SlideShare a Scribd company logo
1 of 14
Download to read offline
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR
ANANTAPUR - 515002 (A.P.) INDIA
EXAMINATION BRANCH
B Tech III Year I Semester (R09) Supplementary Examinations - May 2013 Results
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
M M ARUNACHALAM094E1A0202
9A02504 POWER ELECTRONICS 25 8 33 F 0
9A02506 ELECTRICAL MACHINES LAB ‐ II 17 35 52 P 2
NESA BALA VENKATAPATHI094E1A0204
9A02504 POWER ELECTRONICS 21 25 46 P 4
CHEEMALA PRASANTH KUMAR094E1A0234
9A02505 ELECTRICAL MACHINES III 23 34 57 P 4
S PRAVEEN094E1A0235
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 15 30 45 P 4
JALLA SEKHAR094E1A0245
9A02502 TRANSMISSION OF ELECTRIC POWER 15 AB 15 F 0
9A02503 CONTROL SYSTEMS 16 AB 16 F 0
KOTAPATI CHAITHANYA KUMAR094E1A0405
9A04502 LINEAR IC APPLICATIONS 18 18 36 F 0
9A04504 DIGITAL IC APPLICATIONS 16 6 22 F 0
N HARSHA VARDHANA REDDY094E1A0415
9A04504 DIGITAL IC APPLICATIONS 19 25 44 P 4
RAGI MAHENDRA094E1A0428
9A05406 COMPUTER ORGANIZATION 19 AB 19 F 0
VELLORE SAI PRADEEP094E1A0442
9A02503 CONTROL SYSTEMS 17 14 31 F 0
9A04502 LINEAR IC APPLICATIONS 16 18 34 F 0
9A04504 DIGITAL IC APPLICATIONS 13 0 13 F 0
CHEMBETI VASU094E1A0456
9A04504 DIGITAL IC APPLICATIONS 23 0 23 F 0
PENDLIMARRI ANANDA BABU094E1A0502
9A05503 COMPUTER GRAPHICS 25 2 27 F 0
S DHALAPATHI094E1A0510
9A05503 COMPUTER GRAPHICS 20 AB 20 F 0
G JANAKIRAM094E1A0517
Page 1 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A05505 OPERATING SYSTEMS 19 AB 19 F 0
A BHARATH094E1A1206
9A04602 MICROPROCESSORS & MICROCONTROLLERS 9 31 40 P 4
9A12501 AUTOMATA & COMPILER DESIGN 19 13 32 F 0
DINNEPATI LOKESH094E1A1220
9A05505 OPERATING SYSTEMS 25 9 34 F 0
PERUMBEDU NAVEENKUMAR094E1A1224
9A05502 SOFTWARE ENGINEERING 18 AB 18 F 0
9A12501 AUTOMATA & COMPILER DESIGN 19 AB 19 F 0
9A12502 WEB PROGRAMMING 22 AB 22 F 0
NAGAPATLA ANAND104E1A0102
9A01502 CONCRETE TECHNOLOGY 22 AB 22 F 0
9A01504 STRUCTURAL ANALYSIS II 20 AB 20 F 0
9A01505 ENGINEERING GEOLOGY 15 7 22 F 0
BACHU DATTA SAI104E1A0111
9A01502 CONCRETE TECHNOLOGY 25 AB 25 F 0
9A01505 ENGINEERING GEOLOGY 23 0 23 F 0
YAMMANURU DINESH KUMAR REDDY104E1A0114
9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 23 28 51 P 4
CHUKKALA JAYAKRISHNA104E1A0118
9A01503 WATER RESOURCES ENGINEERING I 25 AB 25 F 0
9A01504 STRUCTURAL ANALYSIS II 22 AB 22 F 0
9A01505 ENGINEERING GEOLOGY 18 28 46 P 4
THIMMISETTY KESAVA REDDY104E1A0121
9A01503 WATER RESOURCES ENGINEERING I 20 25 45 P 4
KOTI MOGILESWAR104E1A0126
9A01502 CONCRETE TECHNOLOGY 22 AB 22 F 0
9A01504 STRUCTURAL ANALYSIS II 26 AB 26 F 0
ARIMBAKKAM MUNIRATHNAM104E1A0128
9A01503 WATER RESOURCES ENGINEERING I 20 4 24 F 0
9A01505 ENGINEERING GEOLOGY 25 AB 25 F 0
BALAIAHGARI NAVEENKRISHNA104E1A0130
9A01505 ENGINEERING GEOLOGY 24 26 50 P 4
PADIRI PARTHA SARADHY REDDY104E1A0132
9A01503 WATER RESOURCES ENGINEERING I 26 7 33 F 0
9A01505 ENGINEERING GEOLOGY 22 14 36 F 0
N SREEKAR104E1A0147
Page 2 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A01505 ENGINEERING GEOLOGY 26 26 52 P 4
K SUDHIR KUMAR104E1A0149
9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 19 14 33 F 0
9A01502 CONCRETE TECHNOLOGY 22 31 53 P 4
9A01504 STRUCTURAL ANALYSIS II 21 25 46 P 4
SURESH NALLAGATLA104E1A0150
9A01502 CONCRETE TECHNOLOGY 25 39 64 P 4
NAGINENI UDAY KRISHNA104E1A0153
9A01505 ENGINEERING GEOLOGY 25 AB 25 F 0
S UDAY VARMA104E1A0154
9A01503 WATER RESOURCES ENGINEERING I 24 8 32 F 0
CUDAPA VASU104E1A0155
9A01505 ENGINEERING GEOLOGY 26 28 54 P 4
TANGUTOORI VIJAY KUMAR104E1A0158
9A01503 WATER RESOURCES ENGINEERING I 28 26 54 P 4
GILAKAPATI YASODHA104E1A0159
9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 28 17 45 F 0
9A01502 CONCRETE TECHNOLOGY 23 41 64 P 4
9A01505 ENGINEERING GEOLOGY 27 52 79 P 4
KOLATHURU BALA SEKHAR104E1A0202
9A02503 CONTROL SYSTEMS 25 AB 25 F 0
9A02504 POWER ELECTRONICS 18 AB 18 F 0
KOLLURU CHARAN KUMAR104E1A0204
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 18 AB 18 F 0
9A02503 CONTROL SYSTEMS 24 9 33 F 0
9A02504 POWER ELECTRONICS 22 AB 22 F 0
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 26 AB 26 F 0
DUGGANI GOPI104E1A0210
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 15 25 40 P 4
9A02503 CONTROL SYSTEMS 22 8 30 F 0
9A02504 POWER ELECTRONICS 23 28 51 P 4
B HEMANTH KUMAR104E1A0211
9A02503 CONTROL SYSTEMS 18 11 29 F 0
9A02505 ELECTRICAL MACHINES III 19 26 45 P 4
GUNDLAPALLI JAGADEESH104E1A0212
9A02503 CONTROL SYSTEMS 23 30 53 P 4
RAMBA JAHNAVI104E1A0213
Page 3 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 25 37 62 P 4
KONIDALA JYOSHNA104E1A0215
9A02504 POWER ELECTRONICS 24 28 52 P 4
G JYOTHSNA104E1A0216
9A02503 CONTROL SYSTEMS 23 14 37 F 0
BUKYA KALYANI104E1A0217
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 20 40 60 P 4
9A02504 POWER ELECTRONICS 23 25 48 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 28 33 61 P 4
MOODE KIRAN KUMAR NAIK104E1A0218
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 20 37 57 P 4
9A02504 POWER ELECTRONICS 20 25 45 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 26 25 51 P 4
PINNAMREDDY KUMARASWAMI REDDY104E1A0219
9A02504 POWER ELECTRONICS 27 32 59 P 4
M LEPAKSHI104E1A0220
9A02504 POWER ELECTRONICS 21 25 46 P 4
LEKKALA LOKESH104E1A0222
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 18 18 36 F 0
9A02503 CONTROL SYSTEMS 30 AB 30 F 0
9A02504 POWER ELECTRONICS 25 25 50 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 26 15 41 F 0
P MADHAN KUMAR104E1A0223
9A02503 CONTROL SYSTEMS 24 7 31 F 0
9A02504 POWER ELECTRONICS 21 27 48 P 4
VELAPPAGARI MANI104E1A0225
9A02504 POWER ELECTRONICS 19 27 46 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 25 AB 25 F 0
P MANOJ KUMAR104E1A0227
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 19 25 44 P 4
9A02503 CONTROL SYSTEMS 22 11 33 F 0
9A02504 POWER ELECTRONICS 21 25 46 P 4
B V MURALI104E1A0231
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 28 AB 28 F 0
9A02504 POWER ELECTRONICS 27 28 55 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 27 AB 27 F 0
SHAIK NAZEEBULLA PEER104E1A0235
Page 4 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A02505 ELECTRICAL MACHINES III 26 25 51 P 4
B PRASANNA KUMARI104E1A0237
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 30 25 55 P 4
KOTTAKONDA SARAVANA104E1A0241
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 28 31 59 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 29 30 59 P 4
A SATHEESH104E1A0242
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 25 25 50 P 4
9A02504 POWER ELECTRONICS 23 18 41 F 0
B SRAVAN104E1A0244
