bostwick is a Qualified Person within the meaning of Canadian Securities
Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43-101 compliant mineral reserve and resource estimates are detailed in the tables in the appendix of this presentation. Information pertaining to the
geological and exploration content has been reviewed and approved by Aoife McGrath, Alamos' Vice President, Exploration, a Qualified Person.
All figures in US$ unless otherwise indicated.
3
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 Includes cash, cash equivalents and equity securities of as of December 31, 2017. Total liquidity also includes undrawn $400m credit facility.
Strong Platform for Delivering Long Term Value
Diversified gold production
480,000 – 520,000 oz from
four North American mines
Expanding margins
$950/oz AISC1 in 2018, declining
through 2020
Peer leading growth
Portfolio of 6 low-cost
development projects
Strong balance sheet
Debt free, $235m cash2 & $635m
total liquidity to support growth
Track record of
delivering
shareholder value
4
2017 Year in Review – Record Performance
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
• Met production guidance – third consecutive year
• 10% production growth driving record performance
• ~7% reduction in AISC1
• Strongest operating cash flow & mine-site FCF since 2015 merger
• Strengthened operating base – Richmont acquisition completed late November
Record operational performance
• Delivered three feasibility studies outlining >400koz of high margin production growth
• La Yaqui initial production early September ahead of schedule
• Kirazlı site development underway
Advanced development pipeline
• Debt free having eliminated $315m of debt
• Increased total liquidity to >$600m through expanded revolver on better terms
• Attractive valuation opportunity
Improved financial flexibility
5
2015A 2016A 2017A 2018E
$1,091
$1,010
$940 $950
2015A 2016A 2017E 2018E
Growing Production, Declining Costs, Expanding Margins
Gold Production (000 oz)
AISC1,2,3 (US$/oz)
-6%
Cost of Sales1,4 (US$/oz)
1 2017E guidance excludes Island Gold Mine with the acquisition closing on November 23, 2017.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses.
4 Cost of sales includes mining and processing costs, royalties and amortization.
5 AISC Margin calculated as realized gold price less AISC. For 2017E and 2018E this assumes a $1,250/oz gold price
+31%
AISC Margin1,2,5 (US$/oz)
-3%
+28%
392
480-520
380
429
$1,241
$1,103
$1,065 $1,075
2015A 2016A 2017E 2018E
$57
$229
$322 $300
2015A 2016A 2017E 2018E
6
Canada
57%Mexico
23%
Turkey
20%
AĞI DAĞI (TURKEY) – Permitting3
Average Au Production 178koz
Mine-site AISC2 $411
After-tax IRR +39%
KIRAZLI (TURKEY) – Permitting3
Average Au Production 104 koz
Mine-site AISC2 $373/oz
After-tax IRR +44%
ÇAMYURT (TURKEY) – Permitting3
Average Au Production 93 koz
Mine-site AISC2 $645
After-tax IRR +253%
Top 10 North American Gold Producer
MULATOS (SONORA, MEXICO)
2018E Au Production 150-160 koz
2018E Au Mine-site AISC US$900/oz
EL CHANATE (SONORA, MEXICO)
2018E Au Production 40-50 koz
2018E Au Mine-site AISC US$1,200/oz
YOUNG-DAVIDSON (ONTARIO, CANADA)
2018E Au Production 200-210 koz
2018E Au Mine-site AISC US$850/oz
Producing Assets
Exploration / Development Assets
1 Source: Select street research
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Average annual production and mine-site AISC for Turkish projects and Lynn Lake are detailed in economic studies completed in 2017.
Note: Mineral resources are exclusive of mineral reserves. See mineral reserve and resource estimates and associated footnotes in appendix.
ISLAND GOLD (ONTARIO, CANADA)
2018E Au Production 90-100 koz
2018E Au Mine-site AISC US$825/oz
QUARTZ MOUNTAIN (USA) – Adv. Exploration
Total Au M&I Resources 0.3 Moz (12.2mt @ 0.87 g/t)
Total Au Inf. Resources 1.1 Moz (39.2mt @0.91 g/t)
ESPERANZA (MEXICO) – Permitting
Total Au M&I Resources 1.1 Moz (34.4mt @ 0.98 g/t)
LYNN LAKE (CANADA) – Permitting3
Average Au Production 143 koz (Years 1-10)
Mine-site AISC2 $745
After-tax IRR +13%
Asset NPV by Geography1
Asset NPV by Stage1
Production
72%
Development
28%
Canada
60%
Mexico
40%
North American Production
7
Kirazlı
Ağı Dağı
Çamyurt
Lynn Lake
Permitting &
Development
Young-Davidson
Stable Operating Base; Peer Leading Growth Profile
Island Gold
Mulatos
El Chanate
Mulatos District
Island Gold District
Esperanza
Quartz Mountain
>400 koz
Combined annual production
growth potential
North
American
Production
Exploration
Controlled, disciplined, multi-stage growth
44%
After-tax IRR1
39%
After-tax IRR1
253%
After-tax IRR1
13%
After-tax IRR1
~500 koz
Stable, long-term production base;
declining cost profile
1 After-tax IRR for Turkish and Lynn Lake projects based on gold and silver prices of $1,250 and $16 per ounce, respectively. For more details, see press releases dated February 15 & 22, 2017 and December 14, 2017.
8
$315m
High yield notes retired in April 2017
Strong Balance Sheet – Debt Free
1 Unaudited management estimate as of December 31, 2017.
2 Cash, cash equivalents & equity securities as of December 31, 2017.
3 Total liquidity includes cash, cash equivalents, equity securities and undrawn $400m credit facility for Alamos Gold as of December 31, 2017
4As of January 10, 2018
Balance Sheet
Cash & Cash Eq.1,2 US$235 million
Total Liquidity3 US$635 million
Total Debt US$0
Capital Structure
Shares Outstanding 389.1 million
Warrants 12.2 million
Employee Options 11.1 million
Fully Diluted 415.4 million
Recent Share Price (TSX)4 C$7.94
Market Capitalization ~C$3.1 billion
$24m
Annual interest savings; $72m over remaining
term
$235m
$400m
$635m
As of December 31, 2017
Cash & Total Liquidity
Cash, cash equivalents & equity securitiesUndrawn Credit Facility
3
9
671%
8%
275%
-50%
450%
950%
1450%
1950%
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Alamos Gold Share Price (TSX)
S&P/TSX Global Gold Index
Gold (US$/oz)
Track Record of Delivering Shareholder Value
1 Based on consensus analyst net asset value (NAV) estimates.
2 Cumulative free cash flow (FCF) generated to date. Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
15%
Annualized return
since 2003
$118m
Dividends paid to
date
Mulatos (US$m) Turkey (US$m)Young-Davidson (US$m) Lynn Lake (US$m)
Acquisition
Cost (2003)
Acquisition
Cost (2015)
Acquisition Cost (2010)
& Capital Invested
Acquisition Cost (2016)
& Capital Invested
Consensus NAV &
Cumulative FCF
Consensus NAV Consensus NAV
$20
$23
Consensus NAV &
Cumulative FCF
Capital Invested Consensus NAV1
Cumulative FCF2Acquisition Cost
$10
$427
$400
$950
$1,159
$148
$91
$504
$71
10
Operations – Diversified North American Production
Long life reserve base
Declining costs & capital
Growing free cash flow
Growing production
11
Record Q4 & 2017 Performance
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses. For the purposes of calculating all-in sustaining costs at individual mine sites, the Company does not include corporate and
administrative and share based compensation expenses.
3 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
4 Includes capitalized exploration
5 2017 guidance excludes revised capital budget for Turkish projects approved in April 2017
10%
Production
growth from FY
2016
~7%
Decrease in all-in
sustaining costs3
from FY 2016
429 koz
Achieved production guidance
with record performance
2016A
Q3 YTD
2017
Q4 2017 2017A 2017E
Total gold production (k oz) 392 309 120 429 400-430
Gold sales (k oz) 389 303 127 430 -
Cost of sales (US$/oz, includes
amortization)1
$1,103 $1,056 - - $1,065
All-in sustaining costs (US$/oz)2,3 $1,010 $946 - - $940
Capital Expenditures (US$M) $146.5 $123.3 - - $140-157
Average realized gold price
(US$/oz)
$1,239 $1,256 $1,275 $1,262
Operating revenues (US$M) $482.2 $381.1 $161.7 $542.8 -
Cash provided by operations
before changes in WC (US$M)3
$148.0 $130.6 - - -
Mine-site free cash flow (US$M) 3 $35.4 $40.4
Net earnings (US$M) ($17.9) $31.3 - - -
Earnings per share (basic) ($0.07) $0.11 - - -
Cash, cash equivalents & equity
securities (US$M)
$266 $168 ~$235 ~$235 -
Total debt (US$/M) $315 $0 $0 $0 -
Strongest earnings, cash flow &
mine-site free cash flow since
since 2015 merger
12
La Yaqui Phase I
Q4 2017 Scorecard
La Yaqui initial production
early September ahead of
schedule
Kirazlı site development
underway
Record Q4 production
driven by record quarter
from Young-Davidson
Young-Davidson
MCM waste pass & pebble
crusher completed
13
Young-Davidson – Flagship, Long-Life Production
2016A Q4/17A 2017A 2017E 2018E
Gold Production (k oz) 170.0 56.5 200.0 200-210 200-210
Cost of Sales1 (US$/oz) $1,087 - - $1,050 $1,075
Total Cash Costs2,3 (US$/oz) $657 - - $625 $675
Mine-site AISC2,3 (US$/oz) $897 - - $775 $850
Total Capital (US$m) $95 - - $70-80 $70-80
Mine-site FCF2 (US$m) $4 - - - -
• One of Canada’s largest underground gold mines
• 15 year mine life based on YE 2016 mineral reserves
• Large resource base & exploration potential to support
mine life extension
• Significant Canadian dollar exposure; ~95% of costs
Location: Ontario, Canada Stage: Producing
Ownership: 100% interest Operation: Underground
Gold Reserves & Resources4 Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Underground Reserves 42,054 2.70 3,653
M&I Underground Resources 10,792 3.39 1,177
Inferred Underground Resources 3,524 2.76 313
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation.
4 See mineral reserve and resource estimates and associated footnotes in appendix.
14
$1,162
$1,087 $1,068 $1,075
2015A 2016A 2017 Q3
YTD
2018E
$986
$897
$824 $850
2015A 2016A 2017 Q3
YTD
2018E2015A 2016A 2017A 2018E
-31%
Growing production; declining
costs; declining capital intensity
Young-Davidson – Ramp up of Underground Mining
-14%+28%
~6,600 tpd
Average underground mining rate in 2017
-7%
6,000 tpd
average underground mining rate in 2016
1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
2 Cost of sales includes mining and processing costs, royalties and amortization
Total Capital Spending (US$m)
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Q1/13
Q2/13
Q3/13
Q4/13
Q1/14
Q2/14
Q3/14
Q4/14
Q1/15
Q2/15
Q3/15
Q4/15
Q1/16
Q2/16
Q3/16
Q4/16
Q1/17
Q2/17
Q3/17
Underground TPD Mill TPD Processed Grade (g/t Au)
Tonnesperday
g/tAu
Mine-site AISC (US$/oz)Production (000 oz)
Cost of Sales2 (US$/oz)
160 170
200 200-210
2015A 2016A 2017E 2018E
$108
$95
$70-80 $70-80
15
Island Gold – High-Grade, Low Cost Production
Location: Ontario, Canada Stage: Producing
Ownership: 100% interest Operation: Underground
Gold Reserves & Resources5 Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Underground Reserves 2,551 9.17 752
M&I Underground Resources 479 5.94 91
Inferred Underground Resources 3,042 10.18 996
Highly Productive Gold Mining District
2016A Q4/17A 2017A 2017E 2018E
Gold Production (k oz)1 83.3 22.1 98.6 87-93 90-100
Cost of Sales2 (US$/oz) - - - - $1,175
Total Cash Costs3 (US$/oz) $587 - - $550-$590 $575
Mine-site AISC3 (US$/oz) $745 - - $725-$765 $825
Total Capital4 (US$m) $43 - - $40-$44 $50-55
Mine-site FCF3 (US$m) ($2) - - - -
1 Operating results from Island Gold prior to its acquisition has been included for comparative purposes. Production attributable to Alamos
totals 9,000 oz in 2017 following the closing of the Richmont Mines acquisition on Nov. 23, 2017.
2 Cost of sales includes mining and processing costs, royalties and amortization.
3 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
4 Excludes exploration
5 See mineral reserve and resource estimates and associated footnotes in appendix.
• One of Canada’s highest grade & lowest cost gold mines
• PEA expansion to drive production higher & costs lower
• Significant upside potential reflecting inclusion of all
mineral resources & ongoing exploration success
• Significant exploration potential laterally & at depth
0 50 100km
Marathon
Wawa
Hearst
Timmins
Iroquois Falls
Smooth Rock Falls
Eagle River, Wesdome
Borden,Goldcorp
Island Gold
Magino, Argonaut
Cote, IAMGOLD
Black Fox, McEwen
Timmins West, Tahoe
Holloway, Kirkland Lake
Porcupine,Goldcorp
Bell Creek, Tahoe
Young-Davidson
Macassa, Kirkland Lake
Holt, Kirkland Lake
Lake Superior
ONTARIO
Hemlo, Barrick
144
101
17
17
11
101
Mine/
Project
City
Dome Mine, Goldcorp
Hoyle Pond, Goldcorp
Cochrane
Pamour (PJV), Goldcorp
Taylor,
Kirkland Lake
Detour Lake Mine, Detour Gold
>25 Moz gold produced3
>35 Moz in defined reserves
16
90 94
125
$735
$881
$550
$0
$100
$200
$300
$400
$500
$600
$700
$800
$900
$1,00
0
50
100
150
200
250
300
350
2017E 2018E 2019E - 2024E Average
Gold Production (k oz) AISC (US$/oz)
$550
$700
$713
$715
$720
$730
$735
$775
$782
$787
$870
$980
$985
$1,050
$1,075
$1,113
$1,150
$1,200
IslandGoldPEA
2019-2024
Seabee
LaRonde
Musselwhite
Meliadine
CanadianMalartic
IslandGold
Young-Davidson
Lapa
Macassa
RedLake
Westwood
Eleonore
BellCreek
DetourLake
EagleRiver
CasaBerardi
BlackFox
Island Gold – Growing Production, Declining Costs
2017E All-in Sustaining Costs (US$/oz)
Mineral Reserve Grade (g/t Au)
Source: Company filings
Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
Note: AISC based on midpoint of 2017 guidance where available, otherwise 1H/17 metrics shown. Eagle River AISC shown is Wesdome consolidated. Bell Creek AISC shown consolidated with Timmins West. TMAC AISC
excluded due to recent guidance revisions. Island Gold based on PEA.
+39%
PEA Expansion: Island Gold Operating Profile
20.8
14.6
9.2 9.2 8.8 8.4 8.3 7.7 7.3 6.4 6.1
4.6 4.5 4.3 4.3 4.2 3.6 2.7
1.1 1.0
Macassa
Brucejack
IslandGold
EagleRiver
Westwood
Seabee
RedLake
HopeBay
Meliadine
Musselwhite
Eleonore
Lapa
LaRonde
CasaBerardi
BlackFox
BellCreek
TimminsWest
Young-Davidson
CanadianMalartic
DetourLake
39%
expected production
growth
Significant upside potential
>750 koz of Inferred resources not factored into
mine plan + ongoing exploration potential
-25%
expected decrease in
LOM AISC
17
67
564
1,037 1,003
768
996
154
111
233
219
72
91
172
141
144
184
562
752
4
5
6
7
8
9
10
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2011 2012 2013 2014 2015 2016
