PELATIHAN & SERTIFIKASI
MANAJEMEN PROYEK
(Project Management Workshop & Certification )
IAMPI-PS 1
IAMPI
Ikatan Ahli Manajemen Proyek Indonesia
(Indonesian Society of Project Management Professionals)
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK
MENGENAL
PROJECT MANAGEMENT STANDARD
2
IAMPI-PS
3
STANDARD & KNOWLEDGE
ICB IPMA
Competence Baseline
Version 3.0
IPMA APM PMI
Project Management Body
of Knowledge
Fourth Edition
Project Management Body
of Knowledge
Fourth Edition 2008
IAMPI-PS
4
ICB IPMA
Competence Baseline
Version 3.0
IPMA STANDARD & KNOWLEDGE
IAMPI-PS
5
Project Management Body
of Knowledge
Fourth Edition
APM STANDARD & KNOWLEDGE
IAMPI-PS
6
PMI STANDARD & KNOWLEDGE
Project Management
Body of Knowledge
PMBOK ®
Guide
PMBOK p. 13
PROGRAM
MANAGEMENT
PORTFOLIO
MANAGEMENT
OTHER
STANDARDS
IAMPI-PS
7
MATRIX OF KNOWLEDGE & DELIVERY
STANDARD
KNOWLEDGE DELIVERY
NON CONSTRUCTION
CONSTRUCTION
PMBOK ®
Project Scope Management
Project Time Management
Project Cost Management
Project Quality Management
Project Human Resource Management
Project Communication Management
Project Risk Management
Project Procurement Management
Project Integration Management
TRADISIONAL
DESIGN
&
BUILD
TURNKEY
BOT/BOOT
AT
RISK
IAMPI-PS
EPCI
8
STANDARD, KNOWLEDGE & STAKEHOLDER
IN CONSTRUCTION
STANDARD &
KNOWLEDGE
OWNER/CLIENT
/USER
CONTRACTOR
CONSULTANT
IAMPI-PS
9
IAMPI-PS
PENERAPAN
PROJECT MANAGEMENT &
PHILOSOPHY
10
PHILOSOPHY
OWNER
CONSULTANT CONTRACTOR
Need Project
Management
Need Project
Management
Need Project
Management
IAMPI-PS
Construction Management
PROJECT MANAGEMENT
IN CONSTRUCTION PHILOSOPHY
Project Management O & M + D
PROC
FS OPERATIONAL
Option
PHASES
CM Supervision (Indonesia, decre
18-1999)
CM Professionals & EPC
(Indonesia/Private)
CM option
CMAA
CONSTRUCTION
consultant
Construction
Design consultant
& QS
LKPP
Commitee Supervision Consultant
Const Contractor
Building
Management/Operator
ENG
11
PP no. 4 tahun 2010
Pito Sumarno
12
CONSTRUCTION PHASES IN EPC
Pre-FEED
FEED
Front-End
Engineering
Design
EPCI
Detailed
Engineering,
Procurement
Construction,
Installation
OPERASI
Appraisal
Pito Sumarno
Client Agency
Project
Manager
Design Manager Construction
Manager
Project
Architect
Project
Mech.Eng
Project
Str.Eng
Project
Elect.Eng
Project
Civil Eng
General
Contractor
Sub-
Contractor
Sub-
Contractor
QC.
Inspection
Const.
Surveys
Resident Project
Representative
A/E Design staff
A/E Const.
Staff Surveyors
Labor Force
Project
Management
Level
Construction
Management
Level
Functional
Management
Level
Staff
Level
FUNCTIONAL RELATIONSHIPS under a
DESIGN/CONSTRUCTION MANAGER
CONTRACT
Edward R.Fisk, Construction Project Administration, Seventh Edition, p. 13 Organization Chart
13
IAMPI-PS
Client Agency
Owner
Project Manager
Consultan
Perencana PM
Consultan CM
(PM)
Project
Design Team
Architect/ Str
Eng/ Civil
Eng/ Elect
Eng/ Mech
Eng
General
Contractor
PM
Site Office
Eng/ QS
Field &
Support
A/E Design staff
A/E Const.
Staff Surveyors
Labor Force
Project
Management
Level
Construction
Management
Level
Functional
Management
Level
Staff
Level
FUNCTIONAL RELATIONSHIPS under a
PRIME CONTRACTOR and
CONSULTANT/ CM PROF.
Pito, Construction Project Administration, modified
Operation
Manager
Engineering
Manager
Consultan QS
Project QA Team
Architect/ Str
Eng/ Civil Eng/
Elect Eng/ Mech
Eng
Commercial
Manager
Sub Cont &
NSC
Admin
14
IAMPI-PS
Client Agency
Owner
Project Manager
Consultan
Perencana PM
Consultan CM
(PM)
Project
Design Team
Architect/ Str
Eng/ Civil
Eng/ Elect
Eng/ Mech
Eng
Contractor
I
(PM)
A/E Design staff
A/E Const.
Staff Surveyors
Labor Force
Project
Management
Level
Construction
Management
Level
Functional
Management
Level
Staff
Level
FUNCTIONAL RELATIONSHIPS under a
CONTRACTOR and CONSULTANT/ CM
PROF.
Pito, Construction Project Administration, modified
Site Process
Consultan QS
Project QA Team
Architect/ Str
Eng/ Civil Eng/
Elect Eng/ Mech
Eng
Contractor
II
(PM)
Contractor
III
(PM)
15
IAMPI-PS
Client Agency
Owner
Project Manager
Consultan
Perencana PM
Consultan
Supervisi
Project Design
Team Architect/
Str Eng/ Civil
Eng/ Elect Eng/
Mech Eng
General
Contractor
PM
Site Office
Eng/ QS
Field &
Support
A/E Design staff
A/E Const.
Staff Surveyors
Labor Force
Project
Management
Level
Construction
Management
Level
Functional
Management
Level
Staff
Level
FUNCTIONAL RELATIONSHIPS under a
PRIME CONTRACTOR and
CONSULTANT SUPERVISION
Pito, Construction Project Administration, modified Organization Chart
Operation
Manager
Eng Manager Project SPV
Team
Monitoring/
Controlling/
Reporting
Commercial
Manager
Admin Sub Cont NSC
16
IAMPI-PS
Client Agency
Project
Manager
Design Manager Construction
Manager
Project
Architect
Project
Mech.Eng
Project
Str.Eng
Project
Elect.Eng
Project
Civil Eng
General
Contractor
Sub-
Contractor
Sub-
Contractor
QC.
Inspection
Const.
Surveys
Resident Project
Representative
A/E Design staff
A/E Const.
Staff Surveyors
Labor Force
Staff
Level
Edward R.Fisk, Construction Project Administration, Seventh Edition, p. 13 Organization Chart
PM
PM
PM/CM
PM/CM+
Associte
PM/CM+
Associate
PM/CM+
Associate
CM Pract.
Kompetensi yang harus
dikuasai
17
IAMPI-PS
SIKLUS KEHIDUPAN (LIFE CYCLE)
TELUR ULAT
KEPOMPONG
KUPU-KUPU
 Mengalami Perubahan Bentuk
 Membutuhkan Waktu
 Membutuhkan Sumber Daya (resources)
Budhy Manan IAMPI 18
IAMPI-PS
19
INITIAL INTERMEDIATE FINAL
Charter
Scope Statement
Plan
Baseline
Progress
Acceptance
Approval
Handover
Product
Idea
Project Management Team
Inputs
Phases
Project
Management
Outputs
Project
Deliverable
Typical Sequence of Phases in a Project Life
Cycle
PMBOK p. 23
IAMPI-PS
20
INITIAL INTERMEDIATE FINAL
Product
Life Cycle
Product
Operation
Divestment
IDEA
Business
Plan
Upgrade
Project
Life Cycle
Relationship Between the Product & the
Project Life cycles
PMBOK p. 24
IAMPI-PS
A temporary endeavor undertaken to create a unique
product, service, or result.
(Usaha sementara dilaksanakan untuk menciptakan suatu
produk, jasa atau hasil yang unik ).
– Temporary
every project has a definite beginning and a definite end.
(Mempunyai tanggal start dan finish yang pasti)
APAKAH PROYEK ITU ?
PMBOK p. 5 21
IAMPI-PS
– Setiap Project menciptakan :
– Unique product, Services, or Results
the product or service is different in some distinguishing way
from all similar products or services.
 Sesuatu yang Unique dan kejadiannya hanya sekali,
