SlideShare a Scribd company logo
1 of 7
Download to read offline
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR
ANANTAPUR - 515002 (A.P.) INDIA
EXAMINATION BRANCH
B Tech IV Year I Semester (R09) Supplementary Examinations - May 2013 Results
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
HEMANTH O07F61A0232
9A02701 DISTRIBUTION OF ELECTRIC POWER 21 12 33 F 0
9A02705 HIGH VOLTAGE ENGINEERING 20 7 27 F 0
9A04603 DIGITAL SIGNAL PROCESSING 20 13 33 F 0
RAJ KUMAR P07F61A0278
9A02703 SWITCH GEAR AND PROTECTION 22 25 47 P 4
BANDILA ARUNACHALAM08F61A0301
9A03703 FINITE ELEMENT METHODS 20 2 22 F 0
R SRINIVAS08F61A04B1
9A05506 COMPUTER NETWORKS 27 28 55 P 4
T GUNASREE08F61A0527
RA9A12701 MOBILE APPLICATION DEVELOPMENT 26 33 59 P 4
MADANAPU AMARNATH09F61A0101
9A01702 BRIDGE ENGINEERING 20 25 45 P 4
MUNAGALA BALAJI09F61A0103
9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 25 55 P 4
9A01703 GEOTECHNICAL ENGINEERING‐II 14 26 40 P 4
ELAGANURU BHARGAVI09F61A0106
9A01702 BRIDGE ENGINEERING 29 29 58 P 4
PODAMEKALA CHANDRA KUMAR09F61A0107
9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 40 70 P 4
A CHENDU09F61A0108
9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 46 76 P 4
RAJA M P09F61A0125
9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 28 12 40 F 0
M SARATH KUMAR09F61A0130
9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 29 25 54 P 4
P SURESH09F61A0139
9A01702 BRIDGE ENGINEERING 19 30 49 P 4
BUKKYA VAMSI KRISHNA NAIK09F61A0143
9A01702 BRIDGE ENGINEERING 18 39 57 P 4
Page 1 of 7
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Thursday, July 25, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
SHAIK ABDUL HAMEED09F61A0201
9A02703 SWITCH GEAR AND PROTECTION 18 16 34 F 0
9A04603 DIGITAL SIGNAL PROCESSING 22 5 27 F 0
INDLA JEEVANA09F61A0219
9A02703 SWITCH GEAR AND PROTECTION 24 25 49 P 4
SYAMPOOR SREENIVASA KISHORE09F61A0249
9A02702 FUNDAMENTALS OF HVDC & FACTS DEVICES 24 38 62 P 4
9A02703 SWITCH GEAR AND PROTECTION 27 15 42 F 0
TANDLAM SUBASH CHANDRA09F61A0250
9A04603 DIGITAL SIGNAL PROCESSING 20 32 52 P 4
KANCHI DILIPKUMAR09F61A0306
9A03701 OPERATIONS RESEARCH 28 18 46 F 0
9A03702 AUTOMATION & ROBOTICS 28 32 60 P 4
9A03703 FINITE ELEMENT METHODS 21 25 46 P 4
S D GNANADEVACHANDRAN09F61A0307
9A03703 FINITE ELEMENT METHODS 15 13 28 F 0
RAJAN KAVITHA09F61A0316
9A03703 FINITE ELEMENT METHODS 25 50 75 P 4
MANNURU MASTHANI09F61A0322
9A03701 OPERATIONS RESEARCH 22 42 64 P 4
9A03702 AUTOMATION & ROBOTICS 24 30 54 P 4
9A03703 FINITE ELEMENT METHODS 12 6 18 F 0
9A03704 INSTRUMENTATION AND CONTROL SYSTEMS 0 24 24 F 0
PAPPUCHETTY NARENDRA09F61A0327
9A03703 FINITE ELEMENT METHODS 22 26 48 P 4
M RAMESH NAIK09F61A0342
9A03703 FINITE ELEMENT METHODS 18 13 31 F 0
MUNDLAPATI RAMESH09F61A0343
9A03702 AUTOMATION & ROBOTICS 26 40 66 P 4
9A03703 FINITE ELEMENT METHODS 18 6 24 F 0
MELPAD KESAVULU SWAMI NADHAM09F61A0351
9A03703 FINITE ELEMENT METHODS 28 13 41 F 0
B VINOD09F61A0354
9A03703 FINITE ELEMENT METHODS 25 42 67 P 4
J YASWANTHA GURU09F61A0355
9A03703 FINITE ELEMENT METHODS 21 25 46 P 4
9A03704 INSTRUMENTATION AND CONTROL SYSTEMS 27 39 66 P 4
S K FARHANA09F61A0426
Page 2 of 7
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Thursday, July 25, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 18 31 49 P 4
9AHS701 MANAGEMENT SCIENCE 23 32 55 P 4
P GOPI CHAND09F61A0429
9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 19 41 60 P 4
9A05506 COMPUTER NETWORKS 27 25 52 P 4
CHAMARTHY HEMAPRIYA09F61A0434
9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 20 41 61 P 4
M JAYA SURYA09F61A0437
9A04702 OPTICAL COMMUNICATIONS 21 AB 21 F 0
9A04703 RADAR SYSTEMS 22 AB 22 F 0
KADIRI KRISHNA CHAITANYA09F61A0443
9A04702 OPTICAL COMMUNICATIONS 21 25 46 P 4
BAGEPALLI LAVANYA09F61A0446
9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 29 50 79 P 4
BATHULA LOKESH09F61A0448
9A05506 COMPUTER NETWORKS 22 25 47 P 4
CHINTAKUNTA MUNI KIRAN KUMAR09F61A0458
9A04702 OPTICAL COMMUNICATIONS 24 31 55 P 4
DUVVURU PAVAN KUMAR09F61A0465
9A04703 RADAR SYSTEMS 26 29 55 P 4
9A05506 COMPUTER NETWORKS 24 25 49 P 4
MADALA PAVAN KUMAR09F61A0466
9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 25 27 52 P 4
M H PRASANTH09F61A0469
9A05506 COMPUTER NETWORKS 24 25 49 P 4
PURUSHOTTAM S REDDY09F61A0471
9A05506 COMPUTER NETWORKS 25 30 55 P 4
V SESHA REDDY09F61A0486
9A05506 COMPUTER NETWORKS 26 AB 26 F 0
GANGANAPALLI VIDYASAGAR09F61A04B6
9A05506 COMPUTER NETWORKS 19 12 31 F 0
9AHS701 MANAGEMENT SCIENCE 23 18 41 F 0
VEMURU VIJAYA KUMAR09F61A04B7
9AHS701 MANAGEMENT SCIENCE 24 25 49 P 4
PERUMA REDDY VISHNU09F61A04C0
9A05506 COMPUTER NETWORKS 26 25 51 P 4
TALUPULA VISWA TEJA09F61A04C2
9A05506 COMPUTER NETWORKS 26 25 51 P 4
Page 3 of 7
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Thursday, July 25, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
MURE AMARANATHA REDDY09F61A0503
9A05707 SOFTWARE PROJECT MANAGEMENT 27 58 85 P 4
AVULA AMARANATH09F61A0504
9A05704 ADVANCED COMPUTER ARCHITECTURE 25 11 36 F 0
9A05706 DATA WAREHOUSING AND DATA MINING 19 30 49 P 4