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 17 25 42 P 4
9A02503 CONTROL SYSTEMS 22 1 23 F 0
9A02504 POWER ELECTRONICS 20 16 36 F 0
9A02505 ELECTRICAL MACHINES III 19 0 19 F 0
MANDATI VARMA104E1A0250
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 26 31 57 P 4
BONA VENKATESWARA REDDY104E1A0256
9A02504 POWER ELECTRONICS 18 25 43 P 4
T VIKRAM104E1A0258
9A02503 CONTROL SYSTEMS 23 16 39 F 0
D S AKBAR BASHA104E1A0402
9A02503 CONTROL SYSTEMS 27 29 56 P 4
9A04503 ANTENNAS & WAVE PROPAGATION 26 6 32 F 0
KANDAPAREDDY AMARNADH104E1A0404
9A02503 CONTROL SYSTEMS 25 AB 25 F 0
9A04503 ANTENNAS & WAVE PROPAGATION 23 AB 23 F 0
9A04504 DIGITAL IC APPLICATIONS 26 1 27 F 0
9A05406 COMPUTER ORGANIZATION 23 12 35 F 0
SANGAPU ANANDA BABU104E1A0405
9A02503 CONTROL SYSTEMS 23 25 48 P 4
9A04504 DIGITAL IC APPLICATIONS 27 25 52 P 4
R ARJUN HARISH CHANDRASHEKAR104E1A0407
9A05406 COMPUTER ORGANIZATION 29 25 54 P 4
SHAIK AZAZALI104E1A0410
9A04503 ANTENNAS & WAVE PROPAGATION 27 7 34 F 0
K BHANU PRAKASH NAIK104E1A0411
9A04503 ANTENNAS & WAVE PROPAGATION 27 5 32 F 0
Page 5 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A04504 DIGITAL IC APPLICATIONS 21 25 46 P 4
9A05406 COMPUTER ORGANIZATION 23 16 39 F 0
CHELAGOLA BHARGAV KRISHNA104E1A0412
9A05406 COMPUTER ORGANIZATION 29 12 41 F 0
J BINDU104E1A0416
9A05406 COMPUTER ORGANIZATION 30 31 61 P 4
M BINDU104E1A0417
9A04504 DIGITAL IC APPLICATIONS 28 12 40 F 0
PANDLURU CHANDANA PRIYA104E1A0419
9A04504 DIGITAL IC APPLICATIONS 22 9 31 F 0
D CHANDRA PRAVEEN104E1A0420
9A04501 ANALOG COMMUNICATIONS 28 18 46 F 0
9A04502 LINEAR IC APPLICATIONS 20 26 46 P 4
9A04503 ANTENNAS & WAVE PROPAGATION 23 6 29 F 0
9A04504 DIGITAL IC APPLICATIONS 26 25 51 P 4
9A05406 COMPUTER ORGANIZATION 25 12 37 F 0
MARRI CHANDRASEKHAR104E1A0421
9A05406 COMPUTER ORGANIZATION 27 29 56 P 4
SESHADRI DEEPAKSRINIVAS104E1A0423
9A04504 DIGITAL IC APPLICATIONS 28 25 53 P 4
BANDI DEVI104E1A0425
9A05406 COMPUTER ORGANIZATION 28 15 43 F 0
N GANESH104E1A0428
9A04502 LINEAR IC APPLICATIONS 9 15 24 F 0
9A04504 DIGITAL IC APPLICATIONS 14 3 17 F 0
9A05406 COMPUTER ORGANIZATION 25 12 37 F 0
SAVATA GANESH104E1A0430
9A05406 COMPUTER ORGANIZATION 25 26 51 P 4
GURRAMPATI GURUMOHAN REDDY104E1A0434
9A04504 DIGITAL IC APPLICATIONS 29 25 54 P 4
GOLLAPALLI HEMADRI104E1A0436
9A04504 DIGITAL IC APPLICATIONS 28 16 44 F 0
POTHUGUNTA HEMANTH104E1A0438
9A05406 COMPUTER ORGANIZATION 29 32 61 P 4
MATTIPALA JAGADEESH104E1A0440
9A05406 COMPUTER ORGANIZATION 28 17 45 F 0
T JANARDHAN104E1A0442
9A05406 COMPUTER ORGANIZATION 29 30 59 P 4
Page 6 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
C KUMAR104E1A0447
9A04501 ANALOG COMMUNICATIONS 20 29 49 P 4
9A04502 LINEAR IC APPLICATIONS 15 AB 15 F 0
PADIRI KUPPAM LAVANYA104E1A0450
9A05406 COMPUTER ORGANIZATION 30 41 71 P 4
VIRAGADINLA LOKESH KUMAR104E1A0453
9A04504 DIGITAL IC APPLICATIONS 28 30 58 P 4
P MADHURI104E1A0455
9A05406 COMPUTER ORGANIZATION 23 33 56 P 4
CHALAMAGUNTA MADHUSUDHAN104E1A0456
9A04501 ANALOG COMMUNICATIONS 17 15 32 F 0
9A04502 LINEAR IC APPLICATIONS 15 17 32 F 0
P MANJUNATH104E1A0459
9A05406 COMPUTER ORGANIZATION 28 34 62 P 4
CHITTAM MOHAN BABU104E1A0460
9A02503 CONTROL SYSTEMS 24 AB 24 F 0
9A04501 ANALOG COMMUNICATIONS 22 32 54 P 4
9A04502 LINEAR IC APPLICATIONS 17 35 52 P 4
BASAPURAMGOVINDAPPAGARI NAGARAJU104E1A0464
9A04501 ANALOG COMMUNICATIONS 19 15 34 F 0
9A04504 DIGITAL IC APPLICATIONS 28 25 53 P 4
9A05406 COMPUTER ORGANIZATION 26 9 35 F 0
THALURU NARESH104E1A0466
9A02503 CONTROL SYSTEMS 19 32 51 P 4
9A04503 ANTENNAS & WAVE PROPAGATION 26 5 31 F 0
JANARDHANA NAVEEN KUMAR104E1A0468
9A04504 DIGITAL IC APPLICATIONS 26 9 35 F 0
9A05406 COMPUTER ORGANIZATION 27 16 43 F 0
C PARIMALA104E1A0471
9A04504 DIGITAL IC APPLICATIONS 21 25 46 P 4
VADAPALLI PAVAN104E1A0472
9A05406 COMPUTER ORGANIZATION 24 15 39 F 0
MAGATHALA RAGHU104E1A0476
9A05406 COMPUTER ORGANIZATION 28 15 43 F 0
G RAJASEKHAR104E1A0477
9A02503 CONTROL SYSTEMS 20 AB 20 F 0
9A04503 ANTENNAS & WAVE PROPAGATION 27 AB 27 F 0
9A04504 DIGITAL IC APPLICATIONS 28 AB 28 F 0
Page 7 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
M RASUKUTTI104E1A0479
9A02503 CONTROL SYSTEMS 17 13 30 F 0
9A04503 ANTENNAS & WAVE PROPAGATION 26 17 43 F 0
9A04504 DIGITAL IC APPLICATIONS 27 16 43 F 0
S ROHINI104E1A0481
9A05406 COMPUTER ORGANIZATION 29 27 56 P 4
R SAIPRASAD104E1A0484
9A02503 CONTROL SYSTEMS 25 AB 25 F 0
9A04502 LINEAR IC APPLICATIONS 23 AB 23 F 0
9A04503 ANTENNAS & WAVE PROPAGATION 23 AB 23 F 0
9A04504 DIGITAL IC APPLICATIONS 26 AB 26 F 0
9A05406 COMPUTER ORGANIZATION 27 AB 27 F 0
GANJI SAICHAND104E1A0486
9A05406 COMPUTER ORGANIZATION 27 35 62 P 4
AMUDALAGUNASEKARAN SARANYA104E1A0490
9A05406 COMPUTER ORGANIZATION 30 31 61 P 4
K P SATHYA PRIYA104E1A0491
9A04502 LINEAR IC APPLICATIONS 23 46 69 P 4
KOGURU REDDI SHARMILA104E1A0494
9A05406 COMPUTER ORGANIZATION 27 26 53 P 4
ETAY STALIN EMMANUEL104E1A0498
9A05406 COMPUTER ORGANIZATION 20 16 36 F 0
KANAPARTHI SUNDARARAMI REDDY104E1A04A1
9A04504 DIGITAL IC APPLICATIONS 28 30 58 P 4
BATTU SUNIL BABU104E1A04A2
9A05406 COMPUTER ORGANIZATION 21 14 35 F 0
BUSINENI SUNILKUMAR104E1A04A3
9A02503 CONTROL SYSTEMS 15 AB 15 F 0
9A04501 ANALOG COMMUNICATIONS 21 AB 21 F 0
9A04502 LINEAR IC APPLICATIONS 18 AB 18 F 0
9A04503 ANTENNAS & WAVE PROPAGATION 21 AB 21 F 0
9A04504 DIGITAL IC APPLICATIONS 20 AB 20 F 0
9A04505 LINEAR & DIGITAL IC APPLICATIONS LAB 22 34 56 P 2
MANNAM SUNIL KUMAR104E1A04A4
9A04503 ANTENNAS & WAVE PROPAGATION 24 12 36 F 0
P SUNIL104E1A04A5
9A04501 ANALOG COMMUNICATIONS 20 25 45 P 4
Page 8 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A04504 DIGITAL IC APPLICATIONS 25 26 51 P 4
BATHALA SURYA PRADEEP104E1A04A8
9A04503 ANTENNAS & WAVE PROPAGATION 26 14 40 F 0
L THARUN104E1A04B0
9A05406 COMPUTER ORGANIZATION 25 10 35 F 0
MANDADI VENKATESH104E1A04B4
9A02503 CONTROL SYSTEMS 26 41 67 P 4
NADI NTI VILSONKUMAR104E1A04B5
9A04504 DIGITAL IC APPLICATIONS 28 28 56 P 4
9A05406 COMPUTER ORGANIZATION 24 14 38 F 0
N VINODH KUMAR104E1A04B6
9A04501 ANALOG COMMUNICATIONS 23 28 51 P 4
9A04502 LINEAR IC APPLICATIONS 17 14 31 F 0
THOTI YUVARAJU104E1A04B9
9A05406 COMPUTER ORGANIZATION 28 31 59 P 4
A U ABIRAMI104E1A0501
9A05503 COMPUTER GRAPHICS 27 29 56 P 4
K BALUMAHENDRA104E1A0504
9A05503 COMPUTER GRAPHICS 25 1 26 F 0
9A05504 COMPILER DESIGN 16 0 16 F 0
9A05505 OPERATING SYSTEMS 23 9 32 F 0
M BHARGAVI104E1A0505
9A05501 PRINCIPLES OF PROGRAMMING LANGUAGES 30 33 63 P 4
9A05502 SOFTWARE ENGINEERING 30 29 59 P 4
9A05503 COMPUTER GRAPHICS 28 28 56 P 4
MANGUMURI CHAMUNDI104E1A0506
9A05503 COMPUTER GRAPHICS 27 26 53 P 4
VANNE DEEPA104E1A0511
9A05503 COMPUTER GRAPHICS 29 27 56 P 4