Island Gold – Mineral Reserve & Resource Growth
Mineral Reserves and Resources Over Time (koz)
Mineral Reserve grade
Reserves
M&I Resources
Inferred Resources +309%
Increase mineral reserves since 2014
Strong track record of mineral reserve & resource growth
~$35/oz
Low 2016 discovery costs
+30%
Increase in 2016 year end inferred
mineral resource; 20% increase in grade
+44%
Mineral reserve grade increase since
2014
Grade(g/tAu)
ozAu
1,2
1 See mineral reserve and resource estimates and associated footnotes in appendix.
2 Includes Proven & Probable reserves of 752,000 oz (2.6 mt at 9.17 g/t Au), Measured & Indicated resources of 91,000 oz (0.5 mt at 5.94 g/t Au) & Inferred resources of 996,000 oz (3.0 mt at 10.18 g/t Au)
18
Island Gold – Significant Exploration Potential
Gold Metal Factor (Grade x True Width) - C & E1E Zones as of March 31, 2017
Significant exploration potential laterally
& at depth
>750 k oz of Inferred mineral resources
not included in PEA expansion plan
19
Island Gold – Ongoing Exploration Success
Gold Metal Factor (Grade x True Width) - C & E1E Zones as of January 10, 2018
Delineation drilling within C-Zone
94.97 g/t Au over 3.83 m (840-529-24)
62.85 g/t Au over 4.72 m (840-529-13)
109.01 g/t Au over 2.55 m (840-524-23)
14.82 g/t Au over 10.03 m (860-509-10)
Exploration drilling
13.32 g/t Au over 12.18 m (MH11, E1E Zone)
10.58 g/t Au over 5.44 m (740-465-63, C Zone)
23.71 g/t Au over 2.86 m (840-524-18, C Zone)
25.92 g/t Au over 6.80 m (340-587-02, G6 Zone)
22.28 g/t Au over 7.71 m (740-465-45, X Zone)
Grades & average thickness
increasing at depth
Less than 15% of land package
drilled
1 For further details, refer to press release dated Jan 11, 2018 “Alamos Reports Fourth Quarter 2017 Production and Provides 2018 Outlook”
New highlight intercepts since July 20171
20
Mulatos – Our Founding Operation
• Initial production 2005
• ~$400m of free cash flow1 generated to date
• Declining cost profile; 5% NSR royalty nearing completion
• Large underexplored land package (28,773 ha)
Location: Sonora, Mexico Stage: Producing
Ownership: 100% interest
Operation: Open pit, heap leach
& high grade mill
2016A Q4/17A 2017A 2017E 2018E
Gold Production (k oz) 154.0 42.7 160.0 150-160 150-160
Cost of Sales1 (US$/oz) $1,088 - - $1,015 $950
Total Cash Costs2 (US$/oz) $838 - - $815 $800
Mine-site AISC2 (US$/oz) $916 - - $890 $900
Total Capital3 (US$m) $33 - - $33-40 $26-30
Mine-site FCF2,4 (US$m) $27 - - - -
Gold Reserves & Resources5 Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Reserves 49,995 1.17 1,885
M&I Resources 76,084 1.14 2,798
Inferred Resources 10,280 0.98 325
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Capital spending guidance for 2017 and 2018 excludes capitalized exploration.
5 See mineral reserve and resource estimates and associated footnotes in appendix.
21
La Yaqui & Cerro Pelon
Mulatos – District Exploration Potential
1 See mineral reserve and resource estimates and associated footnotes in appendix.
2 Includes Proven & Probable reserves of 608,000 oz (13.5 mt at 1.40 g/t Au), Measured & Indicated resources of 68,000 oz (1.1 mt at 1.91 g/t Au) & Inferred resources of 8,000 oz (0.2 mt at 1.39 g/t Au) for La Yaqui and Proven & Probable
reserves of 170,000 oz (3.3 mt at 1.63 g/t Au), Measured & Indicated resources of 47,000 oz (0.6 mt at 2.56 g/t Au) & Inferred resources of 4,000 oz (0.1 mt at 1.23 g/t Au) for Cerro Pelon.
District potential
Large underexplored land package; >70% of past drilling
focused near Mulatos mine
Mulatos District
Mulatos mine
220 259
778
47
115
236
0
100
200
300
400
500
600
700
800
900
1000
2014 2015 2016
Ounces(000Au)
Proven & Probable Mineral Reserves
Inferred Mineral Resources
Measured & Indicated Mineral Resources
1,2
La Yaqui Phase I
La Yaqui Grande
778k oz
Combined mineral reserves1,2 at La Yaqui & Cerro Pelon,
a 254% increase since 2014
22
El Chanate – Consistent Gold Producer
• $3m site free cash flow2 generated Q3 2017 YTD
• $1,270/oz minimum realized gold price in 2018 with
production hedged5
• Significant free cash flow at end of mine life through residual
leaching
Location: Sonora, Mexico Stage: Producing
Ownership: 100% interest Operation: Open pit, heap leach
Gold Reserves & Resources4 Tonnes
(000)
Grade
(g/t Au)
oz Au
(000)
P&P Reserves – Open Pit 10,812 0.56 193
P&P Reserves – Leach Pad Inventory - - 100
M&I Resources 4,415 0.66 93
2016A Q4/17A 2017A 2017E 2018E
Gold Production (k oz) 68.0 12.1 60.4 50-60 40-50
Cost of Sales1 (US$/oz) $1,177 - - $1,265 $1,270
Total Cash Costs2,3 (US$/oz) $1,052 - - $1,200 $1,200
Mine-site AISC2,3 (US$/oz) $1,069 - - $1,200 $1,200
Total Capital (US$m) $1 - - $2 -
Mine-site FCF2 (US$m) $5 - - - -
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation.
4 See mineral reserve and resource estimates and associated footnotes in appendix.
5 El Chanate’s 2017 and 2018 production has been hedged through gold collar contracts which ensure a minimum gold price of $1,270 per ounce and participation up to $1,444 per ounce in 2018.
23
Development – Peer Leading Growth Profile
Low cost, low capital
intensity growth
Capacity to double
current rate of production
6 development projects
24
Development: Kirazlı, Ağı Dağı & Çamyurt
Location: Turkey Stage: Development
Ownership: 100% interest Operation: Open pit, heap leach
• Kirazlı & Ağı Dağı EIAs approved
• Kirazlı Forestry Permits granted January 2017
• Kirazlı & Ağı Dağı feasibility studies completed February
20171 outlining 185% increase in combined after-tax NPV8%
• Tax incentives & mining law supportive of industry
Kirazlı2
Tonnes Grade Contained Ounces
(000) (g/t Au) (g/t Ag) (000 Au) (000 Ag)
Proven & Probable 26,104 0.79 12.01 665 10,078
Measured & Indicated 5,966 0.43 2.18 82 418
Inferred 5,689 0.59 8.96 108 1,638
Ağı Dağı2
Proven & Probable 54,361 0.67 5.41 1,166 9,459
Measured & Indicated 34,887 0.46 2.18 518 2,445
Inferred 16,760 0.46 2.85 245 1,534
Çamyurt2
Measured & Indicated 17,721 0.89 6.14 508 3,497
Inferred 2,791 0.95 5.77 85 518
1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi feasibility studies & Camyurt preliminary economic assessment. The 185% increase is compared to the 2012 pre-feasibility study
2 See mineral reserve and resource estimates and associated footnotes in appendix
25
Development: Kirazlı, Ağı Dağı & Çamyurt Economic Studies
After-taxNPV8%(US$m)
$82m
$187m
$88m
$298m
$86m
$0
$100
$200
$300
$400
$500
$600
2012 2017
Kirazlı Ağı Dağı Çamyurt
+236%
1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi Feasibility studies & Camyurt PEA. After-tax NPV8% in 2012 prefeasibility study and after-tax NPV8% and IRR in 2017 feasibility studies and PEA
assume gold and silver prices of $1,250 and $16 per ounce, respectively
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures
11
2017 Positive Economic Studies1
Kirazlı
Feasibility
Study
Ağı Dağı
Feasibility
Study
Çamyurt
PEA
Mine Life Years 5 6 4
Average Annual Production
oz Au 104,000 177,600 93,200
oz Ag 617,300 444,200 403,000
Average grade g/t Au 0.79 0.67 0.92
Mine-site AISC2
US$m $373 $411 $645
Initial Capex US$m $152 $250 $10
Total Capex US$m $180 $313 $26
After-tax NPV5%
US$m $223 $360 $111
After-tax NPV8%
US$m $187 $298 $86
After-tax IRR % 44% 39% 253%
Gold Price Assumption US$/oz $1,250 $1,250 $1,250
>39%
After-tax IRR for each of Kirazlı, Ağı Dağı & Çamyurt1
Low cost, high return growth
26
Quartz Mountain
Location: Oregon, United States
Ownership: Right to earn a 100% interest4
Stage: Advanced Exploration
Esperanza
Location: Morelos State, Mexico
Ownership: 100% interest
Stage: Development
Operation: Open pit, heap leach
Development: Lynn Lake, Esperanza & Quartz Mountain
1 Lynn Lake December 2017 feasibility study based on gold and silver price assumptions of $1250 and $16 per ounce, respectively. See press release dated December 14, 2017 for more details.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Historic column recovery tests for gold at Quartz Mountain varied between 74% and 88% for the felsic rock hosted mineralization; see Orsa Ventures press release dated February 12, 2013
4 See mineral reserve and resource estimates and associated footnotes in appendix.
5 Additional C$3m due on completion of feasibility study & C$15m or 2% NSR upon successful permitting
Lynn Lake
Location: Manitoba, Canada
Ownership: 100% interest
Stage: Permitting
Operation: Open pit
Tonnes Grade Oz Au
(000) (g/t Au) (g/t Ag) (000 Au) (000 Ag)
M&IResources4
34,352 0.98 8.09 1,083 8,936
Inf. Resources 718 0.80 15.04 18 347
Tonnes Grade Oz Au
(000) (g/t Au) (000 Au)
M&IResources4
12,156 0.87 339
Inferred Resources 39,205 0.91 1,147
• Excellent infrastructure; low technical
risk
• Low capital intensity & operating costs
• Average annual production potential >
100k oz
• AISC expected to be lowest quartile2
• Located on northern extension of
prolific Basin & Range Province of
Nevada
• Low strip ratio, favourable metallurgy3
• Acquisition cost $3.5m5
• High grade, open pit with significant
exploration potential
• Existing infrastructure in place
• Low cost hydroelectric power
• Feasibility study results announced Dec 20171
• Average production: 143 koz (Years 1-10)
• LOM Mine-site AISC2
: $745
• After-tax NPV5%: $123m; IRR: 13%
Tonnes Grade Oz Au
(000) (g/t Au) (g/t Ag) (000 Au) (000 Ag)
P&P Reserves4
26,800 1.89 2.99 1,625 2,578
M&I Resources4
6,815 1.49 4.77 327 667
Inf. Resources 45,812 1.11 2.80 1,629 67
27
Alamos – Investment Case
Catalysts
Diversified intermediate gold producer Low-cost growth profile
Strong balance sheet to support
growth
Long term track record of delivering
shareholder value
 Q1 2017: Received Forestry Permits for Kirazlı project
 Q1 2017: Positive Kirazlı & Ağı Dağı feasibility studies & Çamyurt PEA
 Q1 2017: 31% increase in combined mineral reserves
 Q3 2017: Initial production at La Yaqui
 Q4 2017: Closing of Richmont acquisition
 Q4 2017: Met consolidated 2017 production guidance
2018: Ongoing exploration at Island Gold and Mulatos
2018: Receipt of GSM permit for Kirazlı
H2 2018: Completion of Phase I Expansion at Island Gold
28
Appendices
29
Board of Directors and Executive and Management Team
Board of Directors
Executive and Management Team
Paul J. Murphy
John A.
McCluskey
Mark J. Daniel
Patrick D.
Downey
David Fleck David Gower
Claire M. C.
Kennedy
Ronald E. Smith Kenneth Stowe
Chairman Director Director Director Director Director Director Director Director
John A. McCluskey Jamie Porter Peter MacPhail Christine Barwell Chris Bostwick Luis Chavez
President and CEO Chief Financial Officer Chief Operating Officer VP, Human Resources VP, Technical Services Senior VP, Mexico
Andrew Cormier Nils Engelstad Greg Fisher Aoife McGrath Scott Parsons Colin Webster
VP, Development & Construction VP, General Counsel VP, Finance VP, Exploration VP, Investor Relations VP Sustainability & External Affairs
30
Sustainability
• Our Objectives
• As we pursue further growth, we will continue to measure our success as an
organization by our performance in achievement of our sustainability objectives:
• Protecting the health and well-being of our employees
• Creating shared value with our host communities and countries
• Ensuring that our operations are net-positive for the environment
• Over the years, Alamos has been recognized for its achievements in these areas:
Clean Industry Certification from PROFEPA
• Alamos was certified as an Industria Limpia (clean industry)
in recognition of the excellence of environmental management
at Mulatos
CSR Award from Mexican Center for Philanthropy (CEMEFI)
• Signifies exceptional record of CSR performance;
• 2016 marked the 8th consecutive year for Alamos
31
2018 Guidance – Alamos
2018 Guidance 2017 Guidance
Young-
Davidson
Island Gold Mulatos El Chanate Total Total
Gold production (000’s ounces) 200-210 90-100 150-160 40-50 480-520 429 (actual)
Cost of Sales (in millions)(4) $220 $112 $147 $57 $536 $442
Cost of Sales ($ per ounce)(4) $1,075 $1,175 $950 $1,270 $1,075 $1,065
Total cash costs ($ per ounce) (1) $675 $575 $800 $1,200 $740 $765
All-in sustaining costs ($ per ounce) (1)
$950 $940
Mine-site all-in sustaining costs ($ per ounce)(1),(3) $850 $825 $900 $1,200 - -
Capital expenditures (in millions)
Sustaining capital(1) $35-40 $25-27 $8-10 - $68-77 $40-47
Growth capital(1) $35-40 $25-28(2) $18-20(2) - $78-88 $65-75
Total capital(1) $70-80 $50-55 $26-30 - $146-165 $105-122
Corporate & Administrative (in millions) $18 $16
1. Refer to the “Cautionary non-GAAP Measures and Additional GAAP Measures” disclosure.
2. Excludes capitalized exploration.
3. For the purposes of calculating mine-site all-in sustaining costs at individual mine sites, the Company does not include an allocation of corporate and administrative and share based compensation expenses to the mine sites.
4. Cost of sales includes mining and processing costs, royalties, and amortization expense
2018 Guidance 2017 Guidance
Sustaining Capital Growth Capital Total Total
Development Projects (in millions)
Turkey - $100 $100 $4
Lynn Lake - $8 $8 $9
La Yaqui Grande & Cerro Pelon - $13 $13 -
Esperanza & Quartz Mountain - $2 $2 $3
Total – Development Projects - $123 $123 $16
Capitalized Exploration (in millions)
Island Gold - $12 $12 -
Mulatos - $7 $7 $15
Lynn Lake - $4 $4 $4
Total – Capitalized Exploration - $23 $23 $19
Total Consolidated Budget $68-77 $224-234 $292-311 $140-157
32
Young-Davidson – Increasing Grade & Productivity
1 Cost of sales includes mining and processing costs, royalties and amortization.
2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures.
3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation.
4 Excludes hydro rebate not attributable to Q4/15
Underground ramp up driving production higher and unit costs lower
Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Q4/17
Gold ounces produced 35,104 40,166 40,538 40,945 38,098 39,365 38,201 44,694 39,065 42,644 43,629 44,662 40,400 47,300 55,800 56,500
Cost of sales1 (US$/oz) $1,677 $1,625 $1,370 $1,211 $1,216 $1,298 $1,165 $986 $1,058 $1,182 $1,032 $1,077 $1,148 $1,113 $966 -