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 28 34 62 P 4
GANJI CHANDRAKANTH09F61A0512
9A05706 DATA WAREHOUSING AND DATA MINING 19 28 47 P 4
9A05707 SOFTWARE PROJECT MANAGEMENT 24 17 41 F 0
ELURU DAVEED09F61A0515
9A05704 ADVANCED COMPUTER ARCHITECTURE 26 31 57 P 4
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 29 38 67 P 4
B M GOPICHAND09F61A0524
9A05704 ADVANCED COMPUTER ARCHITECTURE 28 36 64 P 4
VISWARAJU GOWTHAMI09F61A0525
9A05704 ADVANCED COMPUTER ARCHITECTURE 27 33 60 P 4
NATESAN JAIGANESH09F61A0528
9A05704 ADVANCED COMPUTER ARCHITECTURE 21 8 29 F 0
9A05706 DATA WAREHOUSING AND DATA MINING 22 25 47 P 4
9A05707 SOFTWARE PROJECT MANAGEMENT 25 AB 25 F 0
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 24 17 41 F 0
LINGALA JASWANTHKUMAR REDDY09F61A0529
9A05704 ADVANCED COMPUTER ARCHITECTURE 21 17 38 F 0
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 25 31 56 P 4
JAYAKRISHNA K V09F61A0530
9A05706 DATA WAREHOUSING AND DATA MINING 20 29 49 P 4
9A05707 SOFTWARE PROJECT MANAGEMENT 28 36 64 P 4
VALLU KAMAL KISHORE09F61A0533
9A05704 ADVANCED COMPUTER ARCHITECTURE 23 AB 23 F 0
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 26 AB 26 F 0
INJAM KEERTHI09F61A0534
9A05707 SOFTWARE PROJECT MANAGEMENT 26 49 75 P 4
K KIRAN09F61A0536
9A05701 WEB TECHNOLOGIES 19 6 25 F 0
9A05706 DATA WAREHOUSING AND DATA MINING 16 36 52 P 4
9A05707 SOFTWARE PROJECT MANAGEMENT 27 41 68 P 4
KOTI KUMAR09F61A0537
Page 4 of 7
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Thursday, July 25, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A05706 DATA WAREHOUSING AND DATA MINING 24 33 57 P 4
MANUBROLU MAHESH BABU09F61A0541
9A05706 DATA WAREHOUSING AND DATA MINING 17 32 49 P 4
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 25 29 54 P 4
MUNNELLA MANOHAR09F61A0542
9A05704 ADVANCED COMPUTER ARCHITECTURE 25 25 50 P 4
D MANOJ09F61A0543
9A05707 SOFTWARE PROJECT MANAGEMENT 15 AB 15 F 0
S MURALIKRISHNA09F61A0545
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 26 33 59 P 4
KASALA MURALI09F61A0546
9A05704 ADVANCED COMPUTER ARCHITECTURE 18 12 30 F 0
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 24 31 55 P 4
KARANAM NANDINI09F61A0547
9A05707 SOFTWARE PROJECT MANAGEMENT 26 49 75 P 4
B NAVEEN09F61A0551
9A05707 SOFTWARE PROJECT MANAGEMENT 27 39 66 P 4
KAYYALA NITHIN09F61A0552
9A05707 SOFTWARE PROJECT MANAGEMENT 25 43 68 P 4
VALLEPU PRASANNA09F61A0553
9A05706 DATA WAREHOUSING AND DATA MINING 18 40 58 P 4
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 28 34 62 P 4
BANDI PRAVEEN REDDY09F61A0556
9A05702 SOFTWARE TESTING 16 30 46 P 4
9A05704 ADVANCED COMPUTER ARCHITECTURE 20 11 31 F 0
9A05706 DATA WAREHOUSING AND DATA MINING 18 29 47 P 4
PARAMALA VENKATA LAKSHMI PRIYANKA09F61A0558
9A05701 WEB TECHNOLOGIES 22 11 33 F 0
9A05704 ADVANCED COMPUTER ARCHITECTURE 20 25 45 P 4
9A05706 DATA WAREHOUSING AND DATA MINING 20 33 53 P 4
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 25 18 43 F 0
VELLA RAMU09F61A0562
9A05706 DATA WAREHOUSING AND DATA MINING 27 36 63 P 4
AVLAKUNTAREDDY SEKHAR09F61A0566
9A05707 SOFTWARE PROJECT MANAGEMENT 28 30 58 P 4
PEDDAGUTTLAPALLI SANDEEP REDDY09F61A0572
9A05704 ADVANCED COMPUTER ARCHITECTURE 20 25 45 P 4
Page 5 of 7
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Thursday, July 25, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 24 35 59 P 4
L SATHEESH REDDY09F61A0575
9A05706 DATA WAREHOUSING AND DATA MINING 25 38 63 P 4
SHAIK MOHAMMED NAWAZ09F61A0576
9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 29 31 60 P 4
P SREELEKHA09F61A0584
9A05704 ADVANCED COMPUTER ARCHITECTURE 24 27 51 P 4
9A05706 DATA WAREHOUSING AND DATA MINING 17 32 49 P 4
N SREENIVASULU09F61A0585
9A05704 ADVANCED COMPUTER ARCHITECTURE 27 26 53 P 4
MODI SUDHARSAN09F61A0587
9A05711 SOFTWARE TESTING AND CASE TOOLS LAB 23 40 63 P 2
BODDU UDAY KUMAR09F61A0595
9A05704 ADVANCED COMPUTER ARCHITECTURE 22 34 56 P 4
N VASUDHA09F61A0598
9A05706 DATA WAREHOUSING AND DATA MINING 28 35 63 P 4
B VIJAYRAJ09F61A05A3
9A05704 ADVANCED COMPUTER ARCHITECTURE 21 25 46 P 4
MUNIRATHNAM VINOD KUMAR09F61A05A6
9A05707 SOFTWARE PROJECT MANAGEMENT 28 47 75 P 4
ADUSUPALLI VINODRAM CHOWDARY09F61A05A7
9A05704 ADVANCED COMPUTER ARCHITECTURE 26 25 51 P 4
9A05706 DATA WAREHOUSING AND DATA MINING 25 38 63 P 4
MUPPALA NARESH10F65A0105
9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 37 67 P 4
DAMU GOOTURU10F65A0301
9A03701 OPERATIONS RESEARCH 26 56 82 P 4
P MAHESH10F65A0403
9AHS701 MANAGEMENT SCIENCE 24 AB 24 F 0
VELKURU SURESH10F65A0411
9AHS701 MANAGEMENT SCIENCE 24 32 56 P 4
KOPPUROLA MOHAN10F65A0502
9A05707 SOFTWARE PROJECT MANAGEMENT 26 36 62 P 4
PRAVEEN KOPPALA10F65A0503
9A05711 SOFTWARE TESTING AND CASE TOOLS LAB 23 42 65 P 2
SURESH B P10F65A0504
9A05704 ADVANCED COMPUTER ARCHITECTURE 24 29 53 P 4
MUKKOTI RAJESH10F65A0505
Page 6 of 7
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Thursday, July 25, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
9A05707 SOFTWARE PROJECT MANAGEMENT 25 38 63 P 4
Page 7 of 7
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Thursday, July 25, 2013