 Mempunyai tujuan khusus, dan diselesaikan didalam spesifikasi
yang pasti, dikerjakan oleh manusia.
 Dibatasi oleh anggaran dan sumberdaya yang terbatas,
 Hal yang dapat diurai dengan jelas dan dapat dilaksanakan,
 Hasil deliverablenya terukur dan dapat dikuantifikasi.
 Dapat direncanakan, dilaksanakan, dikendalikan
PMBOK p. 5 22
IAMPI-PS
CONTOH-CONTOH P R O Y E K
Membangun jembatan SURAMADU.
Membangun Pabrik pengolahan sampah.
Menyusun dan mengimplementasi ‘information system
baru untuk bank.
Mencari penangkal obat untuk SARS.
Melakukan ‘turn around’ (pemeliharaan) kilang minyak.
Melaksanakan pemilihan umum.
Membuat prototipe kendaraan hemat energi
Pengembangan suatu produk baru atau jasa. Dll.
23
IAMPI-PS
• Perkembangan Pasar Global
• Kemajuan Information Technology
• Kemajuan dalam Construction Materials
• Persyaratan dari Pemilik yang lebih ketat
• Jenis-jenis kontrak yang baru
• Mekanisasi dari aktivitas
• Pabrikasi yang dilakukan Off-site
• Resource (sumber daya) yang terbatas
• Cycle time yang lebih pendek
• Kondisi yang tidak dapat diramalkan dan risiko
yang lebih tinggi.
TREND & PROBLEM MASA KINI
24
IAMPI-PS
PROYEK DICIPTAKAN SEBAGAI SATU STRATEGIC TOOL DARI
PEMILIK PROYEK UNTUK MEMENUHI ‘MISI NYA,
KELANGSUNGAN HIDUPNYA DAN UNTUK MENGALAHKAN
KOMPETITORNYA.
 We Have To Do More With Less (Lebih Efisien)
 We Have To Do It Faster (Lebih Cepat)
 We Have To Do It Cheaper (Lebih Murah)
 We Have To Do It Better (Lebih Baik)
 We Have To Do It Right The First Time (Tidak
Boleh Salah)
25
IAMPI-PS
1. APA YANG DIBANGUN? (SCOPE)
2. BERAPA BIAYANYA? (COST)
3. BERAPA LAMA MEMBANGUNNYA? (TIME)
4. APA SPESIFIKASI MATERIAL & PERALATANNYA?
(QUALITY)
5. APA SAJA YANG AKAN MEMPENGARUHI
KINERJA PROYEK? ( RISK)
INFORMASI DASAR DARI PROYEK
BIAYA – MUTU – WAKTU – LINGKUP -
LINGKUNGAN 26
IAMPI-PS
Karena Kebiasaan dalam Merespon tugas yang
diberikan :
 Melibatkan interprestasi dari berbagai profesi
keahlian
 Dipengaruhi loyalitas
 Melihat proyek dari posisi yang sangat berbeda.
MENGAPA DIPERLUKAN
MANAJEMEN PROYEK ?
27
IAMPI-PS
Needs Project Management?
Anthony Walker,MSc, PhD, ARICS, Project
Management in Construction, p. 16 (Original
idea and sketches by Dave Taylor)
28
IAMPI-PS
APAKAH
MANAJEMEN PROYEK ITU ?
• The application of knowledge , skill, tools & techniques to
project activities to meet the project requirements.
 Adalah penerapan pengetahuan, ketrampilan/kemampuan,
sarana dan teknik pada kegiatan proyek agar dapat memenuhi
kebutuhan stakeholder dan harapan dari sebuah proyek.
PMBOK ® p. 6
SEHINGGA DIPERLUKAN MANAJEMEN PROYEK
29
IAMPI-PS
• Diselesaikan melalui penerapan proses
initiating, planning, executing, monitoring &
controlling and closing,
PMBOK ® p. 6
IAMPI-PS
30
31
Project Management Process Group Triangle
PMBOK 2004, p. 69
Phase Phase Phase Phase
Life Cycle
Project
process
groups
CLOSING
PROCESSES
PLANNING PROCESSES
EXECUTING PROCESSES
INITIATING
PROCESSES
Monitoring and
Controlling process
IAMPI-PS
PMBOK ® p. 6
Untuk memenuhi kebutuhan dan harapan yang
melibatkan penyeimbangan beberapa tuntutan yakni:
 Kebutahan (teridentifikasi) dan Harapan (tidak
teridentifikasi).
 Stakeholders dengan kebutuhan dan harapan
yang berbeda,
 Ruang Lingkup, Mutu, Jadwal waktu,
Anggaran, Sumber Daya dan Risiko
IAMPI-PS 32
33
• By balancing competing demands among :
Budget
Quality
Schedule
Scope
Resources
√
Risk
PMBOK ® p. 6
IAMPI-PS
MENGAPA MANAJEMEN PROYEK DIBUTUHKAN
OLEH SUATU ORGANISASI
• Karena mengandung suatu methodologi manajemen
proyek yang bermanfaat untuk :
 Memenuhi kebutuhan dari proyek dan pelanggan.
 Meniadakan “reinventing the wheel” dengan cara
melakukan standarisasi dari pekerjaan proyek yang
repetitip.
 Mengurangi jumlah pekerjaan yang mungkin terlewati.
 Menghilangkan duplikasi pekerjaan.
 Mengendalikan Lingkup, schedule, budget, dan
sumberdaya (resources) proyek.
 Memaksimalkan pemakaian sumberdaya (resources).
34
IAMPI-PS
APA MANFAAT MANAJEMEN PROYEK
Untuk meningkatkan efektivitas dan efisiensi proyek-proyek,
Yaitu
Mengurangi kemungkinan kegagalan dan meningkatkan
kemungkinan keberhasilan.’
.
35
IAMPI-PS
TUJUAN DAN SASARAN
MANAJEMEN PROYEK
• Dana yang dikeluarkan harus dimanfaatkan se-
efektif dan se-efisien mungkin.
• Setiap proyek harus dapat diselesaikan dengan
waktu yang tidak boleh terlambat, mutu yang
sesuai dan biaya yang semurah mungkin.
• Tingkat kebocoran anggaran harus se-minimal
mungkin
36
IAMPI-PS
MENGAPA PROYEK GAGAL
• Masalah SDM.
– Kurangnya ketrampilan dan pengetahuan anggota team.
– Kekurang pengertian tentang sasaran bersama
– Kurangnya pembinaan team
• Methodology
– Belum ada prosedur yang standar atau
– Penyusunan project prosedur yang tidak tepat
– Tidak dipakainya project prosedur yang telah disusun
dengan susah payah
• Pendanaan
– Perencanaan pendanaan yang tidak sesuai
37
IAMPI-PS
 Keterbatasan teknologi.
– Kekurangan penguasaan basis teknologi sebagai sarana
melaksanakan proyek.
– Tidak diperhitungkannya keperluan teknologi untuk
melaksanakan proyek pada waktu merencanakan proyek.
– Kekurang mampuan dalam mengidentifikasikan sumber-
sumber teknologi yang diperlukan untuk menunjang
pelaksanaan proyek
– Belum tersedianya teknologi untuk melaksanakan proyek.
 Permainan Politik
– Pengutamaan kepentingan pribadi dan pemanfaatan
proyek untuk pemenuhan hasrat pribadi.
38
IAMPI-PS
AGAR PROYEK DAPAT BERHASIL
• Sasaran harus jelas, metodologi yang tepat dan pelaksana yang
profesional
• Anggaran yang pasti tetapi realistis sesuai dana yang tersedia
• Target waktu yang pasti tetapi realistis
• Team yang terkoordinir dan termotivasikan dengan baik
• Komunikasi yang simple tetapi efektif
• Pengambilan keputusan yang jelas dan mengarah kedepan
• Perencanaan yang flexible sehingga dapat mengakomodasi
sesuatu yang tidak diharapkan.
• Penyedia Jasa (Konsultan/Kontraktor/Supplier) profesional dan
terpercaya.
39
IAMPI-PS
APA YANG TERJADI BILA MANAJEMEN
PROYEK TIDAK DITRAPKAN
Beberapa Ciri akibat bila tidak menerapkan manajemen proyek
• Target waktu/deadline tidak tercapai,
• Pekerjaan harus diulang atau terjadi duplikasi,
• Budget/anggaran yang dilampaui,
• Kemajuan proyek yang tidak jelas,
• Konflik di antara staf selama penugasan diproyek,
• Kompetensi yang kurang dari anggota tim proyek,
• Perubahan lingkup proyek yang terus menerus,
• Staf proyek menerapkan metode pengelolaan proyek sesuai
pengalaman dan selera sendiri sendiri dan tidak ada standarisasi.