Total cash costs per oz. (2,3)
$1,009 $871 $723 $719 $745 $697 $681 $617 $616 $738 $607 $667 $710 $677 $572 -
Mine-site AISC per oz.(2,3)
$1,315 $1,144 $959 $912 $987 $1,008 $979 $980 $846 $965 $849 $926 $851 $895 $ 744 -
Underground mine
Tonnes mined per day 2,611 3,595 3,753 4,140 4,130 5,149 5,081 5,911 5,776 6,123 5,467 6,675 6,400 6,377 6,544
Grades (g/t) 2.8 3.3 3.1 3.0 3.0 2.6 2.6 2.6 2.6 2.4 2.8 2.4 2.6 2.6 2.9 -
Development metres 3,772 3,545 3,269 3,438 3,409 3,789 3,619 3,769 3,490 3,168 2,677 3,044 3,242 3,425 3,344 -
Unit UG mining costs (US$) $46 $45 $41 $39 $39 $33 $32 $294 $31 $34 $34 $32 $36 $33 $34 -
Unit UG mining costs (CAD$) $51 $49 $45 $44 $48 $41 $41 $384 $42 $44 $45 $42 $47 $44 $43 -
Mill processing facility
Tonnes processed per day 7,163 8,230 7,670 7,757 7,186 7,677 7,680 7,630 7,342 7,006 6,833 7,552 7,718 6,917 7,553
Grades (inc. OP stockpile) 1.8 2.2 1.9 2.0 2.0 2.0 1.9 2.2 2.1 2.1 2.4 2.2 2.2 2.5 2.7 -
Recoveries (%) 87% 88% 90% 88% 86% 88% 92% 91% 90% 92% 93% 90% 89% 92% 93% -
$20
$25
$30
$35
$40
$45
$50
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17
Underground tonnes mined per day Unit UG mining costs (US$/t)
UndergroundTPD
UnitUGminingcosts(US$/t)
33
2016 2017 2018 2019 2020
 Commissioning of MCM
shaft
 Transition to 100% owner
development
 Ramp up to 7,000 tpd
 Raise boring of lower NG
shaft
 Completion of MCM waste
pass
• Shaft bottom infrastructure
• Northgate shaft –
changeover to shaft bottom
• Northgate shaft hoisting
from 8900L
Young-Davidson – Development Schedule
Please refer to Cautionary Notes on non-GAAP
Measures and Additional GAAP Measures.
Declining capital intensity
34
Young-Davidson – Long Section
Declining capital intensity
Higher underground mining
rates – stronger production
Strong free cash flow growth
Development of lower mine
infrastructure to support:
Productivity improvements –
lower costs
35
Island Gold – 2017 Drilling Program
Significant Exploration Potential at Depth and to the East
36
Island Gold – Regional Exploration
37
Mulatos District
38
Kirazlı, Ağı Dağı & Çamyurt Economic Studies – 2017
Feasibility Study - 2017 Preliminary Economic Assessment - 2017
Kirazlı Ağı Dağı Çamyurt
Production
Mine life (years) 5 6 4
Total gold production (ounces) 540,000 937,300 373,200
Total silver production (ounces) 3,141,000 2,365,200 1,612,600
Average annual production (ounces)1
Gold 104,000 177,600 93,200
Silver 617,300 444,200 403,000
Total ore mined (tonnes) 26,100,000 54,361,000 16,580,000
Total waste mined (tonnes) 37,900,000 55,893,000 30,874,000
Total material mined (tonnes) 64,000,000 110,254,000 47,454,000
Waste-to-ore ratio2
1.45 1.03 1.86
Average grade (grams per tonne)
Gold 0.79 0.67 0.92
Silver 12.0 5.4 6.3
Recovery (%)
Gold 81% 80% 76%
Silver 31% 25% 48%
Average throughput (tpd) 15,000 30,000 15,000
Operating Costs
Total cost per tonne of ore3
$8.49 $6.46 $14.03
Total cash cost (per ounce sold)4
$339 $374 $604
Mine-site all-in sustaining cost (per ounce sold)4
$373 $411 $645
Capital Costs (millions)
Pre-production capital expenditure $151.9 $250.3 $10.2
Sustaining capital expenditure $18.1 $33.9 $9.4
Reclamation costs (net of salvage value) $9.9 $28.8 $5.9
Total capital expenditure $179.8 $312.9 $25.5
Economic Analysis
IRR (after-tax) 44.3% 38.7% 253.0%
NPV @ 0% discount rate (after-tax, millions) $299.3 $492.8 $173.8
NPV @ 5% discount rate (after-tax millions) $222.9 $360.2 $111.4
NPV @ 8% discount rate (after-tax, millions) $186.5 $297.6 $86.2
Gold price assumption (average, per ounce sold) $1,250 $1,250 $1,250
Silver price assumption (average, per ounce sold) $16.00 $16.00 $16.00
Exchange Rate (Turkish Lira/US Dollar) 2.90:1 2.90:1 2.90:1
1 Average annual production is based on five full years of production for Kirazlı and Ağı Dağı and excludes pre-commercial production
2 Reported waste-to-ore ratio is over the life of mine. The waste-to-ore ratio during commercial production is 0.70:1 for Ağı Dağı and 1.19:1 for Kirazlı in the 2017 feasibility study
3 Total unit cost per tonne of ore excludes silver as a by-product credit
4 Total cash costs and mine-site all-in sustaining costs include silver as a by-product credit
39
Lynn Lake Feasibility Study – 2017
Feasibility Study Highlights - December 2017
Production
Mine life (years) 10.4
Total gold production (000 ounces) 1,495
Total silver production (000 ounces) 1,263
Average annual gold production1
Years 1 to 6 (000 ounces) 170
Years 1 to 10 (000 ounces) 143
Total ore mined (000 tonnes) 26,803
Total waste mined (000 tonnes) 195,188
Total material mined (000 tonnes) 221,991
Waste-to-ore ratio2
7.28
Average grade (grams per tonne)
Gold 1.89
Silver 2.99
Recovery (%)
Gold (Average MacLellan and Gordon) 92%
Silver (MacLellan only) 49%
Average mill throughput (tonnes per day (“tpd”)) 7,000
Operating Costs
Total cost per tonne of ore3
$36.06
Total cash cost (per ounce sold)4
$645
Mine-site all-in sustaining cost (per ounce sold)4
$745
Capital Costs (millions)
Pre-production capital expenditure $338.0
Sustaining capital expenditure $126.6
Reclamation costs $21.1
Total capital expenditure $485.6
Base Case Economic Analysis
IRR (after-tax) 12.5%
NPV @ 0% discount rate (millions, after-tax) $279.0
NPV @ 5% discount rate (millions, after-tax) $123.4
Gold price assumption (average, per ounce sold) $1,250
Silver price assumption (average, per ounce sold) $16.00
Exchange Rate (US Dollar/Canadian Dollar) 0.75
1. Average annual production excludes pre-commercial production
2. Reported waste-to-ore ratio is over the life of mine and includes overburden as waste. The waste-to-ore ratio during commercial production is 7.06:1
3. Total unit cost per tonne (“t”) of ore includes royalties and silver as a by-product credit
4. Total cash costs and mine-site all-in sustaining costs include royalties and silver as a by-product credit
40
2016 Proven and Probable Mineral Reserves
PROVEN AND PROBABLE GOLD RESERVES (as at December 31, 2016)
Proven Reserves Probable Reserves Total Proven and Probable
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's)
Young-Davidson - Surface 1,165 0.91 34 0 0.00 0 1,165 0.91 34
Young-Davidson - Underground 14,851 2.80 1,336 27,203 2.65 2,317 42,054 2.70 3,653
Total Young-Davidson 16,016 2.66 1,370 27,203 2.65 2,317 43,220 2.65 3,687
Island Gold 573 8.68 160 1,978 9.31 592 2,551 9.17 752
Mulatos Main Pits 4,173 1.02 137 21,847 0.87 613 26,020 0.90 750
San Carlos Underground 72 13.06 30 34 8.64 9 106 11.65 40
Stockpiles 7,129 1.38 317 0 0.00 0 7,129 1.38 317
La Yaqui 470 1.48 22 1,469 1.37 65 1,939 1.40 87
La Yaqui Grande 0 0.00 0 11,548 1.40 521 11,548 1.40 521
Cerro Pelon 960 1.70 53 2,293 1.59 117 3,253 1.63 170
Total Mulatos 12,804 1.36 559 37,191 1.11 1,325 49,995 1.17 1,885
El Chanate - Open Pit 7,008 0.51 114 3,804 0.65 79 10,812 0.56 193
El Chanate - Leach Pad Inv. 100 100
Total El Chanate 7,008 0.95 214 3,804 0.65 79 10,812 0.84 293
MacLellan 9,550 1.91 586 8,530 1.32 361 18,080 1.63 947
Gordon 2,310 2.82 210 6,410 2.27 468 8,720 2.42 678
Total Lynn Lake 11,860 2.09 796 14,940 1.73 829 26,800 1.89 1,625
Agi Dagi 1,450 0.76 36 52,911 0.66 1,130 54,361 0.67 1,166
Kirazli 700 1.25 28 25,404 0.78 637 26,104 0.79 665
Total Turkey 2,150 0.93 64 78,315 0.70 1,767 80,465 0.71 1,831
Alamos - Total 50,412 1.95 3,163 163,431 1.32 6,910 213,843 1.47 10,073
PROVEN AND PROBABLE SILVER MINERAL RESERVES (as at December 31, 2016)
Proven Reserves Probable Reserves Total Proven and Probable
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's)
La Yaqui 470 7.40 112 1,469 7.19 340 1,939 7.25 452
La Yaqui Grande 0 0.00 0 11,548 19.94 7,403 11,548 19.94 7,403
MacLellan (Lynn Lake) 9,550 5.01 1,539 8,530 3.79 1,039 18,080 4.43 2,578
Ağı Dağı 1,450 6.22 290 52,911 5.39 9,169 54,361 5.41 9,459
Kirazli 700 15.90 358 25,404 11.90 9,720 26,104 12.01 10,078
Alamos - Total 12,170 5.88 2,299 99,862 8.62 27,671 112,032 8.32 29,970
41
2016 Total Measured and Indicated Mineral Resources
MEASURED AND INDICATED GOLD MINERAL RESOURCES (as at December 31, 2016)
Measured Resources Indicated Resources Total Measured and Indicated
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's)
Young-Davidson - Surface 496 1.13 18 1,242 1.28 51 1,739 1.24 69
Young-Davidson - Underground 5,876 3.33 629 4,916 3.47 548 10,792 3.39 1,177
Total Young-Davidson 6,373 3.16 647 6,158 3.03 599 12,531 3.09 1,246
Island Gold 34 4.94 5 446 6.01 86 479 5.94 91
Mulatos 8,270 1.24 330 64,221 1.08 2,224 72,491 1.10 2,554
San Carlos UG 196 6.11 39 362 4.70 55 558 5.20 93
La Yaqui 0 - 0 1,108 1.91 68 1,108 1.91 68
Cerro Pelon 117 2.75 10 455 2.52 37 572 2.56 47
Carricito 58 0.82 2 1,297 0.82 34 1,355 0.83 36
Total Mulatos 8,641 1.37 381 67,443 1.12 2,418 76,084 1.14 2,798
El Chanate 1,092 0.55 19 3,323 0.69 74 4,415 0.66 93
MacLellan 2,110 1.86 126 2,240 1.24 89 4,350 1.57 215
Gordon 10 1.72 0 450 1.96 28 460 1.96 29
Burnt Timber 0 - 0 1,021 1.40 46 1,021 1.40 46
Linkwood 0 - 0 984 1.16 37 984 1.17 37
Total Lynn Lake 2,120 1.86 126 4,695 1.32 200 6,815 1.49 327
Esperanza 19,226 1.01 622 15,126 0.95 462 34,352 0.98 1,083
Ağı Dağı 553 0.44 8 34,334 0.46 510 34,887 0.46 518
Kirazli 118 0.50 2 5,848 0.43 80 5,966 0.43 82
Çamyurt 513 1.00 16 17,208 0.89 492 17,721 0.89 508
Total Turkey 1,184 0.68 26 57,390 0.59 1,082 58,574 0.59 1,108
Quartz Mountain 214 0.95 7 11,942 0.87 333 12,156 0.87 339
Alamos - Total 38,883 1.47 1,833 166,523 0.98 5,253 205,406 1.07 7,087
MEASURED AND INDICATED SILVER MINERAL RESOURCES (as at December 31, 2016)
Measured Resources Indicated Resources Total Measured and Indicated
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's)
La Yaqui Grande 0 0.00 0 1,108 15 523 1,108 15 523
Esperanza 19,226 7.25 4,482 15,126 9.16 4,455 34,352 8.09 8,936
MacLellan (Lynn Lake) 2,110 5.34 362 2,240 4.24 305 4,350 4.77 667
Ağı Dağı 553 1.59 28 34,334 2.19 2,417 34,887 2.18 2,445
Kirazli 118 2.73 10 5,848 2.17 408 5,966 2.18 418
Çamyurt 513 5.63 93 17,208 6.15 3,404 17,721 6.14 3,497
Alamos - Total 22,520 6.87 4,975 75,864 4.72 11,512 98,384 5.21 16,486
42
2016 Total Inferred Mineral Resources
INFERRED GOLD MINERAL RESOURCES (as at December 31, 2016)
Tonnes Grade Ounces
(000's) (g/t Au) (000's)
Young-Davidson - Surface 31 0.99 1
Young-Davidson - Underground 3,524 2.76 313
Total Young-Davidson 3,555 2.75 314
Island Gold 3,042 10.18 996
Mulatos 8,935 0.92 265
San Carlos UG 162 4.93 26
La Yaqui 174 1.39 8
Cerro Pelon 109 1.23 4
Carricito 900 0.74 22
Total Mulatos 10,280 0.98 325
El Chanate 112 0.71 3
MacLellan 750 1.62 39
Gordon 620 1.30 26
Burnt Timber 23,438 1.04 781
Linkwood 21,004 1.16 783
Total Lynn Lake 45,812 1.11 1,629
Esperanza 718 0.80 18
Ağı Dağı 16,760 0.46 245
Kirazli 5,689 0.59 108
Çamyurt 2,791 0.95 85
Total Turkey 25,240 0.54 438
Quartz Mountain 39,205 0.91 1,147
Alamos - Total 127,965 1.18 4,869
INFERRED SILVER MINERAL RESOURCES (as at December 31, 2016)
Tonnes Grade Ounces
(000's) (g/t Ag) (000's)
La Yaqui Grande 174 5.55 31
Esperanza 718 15.04 347
MacLellan 750 2.80 67
Ağı Dağı 16,760 2.85 1,534
Kirazli 5,689 8.96 1,638
Çamyurt 2,791 5.77 518
Alamos - Total 26,882 4.78 4,135
43
Notes to Mineral Reserve and Resource Estimates
Mineral Resources
Jeffrey Volk, CPG, FAusIMM Director - Reserves and Resource, Alamos Gold Inc. Young-Davidson, El Chanate, San Carlos U/G, Lynn Lake
Marc Jutras, P.Eng Principal, Ginto Consulting Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Carricito, Esperanza, Ağı Dağı, Kirazlı, Çamyurt, Quartz Mountain
Raynald Vincent P.Eng. M.P.M. Chief Geologist, Island Gold Island Gold
Mineral Reserves
Chris Bostwick, FAusIMM VP Technical Services, Alamos Gold Inc. Young-Davidson, El Chanate, San Carlos Underground, Lynn Lake
Herb Welhener, SME-QP VP, Independent Mining Consultants Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Ağı Dağı, Kirazlı
Léon Grondin Leblanc, P.Eng. Chief Engineer, Island Gold Island Gold
Resources Reserves
Gold Price Cutoff Gold Price Cutoff Met Recovery
Mulatos:
Mulatos Main Open Pit $1,400 0.5 $1,250 see notes >50%
San Carlos Underground $1,400 2.5 $1,250 3.27 70%
Cerro Pelon $1,400 0.5 $1,250 see notes 75%
La Yaqui $1,400 0.5 $1,250 see notes 75%
Carricito $1,400 0.3 n/a n/a >50%
Young-Davidson - Surface $1,400 0.5 $1,250 0.5 91%
Young-Davidson - Underground $1,400 1.3 $1,250 1.9 91%
Island Gold CAD $1,500 4.5 CAD 1,500 4.0-4.3 96.5%
El Chanate $1,400 0.15 $1,250 0.15 30-65%
Lynn Lake (MacLellan) $1,400 0.42 $1,250 0.47 91-92%
Lynn Lake (Gordon) $1400 0.62 $1,200 0.69 89-94%
Lynn Lake (Burnt Timber and Linkwood) $1,555 0.4 n/a n/a 89-92%
Esperanza $1,400 0.4 n/a n/a 60-72%
Ağı Dağı $1,400 0.2 $1,250 see notes 80%
Kirazlı $1,400 0.2 $1,250 see notes 81%
Çamyurt $1,400 0.2 n/a n/a 78%
Quartz Mountain $1,400 0.21 Oxide, 0.6 Sulfide n/a n/a 65-80%
Qualified Persons:
Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this presentation. Chris
Bostwick is a Qualified Person within the meaning of Canadian Securities Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43-
101 compliant mineral reserve and resource estimates are detailed in the following table.
Notes to Mineral Reserve and Resource Tables:
• The Company’s Mineral Reserves and Mineral Resource as at December 31, 2016 are classified in accordance with the Canadian Institute of Mining Metallurgy and Petroleum’s “CIM Standards on Mineral
Resources and Reserves, Definition and Guidelines” as per Canadian Securities Administrator’s NI 43-101 requirements.
• Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
• Mineral Resources are exclusive of Mineral Reserves.
• Mineral Reserve cut-off grade for the Mulatos Mine, the Cerro Pelon Pit, the La Yaqui Pit, the Kirazlı Pit and the Ağı Dağı Pit are determined as a net of process value of $0.10 per tonne for each model
block
• All Measured, Indicated and Inferred Mineral Resources are pit constrained with the exception of those outside the Mulatos Main Pits on the Mulatos property which have no economic restrictions and
are tabulated by gold cut-off grade.
44
Scott K. Parsons, CFA
VP, Investor Relations
416.368.9932 x 5439
sparsons@alamosgold.com