More Related Content

What's hot

III B.TECH. II SEM R07 SUPPLE. APRIL 2013
III B.TECH. II SEM R07 SUPPLE. APRIL 2013III B.TECH. II SEM R07 SUPPLE. APRIL 2013
III B.TECH. II SEM R07 SUPPLE. APRIL 2013P.G.GOPI NATH
 
Iii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 resultsIii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 resultsVARIGONDA GOPI
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...VARIGONDA GOPI
 
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsAB Madhu Mohana Raju
 
I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012P.G.GOPI NATH
 
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013P.G.GOPI NATH
 
I year b.tech (r09) supplementary nov dec 2012 exams results
I year b.tech (r09) supplementary nov dec 2012 exams resultsI year b.tech (r09) supplementary nov dec 2012 exams results
I year b.tech (r09) supplementary nov dec 2012 exams resultsAB Madhu Mohana Raju
 
II B.TECH. I SEM(R05) SUPPLE.
II B.TECH. I SEM(R05) SUPPLE. II B.TECH. I SEM(R05) SUPPLE.
II B.TECH. I SEM(R05) SUPPLE. P.G.GOPI NATH
 
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIi b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsAB Madhu Mohana Raju
 
Iv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsIv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsVARIGONDA GOPI
 
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsB.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsVARIGONDA GOPI
 
Iv b.tech i sem result
Iv b.tech i sem resultIv b.tech i sem result
Iv b.tech i sem resultVARIGONDA GOPI
 
