This document provides work drawings for the development and expansion of the drinking water supply system in Desa Kanamit, Maliku Subdistrict, Pulang Pisau Regency. The drawings include plans and details for a pump house, pipeline bridges, and water distribution piping. The work is being carried out by the Public Works and Spatial Planning Agency of Pulang Pisau Regency as part of a program to manage and develop drinking water systems in the regency.
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Water Supply Network Expansion in Kanamit Village
1. GAMBAR KERJA
GAMBAR KERJA
PROGRAM :
PROGRAM PENGELOLAAN DAN PENGEMBANGAN
SISTEM PENYEDIAAN AIR MINUM
KEGIATAN :
PEKERJAAN :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN
AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTA
LOKASI :
PEMBANGUNAN DAN PERLUASAN JARINGAN SPAM PASCA PAMSIMAS
DI DESA KANAMIT
KEC. MALIKU
KAB. PULANG PISAU
PEMERINTAH KABUPATEN PULANG PISAU
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
Alamat : Jln. TingangMentengNo.60Telp.
(0513) 61376 Fax.(0513) 61313 Pulang Pisau
2. LEMBAR PENGESAHAN GAMBAR KERJA
DIBUAT OLEH
KONSULTAN PERENCANAAN
CV. LISTRA ARCDIMENSI
Pusat Palangka Raya
PANDU PRATAMA, ST
DIREKTUR
MENGETAHUI
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN PULANG PISAU
MICKY PRASETIA, ST., MT
NIP. 19830114 201001 1 010
DIPERIKSA OLEH
KUASA PENGGUNA ANGGARAN/PPK
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN PULANG PISAU
TITIEN MARIA, ST
NIP. 19701031 200501 2 005
PEKERJAAN :
PEMBANGUNAN DAN PERLUASAN JARINGAN SPAM PASCA PAMSIMAS DI
DESA KANAMIT
LOKASI :
KEC. MALIKU
KAB. PULANG PISAU
TAHUN 2022
KEGIATAN :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN
AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTA
PROGRAM :
PROGRAM PENGELOLAAN DAN PENGEMBANGAN
SISTEM PENYEDIAAN AIR MINUM
PEMERINTAH KABUPATEN PULANG PISAU
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
Alamat : Jln. TingangMentengNo.60Telp.
(0513) 61376 Fax.(0513) 61313 Pulang Pisau
12. 0.80m
0.80m
Pipa 4"
Muka Tanah
POT. GATE VALVE 4"
Gate Valve 4"
Trust Block
Valve Stub Flang Full Set 4"
POTONGAN GALIAN PIPA Ø4"
Skala 1:50
0.20
0.60
13. Pipa Gip Ø4"
DETAIL PONDASI BETON JEMBATAN PIPA 3,5 M
Skala 1:25
Pipa HDPE Dia Ø4"
Elbow GI Ø4"
Pipa GIP Dia 3"
Elbow Pipa GI Dia 4"
DETAIL A
DETAIL B
POTONGAN JEMBATAN 3,5 M PIPA Ø4"
Skala 1:50
Elbow GI 45°
Pipa HDPE
Stub Flang FULL SET Ø4"
3.50
A
B
Stub Flang FULL
SET Dia Ø4"
Elbow GI 45°
Beton Pengunci
Pondasi Jembatan
Pipa Ø4"
Pondasi Beton
Pipa 50x50
Kolom 20/30
0.50
0.50
Pipa Gip Ø4"
1.00
0.20
Kolom 20/30
0.50
0.10