More Related Content

What's hot

Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016alamosgoldinc
 
Alamos corporate presentation aug 19 2015 final
Alamos corporate presentation   aug 19 2015 finalAlamos corporate presentation   aug 19 2015 final
Alamos corporate presentation aug 19 2015 finalalamosgoldinc
 
Alamos Corporate Presentation - September 2015
 Alamos Corporate Presentation - September 2015 Alamos Corporate Presentation - September 2015
Alamos Corporate Presentation - September 2015alamosgoldinc
 
Alamos corporate presentation sept 10 2015 final
Alamos corporate presentation   sept 10 2015 finalAlamos corporate presentation   sept 10 2015 final
Alamos corporate presentation sept 10 2015 finalalamosgoldinc
 
Alamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 FinalAlamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 Finalalamosgoldinc
 
Alamos corporate presentation nov 16 2015 final
Alamos corporate presentation   nov 16 2015 finalAlamos corporate presentation   nov 16 2015 final
Alamos corporate presentation nov 16 2015 finalalamosgoldinc
 
Alamos corporate presentation dec 14 2015 final
Alamos corporate presentation   dec 14 2015 finalAlamos corporate presentation   dec 14 2015 final
Alamos corporate presentation dec 14 2015 finalalamosgoldinc
 
Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017alamosgoldinc
 
Alamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 finalAlamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 finalalamosgoldinc
 
Alamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 finalAlamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 finalalamosgoldinc
 
Alamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 finalAlamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 finalalamosgoldinc
 
Alamos corporate presentation july 2 2015 final
Alamos corporate presentation   july 2 2015 finalAlamos corporate presentation   july 2 2015 final
Alamos corporate presentation july 2 2015 finalalamosgoldinc
 
Alamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 finalAlamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 finalalamosgoldinc
 
Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016alamosgoldinc
 
Alamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 finalAlamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 finalalamosgoldinc
 
Alamos corporate presentation april 9 2015 final
Alamos corporate presentation   april 9 2015 finalAlamos corporate presentation   april 9 2015 final
Alamos corporate presentation april 9 2015 finalalamosgoldinc
 
Alamos Gold and Aurico Gold Merger Presentation
Alamos Gold and Aurico Gold Merger PresentationAlamos Gold and Aurico Gold Merger Presentation
Alamos Gold and Aurico Gold Merger Presentationalamosgoldinc
 
Alamos and au rico merger presentation final
Alamos and au rico merger presentation finalAlamos and au rico merger presentation final
Alamos and au rico merger presentation finalalamosgoldinc
 
AuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger PresentationAuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger PresentationAuRico Gold
 
Alamos corporate-presentation-march-2015-final
Alamos corporate-presentation-march-2015-finalAlamos corporate-presentation-march-2015-final
Alamos corporate-presentation-march-2015-finalalamosgoldinc
 

What's hot (20)

Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016Alamos Corporate Presentation Jan 14 2016
Alamos Corporate Presentation Jan 14 2016
 
Alamos corporate presentation aug 19 2015 final
Alamos corporate presentation   aug 19 2015 finalAlamos corporate presentation   aug 19 2015 final
Alamos corporate presentation aug 19 2015 final
 
Alamos Corporate Presentation - September 2015
 Alamos Corporate Presentation - September 2015 Alamos Corporate Presentation - September 2015
Alamos Corporate Presentation - September 2015
 
Alamos corporate presentation sept 10 2015 final
Alamos corporate presentation   sept 10 2015 finalAlamos corporate presentation   sept 10 2015 final
Alamos corporate presentation sept 10 2015 final
 
Alamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 FinalAlamos Corporate Presentation 2015 Final
Alamos Corporate Presentation 2015 Final
 
Alamos corporate presentation nov 16 2015 final
Alamos corporate presentation   nov 16 2015 finalAlamos corporate presentation   nov 16 2015 final
Alamos corporate presentation nov 16 2015 final
 
Alamos corporate presentation dec 14 2015 final
Alamos corporate presentation   dec 14 2015 finalAlamos corporate presentation   dec 14 2015 final
Alamos corporate presentation dec 14 2015 final
 
Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017Alamos corp presentation april 1 2017
Alamos corp presentation april 1 2017
 
Alamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 finalAlamos corp presentation june 12 2017 final
Alamos corp presentation june 12 2017 final
 
Alamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 finalAlamos corp presentation feb 23 2017 final
Alamos corp presentation feb 23 2017 final
 
Alamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 finalAlamos corporate presentation oct 11 2016 final
Alamos corporate presentation oct 11 2016 final
 
Alamos corporate presentation july 2 2015 final
Alamos corporate presentation   july 2 2015 finalAlamos corporate presentation   july 2 2015 final
Alamos corporate presentation july 2 2015 final
 
Alamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 finalAlamos corporate presentation oct 27 2016 final
Alamos corporate presentation oct 27 2016 final
 
Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016Alamos corporate presentation nov 10 2016
Alamos corporate presentation nov 10 2016
 
Alamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 finalAlamos corporate presentation nov 21 2016 final
Alamos corporate presentation nov 21 2016 final
 
Alamos corporate presentation april 9 2015 final
Alamos corporate presentation   april 9 2015 finalAlamos corporate presentation   april 9 2015 final
Alamos corporate presentation april 9 2015 final
 
Alamos Gold and Aurico Gold Merger Presentation
Alamos Gold and Aurico Gold Merger PresentationAlamos Gold and Aurico Gold Merger Presentation
Alamos Gold and Aurico Gold Merger Presentation
 
Alamos and au rico merger presentation final
Alamos and au rico merger presentation finalAlamos and au rico merger presentation final
Alamos and au rico merger presentation final
 
AuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger PresentationAuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger Presentation
 
Alamos corporate-presentation-march-2015-final
Alamos corporate-presentation-march-2015-finalAlamos corporate-presentation-march-2015-final
Alamos corporate-presentation-march-2015-final
 

Similar to Alamos corp presentation jan 17 2018 final

Alamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final webAlamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final webalamosgoldinc
 
Alamos corp presentation nov 3 2017 final (1)
Alamos corp presentation nov 3 2017 final (1)Alamos corp presentation nov 3 2017 final (1)
Alamos corp presentation nov 3 2017 final (1)alamosgoldinc
 
Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalalamosgoldinc
 
Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalrichmontminesinc2016
 
Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019alamosgoldinc
 
Alamos corp presentation March 2017
Alamos corp presentation March 2017Alamos corp presentation March 2017
Alamos corp presentation March 2017alamosgoldinc
 
Alamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALAlamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALalamosgoldinc
 
Alamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalAlamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalalamosgoldinc
 
Alamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 finalAlamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 finalalamosgoldinc
 
Alamos corporate presentation march 31 2016
Alamos corporate presentation march 31 2016Alamos corporate presentation march 31 2016
Alamos corporate presentation march 31 2016alamosgoldinc
 
Alamos corporate presentation april 2016
Alamos corporate presentation april 2016Alamos corporate presentation april 2016
Alamos corporate presentation april 2016alamosgoldinc
 
Alamos corporate presentation april 15 2016
Alamos corporate presentation april 15 2016Alamos corporate presentation april 15 2016
Alamos corporate presentation april 15 2016alamosgoldinc
 
Alamos corporate presentation april 2016
Alamos corporate presentation april 2016Alamos corporate presentation april 2016
Alamos corporate presentation april 2016alamosgoldinc
 
Alamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 finalAlamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 finalalamosgoldinc
 
Alamos corporate presentation may 2016 final
Alamos corporate presentation may 2016 finalAlamos corporate presentation may 2016 final
Alamos corporate presentation may 2016 finalalamosgoldinc
 
Alamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 finalAlamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 finalalamosgoldinc
 
Alamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalAlamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalalamosgoldinc
 

Similar to Alamos corp presentation jan 17 2018 final (17)

Alamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final webAlamos corp presentation sept 22 2017 final web
Alamos corp presentation sept 22 2017 final web
 
Alamos corp presentation nov 3 2017 final (1)
Alamos corp presentation nov 3 2017 final (1)Alamos corp presentation nov 3 2017 final (1)
Alamos corp presentation nov 3 2017 final (1)
 
Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation final
 
Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation final
 
Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019Alamos Gold Corporate Presentation August 2019
Alamos Gold Corporate Presentation August 2019
 
Alamos corp presentation March 2017
Alamos corp presentation March 2017Alamos corp presentation March 2017
Alamos corp presentation March 2017
 
Alamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINALAlamos Corp Presentation_May 11 2017_FINAL
Alamos Corp Presentation_May 11 2017_FINAL
 
Alamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 finalAlamos corp presentation june 22 2017 final
Alamos corp presentation june 22 2017 final
 
Alamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 finalAlamos corp presentation jan 17 2017 final
Alamos corp presentation jan 17 2017 final
 
Alamos corporate presentation march 31 2016
Alamos corporate presentation march 31 2016Alamos corporate presentation march 31 2016
Alamos corporate presentation march 31 2016
 
Alamos corporate presentation april 2016
Alamos corporate presentation april 2016Alamos corporate presentation april 2016
Alamos corporate presentation april 2016
 
Alamos corporate presentation april 15 2016
Alamos corporate presentation april 15 2016Alamos corporate presentation april 15 2016
Alamos corporate presentation april 15 2016
 