THOTA ESWARAMMA104E1A0515
9A05503 COMPUTER GRAPHICS 24 25 49 P 4
V K GAYATHRI104E1A0516
9A05503 COMPUTER GRAPHICS 21 AB 21 F 0
MOPURI GOPAIAH104E1A0517
9A05503 COMPUTER GRAPHICS 28 25 53 P 4
9A05505 OPERATING SYSTEMS 21 26 47 P 4
9A05506 COMPUTER NETWORKS 26 25 51 P 4
LINGALA GOVARDHAN REDDY104E1A0518
Page 9 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A05503 COMPUTER GRAPHICS 25 AB 25 F 0
ENAGANTI HARIKUMAR104E1A0519
9A05503 COMPUTER GRAPHICS 25 25 50 P 4
JAGADHABHI INDUMATHI104E1A0520
9A05503 COMPUTER GRAPHICS 27 29 56 P 4
POOJARI JAGADEESH104E1A0521
9A05502 SOFTWARE ENGINEERING 28 26 54 P 4
9A05505 OPERATING SYSTEMS 26 27 53 P 4
SALVA KAVYA104E1A0522
9A05503 COMPUTER GRAPHICS 25 11 36 F 0
KEERTHY P104E1A0523
9A05503 COMPUTER GRAPHICS 28 29 57 P 4
C A KRISHNAN104E1A0524
9A05505 OPERATING SYSTEMS 25 43 68 P 4
EDDUDHALA KUSUMA104E1A0525
9A05503 COMPUTER GRAPHICS 24 AB 24 F 0
MUKKARA MONICA CHOUDARY104E1A0528
9A05502 SOFTWARE ENGINEERING 27 25 52 P 4
9A05503 COMPUTER GRAPHICS 24 18 42 F 0
9A05505 OPERATING SYSTEMS 18 25 43 P 4
DOMMARAJU NAGA TEJA104E1A0530
9A05502 SOFTWARE ENGINEERING 27 25 52 P 4
JALAGAM NAVEEN KUMAR104E1A0531
9A05503 COMPUTER GRAPHICS 29 25 54 P 4
M S NAVEEN KUMAR104E1A0532
9A05503 COMPUTER GRAPHICS 21 12 33 F 0
C RAJESH104E1A0535
9A05503 COMPUTER GRAPHICS 22 14 36 F 0
N RANJITHKUMAR104E1A0537
9A05503 COMPUTER GRAPHICS 26 25 51 P 4
9A05504 COMPILER DESIGN 23 9 32 F 0
9A05505 OPERATING SYSTEMS 22 25 47 P 4
KS RUBYANIRMAL KUMAR104E1A0538
9A05503 COMPUTER GRAPHICS 24 18 42 F 0
9A05505 OPERATING SYSTEMS 24 13 37 F 0
J N RUPESH104E1A0539
9A05502 SOFTWARE ENGINEERING 28 34 62 P 4
9A05503 COMPUTER GRAPHICS 25 16 41 F 0
Page 10 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A05505 OPERATING SYSTEMS 20 11 31 F 0
ALAGESAN SATHYA104E1A0541
9A05503 COMPUTER GRAPHICS 25 14 39 F 0
SHAVALA SHAILAJA104E1A0542
9A05501 PRINCIPLES OF PROGRAMMING LANGUAGES 15 5 20 F 0
9A05504 COMPILER DESIGN 15 AB 15 F 0
9A05505 OPERATING SYSTEMS 18 AB 18 F 0
KATTA SIVA PRASAD104E1A0544
9A05503 COMPUTER GRAPHICS 25 12 37 F 0
9A05504 COMPILER DESIGN 26 15 41 F 0
AKKUPALLI SRUTHI104E1A0545
9A05503 COMPUTER GRAPHICS 26 25 51 P 4
M SUDHA SRINIVAS104E1A0546
9A05505 OPERATING SYSTEMS 20 27 47 P 4
DOMMARAJU SUNANDA104E1A0547
9A05502 SOFTWARE ENGINEERING 28 25 53 P 4
9A05503 COMPUTER GRAPHICS 26 14 40 F 0
9A05504 COMPILER DESIGN 27 9 36 F 0
9A05505 OPERATING SYSTEMS 26 16 42 F 0
A THEJASWINI104E1A0554
9A05503 COMPUTER GRAPHICS 27 18 45 F 0
AKEPATI ANIL KUMAR REDDY104E1A1202
9A05505 OPERATING SYSTEMS 23 8 31 F 0
K BHARATH104E1A1205
9A04602 MICROPROCESSORS & MICROCONTROLLERS 21 AB 21 F 0
9A05505 OPERATING SYSTEMS 27 AB 27 F 0
9A12501 AUTOMATA & COMPILER DESIGN 27 AB 27 F 0
N BHARGAV104E1A1206
9A05502 SOFTWARE ENGINEERING 25 AB 25 F 0
9A05506 COMPUTER NETWORKS 24 14 38 F 0
L BINDU104E1A1207
9A12502 WEB PROGRAMMING 22 AB 22 F 0
K DHARANI104E1A1208
9A04602 MICROPROCESSORS & MICROCONTROLLERS 21 27 48 P 4
9A12501 AUTOMATA & COMPILER DESIGN 16 25 41 P 4
AS HEMALATHA104E1A1213
9A05505 OPERATING SYSTEMS 28 25 53 P 4
SANDRA KARYAVARDHI104E1A1215
Page 11 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A12502 WEB PROGRAMMING 24 37 61 P 4
M KISHORE KUMAR104E1A1216
9A12502 WEB PROGRAMMING 21 35 56 P 4
M R MAHENDRA104E1A1217
9A04602 MICROPROCESSORS & MICROCONTROLLERS 22 27 49 P 4
9A05506 COMPUTER NETWORKS 26 25 51 P 4
9A12501 AUTOMATA & COMPILER DESIGN 28 25 53 P 4
9A12502 WEB PROGRAMMING 21 AB 21 F 0
BHAKTHAN MONIKA REDDY104E1A1219
9A04602 MICROPROCESSORS & MICROCONTROLLERS 25 26 51 P 4
PULIGORU MRUDULA104E1A1221
9A05505 OPERATING SYSTEMS 21 13 34 F 0
S POORNIMA104E1A1224
9A05505 OPERATING SYSTEMS 24 2 26 F 0
P PRATHEEP104E1A1225
9A04602 MICROPROCESSORS & MICROCONTROLLERS 24 32 56 P 4
POTHURU PRAVEEN KUMAR104E1A1226
9A04602 MICROPROCESSORS & MICROCONTROLLERS 23 29 52 P 4
9A05505 OPERATING SYSTEMS 25 12 37 F 0
9A12501 AUTOMATA & COMPILER DESIGN 22 0 22 F 0
9A12502 WEB PROGRAMMING 26 27 53 P 4
DASARIRAJU RAJESH104E1A1227
9A04602 MICROPROCESSORS & MICROCONTROLLERS 19 AB 19 F 0
9A12502 WEB PROGRAMMING 28 AB 28 F 0
MUNTHA SANDEEP YADAV104E1A1229
9A05505 OPERATING SYSTEMS 26 25 51 P 4
A SANTHOSH KUMAR104E1A1230
9A04602 MICROPROCESSORS & MICROCONTROLLERS 22 27 49 P 4
9A05502 SOFTWARE ENGINEERING 26 27 53 P 4
9A05506 COMPUTER NETWORKS 20 16 36 F 0
V SPANDANA104E1A1234
9A04602 MICROPROCESSORS & MICROCONTROLLERS 27 27 54 P 4
9A05502 SOFTWARE ENGINEERING 30 27 57 P 4
MUDDULURU SRAVANI104E1A1235
9A04602 MICROPROCESSORS & MICROCONTROLLERS 27 37 64 P 4
S SRINATH104E1A1236
9A05502 SOFTWARE ENGINEERING 26 15 41 F 0
Page 12 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A05505 OPERATING SYSTEMS 26 12 38 F 0
9A12501 AUTOMATA & COMPILER DESIGN 26 25 51 P 4
P SRUTHI104E1A1238
9A04602 MICROPROCESSORS & MICROCONTROLLERS 23 25 48 P 4
9A05502 SOFTWARE ENGINEERING 30 16 46 F 0
NARRAVULA TEJESWARI104E1A1240
9A05505 OPERATING SYSTEMS 30 16 46 F 0
KEERTHIPATI THEJASWI104E1A1241
9A04602 MICROPROCESSORS & MICROCONTROLLERS 24 26 50 P 4
P VIKRAM104E1A1243
9A04602 MICROPROCESSORS & MICROCONTROLLERS 28 26 54 P 4
9A12501 AUTOMATA & COMPILER DESIGN 22 9 31 F 0
9A12502 WEB PROGRAMMING 26 AB 26 F 0
A YAMINI104E1A1247
9A05502 SOFTWARE ENGINEERING 28 25 53 P 4
9A05505 OPERATING SYSTEMS 30 8 38 F 0
CHINTA GANESH104E5A0203
9A02503 CONTROL SYSTEMS 16 25 41 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 24 25 49 P 4
SK ARIFF AHAMED114E5A0101
9A01502 CONCRETE TECHNOLOGY 24 32 56 P 4
DASU LAKSHMI NARAYANA114E5A0103
9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 27 28 55 P 4
9A01502 CONCRETE TECHNOLOGY 24 38 62 P 4
GUNDLURI SADDHAM114E5A0107
9A01502 CONCRETE TECHNOLOGY 30 53 83 P 4
9A01503 WATER RESOURCES ENGINEERING I 28 35 63 P 4
9A01504 STRUCTURAL ANALYSIS II 30 46 76 P 4
NAMPALLI CHANDU114E5A0201
9A02503 CONTROL SYSTEMS 25 14 39 F 0
9A02504 POWER ELECTRONICS 22 27 49 P 4
CHITTI BOINA GANGAIAH114E5A0203
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 29 AB 29 F 0
BUSAPALLI SIVA KUMAR114E5A0207
9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 28 25 53 P 4
9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 29 AB 29 F 0
NALLAPERUMALAGARI SIVA114E5A0208
Page 13 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A02503 CONTROL SYSTEMS 28 29 57 P 4
ROYAL VENKATA MUNI114E5A0210
9A02502 TRANSMISSION OF ELECTRIC POWER 23 29 52 P 4
9A02503 CONTROL SYSTEMS 9 2 11 F 0
9A02504 POWER ELECTRONICS 25 32 57 P 4
KUDUMALA VENKATA RAMANAIAH114E5A0405
9A05406 COMPUTER ORGANIZATION 25 30 55 P 4
Y SURESH114E5A0501
9A05503 COMPUTER GRAPHICS 25 25 50 P 4
Page 14 of 14
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 17, 2013