IAMPI-PS 40
PERKEMBANGAN MANAJEMEN PROYEK
BERDASARKAN PENGETAHUAN
2004
2008
IAMPI-PS 41
42
IAMPI-PS
PROJECT MANAGEMENT OFFICE
PMO adalah suatu Badan atau organisasi yang diberikan berbagai tanggung jawab terkait
dengan koordinasi terpusat dan pengaturan proyek.
Bisa dinamakan “ program management office”, “ project office”, atau “ program office”.
Fungsi Utama :
Mengatur administrasi sumber daya semua proyek.
Mengidentifikasi dan mengembangkan project management methodology, best
practices dan standard
Memberikan pelatihan, pembinaan, pembekalan dan mengingatkan kembali.
Mengendalikan kebijakan standar manajemen proyek, prosedur, format melalui
audit proyek.
Mengembangkan dan mengatur kebijakan proyek, prosedur, format format dan
membagi dokumentasi lainya dan
Mengkoordinasikan komunikasi proyek.
43
IAMPI-PS
PROJECT MANAGEMENT OFFICE
Perbedaan antara Peran Project Manager dengan PMO:
PM fokus pada tujuan proyek
PMO mengelola program perubahan lingkup
PM mengendalikan sumber daya sesuai tujuan proyek
PMO mengoptimalkan sumber daya untuk organisasi proyek
PM mengelola keterbatasan Lingkup, jadwal, biaya, dan mutu proyek dll,
PMO mengelola methodologi, standar, semua risiko/peluang dan
ketergantungan proyek pada tingkat perusahaan.
44
IAMPI-PS
45
PMO Pada Organisasi
Human
Resources
Research
New Product
Development
Testing &
Integration
Sales and
Marketing
Research and
Development
Finance
IT Div.
Project 1
Project 2
Project 3
Merger & Acquisition
Annual Budget
Corporate Restructuring
& Transformation
Market
Research
Product
Launches
Marketing &
Sales
Initiatives
Recruiting
Events
Human
Resource
management
System
Training
Programs
BoD
PMO
Project Management Office:
Fokus pada satu proyek yang memiliki
kompleksitas dan risiko tinggi.
IAMPI-PS
46
PMO Pada Organisasi
Human
Resources
Research
New Product
Development
Testing &
Integration
Sales and
Marketing
Research and
Development
Finance
IT Div.
Project 1
Project 2
Project 3
Merger & Acquisition
Annual Budget
Corporate Restructuring
& Transformation
Market
Research
Product
Launches
Marketing &
Sales
Initiatives
Recruiting
Events
Human
Resource
management
System
Training
Programs
BoD
PMO
Program Management Office:
Berada pada Bagian IT , yang mengelola
berbagai ukuran /proyek dan
memperpadukan sumber daya proyek proyek.
IAMPI-PS
47
PMO Pada Organisasi
Human
Resources
Research
New Product
Development
Testing &
Integration
Sales and
Marketing
Research and
Development
Finance
IT Div.
Project 1
Project 2
Project 3
Merger & Acquisition
Annual Budget
Corporate Restructuring
& Transformation
Market
Research
Product
Launches
Marketing &
Sales
Initiatives
Recruiting
Events
Human
Resource
management
System
Training
Programs
BoD
PMO
Portfolio Management Office:
memilih, memprioritaskan, mengelola dan
monitor proyek agar tercapai sasaran
organisasi/perusahaan.
IAMPI-PS
STAKEHOLDERS
Adalah perseorangan atau organisasi seperti : (customers, sponsors,
perusahaan, atau kalayak umum) secara aktif terlibat didalam proyek atau
siapa yang memiliki minat secara positif atau negatif berdampak pada kinerja
atau penyelesaian proyek. Stakeholder juga menggunakan pengaruhnya
terhadap proyek, hasil nya dan anggota team proyek.
Berikut ini contoh dari project stakeholders :
• Customers/Users
• Sponsor
• Portfolio Manager/portfolio review board
• Program Managers
• Project Management Office
• Project Managers
• Project Team
• Functional Managers
• Operation Management
• Sellers/business partners
PMBOK p. 23
48
IAMPI-PS
HUBUNGAN ANTARA STAKEHOLDERS
DAN PROYEK
PMBOK p. 24
Portfolio
Manager
Program
Manager
Other
Stakeholders
Project
Management
Office
Project
Management
Team
Project
Manager
Other Project
Team
Memebers
Customers/
Users
Sellers/ Business
Partners
Functional
Managers
Operation
Management
Sponsor
Project Stakeholders
Project Team
The Project
Project Life Cycle and Organization
49
IAMPI-PS
50
9 Areas of project Management Body of Knowledge
IAMPI-PS
51
4 Areas of Construction extension to Project
Management Body of Knowledge
Project Environmental Management
Project Financial Management
Project Claim Management
Project Safety Management
PMBOK ext const p. 7
IAMPI-PS
52
KERANGKA DASAR
MANAJEMEN PROYEK
TERIMA KASIH
IAMPI-PS
Berbagai Jenis Persetujuan BPMIGAS
• Plan of Development (POD)
Rencana Pengembangan satu atau lebih lapangan migas secara
terpadu (integrated) untuk memproduksikan cadangan hidrokarbon
secara optimal dengan mempertimbangkan aspek teknis, ekonomis,
dan HSE
• Authorization for Expenditure (AFE)
Otorisasi/Persetujuan pembelanjaan kapital (teknis dan biaya)
• Work Program and Budget (WP&B)
Persetujuan atas rencana kerja dan anggaran tahunan
• Rencana Lelang, dan Usulan Pemenang Lelang
• Kerja Tambah/Kurang (PLK) terhadap kontrak berjalan
• AFE Closed Out
Pertanggungjawaban realisasi AFE
IAMPI-PS 53
Bisnis Proses
Pengajuan usulan AFE pre-FEED
Evaluasi Teknis & Biaya
Setuju?
Rekomendasi Konsep
dan biaya life-cycle-cost
Setuju?
Pelaksanaan pre-FEED
Pengajuan usulan AFE FEED
Evaluasi Teknis & Biaya
Setuju?
Evaluasi dan
Persetujuan
POD?
Evaluasi POD
Rekomendasi desain dgn the
most cost effective solution
Setuju?
Pelaksanaan FEED
Sesuai dengan
approved
POD?
Pengajuan usulan AFE EPCI
Evaluasi Teknis & Biaya
Setuju?
Start-Up and
Commissioning
Acceptable?
Pelaksanaan EPCI
AFE Close Out
Placed Into Service
AFE Close Out
AFE Close Out
IAMPI-PS 54
POD / AFE / WP&B / PTK007
Pre-FEED
FEED
(Front End Engineering
Design)
EPCI
(Detailed Engineering,
Procurement, Construction,
Installation)
OPERASI
POD Development
Annual - Work Program & Budget (WP&B)
AFE Fas-Prod :
- Conceptual Eng.
- Survey Geotechnical
- Survey Geophysical
- Amdal
AFE Fas-Prod :
- FEED (Optimisasi & Basic Design)
- PMT
- Survey Geotechnical
- Survey Geophysical
AFE Fas-Prod :
- EPCI
- PMT
-Certification
AFE Fas-Prod :
- Overhaul
- Upgrading
- Maintenance
- Modification, etc
Kontrak-kontrak Pengadaan Barang & Jasa (PTK-007)
IAMPI-PS 55
Tahapan Proyek
PRE-FEED FEED EPCI OPERASI
Appraise Select Define Execute Operate
Execute Operate
FEL-0
Identify
FEL-1
Appraise
FEL-1
Select
FEL-2
Optimize
FEL-3
Define
Phase-1
Identify & Assess Opportunity
Phase-2
Generate & Select
Alternative(s)
Phase-3
Develop Preferred Alternative
Phase-4
Execute
Phase-5
Operate & Evaluate
Appraisal Design Pre-Project Basic Engineering EPSC
Comm &
StartUp
Operations
IAMPI-PS 56

