SlideShare a Scribd company logo
1 of 2
CV ADEEL JUNAID HAIDER
1). Name Adeel Junaid Haider
2). Father’s Name Ghulam Haider
3). Religion Islam
4). Nationality Pakistani
5) Work Permit Eligible Malaysian Work
Permit
6). Date of Birth 18-01-1991
7). Residential Address No. 18-3 Block D Jalan PJS 3/46
Taman Sri Manja 46000 Petaling Jaya Selangor MALAYSIA
8). Mobie No. 0060163757040
9). E-mail chadeelhaider@gmail.com
1O). Academic Qualification
Degree Subject University/Board Year Marks
obtained
Percentage Division
Matric Science Rawalpindi 2006 636/1050 60.57 First
11). Professional Qualification
Degree Discipline University/Board Year Marks
obtained
Percentage Division
3 years
Mech.
DAE
Mechanical PBTE, Lahore 2007-09 2536/3350 75.70 First
B. Tech
Pass.
Mechanical Preston University,
Isb
2010-12 2.7/4.0
CGPA
2.7 CGPA First
B. Tech
Hons.
Mechanical Preston University,
Isb
2012-14 3.0/4.0
CGPA
3. 0CGPA First
12).Experience: Pakistan Aeronautical complex kamra JF-17 Thunder
Aircraft / F-16 Aircraft
Seven years experience as Charge Hand (Aero Technician) JF-17 Thunder Aircraft/F-16
FTS (Flight Test station) I already worked in hydraulic system, fuel system, pneumatic system, ECS system,
Flight control system and Landing Gear system.
FUEL SYSTEM: Fuel cleaning, fuel feeding transfer sequence check and fuel system indication check,
fuel Air tightness checks, pressure refueling gravity refueling and defueling drop tank removal and
installation.
HYDRAULIC SYSTEM: Hydraulic system1&2 tightness check, Hydraulic pumps pressure check and
removal & Installion, EMG Hydraulic pump pressure check, Hydraulic break pressure(Auto break parking
break normal break anti skidding break) adjustment and removal& installation resiviour charging,
accumulator charging
FLIGHT CONTROL SYS:( aileron, trailing edge flaps, horizontal tail and rudder) adjustment and
degree checks and extension & retraction timing check
PNEUMATIC SYS: Main & EMG sys tightness check, canopy tightness, sys charging, accumulator
charging, emergency landing gear lowering, emergency break check canopy sealing check and drag chute
check
LANDING GEAR SYS: landing gear extension& retraction timing check, landing gear leg charging
tyre charging and nose wheel steering degree check and speed break check, wheel removal & installion
ECS SYS: ECS compensator water separator turbo cooler oil charging |& removal & installion, canopy
safety vale check
We done schedule unshedule aircraft maintenance work, AO(Assembly order) , aircraft maintenance work
card, preparation for ground run, preparation for flight card, post flight card.aircraft refuelling/defuelling
hydraulic charging, pneumatic charging, landing gears leg charging, wheel removal/installation, tyre
charging, accumulator charging, hydraulic pumps removal/installation
FTS(Flight test station) process include Aos Flight test work card and special maintenance works card.FTS
related schedule/unshedule maintenance. schedule/unschedule maintenance of FTS related tester/ground
equipment special tools and towing.
I can operat tester such as HTS, Vehical HTS, Habit/GPU(Ground power supply), Hydraulic charging cart
nitrogen charging trolly, fuel cleaning truck, fuel seauence track, fuel pressurization tester, jacks, ground
supports, fuel tanks pressure mearsurement unit and cockpit air tightness tester.

More Related Content

Viewers also liked (15)

West - Going the Extra Mile
West - Going the Extra MileWest - Going the Extra Mile
West - Going the Extra Mile
 
DIG. MARK. RESUME
DIG. MARK. RESUMEDIG. MARK. RESUME
DIG. MARK. RESUME
 
Appraisal-FPSO Ngoma
Appraisal-FPSO NgomaAppraisal-FPSO Ngoma
Appraisal-FPSO Ngoma
 
Koz Ref SOPH Allcorn
Koz Ref SOPH AllcornKoz Ref SOPH Allcorn
Koz Ref SOPH Allcorn
 
healthcare
healthcarehealthcare
healthcare
 
Star of the year 2006-07
Star of the year 2006-07Star of the year 2006-07
Star of the year 2006-07
 
PrezentacjaCentrumKultury
PrezentacjaCentrumKulturyPrezentacjaCentrumKultury
PrezentacjaCentrumKultury
 
Verbos taxonomia de bloom
Verbos taxonomia de bloomVerbos taxonomia de bloom
Verbos taxonomia de bloom
 
Deltaplein Bebordingsplan sloop riool nuts fase
Deltaplein Bebordingsplan sloop riool nuts faseDeltaplein Bebordingsplan sloop riool nuts fase
Deltaplein Bebordingsplan sloop riool nuts fase
 
sem-7
sem-7sem-7
sem-7
 
Mark 45 fearfully wonderfully made
Mark 45 fearfully wonderfully madeMark 45 fearfully wonderfully made
Mark 45 fearfully wonderfully made
 
Mark 45 decremented
Mark 45 decrementedMark 45 decremented
Mark 45 decremented
 
Exame n de disgnoctico
Exame n de disgnocticoExame n de disgnoctico
Exame n de disgnoctico
 
Need for speed marketing campaign
Need for speed marketing campaignNeed for speed marketing campaign
Need for speed marketing campaign
 
Fs4
Fs4Fs4
Fs4
 

Similar to CV adeeladeel.DOC (20)