I R09 Supple Exams June - 2014 Results
I R09 Supple Exams June - 2014 ResultsI R09 Supple Exams June - 2014 Results
I R09 Supple Exams June - 2014 ResultsVARIGONDA GOPI
 
I YEAR B.TECH R09 SUPPLE NOV-DEC 2011
I YEAR B.TECH R09 SUPPLE NOV-DEC 2011I YEAR B.TECH R09 SUPPLE NOV-DEC 2011
I YEAR B.TECH R09 SUPPLE NOV-DEC 2011P.G.GOPI NATH
 
SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012
SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012
SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
Ii year b.tech i sem nov dec 2012 examination results
Ii year b.tech i sem nov dec 2012 examination resultsIi year b.tech i sem nov dec 2012 examination results
Ii year b.tech i sem nov dec 2012 examination resultsVARIGONDA GOPI
 

What's hot (20)

III B.TECH. II SEM R07 SUPPLE. APRIL 2013
III B.TECH. II SEM R07 SUPPLE. APRIL 2013III B.TECH. II SEM R07 SUPPLE. APRIL 2013
III B.TECH. II SEM R07 SUPPLE. APRIL 2013
 
Iii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 resultsIii year b.tech i sem (r09) regular & supplementary nov 2012 results
Iii year b.tech i sem (r09) regular & supplementary nov 2012 results
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
 
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Iii b.tech ii semester (r09) supplementary nov dec 2012 exams results
 
I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012
 
4 e 21r07s (1)
4 e 21r07s (1)4 e 21r07s (1)
4 e 21r07s (1)
 
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013
 
I year b.tech (r09) supplementary nov dec 2012 exams results
I year b.tech (r09) supplementary nov dec 2012 exams resultsI year b.tech (r09) supplementary nov dec 2012 exams results
I year b.tech (r09) supplementary nov dec 2012 exams results
 
4 e 31r07s (1)
4 e 31r07s (1)4 e 31r07s (1)
4 e 31r07s (1)
 
II B.TECH. I SEM(R05) SUPPLE.
II B.TECH. I SEM(R05) SUPPLE. II B.TECH. I SEM(R05) SUPPLE.
II B.TECH. I SEM(R05) SUPPLE.
 
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams resultsIi b.tech ii semester (r09) supplementary nov dec 2012 exams results
Ii b.tech ii semester (r09) supplementary nov dec 2012 exams results
 
Iv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsIv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 results
 
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsB.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
 
Iv b.tech i sem result
Iv b.tech i sem resultIv b.tech i sem result
Iv b.tech i sem result
 
I R09 Supple Exams June - 2014 Results
I R09 Supple Exams June - 2014 ResultsI R09 Supple Exams June - 2014 Results
I R09 Supple Exams June - 2014 Results
 
I YEAR B.TECH R09 SUPPLE NOV-DEC 2011
I YEAR B.TECH R09 SUPPLE NOV-DEC 2011I YEAR B.TECH R09 SUPPLE NOV-DEC 2011
I YEAR B.TECH R09 SUPPLE NOV-DEC 2011
 
SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012
SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012
SIETK I YEAR B.TECH R05 SUPPLE APRIL MAY 2012
 
4 e 41r07s
4 e 41r07s4 e 41r07s
4 e 41r07s
 
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
 
Ii year b.tech i sem nov dec 2012 examination results
Ii year b.tech i sem nov dec 2012 examination resultsIi year b.tech i sem nov dec 2012 examination results
Ii year b.tech i sem nov dec 2012 examination results
 

Viewers also liked

SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
I YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLE
I YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLEI YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLE
I YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLEP.G.GOPI NATH
 
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011P.G.GOPI NATH
 
III B.TECH. II SEM R07 CORRECTED RES
III B.TECH. II SEM R07 CORRECTED RESIII B.TECH. II SEM R07 CORRECTED RES
III B.TECH. II SEM R07 CORRECTED RESP.G.GOPI NATH
 
SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
IV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEIV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEP.G.GOPI NATH
 
M.TECH. PROJECT VIVA VOCE GRADES
M.TECH. PROJECT VIVA VOCE GRADESM.TECH. PROJECT VIVA VOCE GRADES
M.TECH. PROJECT VIVA VOCE GRADESP.G.GOPI NATH
 
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARCONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARP.G.GOPI NATH
 
I YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLE
I YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLEI YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLE
I YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLEP.G.GOPI NATH
 
II B.TECH I SEM ALL REGULATIONS NOV-2012 TIME TABLE
II B.TECH I SEM ALL REGULATIONS  NOV-2012 TIME TABLEII B.TECH I SEM ALL REGULATIONS  NOV-2012 TIME TABLE
II B.TECH I SEM ALL REGULATIONS NOV-2012 TIME TABLEP.G.GOPI NATH
 
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012P.G.GOPI NATH
 
Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...P.G.GOPI NATH
 
VI SEM MCA R09 MAY_JUNE 2012
VI SEM MCA R09 MAY_JUNE 2012VI SEM MCA R09 MAY_JUNE 2012
VI SEM MCA R09 MAY_JUNE 2012P.G.GOPI NATH
 
SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012P.G.GOPI NATH
 
V SEM MCA REG RESULT OCT 2012
V SEM MCA REG RESULT OCT 2012V SEM MCA REG RESULT OCT 2012
V SEM MCA REG RESULT OCT 2012P.G.GOPI NATH
 