Alamos corporate presentation april 2016
Alamos corporate presentation april 2016Alamos corporate presentation april 2016
Alamos corporate presentation april 2016
 
Alamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 finalAlamos corporate presentation sept 19 2016 final
Alamos corporate presentation sept 19 2016 final
 
Alamos corporate presentation may 2016 final
Alamos corporate presentation may 2016 finalAlamos corporate presentation may 2016 final
Alamos corporate presentation may 2016 final
 
Alamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 finalAlamos corporate presentation dec 2 2016 final
Alamos corporate presentation dec 2 2016 final
 
Alamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-finalAlamos corp-presentation august-3-2017-final
Alamos corp-presentation august-3-2017-final
 

More from alamosgoldinc

Alamos gold corporate presentation may 14 2018 final
Alamos gold corporate presentation   may 14 2018 finalAlamos gold corporate presentation   may 14 2018 final
Alamos gold corporate presentation may 14 2018 finalalamosgoldinc
 
Alamos gold corporate presentation may 1 2018 final
Alamos gold corporate presentation   may 1 2018 finalAlamos gold corporate presentation   may 1 2018 final
Alamos gold corporate presentation may 1 2018 finalalamosgoldinc
 
Alamos gold corporate presentation april 12 2018
Alamos gold corporate presentation   april 12 2018Alamos gold corporate presentation   april 12 2018
Alamos gold corporate presentation april 12 2018alamosgoldinc
 
Alamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 finalAlamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 finalalamosgoldinc
 
Alamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 finalAlamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 finalalamosgoldinc
 
Alamos corporate presentation - September
Alamos corporate presentation - SeptemberAlamos corporate presentation - September
Alamos corporate presentation - Septemberalamosgoldinc
 
Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016alamosgoldinc
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalalamosgoldinc
 

More from alamosgoldinc (8)

Alamos gold corporate presentation may 14 2018 final
Alamos gold corporate presentation   may 14 2018 finalAlamos gold corporate presentation   may 14 2018 final
Alamos gold corporate presentation may 14 2018 final
 
Alamos gold corporate presentation may 1 2018 final
Alamos gold corporate presentation   may 1 2018 finalAlamos gold corporate presentation   may 1 2018 final
Alamos gold corporate presentation may 1 2018 final
 
Alamos gold corporate presentation april 12 2018
Alamos gold corporate presentation   april 12 2018Alamos gold corporate presentation   april 12 2018
Alamos gold corporate presentation april 12 2018
 
Alamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 finalAlamos corp presentation feb 22 2018 final
Alamos corp presentation feb 22 2018 final
 
Alamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 finalAlamos corp presentation jan 11 2018 final
Alamos corp presentation jan 11 2018 final
 
Alamos corporate presentation - September
Alamos corporate presentation - SeptemberAlamos corporate presentation - September
Alamos corporate presentation - September
 
Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016Alamos corporate presentation august 12 2016
Alamos corporate presentation august 12 2016
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 final
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 

Recently uploaded (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Call Girls In Kalkaji 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kalkaji 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Kalkaji 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kalkaji 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
VIP Call Girls Kolkata Kirti Call Now 8617697112 Kolkata Escorts
VIP Call Girls Kolkata Kirti Call Now 8617697112 Kolkata EscortsVIP Call Girls Kolkata Kirti Call Now 8617697112 Kolkata Escorts
VIP Call Girls Kolkata Kirti Call Now 8617697112 Kolkata Escorts
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 