More Related Content

What's hot

B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsVARIGONDA GOPI
 
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013P.G.GOPI NATH
 
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011P.G.GOPI NATH
 
B.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam resultsB.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam resultsVARIGONDA GOPI
 
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIi b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsAB Madhu Mohana Raju
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013P.G.GOPI NATH
 
I year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsI year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsVARIGONDA GOPI
 
IV B.TECH. II SEM R09 REG APRIL 2013
IV B.TECH. II SEM R09 REG APRIL 2013IV B.TECH. II SEM R09 REG APRIL 2013
IV B.TECH. II SEM R09 REG APRIL 2013P.G.GOPI NATH
 
Iii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 resultsIii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 resultsVARIGONDA GOPI
 
B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013prasadmvreddy
 
B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013prasadmvreddy
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsVARIGONDA GOPI
 
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013P.G.GOPI NATH
 
B.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsB.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsVARIGONDA GOPI
 
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013P.G.GOPI NATH
 
B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012VARIGONDA GOPI
 
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsAB Madhu Mohana Raju
 
4 e b.tech i-r07-supplementary results
4 e b.tech i-r07-supplementary results4 e b.tech i-r07-supplementary results
4 e b.tech i-r07-supplementary resultsVARIGONDA GOPI
 

What's hot (20)

B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 Results
 
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
 
4 e 21r07s (1)
4 e 21r07s (1)4 e 21r07s (1)
4 e 21r07s (1)
 
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
 
4 e 31r07s (1)
4 e 31r07s (1)4 e 31r07s (1)
4 e 31r07s (1)
 
B.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam resultsB.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam results
 
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIi b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams results
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
 
I year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsI year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 results
 
IV B.TECH. II SEM R09 REG APRIL 2013
IV B.TECH. II SEM R09 REG APRIL 2013IV B.TECH. II SEM R09 REG APRIL 2013
IV B.TECH. II SEM R09 REG APRIL 2013
 
Iii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 resultsIii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 results
 
B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013
 
B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 results
 
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
 
B.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsB.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 results
 
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
 
B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012
 
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams results
 
4 e b.tech i-r07-supplementary results
4 e b.tech i-r07-supplementary results4 e b.tech i-r07-supplementary results
4 e b.tech i-r07-supplementary results
 

Similar to Iii b.tech i sem (r09) supple exams may 2013 results

B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...VARIGONDA GOPI
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Karthik Kumar
 
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam resultsB.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam resultsVARIGONDA GOPI
 
Iv ii r09 advance supple aug-2014
Iv ii r09  advance supple aug-2014Iv ii r09  advance supple aug-2014
Iv ii r09 advance supple aug-2014VARIGONDA GOPI
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...Karthik Kumar
 
2 1 reg R09 2012 results
2 1 reg R09 2012 results2 1 reg R09 2012 results
2 1 reg R09 2012 resultsKarthik Kumar
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012Karthik Kumar
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)Karthik Kumar
 