II SEM MCA REGULAR AUG-2012
II SEM MCA REGULAR AUG-2012II SEM MCA REGULAR AUG-2012
II SEM MCA REGULAR AUG-2012P.G.GOPI NATH
 
II SEM MBA REG AUG-2012
II SEM MBA REG AUG-2012II SEM MBA REG AUG-2012
II SEM MBA REG AUG-2012P.G.GOPI NATH
 
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEIV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEP.G.GOPI NATH
 
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 

Viewers also liked (20)

SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 
I YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLE
I YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLEI YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLE
I YEAR M.TECH. I SEM SUPPLEMENTARY TIME TABLE
 
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
 
III B.TECH. II SEM R07 CORRECTED RES
III B.TECH. II SEM R07 CORRECTED RESIII B.TECH. II SEM R07 CORRECTED RES
III B.TECH. II SEM R07 CORRECTED RES
 
SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK III YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
 
IV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEIV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLE
 
M.TECH. PROJECT VIVA VOCE GRADES
M.TECH. PROJECT VIVA VOCE GRADESM.TECH. PROJECT VIVA VOCE GRADES
M.TECH. PROJECT VIVA VOCE GRADES
 
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARCONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
 
I YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLE
I YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLEI YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLE
I YEAR M.TECH. II SEM REGULAR & SUPPLE. TIME TABLE
 
II B.TECH I SEM ALL REGULATIONS NOV-2012 TIME TABLE
II B.TECH I SEM ALL REGULATIONS  NOV-2012 TIME TABLEII B.TECH I SEM ALL REGULATIONS  NOV-2012 TIME TABLE
II B.TECH I SEM ALL REGULATIONS NOV-2012 TIME TABLE
 
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
 
Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...
 
VI SEM MCA R09 MAY_JUNE 2012
VI SEM MCA R09 MAY_JUNE 2012VI SEM MCA R09 MAY_JUNE 2012
VI SEM MCA R09 MAY_JUNE 2012
 
SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH II SEM R07 SUPPLE APRIL MAY 2012
 
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
 
V SEM MCA REG RESULT OCT 2012
V SEM MCA REG RESULT OCT 2012V SEM MCA REG RESULT OCT 2012
V SEM MCA REG RESULT OCT 2012
 
II SEM MCA REGULAR AUG-2012
II SEM MCA REGULAR AUG-2012II SEM MCA REGULAR AUG-2012
II SEM MCA REGULAR AUG-2012
 
II SEM MBA REG AUG-2012
II SEM MBA REG AUG-2012II SEM MBA REG AUG-2012
II SEM MBA REG AUG-2012
 
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEIV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
 
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 

Similar to IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011

B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013prasadmvreddy
 
B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013prasadmvreddy
 
B.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam resultsB.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam resultsVARIGONDA GOPI
 
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam resultsB.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam resultsVARIGONDA GOPI
 
Iv ii r09 advance supple aug-2014
Iv ii r09  advance supple aug-2014Iv ii r09  advance supple aug-2014
Iv ii r09 advance supple aug-2014VARIGONDA GOPI
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013P.G.GOPI NATH
 
III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013P.G.GOPI NATH
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...Karthik Kumar
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012Karthik Kumar
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)Karthik Kumar
 
B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsVARIGONDA GOPI
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012Karthik Kumar
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Karthik Kumar
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsVARIGONDA GOPI
 
I year supple pending results-may 2012.pdf
I year supple  pending results-may 2012.pdfI year supple  pending results-may 2012.pdf
I year supple pending results-may 2012.pdfKarthik Kumar
 
Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)Karthik Kumar
 

Similar to IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011 (20)

B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013
 
B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013
 
B.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam resultsB.Tech III year I sem (R09) Supplementary June 2014 Exam results
B.Tech III year I sem (R09) Supplementary June 2014 Exam results
 
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam resultsB.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
B.Tech IV year I Sem (R09) Advance Supple Aug 2014 Exam results
 
Iv ii r09 advance supple aug-2014
Iv ii r09  advance supple aug-2014Iv ii r09  advance supple aug-2014
Iv ii r09 advance supple aug-2014
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
 
2 1 R09 supply
2 1  R09  supply2 1  R09  supply
2 1 R09 supply
 
2 1 R09 supply(2)
2 1 R09  supply(2)2 1 R09  supply(2)
2 1 R09 supply(2)
 
III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)
 
B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 Results
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012
 
I b tech results(2)
I b tech results(2)I b tech results(2)
I b tech results(2)
 
I b tech results
I b tech resultsI b tech results
I b tech results
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 results
 
I year supple pending results-may 2012.pdf
I year supple  pending results-may 2012.pdfI year supple  pending results-may 2012.pdf
I year supple pending results-may 2012.pdf
 
Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)Iii year ii sem (r09) regular(2)
Iii year ii sem (r09) regular(2)
 

More from P.G.GOPI NATH

III B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTIII B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTP.G.GOPI NATH
 
Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...P.G.GOPI NATH
 
I year r05 results.pdf
I year r05 results.pdfI year r05 results.pdf
I year r05 results.pdfP.G.GOPI NATH
 
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013P.G.GOPI NATH
 
IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. P.G.GOPI NATH
 
I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013P.G.GOPI NATH
 
I sem m.tech. supple results
I sem m.tech. supple resultsI sem m.tech. supple results
I sem m.tech. supple resultsP.G.GOPI NATH
 
II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013P.G.GOPI NATH
 
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013P.G.GOPI NATH
 
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013P.G.GOPI NATH
 
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSIMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSP.G.GOPI NATH
 
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSJNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSP.G.GOPI NATH
 
WAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHWAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHP.G.GOPI NATH
 
Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013P.G.GOPI NATH
 
MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013P.G.GOPI NATH
 
MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013P.G.GOPI NATH
 
MBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYMBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYP.G.GOPI NATH
 

More from P.G.GOPI NATH (18)

III B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTIII B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULT
 
Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...
 