More Related Content

What's hot

Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
Knowledge Train
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
ejlp12
 
15 laporan penutupan proyek
15 laporan penutupan proyek15 laporan penutupan proyek
15 laporan penutupan proyek
Ainul Yaqin
 
Contoh Flow Analysis People Development by Daniel Doni Sundjojo
Contoh Flow Analysis People Development by Daniel Doni SundjojoContoh Flow Analysis People Development by Daniel Doni Sundjojo
Contoh Flow Analysis People Development by Daniel Doni Sundjojo
Daniel Doni
 

What's hot (20)

PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
 
Manajemen konstruksi
Manajemen konstruksiManajemen konstruksi
Manajemen konstruksi
 
Azlanmohdnorf
AzlanmohdnorfAzlanmohdnorf
Azlanmohdnorf
 
PMBOK 6 Summary: Module 2 (Planning Processes)
PMBOK 6 Summary: Module 2 (Planning Processes)PMBOK 6 Summary: Module 2 (Planning Processes)
PMBOK 6 Summary: Module 2 (Planning Processes)
 
Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)
 
Workload Analysis Workshop
Workload Analysis WorkshopWorkload Analysis Workshop
Workload Analysis Workshop
 
SPK JKR Malaysia: Terminologi
SPK JKR Malaysia: TerminologiSPK JKR Malaysia: Terminologi
SPK JKR Malaysia: Terminologi
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
Kaizen system guidance
Kaizen system guidanceKaizen system guidance
Kaizen system guidance
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
15 laporan penutupan proyek
15 laporan penutupan proyek15 laporan penutupan proyek
15 laporan penutupan proyek
 
Project management office PMBOK
Project management office PMBOKProject management office PMBOK
Project management office PMBOK
 
PELATIHAN HR Management For NON-HR
PELATIHAN HR Management For NON-HRPELATIHAN HR Management For NON-HR
PELATIHAN HR Management For NON-HR
 
9.0 Project Resource Management Overview
9.0 Project Resource Management Overview9.0 Project Resource Management Overview
9.0 Project Resource Management Overview
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management Office
 
Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3
 
Contoh Flow Analysis People Development by Daniel Doni Sundjojo
Contoh Flow Analysis People Development by Daniel Doni SundjojoContoh Flow Analysis People Development by Daniel Doni Sundjojo
Contoh Flow Analysis People Development by Daniel Doni Sundjojo
 
Manajemen aset berbasis iso 55000
Manajemen aset berbasis iso 55000Manajemen aset berbasis iso 55000
Manajemen aset berbasis iso 55000
 

Similar to 02 ok PROJECT MANAGEMENT FRAMEWORK IAMPI A.ppt

Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina MargapptManajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
HuiSan6
 
Pertemuan 3 manajemen proyek ibsi
Pertemuan 3 manajemen proyek ibsiPertemuan 3 manajemen proyek ibsi
Pertemuan 3 manajemen proyek ibsi
Rony BolaNk
 

Similar to 02 ok PROJECT MANAGEMENT FRAMEWORK IAMPI A.ppt (20)

Mpti1 D3
Mpti1 D3Mpti1 D3
Mpti1 D3
 
Software Project Management - Proses Manajemen Proyek
Software Project Management - Proses Manajemen ProyekSoftware Project Management - Proses Manajemen Proyek
Software Project Management - Proses Manajemen Proyek
 
Software Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen ProyekSoftware Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen Proyek
 
1 manajemen proyek
1 manajemen proyek1 manajemen proyek
1 manajemen proyek
 
0009-P01.pdf
0009-P01.pdf0009-P01.pdf
0009-P01.pdf
 
(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...
(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...
(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...
 