Alamos corp presentation jan 17 2018 final

  • 1. January 2018 Corporate Presentation
  • 2. 2 Cautionary Notes This presentation, the information contained herein, any other materials provided in connection with this presentation and any oral remarks accompanying this presentation (collectively, this “Presentation”) has been prepared by Alamos Gold Inc. (“Alamos”) solely for information purposes. No Stock exchange, securities commission or other regulatory authority has approved or disapproved of the information contained herein. This presentation does not constitute an offering of securities and the information contained herein is subject to the information contained in the Company’s continuous disclosure documents at www.sedar.com. Cautionary Notes Certain statements in this presentation are “forward-looking statements”, including within the meaning of applicable laws. All statements other than statements of historical fact included in this presentation, including, without limitation, statements Alamos’ net asset value, operating cash flow, free cash flow, forecast gold production, Mineral Reserves, Mineral Resources, exploration potential, gold grades, recoveries, waste-to-ore ratios, total cash cost, all-in sustaining costs, debt levels and future plans and objectives of Alamos are forward-looking statements based on forecasts of future operational or financial results, estimates of amounts not yet determinable and assumptions of management that involve various risks and uncertainties. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “estimates” or “intends”, or stating that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements.” Alamos cautions that forward-looking information involves known and unknown risks, uncertainties and other factors that may cause Alamos’ actual results, performance or achievements to be materially different from those expressed or implied by such information, including, but not limited to, gold and silver price volatility; fluctuations in foreign exchange rates and interest rates; the impact of any hedging activities; discrepancies between actual and estimated production, between actual and estimated Mineral Reserves and Mineral Resources or between actual and estimated metallurgical recoveries; costs of production; capital expenditure requirements; the costs and timing of construction and development of new deposits; and the success of exploration and permitting activities. In addition, the factors described or referred to in the section entitled “Risk Factors” in Alamos’ Annual Information Form for the year ended December 31, 2016, which along with other documents setting out risk factors affecting the Company is available on the SEDAR website at www.sedar.com, should be reviewed in conjunction with the information found in this presentation. Although Alamos has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in forward-looking information, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management’s expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking information. Market data and other statistical information used throughout this Presentation are based on internal company research, independent industry publications, government publications, reports by market research firms or their published independent sources. Industry publications, governmental publications, market research surveys and forecasts generally state that the information contained therein has been obtained from sources believed to be reliable. Although Alamos believes such information is accurate and reliable, it has not independently verified any of the data from third party sources cited or used for our management’s industry estimates, nor has Alamos ascertained the underlying economic assumptions relied upon therein. While Alamos believes internal company estimates are reliable, such estimates have not been verified by any independent sources, and Alamos makes no representations as to the accuracy of such estimates. Note to U.S. Investors Alamos prepares its disclosure in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Terms relating to Mineral Resources in this presentation are defined in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy, and Petroleum Standards on Mineral Resources and Mineral Reserves. The Unites States Securities and Exchange Commission (the “SEC”) permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Alamos may use certain terms, such as “Measured Mineral Resources”, “Indicated Mineral Resources”, “Inferred Mineral Resources” and “Probable Mineral Reserves” that the SEC does not recognize (these terms may be used in this presentation and are included in the public filings of Alamos, which have been filed with the SEC and the securities commissions or similar authorities in Canada). Cautionary non-GAAP Measures and Additional GAAP Measures Note that for purposes of this section, GAAP refers to IFRS. The Company believes that investors use certain non-GAAP and additional GAAP measures as indicators to assess gold mining companies. They are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared with GAAP. “Cash flow from operating activities before changes in non-cash working capital” is a non-GAAP performance measure that could provide an indication of the Company’s ability to generate cash flows from operations, and is calculated by adding back the change in non-cash working capital to “Cash provided by (used in) operating activities” as presented on the Company’s consolidated statements of cash flows. “Free cash flow” is a non-GAAP performance measure that is calculated as cash flows from operations net of cash flows invested in mineral property, plant and equipment and exploration and evaluation assets as presented on the Company’s consolidated statements of cash flows and that would provide an indication of the Company’s ability to generate cash flows from its mineral projects. “Mine site free cash flow” is a non-GAAP measure which includes cash flow from operating activities at, less capital expenditures at each mine site. Return on Equity is defined as Earnings from Continuing Operations divided by the average Total Equity for the current and previous year. “Mining cost per tonne of ore” and “Cost per tonne of ore” are non-GAAP performance measures that could provide an indication of the mining and processing efficiency and effectiveness of the mine. These measures are calculated by dividing the relevant mining and processing costs and total costs by the tonnes of ore processed in the period. “Cost per tonne of ore” is usually affected by operating efficiencies and waste-to-ore ratios in the period. “Total cash costs per ounce”, “all-in sustaining costs per ounce”, and “mine-site all-in sustaining costs” as used in this analysis are non-GAAP terms typically used by gold mining companies to assess the level of gross margin available to the Company by subtracting these costs from the unit price realized during the period. These non-GAAP terms are also used to assess the ability of a mining company to generate cash flow from operations. There may be some variation in the method of computation of these metrics as determined by the Company compared with other mining companies. In this context, “total cash costs” reflects mining and processing costs allocated from in-process and dore inventory associated and associated royalties with ounces of gold sold in the period. Total cash costs per ounce are exclusive of exploration costs. “All-in sustaining costs per ounce” include total cash costs, exploration, corporate and administrative, share based compensation and sustaining capital costs. “Mine-site all-in sustaining costs” include total cash costs, exploration, and sustaining capital costs for the mine-site, but exclude an allocation of corporate and administrative and share based compensation. Additional GAAP measures that are presented on the face of the Company’s consolidated statements of comprehensive income and are not meant to be a substitute for other subtotals or totals presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. This includes “Earnings from operations”, which is intended to provide an indication of the Company’s operating performance, and represents the amount of earnings before net finance income/expense, foreign exchange gain/loss, other income/loss, and income tax expense. Non-GAAP and additional GAAP measures do not have a standardized meaning prescribed under IFRS and therefore may not be comparable to similar measures presented by other companies. A reconciliation of historical non-GAAP and additional GAAP measures are available at www.alamosgold.com. Technical Information Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this presentation. Chris Bostwick is a Qualified Person within the meaning of Canadian Securities Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43-101 compliant mineral reserve and resource estimates are detailed in the tables in the appendix of this presentation. Information pertaining to the geological and exploration content has been reviewed and approved by Aoife McGrath, Alamos' Vice President, Exploration, a Qualified Person. All figures in US$ unless otherwise indicated.
  • 3. 3 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 Includes cash, cash equivalents and equity securities of as of December 31, 2017. Total liquidity also includes undrawn $400m credit facility. Strong Platform for Delivering Long Term Value Diversified gold production 480,000 – 520,000 oz from four North American mines Expanding margins $950/oz AISC1 in 2018, declining through 2020 Peer leading growth Portfolio of 6 low-cost development projects Strong balance sheet Debt free, $235m cash2 & $635m total liquidity to support growth Track record of delivering shareholder value
  • 4. 4 2017 Year in Review – Record Performance 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. • Met production guidance – third consecutive year • 10% production growth driving record performance • ~7% reduction in AISC1 • Strongest operating cash flow & mine-site FCF since 2015 merger • Strengthened operating base – Richmont acquisition completed late November Record operational performance • Delivered three feasibility studies outlining >400koz of high margin production growth • La Yaqui initial production early September ahead of schedule • Kirazlı site development underway Advanced development pipeline • Debt free having eliminated $315m of debt • Increased total liquidity to >$600m through expanded revolver on better terms • Attractive valuation opportunity Improved financial flexibility
  • 5. 5 2015A 2016A 2017A 2018E $1,091 $1,010 $940 $950 2015A 2016A 2017E 2018E Growing Production, Declining Costs, Expanding Margins Gold Production (000 oz) AISC1,2,3 (US$/oz) -6% Cost of Sales1,4 (US$/oz) 1 2017E guidance excludes Island Gold Mine with the acquisition closing on November 23, 2017. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses. 4 Cost of sales includes mining and processing costs, royalties and amortization. 5 AISC Margin calculated as realized gold price less AISC. For 2017E and 2018E this assumes a $1,250/oz gold price +31% AISC Margin1,2,5 (US$/oz) -3% +28% 392 480-520 380 429 $1,241 $1,103 $1,065 $1,075 2015A 2016A 2017E 2018E $57 $229 $322 $300 2015A 2016A 2017E 2018E
  • 6. 6 Canada 57%Mexico 23% Turkey 20% AĞI DAĞI (TURKEY) – Permitting3 Average Au Production 178koz Mine-site AISC2 $411 After-tax IRR +39% KIRAZLI (TURKEY) – Permitting3 Average Au Production 104 koz Mine-site AISC2 $373/oz After-tax IRR +44% ÇAMYURT (TURKEY) – Permitting3 Average Au Production 93 koz Mine-site AISC2 $645 After-tax IRR +253% Top 10 North American Gold Producer MULATOS (SONORA, MEXICO) 2018E Au Production 150-160 koz 2018E Au Mine-site AISC US$900/oz EL CHANATE (SONORA, MEXICO) 2018E Au Production 40-50 koz 2018E Au Mine-site AISC US$1,200/oz YOUNG-DAVIDSON (ONTARIO, CANADA) 2018E Au Production 200-210 koz 2018E Au Mine-site AISC US$850/oz Producing Assets Exploration / Development Assets 1 Source: Select street research 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Average annual production and mine-site AISC for Turkish projects and Lynn Lake are detailed in economic studies completed in 2017. Note: Mineral resources are exclusive of mineral reserves. See mineral reserve and resource estimates and associated footnotes in appendix. ISLAND GOLD (ONTARIO, CANADA) 2018E Au Production 90-100 koz 2018E Au Mine-site AISC US$825/oz QUARTZ MOUNTAIN (USA) – Adv. Exploration Total Au M&I Resources 0.3 Moz (12.2mt @ 0.87 g/t) Total Au Inf. Resources 1.1 Moz (39.2mt @0.91 g/t) ESPERANZA (MEXICO) – Permitting Total Au M&I Resources 1.1 Moz (34.4mt @ 0.98 g/t) LYNN LAKE (CANADA) – Permitting3 Average Au Production 143 koz (Years 1-10) Mine-site AISC2 $745 After-tax IRR +13% Asset NPV by Geography1 Asset NPV by Stage1 Production 72% Development 28% Canada 60% Mexico 40% North American Production
  • 7. 7 Kirazlı Ağı Dağı Çamyurt Lynn Lake Permitting & Development Young-Davidson Stable Operating Base; Peer Leading Growth Profile Island Gold Mulatos El Chanate Mulatos District Island Gold District Esperanza Quartz Mountain >400 koz Combined annual production growth potential North American Production Exploration Controlled, disciplined, multi-stage growth 44% After-tax IRR1 39% After-tax IRR1 253% After-tax IRR1 13% After-tax IRR1 ~500 koz Stable, long-term production base; declining cost profile 1 After-tax IRR for Turkish and Lynn Lake projects based on gold and silver prices of $1,250 and $16 per ounce, respectively. For more details, see press releases dated February 15 & 22, 2017 and December 14, 2017.
  • 8. 8 $315m High yield notes retired in April 2017 Strong Balance Sheet – Debt Free 1 Unaudited management estimate as of December 31, 2017. 2 Cash, cash equivalents & equity securities as of December 31, 2017. 3 Total liquidity includes cash, cash equivalents, equity securities and undrawn $400m credit facility for Alamos Gold as of December 31, 2017 4As of January 10, 2018 Balance Sheet Cash & Cash Eq.1,2 US$235 million Total Liquidity3 US$635 million Total Debt US$0 Capital Structure Shares Outstanding 389.1 million Warrants 12.2 million Employee Options 11.1 million Fully Diluted 415.4 million Recent Share Price (TSX)4 C$7.94 Market Capitalization ~C$3.1 billion $24m Annual interest savings; $72m over remaining term $235m $400m $635m As of December 31, 2017 Cash & Total Liquidity Cash, cash equivalents & equity securitiesUndrawn Credit Facility 3
  • 9. 9 671% 8% 275% -50% 450% 950% 1450% 1950% 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Alamos Gold Share Price (TSX) S&P/TSX Global Gold Index Gold (US$/oz) Track Record of Delivering Shareholder Value 1 Based on consensus analyst net asset value (NAV) estimates. 2 Cumulative free cash flow (FCF) generated to date. Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 15% Annualized return since 2003 $118m Dividends paid to date Mulatos (US$m) Turkey (US$m)Young-Davidson (US$m) Lynn Lake (US$m) Acquisition Cost (2003) Acquisition Cost (2015) Acquisition Cost (2010) & Capital Invested Acquisition Cost (2016) & Capital Invested Consensus NAV & Cumulative FCF Consensus NAV Consensus NAV $20 $23 Consensus NAV & Cumulative FCF Capital Invested Consensus NAV1 Cumulative FCF2Acquisition Cost $10 $427 $400 $950 $1,159 $148 $91 $504 $71
  • 10. 10 Operations – Diversified North American Production Long life reserve base Declining costs & capital Growing free cash flow Growing production
  • 11. 11 Record Q4 & 2017 Performance 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Total consolidated all-in sustaining costs include corporate and administrative and share based compensation expenses. For the purposes of calculating all-in sustaining costs at individual mine sites, the Company does not include corporate and administrative and share based compensation expenses. 3 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 4 Includes capitalized exploration 5 2017 guidance excludes revised capital budget for Turkish projects approved in April 2017 10% Production growth from FY 2016 ~7% Decrease in all-in sustaining costs3 from FY 2016 429 koz Achieved production guidance with record performance 2016A Q3 YTD 2017 Q4 2017 2017A 2017E Total gold production (k oz) 392 309 120 429 400-430 Gold sales (k oz) 389 303 127 430 - Cost of sales (US$/oz, includes amortization)1 $1,103 $1,056 - - $1,065 All-in sustaining costs (US$/oz)2,3 $1,010 $946 - - $940 Capital Expenditures (US$M) $146.5 $123.3 - - $140-157 Average realized gold price (US$/oz) $1,239 $1,256 $1,275 $1,262 Operating revenues (US$M) $482.2 $381.1 $161.7 $542.8 - Cash provided by operations before changes in WC (US$M)3 $148.0 $130.6 - - - Mine-site free cash flow (US$M) 3 $35.4 $40.4 Net earnings (US$M) ($17.9) $31.3 - - - Earnings per share (basic) ($0.07) $0.11 - - - Cash, cash equivalents & equity securities (US$M) $266 $168 ~$235 ~$235 - Total debt (US$/M) $315 $0 $0 $0 - Strongest earnings, cash flow & mine-site free cash flow since since 2015 merger