I year r05 results.pdf
I year r05 results.pdfI year r05 results.pdf
I year r05 results.pdf
 
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
 
IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE.
 
I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013
 
I sem m.tech. supple results
I sem m.tech. supple resultsI sem m.tech. supple results
I sem m.tech. supple results
 
II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013
 
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
 
F6 32 r05s
F6 32 r05sF6 32 r05s
F6 32 r05s
 
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
 
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSIMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
 
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSJNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
 
WAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHWAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACH
 
Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013
 
MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013
 
MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013
 
MBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYMBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAY
 

Recently uploaded

Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 

Recently uploaded (20)

Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 

IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011

  • 1. JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR ANANTAPUR - 515002 (A.P.) INDIA EXAMINATION BRANCH B Tech IV Year I Semester (R09) Supplementary Examinations - May 2013 Results SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS HEMANTH O07F61A0232 9A02701 DISTRIBUTION OF ELECTRIC POWER 21 12 33 F 0 9A02705 HIGH VOLTAGE ENGINEERING 20 7 27 F 0 9A04603 DIGITAL SIGNAL PROCESSING 20 13 33 F 0 RAJ KUMAR P07F61A0278 9A02703 SWITCH GEAR AND PROTECTION 22 25 47 P 4 BANDILA ARUNACHALAM08F61A0301 9A03703 FINITE ELEMENT METHODS 20 2 22 F 0 R SRINIVAS08F61A04B1 9A05506 COMPUTER NETWORKS 27 28 55 P 4 T GUNASREE08F61A0527 RA9A12701 MOBILE APPLICATION DEVELOPMENT 26 33 59 P 4 MADANAPU AMARNATH09F61A0101 9A01702 BRIDGE ENGINEERING 20 25 45 P 4 MUNAGALA BALAJI09F61A0103 9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 25 55 P 4 9A01703 GEOTECHNICAL ENGINEERING‐II 14 26 40 P 4 ELAGANURU BHARGAVI09F61A0106 9A01702 BRIDGE ENGINEERING 29 29 58 P 4 PODAMEKALA CHANDRA KUMAR09F61A0107 9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 40 70 P 4 A CHENDU09F61A0108 9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 46 76 P 4 RAJA M P09F61A0125 9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 28 12 40 F 0 M SARATH KUMAR09F61A0130 9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 29 25 54 P 4 P SURESH09F61A0139 9A01702 BRIDGE ENGINEERING 19 30 49 P 4 BUKKYA VAMSI KRISHNA NAIK09F61A0143 9A01702 BRIDGE ENGINEERING 18 39 57 P 4 Page 1 of 7 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Thursday, July 25, 2013
  • 2. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS SHAIK ABDUL HAMEED09F61A0201 9A02703 SWITCH GEAR AND PROTECTION 18 16 34 F 0 9A04603 DIGITAL SIGNAL PROCESSING 22 5 27 F 0 INDLA JEEVANA09F61A0219 9A02703 SWITCH GEAR AND PROTECTION 24 25 49 P 4 SYAMPOOR SREENIVASA KISHORE09F61A0249 9A02702 FUNDAMENTALS OF HVDC & FACTS DEVICES 24 38 62 P 4 9A02703 SWITCH GEAR AND PROTECTION 27 15 42 F 0 TANDLAM SUBASH CHANDRA09F61A0250 9A04603 DIGITAL SIGNAL PROCESSING 20 32 52 P 4 KANCHI DILIPKUMAR09F61A0306 9A03701 OPERATIONS RESEARCH 28 18 46 F 0 9A03702 AUTOMATION & ROBOTICS 28 32 60 P 4 9A03703 FINITE ELEMENT METHODS 21 25 46 P 4 S D GNANADEVACHANDRAN09F61A0307 9A03703 FINITE ELEMENT METHODS 15 13 28 F 0 RAJAN KAVITHA09F61A0316 9A03703 FINITE ELEMENT METHODS 25 50 75 P 4 MANNURU MASTHANI09F61A0322 9A03701 OPERATIONS RESEARCH 22 42 64 P 4 9A03702 