Melvin-resume
Melvin-resumeMelvin-resume
Melvin-resume
 
Melvin-resume
Melvin-resumeMelvin-resume
Melvin-resume
 
Zafar
ZafarZafar
Zafar
 
Zafar
ZafarZafar
Zafar
 
JERAZEN RESUME FOR ENGINE
JERAZEN RESUME FOR ENGINEJERAZEN RESUME FOR ENGINE
JERAZEN RESUME FOR ENGINE
 
sunil manohar current cv
sunil manohar current cvsunil manohar current cv
sunil manohar current cv
 
P.s.santhosh kumar (resume).doc
P.s.santhosh kumar (resume).docP.s.santhosh kumar (resume).doc
P.s.santhosh kumar (resume).doc
 
JERAZEN RESUME for cabin
JERAZEN RESUME for cabinJERAZEN RESUME for cabin
JERAZEN RESUME for cabin
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
Hassan hunzai electrical engineer
Hassan hunzai electrical engineerHassan hunzai electrical engineer
Hassan hunzai electrical engineer
 
Ranjeev Mahan
Ranjeev MahanRanjeev Mahan
Ranjeev Mahan
 
resume
resumeresume
resume
 
JERAZ CABIN RESUME
JERAZ CABIN RESUMEJERAZ CABIN RESUME
JERAZ CABIN RESUME
 
JERAZ CABIN RESUME
JERAZ CABIN RESUMEJERAZ CABIN RESUME
JERAZ CABIN RESUME
 
ROBIN newCV
ROBIN newCV ROBIN newCV
ROBIN newCV
 
Be mech syllabus 7th_2015
Be mech syllabus 7th_2015Be mech syllabus 7th_2015
Be mech syllabus 7th_2015
 
amjad advance
amjad advanceamjad advance
amjad advance
 
Juaid Majed's CV
Juaid Majed's CVJuaid Majed's CV
Juaid Majed's CV
 
PG Diploma Pressure vessel design
PG Diploma Pressure vessel designPG Diploma Pressure vessel design
PG Diploma Pressure vessel design
 

CV adeeladeel.DOC

  • 1. CV ADEEL JUNAID HAIDER 1). Name Adeel Junaid Haider 2). Father’s Name Ghulam Haider 3). Religion Islam 4). Nationality Pakistani 5) Work Permit Eligible Malaysian Work Permit 6). Date of Birth 18-01-1991 7). Residential Address No. 18-3 Block D Jalan PJS 3/46 Taman Sri Manja 46000 Petaling Jaya Selangor MALAYSIA 8). Mobie No. 0060163757040 9). E-mail chadeelhaider@gmail.com 1O). Academic Qualification Degree Subject University/Board Year Marks obtained Percentage Division Matric Science Rawalpindi 2006 636/1050 60.57 First 11). Professional Qualification Degree Discipline University/Board Year Marks obtained Percentage Division 3 years Mech. DAE Mechanical PBTE, Lahore 2007-09 2536/3350 75.70 First B. Tech Pass. Mechanical Preston University, Isb 2010-12 2.7/4.0 CGPA 2.7 CGPA First B. Tech Hons. Mechanical Preston University, Isb 2012-14 3.0/4.0 CGPA 3. 0CGPA First 12).Experience: Pakistan Aeronautical complex kamra JF-17 Thunder Aircraft / F-16 Aircraft Seven years experience as Charge Hand (Aero Technician) JF-17 Thunder Aircraft/F-16 FTS (Flight Test station) I already worked in hydraulic system, fuel system, pneumatic system, ECS system, Flight control system and Landing Gear system.
  • 2. FUEL SYSTEM: Fuel cleaning, fuel feeding transfer sequence check and fuel system indication check, fuel Air tightness checks, pressure refueling gravity refueling and defueling drop tank removal and installation. HYDRAULIC SYSTEM: Hydraulic system1&2 tightness check, Hydraulic pumps pressure check and removal & Installion, EMG Hydraulic pump pressure check, Hydraulic break pressure(Auto break parking break normal break anti skidding break) adjustment and removal& installation resiviour charging, accumulator charging FLIGHT CONTROL SYS:( aileron, trailing edge flaps, horizontal tail and rudder) adjustment and degree checks and extension & retraction timing check PNEUMATIC SYS: Main & EMG sys tightness check, canopy tightness, sys charging, accumulator charging, emergency landing gear lowering, emergency break check canopy sealing check and drag chute check LANDING GEAR SYS: landing gear extension& retraction timing check, landing gear leg charging tyre charging and nose wheel steering degree check and speed break check, wheel removal & installion ECS SYS: ECS compensator water separator turbo cooler oil charging |& removal & installion, canopy safety vale check We done schedule unshedule aircraft maintenance work, AO(Assembly order) , aircraft maintenance work card, preparation for ground run, preparation for flight card, post flight card.aircraft refuelling/defuelling hydraulic charging, pneumatic charging, landing gears leg charging, wheel removal/installation, tyre charging, accumulator charging, hydraulic pumps removal/installation FTS(Flight test station) process include Aos Flight test work card and special maintenance works card.FTS related schedule/unshedule maintenance. schedule/unschedule maintenance of FTS related tester/ground equipment special tools and towing. I can operat tester such as HTS, Vehical HTS, Habit/GPU(Ground power supply), Hydraulic charging cart nitrogen charging trolly, fuel cleaning truck, fuel seauence track, fuel pressurization tester, jacks, ground supports, fuel tanks pressure mearsurement unit and cockpit air tightness tester.