  • 12. 12 La Yaqui Phase I Q4 2017 Scorecard La Yaqui initial production early September ahead of schedule Kirazlı site development underway Record Q4 production driven by record quarter from Young-Davidson Young-Davidson MCM waste pass & pebble crusher completed
  • 13. 13 Young-Davidson – Flagship, Long-Life Production 2016A Q4/17A 2017A 2017E 2018E Gold Production (k oz) 170.0 56.5 200.0 200-210 200-210 Cost of Sales1 (US$/oz) $1,087 - - $1,050 $1,075 Total Cash Costs2,3 (US$/oz) $657 - - $625 $675 Mine-site AISC2,3 (US$/oz) $897 - - $775 $850 Total Capital (US$m) $95 - - $70-80 $70-80 Mine-site FCF2 (US$m) $4 - - - - • One of Canada’s largest underground gold mines • 15 year mine life based on YE 2016 mineral reserves • Large resource base & exploration potential to support mine life extension • Significant Canadian dollar exposure; ~95% of costs Location: Ontario, Canada Stage: Producing Ownership: 100% interest Operation: Underground Gold Reserves & Resources4 Tonnes (000) Grade (g/t Au) oz Au (000) P&P Underground Reserves 42,054 2.70 3,653 M&I Underground Resources 10,792 3.39 1,177 Inferred Underground Resources 3,524 2.76 313 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation. 4 See mineral reserve and resource estimates and associated footnotes in appendix.
  • 14. 14 $1,162 $1,087 $1,068 $1,075 2015A 2016A 2017 Q3 YTD 2018E $986 $897 $824 $850 2015A 2016A 2017 Q3 YTD 2018E2015A 2016A 2017A 2018E -31% Growing production; declining costs; declining capital intensity Young-Davidson – Ramp up of Underground Mining -14%+28% ~6,600 tpd Average underground mining rate in 2017 -7% 6,000 tpd average underground mining rate in 2016 1 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 2 Cost of sales includes mining and processing costs, royalties and amortization Total Capital Spending (US$m) 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6 2.8 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Underground TPD Mill TPD Processed Grade (g/t Au) Tonnesperday g/tAu Mine-site AISC (US$/oz)Production (000 oz) Cost of Sales2 (US$/oz) 160 170 200 200-210 2015A 2016A 2017E 2018E $108 $95 $70-80 $70-80
  • 15. 15 Island Gold – High-Grade, Low Cost Production Location: Ontario, Canada Stage: Producing Ownership: 100% interest Operation: Underground Gold Reserves & Resources5 Tonnes (000) Grade (g/t Au) oz Au (000) P&P Underground Reserves 2,551 9.17 752 M&I Underground Resources 479 5.94 91 Inferred Underground Resources 3,042 10.18 996 Highly Productive Gold Mining District 2016A Q4/17A 2017A 2017E 2018E Gold Production (k oz)1 83.3 22.1 98.6 87-93 90-100 Cost of Sales2 (US$/oz) - - - - $1,175 Total Cash Costs3 (US$/oz) $587 - - $550-$590 $575 Mine-site AISC3 (US$/oz) $745 - - $725-$765 $825 Total Capital4 (US$m) $43 - - $40-$44 $50-55 Mine-site FCF3 (US$m) ($2) - - - - 1 Operating results from Island Gold prior to its acquisition has been included for comparative purposes. Production attributable to Alamos totals 9,000 oz in 2017 following the closing of the Richmont Mines acquisition on Nov. 23, 2017. 2 Cost of sales includes mining and processing costs, royalties and amortization. 3 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 4 Excludes exploration 5 See mineral reserve and resource estimates and associated footnotes in appendix. • One of Canada’s highest grade & lowest cost gold mines • PEA expansion to drive production higher & costs lower • Significant upside potential reflecting inclusion of all mineral resources & ongoing exploration success • Significant exploration potential laterally & at depth 0 50 100km Marathon Wawa Hearst Timmins Iroquois Falls Smooth Rock Falls Eagle River, Wesdome Borden,Goldcorp Island Gold Magino, Argonaut Cote, IAMGOLD Black Fox, McEwen Timmins West, Tahoe Holloway, Kirkland Lake Porcupine,Goldcorp Bell Creek, Tahoe Young-Davidson Macassa, Kirkland Lake Holt, Kirkland Lake Lake Superior ONTARIO Hemlo, Barrick 144 101 17 17 11 101 Mine/ Project City Dome Mine, Goldcorp Hoyle Pond, Goldcorp Cochrane Pamour (PJV), Goldcorp Taylor, Kirkland Lake Detour Lake Mine, Detour Gold >25 Moz gold produced3 >35 Moz in defined reserves
  • 16. 16 90 94 125 $735 $881 $550 $0 $100 $200 $300 $400 $500 $600 $700 $800 $900 $1,00 0 50 100 150 200 250 300 350 2017E 2018E 2019E - 2024E Average Gold Production (k oz) AISC (US$/oz) $550 $700 $713 $715 $720 $730 $735 $775 $782 $787 $870 $980 $985 $1,050 $1,075 $1,113 $1,150 $1,200 IslandGoldPEA 2019-2024 Seabee LaRonde Musselwhite Meliadine CanadianMalartic IslandGold Young-Davidson Lapa Macassa RedLake Westwood Eleonore BellCreek DetourLake EagleRiver CasaBerardi BlackFox Island Gold – Growing Production, Declining Costs 2017E All-in Sustaining Costs (US$/oz) Mineral Reserve Grade (g/t Au) Source: Company filings Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. Note: AISC based on midpoint of 2017 guidance where available, otherwise 1H/17 metrics shown. Eagle River AISC shown is Wesdome consolidated. Bell Creek AISC shown consolidated with Timmins West. TMAC AISC excluded due to recent guidance revisions. Island Gold based on PEA. +39% PEA Expansion: Island Gold Operating Profile 20.8 14.6 9.2 9.2 8.8 8.4 8.3 7.7 7.3 6.4 6.1 4.6 4.5 4.3 4.3 4.2 3.6 2.7 1.1 1.0 Macassa Brucejack IslandGold EagleRiver Westwood Seabee RedLake HopeBay Meliadine Musselwhite Eleonore Lapa LaRonde CasaBerardi BlackFox BellCreek TimminsWest Young-Davidson CanadianMalartic DetourLake 39% expected production growth Significant upside potential >750 koz of Inferred resources not factored into mine plan + ongoing exploration potential -25% expected decrease in LOM AISC
  • 17. 17 67 564 1,037 1,003 768 996 154 111 233 219 72 91 172 141 144 184 562 752 4 5 6 7 8 9 10 - 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2011 2012 2013 2014 2015 2016 Island Gold – Mineral Reserve & Resource Growth Mineral Reserves and Resources Over Time (koz) Mineral Reserve grade Reserves M&I Resources Inferred Resources +309% Increase mineral reserves since 2014 Strong track record of mineral reserve & resource growth ~$35/oz Low 2016 discovery costs +30% Increase in 2016 year end inferred mineral resource; 20% increase in grade +44% Mineral reserve grade increase since 2014 Grade(g/tAu) ozAu 1,2 1 See mineral reserve and resource estimates and associated footnotes in appendix. 2 Includes Proven & Probable reserves of 752,000 oz (2.6 mt at 9.17 g/t Au), Measured & Indicated resources of 91,000 oz (0.5 mt at 5.94 g/t Au) & Inferred resources of 996,000 oz (3.0 mt at 10.18 g/t Au)
  • 18. 18 Island Gold – Significant Exploration Potential Gold Metal Factor (Grade x True Width) - C & E1E Zones as of March 31, 2017 Significant exploration potential laterally & at depth >750 k oz of Inferred mineral resources not included in PEA expansion plan
  • 19. 19 Island Gold – Ongoing Exploration Success Gold Metal Factor (Grade x True Width) - C & E1E Zones as of January 10, 2018 Delineation drilling within C-Zone 94.97 g/t Au over 3.83 m (840-529-24) 62.85 g/t Au over 4.72 m (840-529-13) 109.01 g/t Au over 2.55 m (840-524-23) 14.82 g/t Au over 10.03 m (860-509-10) Exploration drilling 13.32 g/t Au over 12.18 m (MH11, E1E Zone) 10.58 g/t Au over 5.44 m (740-465-63, C Zone) 23.71 g/t Au over 2.86 m (840-524-18, C Zone) 25.92 g/t Au over 6.80 m (340-587-02, G6 Zone) 22.28 g/t Au over 7.71 m (740-465-45, X Zone) Grades & average thickness increasing at depth Less than 15% of land package drilled 1 For further details, refer to press release dated Jan 11, 2018 “Alamos Reports Fourth Quarter 2017 Production and Provides 2018 Outlook” New highlight intercepts since July 20171
  • 20. 20 Mulatos – Our Founding Operation • Initial production 2005 • ~$400m of free cash flow1 generated to date • Declining cost profile; 5% NSR royalty nearing completion • Large underexplored land package (28,773 ha) Location: Sonora, Mexico Stage: Producing Ownership: 100% interest Operation: Open pit, heap leach & high grade mill 2016A Q4/17A 2017A 2017E 2018E Gold Production (k oz) 154.0 42.7 160.0 150-160 150-160 Cost of Sales1 (US$/oz) $1,088 - - $1,015 $950 Total Cash Costs2 (US$/oz) $838 - - $815 $800 Mine-site AISC2 (US$/oz) $916 - - $890 $900 Total Capital3 (US$m) $33 - - $33-40 $26-30 Mine-site FCF2,4 (US$m) $27 - - - - Gold Reserves & Resources5 Tonnes (000) Grade (g/t Au) oz Au (000) P&P Reserves 49,995 1.17 1,885 M&I Resources 76,084 1.14 2,798 Inferred Resources 10,280 0.98 325 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Capital spending guidance for 2017 and 2018 excludes capitalized exploration. 5 See mineral reserve and resource estimates and associated footnotes in appendix.
  • 21. 21 La Yaqui & Cerro Pelon Mulatos – District Exploration Potential 1 See mineral reserve and resource estimates and associated footnotes in appendix. 2 Includes Proven & Probable reserves of 608,000 oz (13.5 mt at 1.40 g/t Au), Measured & Indicated resources of 68,000 oz (1.1 mt at 1.91 g/t Au) & Inferred resources of 8,000 oz (0.2 mt at 1.39 g/t Au) for La Yaqui and Proven & Probable reserves of 170,000 oz (3.3 mt at 1.63 g/t Au), Measured & Indicated resources of 47,000 oz (0.6 mt at 2.56 g/t Au) & Inferred resources of 4,000 oz (0.1 mt at 1.23 g/t Au) for Cerro Pelon. District potential Large underexplored land package; >70% of past drilling focused near Mulatos mine Mulatos District Mulatos mine 220 259 778 47 115 236 0 100 200 300 400 500 600 700 800 900 1000 2014 2015 2016 Ounces(000Au) Proven & Probable Mineral Reserves Inferred Mineral Resources Measured & Indicated Mineral Resources 1,2 La Yaqui Phase I La Yaqui Grande 778k oz Combined mineral reserves1,2 at La Yaqui & Cerro Pelon, a 254% increase since 2014
  • 22. 22 El Chanate – Consistent Gold Producer • $3m site free cash flow2 generated Q3 2017 YTD • $1,270/oz minimum realized gold price in 2018 with production hedged5 • Significant free cash flow at end of mine life through residual leaching Location: Sonora, Mexico Stage: Producing Ownership: 100% interest Operation: Open pit, heap leach Gold Reserves & Resources4 Tonnes (000) Grade (g/t Au) oz Au (000) P&P Reserves – Open Pit 10,812 0.56 193 P&P Reserves – Leach Pad Inventory - - 100 M&I Resources 4,415 0.66 93 2016A Q4/17A 2017A 2017E 2018E Gold Production (k oz) 68.0 12.1 60.4 50-60 40-50 Cost of Sales1 (US$/oz) $1,177 - - $1,265 $1,270 Total Cash Costs2,3 (US$/oz) $1,052 - - $1,200 $1,200 Mine-site AISC2,3 (US$/oz) $1,069 - - $1,200 $1,200 Total Capital (US$m) $1 - - $2 - Mine-site FCF2 (US$m) $5 - - - - 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation. 4 See mineral reserve and resource estimates and associated footnotes in appendix. 5 El Chanate’s 2017 and 2018 production has been hedged through gold collar contracts which ensure a minimum gold price of $1,270 per ounce and participation up to $1,444 per ounce in 2018.
  • 23. 23 Development – Peer Leading Growth Profile Low cost, low capital intensity growth Capacity to double current rate of production 6 development projects
  • 24. 24 Development: Kirazlı, Ağı Dağı & Çamyurt Location: Turkey Stage: Development Ownership: 100% interest Operation: Open pit, heap leach • Kirazlı & Ağı Dağı EIAs approved • Kirazlı Forestry Permits granted January 2017 • Kirazlı & Ağı Dağı feasibility studies completed February 20171 outlining 185% increase in combined after-tax NPV8% • Tax incentives & mining law supportive of industry Kirazlı2 Tonnes Grade Contained Ounces (000) (g/t Au) (g/t Ag) (000 Au) (000 Ag) Proven & Probable 26,104 0.79 12.01 665 10,078 Measured & Indicated 5,966 0.43 2.18 82 418 Inferred 5,689 0.59 8.96 108 1,638 Ağı Dağı2 Proven & Probable 54,361 0.67 5.41 1,166 9,459 Measured & Indicated 34,887 0.46 2.18 518 2,445 Inferred 16,760 0.46 2.85 245 1,534 Çamyurt2 Measured & Indicated 17,721 0.89 6.14 508 3,497 Inferred 2,791 0.95 5.77 85 518 1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi feasibility studies & Camyurt preliminary economic assessment. The 185% increase is compared to the 2012 pre-feasibility study 2 See mineral reserve and resource estimates and associated footnotes in appendix
  • 25. 25 Development: Kirazlı, Ağı Dağı & Çamyurt Economic Studies After-taxNPV8%(US$m) $82m $187m $88m $298m $86m $0 $100 $200 $300 $400 $500 $600 2012 2017 Kirazlı Ağı Dağı Çamyurt +236% 1 Please refer to press releases dated Feb 15 and Feb 22, 2017 regarding Kirazli & Agi Dagi Feasibility studies & Camyurt PEA. After-tax NPV8% in 2012 prefeasibility study and after-tax NPV8% and IRR in 2017 feasibility studies and PEA assume gold and silver prices of $1,250 and $16 per ounce, respectively 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures 11 2017 Positive Economic Studies1 Kirazlı Feasibility Study Ağı Dağı Feasibility Study Çamyurt PEA Mine Life Years 5 6 4 Average Annual Production oz Au 104,000 177,600 93,200 oz Ag 617,300 444,200 403,000 Average grade g/t Au 0.79 0.67 0.92 Mine-site AISC2 US$m $373 $411 $645 Initial Capex US$m $152 $250 $10 Total Capex US$m $180 $313 $26 After-tax NPV5% US$m $223 $360 $111 After-tax NPV8% US$m $187 $298 $86 After-tax IRR % 44% 39% 253% Gold Price Assumption US$/oz $1,250 $1,250 $1,250 >39% After-tax IRR for each of Kirazlı, Ağı Dağı & Çamyurt1 Low cost, high return growth
  • 26. 26 Quartz Mountain Location: Oregon, United States Ownership: Right to earn a 100% interest4 Stage: Advanced Exploration Esperanza Location: Morelos State, Mexico Ownership: 100% interest Stage: Development Operation: Open pit, heap leach Development: Lynn Lake, Esperanza & Quartz Mountain 1 Lynn Lake December 2017 feasibility study based on gold and silver price assumptions of $1250 and $16 per ounce, respectively. See press release dated December 14, 2017 for more details. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Historic column recovery tests for gold at Quartz Mountain varied between 74% and 88% for the felsic rock hosted mineralization; see Orsa Ventures press release dated February 12, 2013 4 See mineral reserve and resource estimates and associated footnotes in appendix. 5 Additional C$3m due on completion of feasibility study & C$15m or 2% NSR upon successful permitting Lynn Lake Location: Manitoba, Canada Ownership: 100% interest Stage: Permitting Operation: Open pit Tonnes Grade Oz Au (000) (g/t Au) (g/t Ag) (000 Au) (000 Ag) M&IResources4 34,352 0.98 8.09 1,083 8,936 Inf. Resources 718 0.80 15.04 18 347 Tonnes Grade Oz Au (000) (g/t Au) (000 Au) M&IResources4 12,156 0.87 339 Inferred Resources 39,205 0.91 1,147 • Excellent infrastructure; low technical risk • Low capital intensity & operating costs • Average annual production potential > 100k oz • AISC expected to be lowest quartile2 • Located on northern extension of prolific Basin & Range Province of Nevada • Low strip ratio, favourable metallurgy3 • Acquisition cost $3.5m5 • High grade, open pit with significant exploration potential • Existing infrastructure in place • Low cost hydroelectric power • Feasibility study results announced Dec 20171 • Average production: 143 koz (Years 1-10) • LOM Mine-site AISC2 : $745 • After-tax NPV5%: $123m; IRR: 13% Tonnes Grade Oz Au (000) (g/t Au) (g/t Ag) (000 Au) (000 Ag) P&P Reserves4 26,800 1.89 2.99 1,625 2,578 M&I Resources4 6,815 1.49 4.77 327 667 Inf. Resources 45,812 1.11 2.80 1,629 67
  • 27. 27 Alamos – Investment Case Catalysts Diversified intermediate gold producer Low-cost growth profile Strong balance sheet to support growth Long term track record of delivering shareholder value  Q1 2017: Received Forestry Permits for Kirazlı project  Q1 2017: Positive Kirazlı & Ağı Dağı feasibility studies & Çamyurt PEA  Q1 2017: 31% increase in combined mineral reserves  Q3 2017: Initial production at La Yaqui  Q4 2017: Closing of Richmont acquisition  Q4 2017: Met consolidated 2017 production guidance 2018: Ongoing exploration at Island Gold and Mulatos 2018: Receipt of GSM permit for Kirazlı H2 2018: Completion of Phase I Expansion at Island Gold
  • 29. 29 Board of Directors and Executive and Management Team Board of Directors Executive and Management Team Paul J. Murphy John A. McCluskey Mark J. Daniel Patrick D. Downey David Fleck David Gower Claire M. C. Kennedy Ronald E. Smith Kenneth Stowe Chairman Director Director Director Director Director Director Director Director John A. McCluskey Jamie Porter Peter MacPhail Christine Barwell Chris Bostwick Luis Chavez President and CEO Chief Financial Officer Chief Operating Officer VP, Human Resources VP, Technical Services Senior VP, Mexico Andrew Cormier Nils Engelstad Greg Fisher Aoife McGrath Scott Parsons Colin Webster VP, Development & Construction VP, General Counsel VP, Finance VP, Exploration VP, Investor Relations VP Sustainability & External Affairs
  • 30. 30 Sustainability • Our Objectives • As we pursue further growth, we will continue to measure our success as an organization by our performance in achievement of our sustainability objectives: • Protecting the health and well-being of our employees • Creating shared value with our host communities and countries • Ensuring that our operations are net-positive for the environment • Over the years, Alamos has been recognized for its achievements in these areas: Clean Industry Certification from PROFEPA • Alamos was certified as an Industria Limpia (clean industry) in recognition of the excellence of environmental management at Mulatos CSR Award from Mexican Center for Philanthropy (CEMEFI) • Signifies exceptional record of CSR performance; • 2016 marked the 8th consecutive year for Alamos