AUTOMATION & ROBOTICS 24 30 54 P 4 9A03703 FINITE ELEMENT METHODS 12 6 18 F 0 9A03704 INSTRUMENTATION AND CONTROL SYSTEMS 0 24 24 F 0 PAPPUCHETTY NARENDRA09F61A0327 9A03703 FINITE ELEMENT METHODS 22 26 48 P 4 M RAMESH NAIK09F61A0342 9A03703 FINITE ELEMENT METHODS 18 13 31 F 0 MUNDLAPATI RAMESH09F61A0343 9A03702 AUTOMATION & ROBOTICS 26 40 66 P 4 9A03703 FINITE ELEMENT METHODS 18 6 24 F 0 MELPAD KESAVULU SWAMI NADHAM09F61A0351 9A03703 FINITE ELEMENT METHODS 28 13 41 F 0 B VINOD09F61A0354 9A03703 FINITE ELEMENT METHODS 25 42 67 P 4 J YASWANTHA GURU09F61A0355 9A03703 FINITE ELEMENT METHODS 21 25 46 P 4 9A03704 INSTRUMENTATION AND CONTROL SYSTEMS 27 39 66 P 4 S K FARHANA09F61A0426 Page 2 of 7 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Thursday, July 25, 2013
  • 3. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 18 31 49 P 4 9AHS701 MANAGEMENT SCIENCE 23 32 55 P 4 P GOPI CHAND09F61A0429 9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 19 41 60 P 4 9A05506 COMPUTER NETWORKS 27 25 52 P 4 CHAMARTHY HEMAPRIYA09F61A0434 9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 20 41 61 P 4 M JAYA SURYA09F61A0437 9A04702 OPTICAL COMMUNICATIONS 21 AB 21 F 0 9A04703 RADAR SYSTEMS 22 AB 22 F 0 KADIRI KRISHNA CHAITANYA09F61A0443 9A04702 OPTICAL COMMUNICATIONS 21 25 46 P 4 BAGEPALLI LAVANYA09F61A0446 9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 29 50 79 P 4 BATHULA LOKESH09F61A0448 9A05506 COMPUTER NETWORKS 22 25 47 P 4 CHINTAKUNTA MUNI KIRAN KUMAR09F61A0458 9A04702 OPTICAL COMMUNICATIONS 24 31 55 P 4 DUVVURU PAVAN KUMAR09F61A0465 9A04703 RADAR SYSTEMS 26 29 55 P 4 9A05506 COMPUTER NETWORKS 24 25 49 P 4 MADALA PAVAN KUMAR09F61A0466 9A04706 DIGITAL DESIGN THROUGH VERILOG HDL 25 27 52 P 4 M H PRASANTH09F61A0469 9A05506 COMPUTER NETWORKS 24 25 49 P 4 PURUSHOTTAM S REDDY09F61A0471 9A05506 COMPUTER NETWORKS 25 30 55 P 4 V SESHA REDDY09F61A0486 9A05506 COMPUTER NETWORKS 26 AB 26 F 0 GANGANAPALLI VIDYASAGAR09F61A04B6 9A05506 COMPUTER NETWORKS 19 12 31 F 0 9AHS701 MANAGEMENT SCIENCE 23 18 41 F 0 VEMURU VIJAYA KUMAR09F61A04B7 9AHS701 MANAGEMENT SCIENCE 24 25 49 P 4 PERUMA REDDY VISHNU09F61A04C0 9A05506 COMPUTER NETWORKS 26 25 51 P 4 TALUPULA VISWA TEJA09F61A04C2 9A05506 COMPUTER NETWORKS 26 25 51 P 4 Page 3 of 7 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Thursday, July 25, 2013
  • 4. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS MURE AMARANATHA REDDY09F61A0503 9A05707 SOFTWARE PROJECT MANAGEMENT 27 58 85 P 4 AVULA AMARANATH09F61A0504 9A05704 ADVANCED COMPUTER ARCHITECTURE 25 11 36 F 0 9A05706 DATA WAREHOUSING AND DATA MINING 19 30 49 P 4 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 28 34 62 P 4 GANJI CHANDRAKANTH09F61A0512 9A05706 DATA WAREHOUSING AND DATA MINING 19 28 47 P 4 9A05707 SOFTWARE PROJECT MANAGEMENT 24 17 41 F 0 ELURU DAVEED09F61A0515 9A05704 ADVANCED COMPUTER ARCHITECTURE 26 31 57 P 4 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 29 38 67 P 4 B M GOPICHAND09F61A0524 9A05704 ADVANCED COMPUTER ARCHITECTURE 28 36 64 P 4 VISWARAJU GOWTHAMI09F61A0525 9A05704 ADVANCED COMPUTER ARCHITECTURE 27 33 60 P 4 NATESAN JAIGANESH09F61A0528 9A05704 ADVANCED COMPUTER ARCHITECTURE 21 8 29 F 0 9A05706 DATA WAREHOUSING AND DATA MINING 22 25 47 P 4 9A05707 SOFTWARE PROJECT MANAGEMENT 25 AB 25 F 0 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 24 17 41 F 0 LINGALA JASWANTHKUMAR REDDY09F61A0529 9A05704 ADVANCED COMPUTER ARCHITECTURE 21 17 38 F 0 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 25 31 56 P 4 JAYAKRISHNA K V09F61A0530 9A05706 DATA WAREHOUSING AND DATA MINING 20 29 49 P 4 9A05707 SOFTWARE PROJECT MANAGEMENT 28 36 64 P 4 VALLU KAMAL KISHORE09F61A0533 9A05704 ADVANCED COMPUTER ARCHITECTURE 23 AB 23 F 0 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 26 AB 26 F 0 INJAM KEERTHI09F61A0534 9A05707 SOFTWARE PROJECT MANAGEMENT 26 49 75 P 4 K KIRAN09F61A0536 9A05701 WEB TECHNOLOGIES 19 6 25 F 0 9A05706 DATA WAREHOUSING AND DATA MINING 16 36 52 P 4 9A05707 SOFTWARE PROJECT MANAGEMENT 27 41 68 P 4 KOTI KUMAR09F61A0537 Page 4 of 7 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Thursday, July 25, 2013