3 1 R09 supply-may-2012
3 1  R09  supply-may-20123 1  R09  supply-may-2012
3 1 R09 supply-may-2012Karthik Kumar
 
I year supple pending results-may 2012.pdf
I year supple  pending results-may 2012.pdfI year supple  pending results-may 2012.pdf
I year supple pending results-may 2012.pdfKarthik Kumar
 
Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)Karthik Kumar
 
3 u i year (r09) supple novdec 11 results
3 u i year (r09) supple novdec  11 results3 u i year (r09) supple novdec  11 results
3 u i year (r09) supple novdec 11 resultsKarthik Kumar
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012Karthik Kumar
 
III-I (R09) supple results may 2012
III-I (R09) supple results may 2012III-I (R09) supple results may 2012
III-I (R09) supple results may 2012SISTKEXAMSECTION
 

Similar to Iii b.tech i sem (r09) supple exams may 2013 results (20)

B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012
 
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam resultsB.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
 
Iv ii r09 advance supple aug-2014
Iv ii r09  advance supple aug-2014Iv ii r09  advance supple aug-2014
Iv ii r09 advance supple aug-2014
 
2 1 R09 supply
2 1  R09  supply2 1  R09  supply
2 1 R09 supply
 
2 1 R09 supply(2)
2 1 R09  supply(2)2 1 R09  supply(2)
2 1 R09 supply(2)
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
 
3 u 3-1 reg r09
3 u  3-1 reg r093 u  3-1 reg r09
3 u 3-1 reg r09
 
2 1 reg R09 2012 results
2 1 reg R09 2012 results2 1 reg R09 2012 results
2 1 reg R09 2012 results
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)
 
3 1 R09 supply-may-2012
3 1  R09  supply-may-20123 1  R09  supply-may-2012
3 1 R09 supply-may-2012
 
I year supple pending results-may 2012.pdf
I year supple  pending results-may 2012.pdfI year supple  pending results-may 2012.pdf
I year supple pending results-may 2012.pdf
 
Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)
 
3 2 sem R09 regular
3 2 sem R09 regular3 2 sem R09 regular
3 2 sem R09 regular
 
I b tech results(2)
I b tech results(2)I b tech results(2)
I b tech results(2)
 
I b tech results
I b tech resultsI b tech results
I b tech results
 
3 u i year (r09) supple novdec 11 results
3 u i year (r09) supple novdec  11 results3 u i year (r09) supple novdec  11 results
3 u i year (r09) supple novdec 11 results
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012
 
III-I (R09) supple results may 2012
III-I (R09) supple results may 2012III-I (R09) supple results may 2012
III-I (R09) supple results may 2012
 

Recently uploaded

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 

Recently uploaded (20)

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Iii b.tech i sem (r09) supple exams may 2013 results