  • 31. 31 2018 Guidance – Alamos 2018 Guidance 2017 Guidance Young- Davidson Island Gold Mulatos El Chanate Total Total Gold production (000’s ounces) 200-210 90-100 150-160 40-50 480-520 429 (actual) Cost of Sales (in millions)(4) $220 $112 $147 $57 $536 $442 Cost of Sales ($ per ounce)(4) $1,075 $1,175 $950 $1,270 $1,075 $1,065 Total cash costs ($ per ounce) (1) $675 $575 $800 $1,200 $740 $765 All-in sustaining costs ($ per ounce) (1) $950 $940 Mine-site all-in sustaining costs ($ per ounce)(1),(3) $850 $825 $900 $1,200 - - Capital expenditures (in millions) Sustaining capital(1) $35-40 $25-27 $8-10 - $68-77 $40-47 Growth capital(1) $35-40 $25-28(2) $18-20(2) - $78-88 $65-75 Total capital(1) $70-80 $50-55 $26-30 - $146-165 $105-122 Corporate & Administrative (in millions) $18 $16 1. Refer to the “Cautionary non-GAAP Measures and Additional GAAP Measures” disclosure. 2. Excludes capitalized exploration. 3. For the purposes of calculating mine-site all-in sustaining costs at individual mine sites, the Company does not include an allocation of corporate and administrative and share based compensation expenses to the mine sites. 4. Cost of sales includes mining and processing costs, royalties, and amortization expense 2018 Guidance 2017 Guidance Sustaining Capital Growth Capital Total Total Development Projects (in millions) Turkey - $100 $100 $4 Lynn Lake - $8 $8 $9 La Yaqui Grande & Cerro Pelon - $13 $13 - Esperanza & Quartz Mountain - $2 $2 $3 Total – Development Projects - $123 $123 $16 Capitalized Exploration (in millions) Island Gold - $12 $12 - Mulatos - $7 $7 $15 Lynn Lake - $4 $4 $4 Total – Capitalized Exploration - $23 $23 $19 Total Consolidated Budget $68-77 $224-234 $292-311 $140-157
  • 32. 32 Young-Davidson – Increasing Grade & Productivity 1 Cost of sales includes mining and processing costs, royalties and amortization. 2 Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. 3 Excludes Net Realizable Value (“NRV”) inventory adjustments. See associated MD&A for a full reconciliation. 4 Excludes hydro rebate not attributable to Q4/15 Underground ramp up driving production higher and unit costs lower Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Q4/17 Gold ounces produced 35,104 40,166 40,538 40,945 38,098 39,365 38,201 44,694 39,065 42,644 43,629 44,662 40,400 47,300 55,800 56,500 Cost of sales1 (US$/oz) $1,677 $1,625 $1,370 $1,211 $1,216 $1,298 $1,165 $986 $1,058 $1,182 $1,032 $1,077 $1,148 $1,113 $966 - Total cash costs per oz. (2,3) $1,009 $871 $723 $719 $745 $697 $681 $617 $616 $738 $607 $667 $710 $677 $572 - Mine-site AISC per oz.(2,3) $1,315 $1,144 $959 $912 $987 $1,008 $979 $980 $846 $965 $849 $926 $851 $895 $ 744 - Underground mine Tonnes mined per day 2,611 3,595 3,753 4,140 4,130 5,149 5,081 5,911 5,776 6,123 5,467 6,675 6,400 6,377 6,544 Grades (g/t) 2.8 3.3 3.1 3.0 3.0 2.6 2.6 2.6 2.6 2.4 2.8 2.4 2.6 2.6 2.9 - Development metres 3,772 3,545 3,269 3,438 3,409 3,789 3,619 3,769 3,490 3,168 2,677 3,044 3,242 3,425 3,344 - Unit UG mining costs (US$) $46 $45 $41 $39 $39 $33 $32 $294 $31 $34 $34 $32 $36 $33 $34 - Unit UG mining costs (CAD$) $51 $49 $45 $44 $48 $41 $41 $384 $42 $44 $45 $42 $47 $44 $43 - Mill processing facility Tonnes processed per day 7,163 8,230 7,670 7,757 7,186 7,677 7,680 7,630 7,342 7,006 6,833 7,552 7,718 6,917 7,553 Grades (inc. OP stockpile) 1.8 2.2 1.9 2.0 2.0 2.0 1.9 2.2 2.1 2.1 2.4 2.2 2.2 2.5 2.7 - Recoveries (%) 87% 88% 90% 88% 86% 88% 92% 91% 90% 92% 93% 90% 89% 92% 93% - $20 $25 $30 $35 $40 $45 $50 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q1/14 Q2/14 Q3/14 Q4/14 Q1/15 Q2/15 Q3/15 Q4/15 Q1/16 Q2/16 Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Underground tonnes mined per day Unit UG mining costs (US$/t) UndergroundTPD UnitUGminingcosts(US$/t)
  • 33. 33 2016 2017 2018 2019 2020  Commissioning of MCM shaft  Transition to 100% owner development  Ramp up to 7,000 tpd  Raise boring of lower NG shaft  Completion of MCM waste pass • Shaft bottom infrastructure • Northgate shaft – changeover to shaft bottom • Northgate shaft hoisting from 8900L Young-Davidson – Development Schedule Please refer to Cautionary Notes on non-GAAP Measures and Additional GAAP Measures. Declining capital intensity
  • 34. 34 Young-Davidson – Long Section Declining capital intensity Higher underground mining rates – stronger production Strong free cash flow growth Development of lower mine infrastructure to support: Productivity improvements – lower costs
  • 35. 35 Island Gold – 2017 Drilling Program Significant Exploration Potential at Depth and to the East
  • 36. 36 Island Gold – Regional Exploration
  • 38. 38 Kirazlı, Ağı Dağı & Çamyurt Economic Studies – 2017 Feasibility Study - 2017 Preliminary Economic Assessment - 2017 Kirazlı Ağı Dağı Çamyurt Production Mine life (years) 5 6 4 Total gold production (ounces) 540,000 937,300 373,200 Total silver production (ounces) 3,141,000 2,365,200 1,612,600 Average annual production (ounces)1 Gold 104,000 177,600 93,200 Silver 617,300 444,200 403,000 Total ore mined (tonnes) 26,100,000 54,361,000 16,580,000 Total waste mined (tonnes) 37,900,000 55,893,000 30,874,000 Total material mined (tonnes) 64,000,000 110,254,000 47,454,000 Waste-to-ore ratio2 1.45 1.03 1.86 Average grade (grams per tonne) Gold 0.79 0.67 0.92 Silver 12.0 5.4 6.3 Recovery (%) Gold 81% 80% 76% Silver 31% 25% 48% Average throughput (tpd) 15,000 30,000 15,000 Operating Costs Total cost per tonne of ore3 $8.49 $6.46 $14.03 Total cash cost (per ounce sold)4 $339 $374 $604 Mine-site all-in sustaining cost (per ounce sold)4 $373 $411 $645 Capital Costs (millions) Pre-production capital expenditure $151.9 $250.3 $10.2 Sustaining capital expenditure $18.1 $33.9 $9.4 Reclamation costs (net of salvage value) $9.9 $28.8 $5.9 Total capital expenditure $179.8 $312.9 $25.5 Economic Analysis IRR (after-tax) 44.3% 38.7% 253.0% NPV @ 0% discount rate (after-tax, millions) $299.3 $492.8 $173.8 NPV @ 5% discount rate (after-tax millions) $222.9 $360.2 $111.4 NPV @ 8% discount rate (after-tax, millions) $186.5 $297.6 $86.2 Gold price assumption (average, per ounce sold) $1,250 $1,250 $1,250 Silver price assumption (average, per ounce sold) $16.00 $16.00 $16.00 Exchange Rate (Turkish Lira/US Dollar) 2.90:1 2.90:1 2.90:1 1 Average annual production is based on five full years of production for Kirazlı and Ağı Dağı and excludes pre-commercial production 2 Reported waste-to-ore ratio is over the life of mine. The waste-to-ore ratio during commercial production is 0.70:1 for Ağı Dağı and 1.19:1 for Kirazlı in the 2017 feasibility study 3 Total unit cost per tonne of ore excludes silver as a by-product credit 4 Total cash costs and mine-site all-in sustaining costs include silver as a by-product credit
  • 39. 39 Lynn Lake Feasibility Study – 2017 Feasibility Study Highlights - December 2017 Production Mine life (years) 10.4 Total gold production (000 ounces) 1,495 Total silver production (000 ounces) 1,263 Average annual gold production1 Years 1 to 6 (000 ounces) 170 Years 1 to 10 (000 ounces) 143 Total ore mined (000 tonnes) 26,803 Total waste mined (000 tonnes) 195,188 Total material mined (000 tonnes) 221,991 Waste-to-ore ratio2 7.28 Average grade (grams per tonne) Gold 1.89 Silver 2.99 Recovery (%) Gold (Average MacLellan and Gordon) 92% Silver (MacLellan only) 49% Average mill throughput (tonnes per day (“tpd”)) 7,000 Operating Costs Total cost per tonne of ore3 $36.06 Total cash cost (per ounce sold)4 $645 Mine-site all-in sustaining cost (per ounce sold)4 $745 Capital Costs (millions) Pre-production capital expenditure $338.0 Sustaining capital expenditure $126.6 Reclamation costs $21.1 Total capital expenditure $485.6 Base Case Economic Analysis IRR (after-tax) 12.5% NPV @ 0% discount rate (millions, after-tax) $279.0 NPV @ 5% discount rate (millions, after-tax) $123.4 Gold price assumption (average, per ounce sold) $1,250 Silver price assumption (average, per ounce sold) $16.00 Exchange Rate (US Dollar/Canadian Dollar) 0.75 1. Average annual production excludes pre-commercial production 2. Reported waste-to-ore ratio is over the life of mine and includes overburden as waste. The waste-to-ore ratio during commercial production is 7.06:1 3. Total unit cost per tonne (“t”) of ore includes royalties and silver as a by-product credit 4. Total cash costs and mine-site all-in sustaining costs include royalties and silver as a by-product credit
  • 40. 40 2016 Proven and Probable Mineral Reserves PROVEN AND PROBABLE GOLD RESERVES (as at December 31, 2016) Proven Reserves Probable Reserves Total Proven and Probable Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) Young-Davidson - Surface 1,165 0.91 34 0 0.00 0 1,165 0.91 34 Young-Davidson - Underground 14,851 2.80 1,336 27,203 2.65 2,317 42,054 2.70 3,653 Total Young-Davidson 16,016 2.66 1,370 27,203 2.65 2,317 43,220 2.65 3,687 Island Gold 573 8.68 160 1,978 9.31 592 2,551 9.17 752 Mulatos Main Pits 4,173 1.02 137 21,847 0.87 613 26,020 0.90 750 San Carlos Underground 72 13.06 30 34 8.64 9 106 11.65 40 Stockpiles 7,129 1.38 317 0 0.00 0 7,129 1.38 317 La Yaqui 470 1.48 22 1,469 1.37 65 1,939 1.40 87 La Yaqui Grande 0 0.00 0 11,548 1.40 521 11,548 1.40 521 Cerro Pelon 960 1.70 53 2,293 1.59 117 3,253 1.63 170 Total Mulatos 12,804 1.36 559 37,191 1.11 1,325 49,995 1.17 1,885 El Chanate - Open Pit 7,008 0.51 114 3,804 0.65 79 10,812 0.56 193 El Chanate - Leach Pad Inv. 100 100 Total El Chanate 7,008 0.95 214 3,804 0.65 79 10,812 0.84 293 MacLellan 9,550 1.91 586 8,530 1.32 361 18,080 1.63 947 Gordon 2,310 2.82 210 6,410 2.27 468 8,720 2.42 678 Total Lynn Lake 11,860 2.09 796 14,940 1.73 829 26,800 1.89 1,625 Agi Dagi 1,450 0.76 36 52,911 0.66 1,130 54,361 0.67 1,166 Kirazli 700 1.25 28 25,404 0.78 637 26,104 0.79 665 Total Turkey 2,150 0.93 64 78,315 0.70 1,767 80,465 0.71 1,831 Alamos - Total 50,412 1.95 3,163 163,431 1.32 6,910 213,843 1.47 10,073 PROVEN AND PROBABLE SILVER MINERAL RESERVES (as at December 31, 2016) Proven Reserves Probable Reserves Total Proven and Probable Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) La Yaqui 470 7.40 112 1,469 7.19 340 1,939 7.25 452 La Yaqui Grande 0 0.00 0 11,548 19.94 7,403 11,548 19.94 7,403 MacLellan (Lynn Lake) 9,550 5.01 1,539 8,530 3.79 1,039 18,080 4.43 2,578 Ağı Dağı 1,450 6.22 290 52,911 5.39 9,169 54,361 5.41 9,459 Kirazli 700 15.90 358 25,404 11.90 9,720 26,104 12.01 10,078 Alamos - Total 12,170 5.88 2,299 99,862 8.62 27,671 112,032 8.32 29,970
  • 41. 41 2016 Total Measured and Indicated Mineral Resources MEASURED AND INDICATED GOLD MINERAL RESOURCES (as at December 31, 2016) Measured Resources Indicated Resources Total Measured and Indicated Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) (000's) (g/t Au) (000's) Young-Davidson - Surface 496 1.13 18 1,242 1.28 51 1,739 1.24 69 Young-Davidson - Underground 5,876 3.33 629 4,916 3.47 548 10,792 3.39 1,177 Total Young-Davidson 6,373 3.16 647 6,158 3.03 599 12,531 3.09 1,246 Island Gold 34 4.94 5 446 6.01 86 479 5.94 91 Mulatos 8,270 1.24 330 64,221 1.08 2,224 72,491 1.10 2,554 San Carlos UG 196 6.11 39 362 4.70 55 558 5.20 93 La Yaqui 0 - 0 1,108 1.91 68 1,108 1.91 68 Cerro Pelon 117 2.75 10 455 2.52 37 572 2.56 47 Carricito 58 0.82 2 1,297 0.82 34 1,355 0.83 36 Total Mulatos 8,641 1.37 381 67,443 1.12 2,418 76,084 1.14 2,798 El Chanate 1,092 0.55 19 3,323 0.69 74 4,415 0.66 93 MacLellan 2,110 1.86 126 2,240 1.24 89 4,350 1.57 215 Gordon 10 1.72 0 450 1.96 28 460 1.96 29 Burnt Timber 0 - 0 1,021 1.40 46 1,021 1.40 46 Linkwood 0 - 0 984 1.16 37 984 1.17 37 Total Lynn Lake 2,120 1.86 126 4,695 1.32 200 6,815 1.49 327 Esperanza 19,226 1.01 622 15,126 0.95 462 34,352 0.98 1,083 Ağı Dağı 553 0.44 8 34,334 0.46 510 34,887 0.46 518 Kirazli 118 0.50 2 5,848 0.43 80 5,966 0.43 82 Çamyurt 513 1.00 16 17,208 0.89 492 17,721 0.89 508 Total Turkey 1,184 0.68 26 57,390 0.59 1,082 58,574 0.59 1,108 Quartz Mountain 214 0.95 7 11,942 0.87 333 12,156 0.87 339 Alamos - Total 38,883 1.47 1,833 166,523 0.98 5,253 205,406 1.07 7,087 MEASURED AND INDICATED SILVER MINERAL RESOURCES (as at December 31, 2016) Measured Resources Indicated Resources Total Measured and Indicated Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) (000's) (g/t Ag) (000's) La Yaqui Grande 0 0.00 0 1,108 15 523 1,108 15 523 Esperanza 19,226 7.25 4,482 15,126 9.16 4,455 34,352 8.09 8,936 MacLellan (Lynn Lake) 2,110 5.34 362 2,240 4.24 305 4,350 4.77 667 Ağı Dağı 553 1.59 28 34,334 2.19 2,417 34,887 2.18 2,445 Kirazli 118 2.73 10 5,848 2.17 408 5,966 2.18 418 Çamyurt 513 5.63 93 17,208 6.15 3,404 17,721 6.14 3,497 Alamos - Total 22,520 6.87 4,975 75,864 4.72 11,512 98,384 5.21 16,486
  • 42. 42 2016 Total Inferred Mineral Resources INFERRED GOLD MINERAL RESOURCES (as at December 31, 2016) Tonnes Grade Ounces (000's) (g/t Au) (000's) Young-Davidson - Surface 31 0.99 1 Young-Davidson - Underground 3,524 2.76 313 Total Young-Davidson 3,555 2.75 314 Island Gold 3,042 10.18 996 Mulatos 8,935 0.92 265 San Carlos UG 162 4.93 26 La Yaqui 174 1.39 8 Cerro Pelon 109 1.23 4 Carricito 900 0.74 22 Total Mulatos 10,280 0.98 325 El Chanate 112 0.71 3 MacLellan 750 1.62 39 Gordon 620 1.30 26 Burnt Timber 23,438 1.04 781 Linkwood 21,004 1.16 783 Total Lynn Lake 45,812 1.11 1,629 Esperanza 718 0.80 18 Ağı Dağı 16,760 0.46 245 Kirazli 5,689 0.59 108 Çamyurt 2,791 0.95 85 Total Turkey 25,240 0.54 438 Quartz Mountain 39,205 0.91 1,147 Alamos - Total 127,965 1.18 4,869 INFERRED SILVER MINERAL RESOURCES (as at December 31, 2016) Tonnes Grade Ounces (000's) (g/t Ag) (000's) La Yaqui Grande 174 5.55 31 Esperanza 718 15.04 347 MacLellan 750 2.80 67 Ağı Dağı 16,760 2.85 1,534 Kirazli 5,689 8.96 1,638 Çamyurt 2,791 5.77 518 Alamos - Total 26,882 4.78 4,135
  • 43. 43 Notes to Mineral Reserve and Resource Estimates Mineral Resources Jeffrey Volk, CPG, FAusIMM Director - Reserves and Resource, Alamos Gold Inc. Young-Davidson, El Chanate, San Carlos U/G, Lynn Lake Marc Jutras, P.Eng Principal, Ginto Consulting Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Carricito, Esperanza, Ağı Dağı, Kirazlı, Çamyurt, Quartz Mountain Raynald Vincent P.Eng. M.P.M. Chief Geologist, Island Gold Island Gold Mineral Reserves Chris Bostwick, FAusIMM VP Technical Services, Alamos Gold Inc. Young-Davidson, El Chanate, San Carlos Underground, Lynn Lake Herb Welhener, SME-QP VP, Independent Mining Consultants Inc. Mulatos Pits, Cerro Pelon, La Yaqui, Ağı Dağı, Kirazlı Léon Grondin Leblanc, P.Eng. Chief Engineer, Island Gold Island Gold Resources Reserves Gold Price Cutoff Gold Price Cutoff Met Recovery Mulatos: Mulatos Main Open Pit $1,400 0.5 $1,250 see notes >50% San Carlos Underground $1,400 2.5 $1,250 3.27 70% Cerro Pelon $1,400 0.5 $1,250 see notes 75% La Yaqui $1,400 0.5 $1,250 see notes 75% Carricito $1,400 0.3 n/a n/a >50% Young-Davidson - Surface $1,400 0.5 $1,250 0.5 91% Young-Davidson - Underground $1,400 1.3 $1,250 1.9 91% Island Gold CAD $1,500 4.5 CAD 1,500 4.0-4.3 96.5% El Chanate $1,400 0.15 $1,250 0.15 30-65% Lynn Lake (MacLellan) $1,400 0.42 $1,250 0.47 91-92% Lynn Lake (Gordon) $1400 0.62 $1,200 0.69 89-94% Lynn Lake (Burnt Timber and Linkwood) $1,555 0.4 n/a n/a 89-92% Esperanza $1,400 0.4 n/a n/a 60-72% Ağı Dağı $1,400 0.2 $1,250 see notes 80% Kirazlı $1,400 0.2 $1,250 see notes 81% Çamyurt $1,400 0.2 n/a n/a 78% Quartz Mountain $1,400 0.21 Oxide, 0.6 Sulfide n/a n/a 65-80% Qualified Persons: Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this presentation. Chris Bostwick is a Qualified Person within the meaning of Canadian Securities Administrator’s National Instrument 43-101 (“NI 43-101”). The Qualified Persons for the National Instrument 43- 101 compliant mineral reserve and resource estimates are detailed in the following table. Notes to Mineral Reserve and Resource Tables: • The Company’s Mineral Reserves and Mineral Resource as at December 31, 2016 are classified in accordance with the Canadian Institute of Mining Metallurgy and Petroleum’s “CIM Standards on Mineral Resources and Reserves, Definition and Guidelines” as per Canadian Securities Administrator’s NI 43-101 requirements. • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. • Mineral Resources are exclusive of Mineral Reserves. • Mineral Reserve cut-off grade for the Mulatos Mine, the Cerro Pelon Pit, the La Yaqui Pit, the Kirazlı Pit and the Ağı Dağı Pit are determined as a net of process value of $0.10 per tonne for each model block • All Measured, Indicated and Inferred Mineral Resources are pit constrained with the exception of those outside the Mulatos Main Pits on the Mulatos property which have no economic restrictions and are tabulated by gold cut-off grade.
  • 44. 44 Scott K. Parsons, CFA VP, Investor Relations 416.368.9932 x 5439 sparsons@alamosgold.com