0009-P01.pdf
0009-P01.pdf0009-P01.pdf
0009-P01.pdf
 
Silabus Training "Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEMENT di E...
Silabus Training "Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEMENT di E...Silabus Training "Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEMENT di E...
Silabus Training "Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEMENT di E...
 
Manajemen proyek (1)
Manajemen proyek (1)Manajemen proyek (1)
Manajemen proyek (1)
 
Rudy m. harahap assurance pengadaan ti
Rudy m. harahap   assurance pengadaan tiRudy m. harahap   assurance pengadaan ti
Rudy m. harahap assurance pengadaan ti
 
Modul kuliah Manajemen Proyek
Modul kuliah Manajemen ProyekModul kuliah Manajemen Proyek
Modul kuliah Manajemen Proyek
 
Bab3 agung
Bab3 agungBab3 agung
Bab3 agung
 
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
 
Tugas audit dan evaluasi ti kelompok 9
Tugas audit dan evaluasi ti kelompok 9Tugas audit dan evaluasi ti kelompok 9
Tugas audit dan evaluasi ti kelompok 9
 
2. Manajemen Proyek PL.pptx
2. Manajemen Proyek PL.pptx2. Manajemen Proyek PL.pptx
2. Manajemen Proyek PL.pptx
 
PENGANTAR MANAJEMEN PROYEK PERANGKAT LUNAK
PENGANTAR MANAJEMEN PROYEK PERANGKAT LUNAKPENGANTAR MANAJEMEN PROYEK PERANGKAT LUNAK
PENGANTAR MANAJEMEN PROYEK PERANGKAT LUNAK
 
Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina MargapptManajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
 
SIKLUS_HIDUP_PROYEK-materi3.pptx
SIKLUS_HIDUP_PROYEK-materi3.pptxSIKLUS_HIDUP_PROYEK-materi3.pptx
SIKLUS_HIDUP_PROYEK-materi3.pptx
 
Pertemuan 3 manajemen proyek ibsi
Pertemuan 3 manajemen proyek ibsiPertemuan 3 manajemen proyek ibsi
Pertemuan 3 manajemen proyek ibsi
 
dasar-dasar-manajemen-proyek.ppt
dasar-dasar-manajemen-proyek.pptdasar-dasar-manajemen-proyek.ppt
dasar-dasar-manajemen-proyek.ppt
 

More from ahfa42 (9)

Kisah abdurrahman bin auf
Kisah abdurrahman bin aufKisah abdurrahman bin auf
Kisah abdurrahman bin auf
 
Knowledge Management (KM) Road Map
Knowledge Management (KM) Road MapKnowledge Management (KM) Road Map
Knowledge Management (KM) Road Map
 
Document Management System for Company
Document Management System for CompanyDocument Management System for Company
Document Management System for Company
 
Kirkpatrick model
Kirkpatrick modelKirkpatrick model
Kirkpatrick model
 
Mengenal hak cipta
Mengenal hak ciptaMengenal hak cipta
Mengenal hak cipta
 
Womm word of mouth marketing
Womm word of mouth marketingWomm word of mouth marketing
Womm word of mouth marketing
 
Mudik aman dan nyaman
Mudik aman dan nyamanMudik aman dan nyaman
Mudik aman dan nyaman
 
Umar bin abdul aziz
Umar bin abdul azizUmar bin abdul aziz
Umar bin abdul aziz
 
Pendekar pedang akhirat
Pendekar pedang akhiratPendekar pedang akhirat
Pendekar pedang akhirat
 

Recently uploaded (9)

Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di Indonesia
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
 
Materi Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptx
Materi Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptxMateri Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptx
Materi Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptx
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptx
 
10.-Programable-Logic-Controller (1).ppt
10.-Programable-Logic-Controller (1).ppt10.-Programable-Logic-Controller (1).ppt
10.-Programable-Logic-Controller (1).ppt
 
Metode numerik Bidang Teknik Sipil perencanaan.pdf
Metode numerik Bidang Teknik Sipil perencanaan.pdfMetode numerik Bidang Teknik Sipil perencanaan.pdf
Metode numerik Bidang Teknik Sipil perencanaan.pdf
 
MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdfMODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
 