  • 1. JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR ANANTAPUR - 515002 (A.P.) INDIA EXAMINATION BRANCH B Tech III Year I Semester (R09) Supplementary Examinations - May 2013 Results SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS M M ARUNACHALAM094E1A0202 9A02504 POWER ELECTRONICS 25 8 33 F 0 9A02506 ELECTRICAL MACHINES LAB ‐ II 17 35 52 P 2 NESA BALA VENKATAPATHI094E1A0204 9A02504 POWER ELECTRONICS 21 25 46 P 4 CHEEMALA PRASANTH KUMAR094E1A0234 9A02505 ELECTRICAL MACHINES III 23 34 57 P 4 S PRAVEEN094E1A0235 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 15 30 45 P 4 JALLA SEKHAR094E1A0245 9A02502 TRANSMISSION OF ELECTRIC POWER 15 AB 15 F 0 9A02503 CONTROL SYSTEMS 16 AB 16 F 0 KOTAPATI CHAITHANYA KUMAR094E1A0405 9A04502 LINEAR IC APPLICATIONS 18 18 36 F 0 9A04504 DIGITAL IC APPLICATIONS 16 6 22 F 0 N HARSHA VARDHANA REDDY094E1A0415 9A04504 DIGITAL IC APPLICATIONS 19 25 44 P 4 RAGI MAHENDRA094E1A0428 9A05406 COMPUTER ORGANIZATION 19 AB 19 F 0 VELLORE SAI PRADEEP094E1A0442 9A02503 CONTROL SYSTEMS 17 14 31 F 0 9A04502 LINEAR IC APPLICATIONS 16 18 34 F 0 9A04504 DIGITAL IC APPLICATIONS 13 0 13 F 0 CHEMBETI VASU094E1A0456 9A04504 DIGITAL IC APPLICATIONS 23 0 23 F 0 PENDLIMARRI ANANDA BABU094E1A0502 9A05503 COMPUTER GRAPHICS 25 2 27 F 0 S DHALAPATHI094E1A0510 9A05503 COMPUTER GRAPHICS 20 AB 20 F 0 G JANAKIRAM094E1A0517 Page 1 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 2. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A05505 OPERATING SYSTEMS 19 AB 19 F 0 A BHARATH094E1A1206 9A04602 MICROPROCESSORS & MICROCONTROLLERS 9 31 40 P 4 9A12501 AUTOMATA & COMPILER DESIGN 19 13 32 F 0 DINNEPATI LOKESH094E1A1220 9A05505 OPERATING SYSTEMS 25 9 34 F 0 PERUMBEDU NAVEENKUMAR094E1A1224 9A05502 SOFTWARE ENGINEERING 18 AB 18 F 0 9A12501 AUTOMATA & COMPILER DESIGN 19 AB 19 F 0 9A12502 WEB PROGRAMMING 22 AB 22 F 0 NAGAPATLA ANAND104E1A0102 9A01502 CONCRETE TECHNOLOGY 22 AB 22 F 0 9A01504 STRUCTURAL ANALYSIS II 20 AB 20 F 0 9A01505 ENGINEERING GEOLOGY 15 7 22 F 0 BACHU DATTA SAI104E1A0111 9A01502 CONCRETE TECHNOLOGY 25 AB 25 F 0 9A01505 ENGINEERING GEOLOGY 23 0 23 F 0 YAMMANURU DINESH KUMAR REDDY104E1A0114 9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 23 28 51 P 4 CHUKKALA JAYAKRISHNA104E1A0118 9A01503 WATER RESOURCES ENGINEERING I 25 AB 25 F 0 9A01504 STRUCTURAL ANALYSIS II 22 AB 22 F 0 9A01505 ENGINEERING GEOLOGY 18 28 46 P 4 THIMMISETTY KESAVA REDDY104E1A0121 9A01503 WATER RESOURCES ENGINEERING I 20 25 45 P 4 KOTI MOGILESWAR104E1A0126 9A01502 CONCRETE TECHNOLOGY 22 AB 22 F 0 9A01504 STRUCTURAL ANALYSIS II 26 AB 26 F 0 ARIMBAKKAM MUNIRATHNAM104E1A0128 9A01503 WATER RESOURCES ENGINEERING I 20 4 24 F 0 9A01505 ENGINEERING GEOLOGY 25 AB 25 F 0 BALAIAHGARI NAVEENKRISHNA104E1A0130 9A01505 ENGINEERING GEOLOGY 24 26 50 P 4 PADIRI PARTHA SARADHY REDDY104E1A0132 9A01503 WATER RESOURCES ENGINEERING I 26 7 33 F 0 9A01505 ENGINEERING GEOLOGY 22 14 36 F 0 N SREEKAR104E1A0147 Page 2 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 3. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A01505 ENGINEERING GEOLOGY 26 26 52 P 4 K SUDHIR KUMAR104E1A0149 9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 19 14 33 F 0 9A01502 CONCRETE TECHNOLOGY 22 31 53 P 4 9A01504 STRUCTURAL ANALYSIS II 21 25 46 P 4 SURESH NALLAGATLA104E1A0150 9A01502 CONCRETE TECHNOLOGY 25 39 64 P 4 NAGINENI UDAY KRISHNA104E1A0153 9A01505 ENGINEERING GEOLOGY 25 AB 25 F 0 S UDAY VARMA104E1A0154 9A01503 WATER RESOURCES ENGINEERING I 24 8 32 F 0 CUDAPA VASU104E1A0155 9A01505 ENGINEERING GEOLOGY 26 28 54 P 4 TANGUTOORI VIJAY KUMAR104E1A0158 9A01503 WATER RESOURCES ENGINEERING I 28 26 54 P 4 GILAKAPATI YASODHA104E1A0159 9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 28 17 45 F 0 9A01502 CONCRETE TECHNOLOGY 23 41 64 P 4 9A01505 ENGINEERING GEOLOGY 27 52 79 P 4 KOLATHURU BALA SEKHAR104E1A0202 9A02503 CONTROL SYSTEMS 25 AB 25 F 0 9A02504 POWER ELECTRONICS 18 AB 18 F 0 KOLLURU CHARAN KUMAR104E1A0204 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 18 AB 18 F 0 9A02503 CONTROL SYSTEMS 24 9 33 F 0 9A02504 POWER ELECTRONICS 22 AB 22 F 0 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 26 AB 26 F 0 DUGGANI GOPI104E1A0210 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 15 25 40 P 4 9A02503 CONTROL SYSTEMS 22 8 30 F 0 9A02504 POWER ELECTRONICS 23 28 51 P 4 B HEMANTH KUMAR104E1A0211 9A02503 CONTROL SYSTEMS 18 11 29 F 0 9A02505 ELECTRICAL MACHINES III 19 26 45 P 4 GUNDLAPALLI JAGADEESH104E1A0212 9A02503 CONTROL SYSTEMS 23 30 53 P 4 RAMBA JAHNAVI104E1A0213 Page 3 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 4. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 25 37 62 P 4 KONIDALA JYOSHNA104E1A0215 9A02504 POWER ELECTRONICS 24 28 52 P 4 G JYOTHSNA104E1A0216 9A02503 CONTROL SYSTEMS 23 14 37 F 0 BUKYA KALYANI104E1A0217 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 20 40 60 P 4 9A02504 POWER ELECTRONICS 23 25 48 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 28 33 61 P 4 MOODE KIRAN KUMAR NAIK104E1A0218 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 20 37 57 P 4 9A02504 POWER ELECTRONICS 20 25 45 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 26 25 51 P 4 PINNAMREDDY KUMARASWAMI REDDY104E1A0219 9A02504 POWER ELECTRONICS 27 32 59 P 4 M LEPAKSHI104E1A0220 9A02504 POWER ELECTRONICS 21 25 46 P 4 LEKKALA LOKESH104E1A0222 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 18 18 36 F 0 9A02503 CONTROL SYSTEMS 30 AB 30 F 0 9A02504 POWER ELECTRONICS 25 25 50 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 26 15 41 F 0 P MADHAN KUMAR104E1A0223 9A02503 CONTROL SYSTEMS 24 7 31 F 0 9A02504 POWER ELECTRONICS 21 27 48 P 4 VELAPPAGARI MANI104E1A0225 9A02504 POWER ELECTRONICS 19 27 46 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 25 AB 25 F 0 P MANOJ KUMAR104E1A0227 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 19 25 44 P 4 9A02503 CONTROL SYSTEMS 22 11 33 F 0 9A02504 POWER ELECTRONICS 21 25 46 P 4 B V MURALI104E1A0231 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 28 AB 28 F 0 9A02504 POWER ELECTRONICS 27 28 55 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 27 AB 27 F 0 SHAIK NAZEEBULLA PEER104E1A0235 Page 4 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 5. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A02505 ELECTRICAL MACHINES III 26 25 51 P 4 B PRASANNA KUMARI104E1A0237 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 30 25 55 P 4 KOTTAKONDA SARAVANA104E1A0241 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 28 31 59 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 29 30 59 P 4 A SATHEESH104E1A0242 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 25 25 50 P 4 9A02504 POWER ELECTRONICS 23 18 41 F 0 B SRAVAN104E1A0244 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 17 25 42 P 4 9A02503 CONTROL SYSTEMS 22 1 23 F 0 9A02504 POWER ELECTRONICS 20 16 36 F 0 9A02505 ELECTRICAL MACHINES III 19 0 19 F 0 MANDATI VARMA104E1A0250 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 26 31 57 P 4 BONA VENKATESWARA REDDY104E1A0256 9A02504 POWER ELECTRONICS 18 25 43 P 4 T VIKRAM104E1A0258 9A02503 CONTROL SYSTEMS 23 16 39 F 0 D S AKBAR BASHA104E1A0402 9A02503 CONTROL SYSTEMS 27 29 56 P 4 9A04503 ANTENNAS & WAVE PROPAGATION 26 6 32 F 0 KANDAPAREDDY AMARNADH104E1A0404 9A02503 CONTROL SYSTEMS 25 AB 25 F 0 9A04503 ANTENNAS & WAVE PROPAGATION 23 AB 23 F 0 9A04504 DIGITAL IC APPLICATIONS 26 1 27 F 0 9A05406 COMPUTER ORGANIZATION 23 12 35 F 0 SANGAPU ANANDA BABU104E1A0405 9A02503 CONTROL SYSTEMS 23 25 48 P 4 9A04504 DIGITAL IC APPLICATIONS 27 25 52 P 4 R ARJUN HARISH CHANDRASHEKAR104E1A0407 9A05406 COMPUTER ORGANIZATION 29 25 54 P 4 SHAIK AZAZALI104E1A0410 9A04503 ANTENNAS & WAVE PROPAGATION 27 7 34 F 0 K BHANU PRAKASH NAIK104E1A0411 9A04503 ANTENNAS & WAVE PROPAGATION 27 5 32 F 0 Page 5 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 6. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A04504 DIGITAL IC APPLICATIONS 21 25 46 P 4 9A05406 COMPUTER ORGANIZATION 23 16 39 F 0 CHELAGOLA BHARGAV KRISHNA104E1A0412 9A05406 COMPUTER ORGANIZATION 29 12 41 F 0 J BINDU104E1A0416 9A05406 COMPUTER ORGANIZATION 30 31 61 P 4 M BINDU104E1A0417 9A04504 DIGITAL IC APPLICATIONS 28 12 40 F 0 PANDLURU CHANDANA PRIYA104E1A0419 9A04504 DIGITAL IC APPLICATIONS 22 9 31 F 0 D CHANDRA PRAVEEN104E1A0420 9A04501 ANALOG COMMUNICATIONS 28 18 46 F 0 9A04502 LINEAR IC APPLICATIONS 20 26 46 P 4 9A04503 ANTENNAS & WAVE PROPAGATION 23 6 29 F 0 9A04504 DIGITAL IC APPLICATIONS 26 25 51 P 4 9A05406 COMPUTER ORGANIZATION 25 12 37 F 0 MARRI CHANDRASEKHAR104E1A0421 9A05406 COMPUTER ORGANIZATION 27 29 56 P 4 SESHADRI DEEPAKSRINIVAS104E1A0423 9A04504 DIGITAL IC APPLICATIONS 28 25 53 P 4 BANDI DEVI104E1A0425 9A05406 COMPUTER ORGANIZATION 28 15 43 F 0 N GANESH104E1A0428 9A04502 LINEAR IC APPLICATIONS 9 15 24 F 0 9A04504 DIGITAL IC APPLICATIONS 14 3 17 F 0 9A05406 COMPUTER ORGANIZATION 25 12 37 F 0 SAVATA GANESH104E1A0430 9A05406 COMPUTER ORGANIZATION 25 26 51 P 4 GURRAMPATI GURUMOHAN REDDY104E1A0434 9A04504 DIGITAL IC APPLICATIONS 29 25 54 P 4 GOLLAPALLI HEMADRI104E1A0436 9A04504 DIGITAL IC APPLICATIONS 28 16 44 F 0 POTHUGUNTA HEMANTH104E1A0438 9A05406 COMPUTER ORGANIZATION 29 32 61 P 4 MATTIPALA JAGADEESH104E1A0440 9A05406 COMPUTER ORGANIZATION 28 17 45 F 0 T JANARDHAN104E1A0442 9A05406 COMPUTER ORGANIZATION 29 30 59 P 4 Page 6 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 7. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS C KUMAR104E1A0447 9A04501 ANALOG COMMUNICATIONS 20 29 49 P 4 9A04502 LINEAR IC APPLICATIONS 15 AB 15 F 0 PADIRI KUPPAM LAVANYA104E1A0450 9A05406 COMPUTER ORGANIZATION 30 41 71 P 4 VIRAGADINLA LOKESH KUMAR104E1A0453 9A04504 DIGITAL IC APPLICATIONS 28 30 58 P 4 P MADHURI104E1A0455 9A05406 COMPUTER ORGANIZATION 23 33 56 P 4 CHALAMAGUNTA MADHUSUDHAN104E1A0456 9A04501 ANALOG COMMUNICATIONS 17 15 32 F 0 9A04502 LINEAR IC APPLICATIONS 15 17 32 F 0 P MANJUNATH104E1A0459 9A05406 COMPUTER ORGANIZATION 28 34 62 P 4 CHITTAM MOHAN BABU104E1A0460 9A02503 CONTROL SYSTEMS 24 AB 24 F 0 9A04501 ANALOG COMMUNICATIONS 22 32 54 P 4 9A04502 LINEAR IC APPLICATIONS 17 35 52 P 4 BASAPURAMGOVINDAPPAGARI NAGARAJU104E1A0464 9A04501 ANALOG COMMUNICATIONS 19 15 34 F 0 9A04504 DIGITAL IC APPLICATIONS 28 25 53 P 4 9A05406 COMPUTER ORGANIZATION 26 9 35 F 0 THALURU NARESH104E1A0466 9A02503 CONTROL SYSTEMS 19 32 51 P 4 9A04503 ANTENNAS & WAVE PROPAGATION 26 5 31 F 0 JANARDHANA NAVEEN KUMAR104E1A0468 9A04504 DIGITAL IC APPLICATIONS 26 9 35 F 0 9A05406 COMPUTER ORGANIZATION 27 16 43 F 0 C PARIMALA104E1A0471 9A04504 DIGITAL IC APPLICATIONS 21 25 46 P 4 VADAPALLI PAVAN104E1A0472 9A05406 COMPUTER ORGANIZATION 24 15 39 F 0 MAGATHALA RAGHU104E1A0476 9A05406 COMPUTER ORGANIZATION 28 15 43 F 0 G RAJASEKHAR104E1A0477 9A02503 CONTROL SYSTEMS 20 AB 20 F 0 9A04503 ANTENNAS & WAVE PROPAGATION 27 AB 27 F 0 9A04504 DIGITAL IC APPLICATIONS 28 AB 28 F 0 Page 7 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 8. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS M RASUKUTTI104E1A0479 9A02503 CONTROL SYSTEMS 17 13 30 F 0 9A04503 ANTENNAS & WAVE PROPAGATION 26 17 43 F 0 9A04504 DIGITAL IC APPLICATIONS 27 16 43 F 0 S ROHINI104E1A0481 9A05406 COMPUTER ORGANIZATION 29 27 56 P 4 R SAIPRASAD104E1A0484 9A02503 CONTROL SYSTEMS 25 AB 25 F 0 9A04502 LINEAR IC APPLICATIONS 23 AB 23 F 0 9A04503 ANTENNAS & WAVE PROPAGATION 23 AB 23 F 0 9A04504 DIGITAL IC APPLICATIONS 26 AB 26 F 0 9A05406 COMPUTER ORGANIZATION 27 AB 27 F 0 GANJI SAICHAND104E1A0486 9A05406 COMPUTER ORGANIZATION 27 35 62 P 4 AMUDALAGUNASEKARAN SARANYA104E1A0490 9A05406 COMPUTER ORGANIZATION 30 31 61 P 4 K P SATHYA PRIYA104E1A0491 9A04502 LINEAR IC APPLICATIONS 23 46 69 P 4 KOGURU REDDI SHARMILA104E1A0494 9A05406 COMPUTER ORGANIZATION 27 26 53 P 4 ETAY STALIN EMMANUEL104E1A0498 9A05406 COMPUTER ORGANIZATION 20 16 36 F 0 KANAPARTHI SUNDARARAMI REDDY104E1A04A1 9A04504 DIGITAL IC APPLICATIONS 28 30 58 P 4 BATTU SUNIL BABU104E1A04A2 9A05406 COMPUTER ORGANIZATION 21 14 35 F 0 BUSINENI SUNILKUMAR104E1A04A3 9A02503 CONTROL SYSTEMS 15 AB 15 F 0 9A04501 ANALOG COMMUNICATIONS 21 AB 21 F 0 9A04502 LINEAR IC APPLICATIONS 18 AB 18 F 0 9A04503 ANTENNAS & WAVE PROPAGATION 21 AB 21 F 0 9A04504 DIGITAL IC APPLICATIONS 20 AB 20 F 0 9A04505 LINEAR & DIGITAL IC APPLICATIONS LAB 22 34 56 P 2 MANNAM SUNIL KUMAR104E1A04A4 9A04503 ANTENNAS & WAVE PROPAGATION 24 12 36 F 0 P SUNIL104E1A04A5 9A04501 ANALOG COMMUNICATIONS 20 25 45 P 4 Page 8 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 9. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A04504 DIGITAL IC APPLICATIONS 25 26 51 P 4 BATHALA SURYA PRADEEP104E1A04A8 9A04503 ANTENNAS & WAVE PROPAGATION 26 14 40 F 0 L THARUN104E1A04B0 9A05406 COMPUTER ORGANIZATION 25 10 35 F 0 MANDADI VENKATESH104E1A04B4 9A02503 CONTROL SYSTEMS 26 41 67 P 4 NADI NTI VILSONKUMAR104E1A04B5 9A04504 DIGITAL IC APPLICATIONS 28 28 56 P 4 9A05406 COMPUTER ORGANIZATION 24 14 38 F 0 N VINODH KUMAR104E1A04B6 9A04501 ANALOG COMMUNICATIONS 23 28 51 P 4 9A04502 LINEAR IC APPLICATIONS 17 14 31 F 0 THOTI YUVARAJU104E1A04B9 9A05406 COMPUTER ORGANIZATION 28 31 59 P 4 A U ABIRAMI104E1A0501 9A05503 COMPUTER GRAPHICS 27 29 56 P 4 K BALUMAHENDRA104E1A0504 9A05503 COMPUTER GRAPHICS 25 1 26 F 0 9A05504 COMPILER DESIGN 16 0 16 F 0 9A05505 OPERATING SYSTEMS 23 9 32 F 0 M BHARGAVI104E1A0505 9A05501 PRINCIPLES OF PROGRAMMING LANGUAGES 30 33 63 P 4 9A05502 SOFTWARE ENGINEERING 30 29 59 P 4 9A05503 COMPUTER GRAPHICS 28 28 56 P 4 MANGUMURI CHAMUNDI104E1A0506 9A05503 COMPUTER GRAPHICS 27 26 53 P 4 VANNE DEEPA104E1A0511 9A05503 COMPUTER GRAPHICS 29 27 56 P 4 THOTA ESWARAMMA104E1A0515 9A05503 COMPUTER GRAPHICS 24 25 49 P 4 V K GAYATHRI104E1A0516 9A05503 COMPUTER GRAPHICS 21 AB 21 F 0 MOPURI GOPAIAH104E1A0517 9A05503 COMPUTER GRAPHICS 28 25 53 P 4 9A05505 OPERATING SYSTEMS 21 26 47 P 4 9A05506 COMPUTER NETWORKS 26 25 51 P 4 LINGALA GOVARDHAN REDDY104E1A0518 Page 9 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 10. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A05503 COMPUTER GRAPHICS 25 AB 25 F 0 ENAGANTI HARIKUMAR104E1A0519 9A05503 COMPUTER GRAPHICS 25 25 50 P 4 JAGADHABHI INDUMATHI104E1A0520 9A05503 COMPUTER GRAPHICS 27 29 56 P 4 POOJARI JAGADEESH104E1A0521 9A05502 SOFTWARE ENGINEERING 28 26 54 P 4 9A05505 OPERATING SYSTEMS 26 27 53 P 4 SALVA KAVYA104E1A0522 9A05503 COMPUTER GRAPHICS 25 11 36 F 0 KEERTHY P104E1A0523 9A05503 COMPUTER GRAPHICS 28 29 57 P 4 C A KRISHNAN104E1A0524 9A05505 OPERATING SYSTEMS 25 43 68 P 4 EDDUDHALA KUSUMA104E1A0525 9A05503 COMPUTER GRAPHICS 24 AB 24 F 0 MUKKARA MONICA CHOUDARY104E1A0528 9A05502 SOFTWARE ENGINEERING 27 25 52 P 4 9A05503 COMPUTER GRAPHICS 24 18 42 F 0 9A05505 OPERATING SYSTEMS 18 25 43 P 4 DOMMARAJU NAGA TEJA104E1A0530 9A05502 SOFTWARE ENGINEERING 27 25 52 P 4 JALAGAM NAVEEN KUMAR104E1A0531 9A05503 COMPUTER GRAPHICS 29 25 54 P 4 M S NAVEEN KUMAR104E1A0532 9A05503 COMPUTER GRAPHICS 21 12 33 F 0 C RAJESH104E1A0535 9A05503 COMPUTER GRAPHICS 22 14 36 F 0 N RANJITHKUMAR104E1A0537 9A05503 COMPUTER GRAPHICS 26 25 51 P 4 9A05504 COMPILER DESIGN 23 9 32 F 0 9A05505 OPERATING SYSTEMS 22 25 47 P 4 KS RUBYANIRMAL KUMAR104E1A0538 9A05503 COMPUTER GRAPHICS 24 18 42 F 0 9A05505 OPERATING SYSTEMS 24 13 37 F 0 J N RUPESH104E1A0539 9A05502 SOFTWARE ENGINEERING 28 34 62 P 4 9A05503 COMPUTER GRAPHICS 25 16 41 F 0 Page 10 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 11. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A05505 OPERATING SYSTEMS 20 11 31 F 0 ALAGESAN SATHYA104E1A0541 9A05503 COMPUTER GRAPHICS 25 14 39 F 0 SHAVALA SHAILAJA104E1A0542 9A05501 PRINCIPLES OF PROGRAMMING LANGUAGES 15 5 20 F 0 9A05504 COMPILER DESIGN 15 AB 15 F 0 9A05505 OPERATING SYSTEMS 18 AB 18 F 0 KATTA SIVA PRASAD104E1A0544 9A05503 COMPUTER GRAPHICS 25 12 37 F 0 9A05504 COMPILER DESIGN 26 15 41 F 0 AKKUPALLI SRUTHI104E1A0545 9A05503 COMPUTER GRAPHICS 26 25 51 P 4 M SUDHA SRINIVAS104E1A0546 9A05505 OPERATING SYSTEMS 20 27 47 P 4 DOMMARAJU SUNANDA104E1A0547 9A05502 SOFTWARE ENGINEERING 28 25 53 P 4 9A05503 COMPUTER GRAPHICS 26 14 40 F 0 9A05504 COMPILER DESIGN 27 9 36 F 0 9A05505 OPERATING SYSTEMS 26 16 42 F 0 A THEJASWINI104E1A0554 9A05503 COMPUTER GRAPHICS 27 18 45 F 0 AKEPATI ANIL KUMAR REDDY104E1A1202 9A05505 OPERATING SYSTEMS 23 8 31 F 0 K BHARATH104E1A1205 9A04602 MICROPROCESSORS & MICROCONTROLLERS 21 AB 21 F 0 9A05505 OPERATING SYSTEMS 27 AB 27 F 0 9A12501 AUTOMATA & COMPILER DESIGN 27 AB 27 F 0 N BHARGAV104E1A1206 9A05502 SOFTWARE ENGINEERING 25 AB 25 F 0 9A05506 COMPUTER NETWORKS 24 14 38 F 0 L BINDU104E1A1207 9A12502 WEB PROGRAMMING 22 AB 22 F 0 K DHARANI104E1A1208 9A04602 MICROPROCESSORS & MICROCONTROLLERS 21 27 48 P 4 9A12501 AUTOMATA & COMPILER DESIGN 16 25 41 P 4 AS HEMALATHA104E1A1213 9A05505 OPERATING SYSTEMS 28 25 53 P 4 SANDRA KARYAVARDHI104E1A1215 Page 11 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 12. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A12502 WEB PROGRAMMING 24 37 61 P 4 M KISHORE KUMAR104E1A1216 9A12502 WEB PROGRAMMING 21 35 56 P 4 M R MAHENDRA104E1A1217 9A04602 MICROPROCESSORS & MICROCONTROLLERS 22 27 49 P 4 9A05506 COMPUTER NETWORKS 26 25 51 P 4 9A12501 AUTOMATA & COMPILER DESIGN 28 25 53 P 4 9A12502 WEB PROGRAMMING 21 AB 21 F 0 BHAKTHAN MONIKA REDDY104E1A1219 9A04602 MICROPROCESSORS & MICROCONTROLLERS 25 26 51 P 4 PULIGORU MRUDULA104E1A1221 9A05505 OPERATING SYSTEMS 21 13 34 F 0 S POORNIMA104E1A1224 9A05505 OPERATING SYSTEMS 24 2 26 F 0 P PRATHEEP104E1A1225 9A04602 MICROPROCESSORS & MICROCONTROLLERS 24 32 56 P 4 POTHURU PRAVEEN KUMAR104E1A1226 9A04602 MICROPROCESSORS & MICROCONTROLLERS 23 29 52 P 4 9A05505 OPERATING SYSTEMS 25 12 37 F 0 9A12501 AUTOMATA & COMPILER DESIGN 22 0 22 F 0 9A12502 WEB PROGRAMMING 26 27 53 P 4 DASARIRAJU RAJESH104E1A1227 9A04602 MICROPROCESSORS & MICROCONTROLLERS 19 AB 19 F 0 9A12502 WEB PROGRAMMING 28 AB 28 F 0 MUNTHA SANDEEP YADAV104E1A1229 9A05505 OPERATING SYSTEMS 26 25 51 P 4 A SANTHOSH KUMAR104E1A1230 9A04602 MICROPROCESSORS & MICROCONTROLLERS 22 27 49 P 4 9A05502 SOFTWARE ENGINEERING 26 27 53 P 4 9A05506 COMPUTER NETWORKS 20 16 36 F 0 V SPANDANA104E1A1234 9A04602 MICROPROCESSORS & MICROCONTROLLERS 27 27 54 P 4 9A05502 SOFTWARE ENGINEERING 30 27 57 P 4 MUDDULURU SRAVANI104E1A1235 9A04602 MICROPROCESSORS & MICROCONTROLLERS 27 37 64 P 4 S SRINATH104E1A1236 9A05502 SOFTWARE ENGINEERING 26 15 41 F 0 Page 12 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 13. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A05505 OPERATING SYSTEMS 26 12 38 F 0 9A12501 AUTOMATA & COMPILER DESIGN 26 25 51 P 4 P SRUTHI104E1A1238 9A04602 MICROPROCESSORS & MICROCONTROLLERS 23 25 48 P 4 9A05502 SOFTWARE ENGINEERING 30 16 46 F 0 NARRAVULA TEJESWARI104E1A1240 9A05505 OPERATING SYSTEMS 30 16 46 F 0 KEERTHIPATI THEJASWI104E1A1241 9A04602 MICROPROCESSORS & MICROCONTROLLERS 24 26 50 P 4 P VIKRAM104E1A1243 9A04602 MICROPROCESSORS & MICROCONTROLLERS 28 26 54 P 4 9A12501 AUTOMATA & COMPILER DESIGN 22 9 31 F 0 9A12502 WEB PROGRAMMING 26 AB 26 F 0 A YAMINI104E1A1247 9A05502 SOFTWARE ENGINEERING 28 25 53 P 4 9A05505 OPERATING SYSTEMS 30 8 38 F 0 CHINTA GANESH104E5A0203 9A02503 CONTROL SYSTEMS 16 25 41 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 24 25 49 P 4 SK ARIFF AHAMED114E5A0101 9A01502 CONCRETE TECHNOLOGY 24 32 56 P 4 DASU LAKSHMI NARAYANA114E5A0103 9A01501 DESIGN & DRAWING OF REINFORCED CONCRETE STRUCTUR 27 28 55 P 4 9A01502 CONCRETE TECHNOLOGY 24 38 62 P 4 GUNDLURI SADDHAM114E5A0107 9A01502 CONCRETE TECHNOLOGY 30 53 83 P 4 9A01503 WATER RESOURCES ENGINEERING I 28 35 63 P 4 9A01504 STRUCTURAL ANALYSIS II 30 46 76 P 4 NAMPALLI CHANDU114E5A0201 9A02503 CONTROL SYSTEMS 25 14 39 F 0 9A02504 POWER ELECTRONICS 22 27 49 P 4 CHITTI BOINA GANGAIAH114E5A0203 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 29 AB 29 F 0 BUSAPALLI SIVA KUMAR114E5A0207 9A02501 ELECTRICAL & ELECTRONIC MEASUREMENTS 28 25 53 P 4 9AHS401 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 29 AB 29 F 0 NALLAPERUMALAGARI SIVA114E5A0208 Page 13 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013
  • 14. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A02503 CONTROL SYSTEMS 28 29 57 P 4 ROYAL VENKATA MUNI114E5A0210 9A02502 TRANSMISSION OF ELECTRIC POWER 23 29 52 P 4 9A02503 CONTROL SYSTEMS 9 2 11 F 0 9A02504 POWER ELECTRONICS 25 32 57 P 4 KUDUMALA VENKATA RAMANAIAH114E5A0405 9A05406 COMPUTER ORGANIZATION 25 30 55 P 4 Y SURESH114E5A0501 9A05503 COMPUTER GRAPHICS 25 25 50 P 4 Page 14 of 14 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 17, 2013