  • 5. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A05706 DATA WAREHOUSING AND DATA MINING 24 33 57 P 4 MANUBROLU MAHESH BABU09F61A0541 9A05706 DATA WAREHOUSING AND DATA MINING 17 32 49 P 4 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 25 29 54 P 4 MUNNELLA MANOHAR09F61A0542 9A05704 ADVANCED COMPUTER ARCHITECTURE 25 25 50 P 4 D MANOJ09F61A0543 9A05707 SOFTWARE PROJECT MANAGEMENT 15 AB 15 F 0 S MURALIKRISHNA09F61A0545 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 26 33 59 P 4 KASALA MURALI09F61A0546 9A05704 ADVANCED COMPUTER ARCHITECTURE 18 12 30 F 0 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 24 31 55 P 4 KARANAM NANDINI09F61A0547 9A05707 SOFTWARE PROJECT MANAGEMENT 26 49 75 P 4 B NAVEEN09F61A0551 9A05707 SOFTWARE PROJECT MANAGEMENT 27 39 66 P 4 KAYYALA NITHIN09F61A0552 9A05707 SOFTWARE PROJECT MANAGEMENT 25 43 68 P 4 VALLEPU PRASANNA09F61A0553 9A05706 DATA WAREHOUSING AND DATA MINING 18 40 58 P 4 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 28 34 62 P 4 BANDI PRAVEEN REDDY09F61A0556 9A05702 SOFTWARE TESTING 16 30 46 P 4 9A05704 ADVANCED COMPUTER ARCHITECTURE 20 11 31 F 0 9A05706 DATA WAREHOUSING AND DATA MINING 18 29 47 P 4 PARAMALA VENKATA LAKSHMI PRIYANKA09F61A0558 9A05701 WEB TECHNOLOGIES 22 11 33 F 0 9A05704 ADVANCED COMPUTER ARCHITECTURE 20 25 45 P 4 9A05706 DATA WAREHOUSING AND DATA MINING 20 33 53 P 4 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 25 18 43 F 0 VELLA RAMU09F61A0562 9A05706 DATA WAREHOUSING AND DATA MINING 27 36 63 P 4 AVLAKUNTAREDDY SEKHAR09F61A0566 9A05707 SOFTWARE PROJECT MANAGEMENT 28 30 58 P 4 PEDDAGUTTLAPALLI SANDEEP REDDY09F61A0572 9A05704 ADVANCED COMPUTER ARCHITECTURE 20 25 45 P 4 Page 5 of 7 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Thursday, July 25, 2013
  • 6. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 24 35 59 P 4 L SATHEESH REDDY09F61A0575 9A05706 DATA WAREHOUSING AND DATA MINING 25 38 63 P 4 SHAIK MOHAMMED NAWAZ09F61A0576 9AHS401 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS 29 31 60 P 4 P SREELEKHA09F61A0584 9A05704 ADVANCED COMPUTER ARCHITECTURE 24 27 51 P 4 9A05706 DATA WAREHOUSING AND DATA MINING 17 32 49 P 4 N SREENIVASULU09F61A0585 9A05704 ADVANCED COMPUTER ARCHITECTURE 27 26 53 P 4 MODI SUDHARSAN09F61A0587 9A05711 SOFTWARE TESTING AND CASE TOOLS LAB 23 40 63 P 2 BODDU UDAY KUMAR09F61A0595 9A05704 ADVANCED COMPUTER ARCHITECTURE 22 34 56 P 4 N VASUDHA09F61A0598 9A05706 DATA WAREHOUSING AND DATA MINING 28 35 63 P 4 B VIJAYRAJ09F61A05A3 9A05704 ADVANCED COMPUTER ARCHITECTURE 21 25 46 P 4 MUNIRATHNAM VINOD KUMAR09F61A05A6 9A05707 SOFTWARE PROJECT MANAGEMENT 28 47 75 P 4 ADUSUPALLI VINODRAM CHOWDARY09F61A05A7 9A05704 ADVANCED COMPUTER ARCHITECTURE 26 25 51 P 4 9A05706 DATA WAREHOUSING AND DATA MINING 25 38 63 P 4 MUPPALA NARESH10F65A0105 9A01701 FINITE ELEMENT METHODS IN CIVIL ENGINEERING 30 37 67 P 4 DAMU GOOTURU10F65A0301 9A03701 OPERATIONS RESEARCH 26 56 82 P 4 P MAHESH10F65A0403 9AHS701 MANAGEMENT SCIENCE 24 AB 24 F 0 VELKURU SURESH10F65A0411 9AHS701 MANAGEMENT SCIENCE 24 32 56 P 4 KOPPUROLA MOHAN10F65A0502 9A05707 SOFTWARE PROJECT MANAGEMENT 26 36 62 P 4 PRAVEEN KOPPALA10F65A0503 9A05711 SOFTWARE TESTING AND CASE TOOLS LAB 23 42 65 P 2 SURESH B P10F65A0504 9A05704 ADVANCED COMPUTER ARCHITECTURE 24 29 53 P 4 MUKKOTI RAJESH10F65A0505 Page 6 of 7 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Thursday, July 25, 2013
  • 7. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS 9A05707 SOFTWARE PROJECT MANAGEMENT 25 38 63 P 4 Page 7 of 7 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Thursday, July 25, 2013