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
 

02 ok PROJECT MANAGEMENT FRAMEWORK IAMPI A.ppt

  • 1. PELATIHAN & SERTIFIKASI MANAJEMEN PROYEK (Project Management Workshop & Certification ) IAMPI-PS 1 IAMPI Ikatan Ahli Manajemen Proyek Indonesia (Indonesian Society of Project Management Professionals) PROJECT MANAGEMENT FRAMEWORK
  • 2. PROJECT MANAGEMENT FRAMEWORK MENGENAL PROJECT MANAGEMENT STANDARD 2 IAMPI-PS
  • 3. 3 STANDARD & KNOWLEDGE ICB IPMA Competence Baseline Version 3.0 IPMA APM PMI Project Management Body of Knowledge Fourth Edition Project Management Body of Knowledge Fourth Edition 2008 IAMPI-PS
  • 4. 4 ICB IPMA Competence Baseline Version 3.0 IPMA STANDARD & KNOWLEDGE IAMPI-PS
  • 5. 5 Project Management Body of Knowledge Fourth Edition APM STANDARD & KNOWLEDGE IAMPI-PS
  • 6. 6 PMI STANDARD & KNOWLEDGE Project Management Body of Knowledge PMBOK ® Guide PMBOK p. 13 PROGRAM MANAGEMENT PORTFOLIO MANAGEMENT OTHER STANDARDS IAMPI-PS
  • 7. 7 MATRIX OF KNOWLEDGE & DELIVERY STANDARD KNOWLEDGE DELIVERY NON CONSTRUCTION CONSTRUCTION PMBOK ® Project Scope Management Project Time Management Project Cost Management Project Quality Management Project Human Resource Management Project Communication Management Project Risk Management Project Procurement Management Project Integration Management TRADISIONAL DESIGN & BUILD TURNKEY BOT/BOOT AT RISK IAMPI-PS EPCI
  • 8. 8 STANDARD, KNOWLEDGE & STAKEHOLDER IN CONSTRUCTION STANDARD & KNOWLEDGE OWNER/CLIENT /USER CONTRACTOR CONSULTANT IAMPI-PS
  • 10. 10 PHILOSOPHY OWNER CONSULTANT CONTRACTOR Need Project Management Need Project Management Need Project Management IAMPI-PS
  • 11. Construction Management PROJECT MANAGEMENT IN CONSTRUCTION PHILOSOPHY Project Management O & M + D PROC FS OPERATIONAL Option PHASES CM Supervision (Indonesia, decre 18-1999) CM Professionals & EPC (Indonesia/Private) CM option CMAA CONSTRUCTION consultant Construction Design consultant & QS LKPP Commitee Supervision Consultant Const Contractor Building Management/Operator ENG 11 PP no. 4 tahun 2010 Pito Sumarno
  • 12. 12 CONSTRUCTION PHASES IN EPC Pre-FEED FEED Front-End Engineering Design EPCI Detailed Engineering, Procurement Construction, Installation OPERASI Appraisal Pito Sumarno
  • 13. Client Agency Project Manager Design Manager Construction Manager Project Architect Project Mech.Eng Project Str.Eng Project Elect.Eng Project Civil Eng General Contractor Sub- Contractor Sub- Contractor QC. Inspection Const. Surveys Resident Project Representative A/E Design staff A/E Const. Staff Surveyors Labor Force Project Management Level Construction Management Level Functional Management Level Staff Level FUNCTIONAL RELATIONSHIPS under a DESIGN/CONSTRUCTION MANAGER CONTRACT Edward R.Fisk, Construction Project Administration, Seventh Edition, p. 13 Organization Chart 13 IAMPI-PS
  • 14. Client Agency Owner Project Manager Consultan Perencana PM Consultan CM (PM) Project Design Team Architect/ Str Eng/ Civil Eng/ Elect Eng/ Mech Eng General Contractor PM Site Office Eng/ QS Field & Support A/E Design staff A/E Const. Staff Surveyors Labor Force Project Management Level Construction Management Level Functional Management Level Staff Level FUNCTIONAL RELATIONSHIPS under a PRIME CONTRACTOR and CONSULTANT/ CM PROF. Pito, Construction Project Administration, modified Operation Manager Engineering Manager Consultan QS Project QA Team Architect/ Str Eng/ Civil Eng/ Elect Eng/ Mech Eng Commercial Manager Sub Cont & NSC Admin 14 IAMPI-PS
  • 15. Client Agency Owner Project Manager Consultan Perencana PM Consultan CM (PM) Project Design Team Architect/ Str Eng/ Civil Eng/ Elect Eng/ Mech Eng Contractor I (PM) A/E Design staff A/E Const. Staff Surveyors Labor Force Project Management Level Construction Management Level Functional Management Level Staff Level FUNCTIONAL RELATIONSHIPS under a CONTRACTOR and CONSULTANT/ CM PROF. Pito, Construction Project Administration, modified Site Process Consultan QS Project QA Team Architect/ Str Eng/ Civil Eng/ Elect Eng/ Mech Eng Contractor II (PM) Contractor III (PM) 15 IAMPI-PS
  • 16. Client Agency Owner Project Manager Consultan Perencana PM Consultan Supervisi Project Design Team Architect/ Str Eng/ Civil Eng/ Elect Eng/ Mech Eng General Contractor PM Site Office Eng/ QS Field & Support A/E Design staff A/E Const. Staff Surveyors Labor Force Project Management Level Construction Management Level Functional Management Level Staff Level FUNCTIONAL RELATIONSHIPS under a PRIME CONTRACTOR and CONSULTANT SUPERVISION Pito, Construction Project Administration, modified Organization Chart Operation Manager Eng Manager Project SPV Team Monitoring/ Controlling/ Reporting Commercial Manager Admin Sub Cont NSC 16 IAMPI-PS
  • 17. Client Agency Project Manager Design Manager Construction Manager Project Architect Project Mech.Eng Project Str.Eng Project Elect.Eng Project Civil Eng General Contractor Sub- Contractor Sub- Contractor QC. Inspection Const. Surveys Resident Project Representative A/E Design staff A/E Const. Staff Surveyors Labor Force Staff Level Edward R.Fisk, Construction Project Administration, Seventh Edition, p. 13 Organization Chart PM PM PM/CM PM/CM+ Associte PM/CM+ Associate PM/CM+ Associate CM Pract. Kompetensi yang harus dikuasai 17 IAMPI-PS
  • 18. SIKLUS KEHIDUPAN (LIFE CYCLE) TELUR ULAT KEPOMPONG KUPU-KUPU  Mengalami Perubahan Bentuk  Membutuhkan Waktu  Membutuhkan Sumber Daya (resources) Budhy Manan IAMPI 18 IAMPI-PS
  • 19. 19 INITIAL INTERMEDIATE FINAL Charter Scope Statement Plan Baseline Progress Acceptance Approval Handover Product Idea Project Management Team Inputs Phases Project Management Outputs Project Deliverable Typical Sequence of Phases in a Project Life Cycle PMBOK p. 23 IAMPI-PS
  • 20. 20 INITIAL INTERMEDIATE FINAL Product Life Cycle Product Operation Divestment IDEA Business Plan Upgrade Project Life Cycle Relationship Between the Product & the Project Life cycles PMBOK p. 24 IAMPI-PS
  • 21. A temporary endeavor undertaken to create a unique product, service, or result. (Usaha sementara dilaksanakan untuk menciptakan suatu produk, jasa atau hasil yang unik ). – Temporary every project has a definite beginning and a definite end. (Mempunyai tanggal start dan finish yang pasti) APAKAH PROYEK ITU ? PMBOK p. 5 21 IAMPI-PS
  • 22. – Setiap Project menciptakan : – Unique product, Services, or Results the product or service is different in some distinguishing way from all similar products or services.  Sesuatu yang Unique dan kejadiannya hanya sekali,  Mempunyai tujuan khusus, dan diselesaikan didalam spesifikasi yang pasti, dikerjakan oleh manusia.  Dibatasi oleh anggaran dan sumberdaya yang terbatas,  Hal yang dapat diurai dengan jelas dan dapat dilaksanakan,  Hasil deliverablenya terukur dan dapat dikuantifikasi.  Dapat direncanakan, dilaksanakan, dikendalikan PMBOK p. 5 22 IAMPI-PS
  • 23. CONTOH-CONTOH P R O Y E K Membangun jembatan SURAMADU. Membangun Pabrik pengolahan sampah. Menyusun dan mengimplementasi ‘information system baru untuk bank. Mencari penangkal obat untuk SARS. Melakukan ‘turn around’ (pemeliharaan) kilang minyak. Melaksanakan pemilihan umum. Membuat prototipe kendaraan hemat energi Pengembangan suatu produk baru atau jasa. Dll. 23 IAMPI-PS
  • 24. • Perkembangan Pasar Global • Kemajuan Information Technology • Kemajuan dalam Construction Materials • Persyaratan dari Pemilik yang lebih ketat • Jenis-jenis kontrak yang baru • Mekanisasi dari aktivitas • Pabrikasi yang dilakukan Off-site • Resource (sumber daya) yang terbatas • Cycle time yang lebih pendek • Kondisi yang tidak dapat diramalkan dan risiko yang lebih tinggi. TREND & PROBLEM MASA KINI 24 IAMPI-PS
  • 25. PROYEK DICIPTAKAN SEBAGAI SATU STRATEGIC TOOL DARI PEMILIK PROYEK UNTUK MEMENUHI ‘MISI NYA, KELANGSUNGAN HIDUPNYA DAN UNTUK MENGALAHKAN KOMPETITORNYA.  We Have To Do More With Less (Lebih Efisien)  We Have To Do It Faster (Lebih Cepat)  We Have To Do It Cheaper (Lebih Murah)  We Have To Do It Better (Lebih Baik)  We Have To Do It Right The First Time (Tidak Boleh Salah) 25 IAMPI-PS
  • 26. 1. APA YANG DIBANGUN? (SCOPE) 2. BERAPA BIAYANYA? (COST) 3. BERAPA LAMA MEMBANGUNNYA? (TIME) 4. APA SPESIFIKASI MATERIAL & PERALATANNYA? (QUALITY) 5. APA SAJA YANG AKAN MEMPENGARUHI KINERJA PROYEK? ( RISK) INFORMASI DASAR DARI PROYEK BIAYA – MUTU – WAKTU – LINGKUP - LINGKUNGAN 26 IAMPI-PS
  • 27. Karena Kebiasaan dalam Merespon tugas yang diberikan :  Melibatkan interprestasi dari berbagai profesi keahlian  Dipengaruhi loyalitas  Melihat proyek dari posisi yang sangat berbeda. MENGAPA DIPERLUKAN MANAJEMEN PROYEK ? 27 IAMPI-PS
  • 28. Needs Project Management? Anthony Walker,MSc, PhD, ARICS, Project Management in Construction, p. 16 (Original idea and sketches by Dave Taylor) 28 IAMPI-PS
  • 29. APAKAH MANAJEMEN PROYEK ITU ? • The application of knowledge , skill, tools & techniques to project activities to meet the project requirements.  Adalah penerapan pengetahuan, ketrampilan/kemampuan, sarana dan teknik pada kegiatan proyek agar dapat memenuhi kebutuhan stakeholder dan harapan dari sebuah proyek. PMBOK ® p. 6 SEHINGGA DIPERLUKAN MANAJEMEN PROYEK 29 IAMPI-PS
  • 30. • Diselesaikan melalui penerapan proses initiating, planning, executing, monitoring & controlling and closing, PMBOK ® p. 6 IAMPI-PS 30
  • 31. 31 Project Management Process Group Triangle PMBOK 2004, p. 69 Phase Phase Phase Phase Life Cycle Project process groups CLOSING PROCESSES PLANNING PROCESSES EXECUTING PROCESSES INITIATING PROCESSES Monitoring and Controlling process IAMPI-PS
  • 32. PMBOK ® p. 6 Untuk memenuhi kebutuhan dan harapan yang melibatkan penyeimbangan beberapa tuntutan yakni:  Kebutahan (teridentifikasi) dan Harapan (tidak teridentifikasi).  Stakeholders dengan kebutuhan dan harapan yang berbeda,  Ruang Lingkup, Mutu, Jadwal waktu, Anggaran, Sumber Daya dan Risiko IAMPI-PS 32
  • 33. 33 • By balancing competing demands among : Budget Quality Schedule Scope Resources √ Risk PMBOK ® p. 6 IAMPI-PS
  • 34. MENGAPA MANAJEMEN PROYEK DIBUTUHKAN OLEH SUATU ORGANISASI • Karena mengandung suatu methodologi manajemen proyek yang bermanfaat untuk :  Memenuhi kebutuhan dari proyek dan pelanggan.  Meniadakan “reinventing the wheel” dengan cara melakukan standarisasi dari pekerjaan proyek yang repetitip.  Mengurangi jumlah pekerjaan yang mungkin terlewati.  Menghilangkan duplikasi pekerjaan.  Mengendalikan Lingkup, schedule, budget, dan sumberdaya (resources) proyek.  Memaksimalkan pemakaian sumberdaya (resources). 34 IAMPI-PS
  • 35. APA MANFAAT MANAJEMEN PROYEK Untuk meningkatkan efektivitas dan efisiensi proyek-proyek, Yaitu Mengurangi kemungkinan kegagalan dan meningkatkan kemungkinan keberhasilan.’ . 35 IAMPI-PS
  • 36. TUJUAN DAN SASARAN MANAJEMEN PROYEK • Dana yang dikeluarkan harus dimanfaatkan se- efektif dan se-efisien mungkin. • Setiap proyek harus dapat diselesaikan dengan waktu yang tidak boleh terlambat, mutu yang sesuai dan biaya yang semurah mungkin. • Tingkat kebocoran anggaran harus se-minimal mungkin 36 IAMPI-PS
  • 37. MENGAPA PROYEK GAGAL • Masalah SDM. – Kurangnya ketrampilan dan pengetahuan anggota team. – Kekurang pengertian tentang sasaran bersama – Kurangnya pembinaan team • Methodology – Belum ada prosedur yang standar atau – Penyusunan project prosedur yang tidak tepat – Tidak dipakainya project prosedur yang telah disusun dengan susah payah • Pendanaan – Perencanaan pendanaan yang tidak sesuai 37 IAMPI-PS
  • 38.  Keterbatasan teknologi. – Kekurangan penguasaan basis teknologi sebagai sarana melaksanakan proyek. – Tidak diperhitungkannya keperluan teknologi untuk melaksanakan proyek pada waktu merencanakan proyek. – Kekurang mampuan dalam mengidentifikasikan sumber- sumber teknologi yang diperlukan untuk menunjang pelaksanaan proyek – Belum tersedianya teknologi untuk melaksanakan proyek.  Permainan Politik – Pengutamaan kepentingan pribadi dan pemanfaatan proyek untuk pemenuhan hasrat pribadi. 38 IAMPI-PS
  • 39. AGAR PROYEK DAPAT BERHASIL • Sasaran harus jelas, metodologi yang tepat dan pelaksana yang profesional • Anggaran yang pasti tetapi realistis sesuai dana yang tersedia • Target waktu yang pasti tetapi realistis • Team yang terkoordinir dan termotivasikan dengan baik • Komunikasi yang simple tetapi efektif • Pengambilan keputusan yang jelas dan mengarah kedepan • Perencanaan yang flexible sehingga dapat mengakomodasi sesuatu yang tidak diharapkan. • Penyedia Jasa (Konsultan/Kontraktor/Supplier) profesional dan terpercaya. 39 IAMPI-PS
  • 40. APA YANG TERJADI BILA MANAJEMEN PROYEK TIDAK DITRAPKAN Beberapa Ciri akibat bila tidak menerapkan manajemen proyek • Target waktu/deadline tidak tercapai, • Pekerjaan harus diulang atau terjadi duplikasi, • Budget/anggaran yang dilampaui, • Kemajuan proyek yang tidak jelas, • Konflik di antara staf selama penugasan diproyek, • Kompetensi yang kurang dari anggota tim proyek, • Perubahan lingkup proyek yang terus menerus, • Staf proyek menerapkan metode pengelolaan proyek sesuai pengalaman dan selera sendiri sendiri dan tidak ada standarisasi. IAMPI-PS 40
  • 41. PERKEMBANGAN MANAJEMEN PROYEK BERDASARKAN PENGETAHUAN 2004 2008 IAMPI-PS 41
  • 43. PROJECT MANAGEMENT OFFICE PMO adalah suatu Badan atau organisasi yang diberikan berbagai tanggung jawab terkait dengan koordinasi terpusat dan pengaturan proyek. Bisa dinamakan “ program management office”, “ project office”, atau “ program office”. Fungsi Utama : Mengatur administrasi sumber daya semua proyek. Mengidentifikasi dan mengembangkan project management methodology, best practices dan standard Memberikan pelatihan, pembinaan, pembekalan dan mengingatkan kembali. Mengendalikan kebijakan standar manajemen proyek, prosedur, format melalui audit proyek. Mengembangkan dan mengatur kebijakan proyek, prosedur, format format dan membagi dokumentasi lainya dan Mengkoordinasikan komunikasi proyek. 43 IAMPI-PS
  • 44. PROJECT MANAGEMENT OFFICE Perbedaan antara Peran Project Manager dengan PMO: PM fokus pada tujuan proyek PMO mengelola program perubahan lingkup PM mengendalikan sumber daya sesuai tujuan proyek PMO mengoptimalkan sumber daya untuk organisasi proyek PM mengelola keterbatasan Lingkup, jadwal, biaya, dan mutu proyek dll, PMO mengelola methodologi, standar, semua risiko/peluang dan ketergantungan proyek pada tingkat perusahaan. 44 IAMPI-PS
  • 45. 45 PMO Pada Organisasi Human Resources Research New Product Development Testing & Integration Sales and Marketing Research and Development Finance IT Div. Project 1 Project 2 Project 3 Merger & Acquisition Annual Budget Corporate Restructuring & Transformation Market Research Product Launches Marketing & Sales Initiatives Recruiting Events Human Resource management System Training Programs BoD PMO Project Management Office: Fokus pada satu proyek yang memiliki kompleksitas dan risiko tinggi. IAMPI-PS
  • 46. 46 PMO Pada Organisasi Human Resources Research New Product Development Testing & Integration Sales and Marketing Research and Development Finance IT Div. Project 1 Project 2 Project 3 Merger & Acquisition Annual Budget Corporate Restructuring & Transformation Market Research Product Launches Marketing & Sales Initiatives Recruiting Events Human Resource management System Training Programs BoD PMO Program Management Office: Berada pada Bagian IT , yang mengelola berbagai ukuran /proyek dan memperpadukan sumber daya proyek proyek. IAMPI-PS
  • 47. 47 PMO Pada Organisasi Human Resources Research New Product Development Testing & Integration Sales and Marketing Research and Development Finance IT Div. Project 1 Project 2 Project 3 Merger & Acquisition Annual Budget Corporate Restructuring & Transformation Market Research Product Launches Marketing & Sales Initiatives Recruiting Events Human Resource management System Training Programs BoD PMO Portfolio Management Office: memilih, memprioritaskan, mengelola dan monitor proyek agar tercapai sasaran organisasi/perusahaan. IAMPI-PS
  • 48. STAKEHOLDERS Adalah perseorangan atau organisasi seperti : (customers, sponsors, perusahaan, atau kalayak umum) secara aktif terlibat didalam proyek atau siapa yang memiliki minat secara positif atau negatif berdampak pada kinerja atau penyelesaian proyek. Stakeholder juga menggunakan pengaruhnya terhadap proyek, hasil nya dan anggota team proyek. Berikut ini contoh dari project stakeholders : • Customers/Users • Sponsor • Portfolio Manager/portfolio review board • Program Managers • Project Management Office • Project Managers • Project Team • Functional Managers • Operation Management • Sellers/business partners PMBOK p. 23 48 IAMPI-PS
  • 49. HUBUNGAN ANTARA STAKEHOLDERS DAN PROYEK PMBOK p. 24 Portfolio Manager Program Manager Other Stakeholders Project Management Office Project Management Team Project Manager Other Project Team Memebers Customers/ Users Sellers/ Business Partners Functional Managers Operation Management Sponsor Project Stakeholders Project Team The Project Project Life Cycle and Organization 49 IAMPI-PS
  • 50. 50 9 Areas of project Management Body of Knowledge IAMPI-PS
  • 51. 51 4 Areas of Construction extension to Project Management Body of Knowledge Project Environmental Management Project Financial Management Project Claim Management Project Safety Management PMBOK ext const p. 7 IAMPI-PS
  • 53. Berbagai Jenis Persetujuan BPMIGAS • Plan of Development (POD) Rencana Pengembangan satu atau lebih lapangan migas secara terpadu (integrated) untuk memproduksikan cadangan hidrokarbon secara optimal dengan mempertimbangkan aspek teknis, ekonomis, dan HSE • Authorization for Expenditure (AFE) Otorisasi/Persetujuan pembelanjaan kapital (teknis dan biaya) • Work Program and Budget (WP&B) Persetujuan atas rencana kerja dan anggaran tahunan • Rencana Lelang, dan Usulan Pemenang Lelang • Kerja Tambah/Kurang (PLK) terhadap kontrak berjalan • AFE Closed Out Pertanggungjawaban realisasi AFE IAMPI-PS 53
  • 54. Bisnis Proses Pengajuan usulan AFE pre-FEED Evaluasi Teknis & Biaya Setuju? Rekomendasi Konsep dan biaya life-cycle-cost Setuju? Pelaksanaan pre-FEED Pengajuan usulan AFE FEED Evaluasi Teknis & Biaya Setuju? Evaluasi dan Persetujuan POD? Evaluasi POD Rekomendasi desain dgn the most cost effective solution Setuju? Pelaksanaan FEED Sesuai dengan approved POD? Pengajuan usulan AFE EPCI Evaluasi Teknis & Biaya Setuju? Start-Up and Commissioning Acceptable? Pelaksanaan EPCI AFE Close Out Placed Into Service AFE Close Out AFE Close Out IAMPI-PS 54
  • 55. POD / AFE / WP&B / PTK007 Pre-FEED FEED (Front End Engineering Design) EPCI (Detailed Engineering, Procurement, Construction, Installation) OPERASI POD Development Annual - Work Program & Budget (WP&B) AFE Fas-Prod : - Conceptual Eng. - Survey Geotechnical - Survey Geophysical - Amdal AFE Fas-Prod : - FEED (Optimisasi & Basic Design) - PMT - Survey Geotechnical - Survey Geophysical AFE Fas-Prod : - EPCI - PMT -Certification AFE Fas-Prod : - Overhaul - Upgrading - Maintenance - Modification, etc Kontrak-kontrak Pengadaan Barang & Jasa (PTK-007) IAMPI-PS 55
  • 56. Tahapan Proyek PRE-FEED FEED EPCI OPERASI Appraise Select Define Execute Operate Execute Operate FEL-0 Identify FEL-1 Appraise FEL-1 Select FEL-2 Optimize FEL-3 Define Phase-1 Identify & Assess Opportunity Phase-2 Generate & Select Alternative(s) Phase-3 Develop Preferred Alternative Phase-4 Execute Phase-5 Operate & Evaluate Appraisal Design Pre-Project Basic Engineering EPSC Comm & StartUp Operations IAMPI-PS 56