SlideShare a Scribd company logo
1 of 2
Zoran Joković
Personal data Date of birth: 13th
November 1968
Address: Braće Jerkovića 139 Beograd
Mobile phone: 381648111490
Email: zokijokovic@gmail.com
Skype: cm052512
Education 1988 - 1997 University of Niš Faculty of Occupational Safety
Course: Fire protection, Mark average: 7
Key
achievements
• Fire protection engineer (Master)
• State License for the design of fire protection
• State License management of fire protection
• Experience of fire protection and HSE design in the oil industry
• State HSE License
Work
experience
11.1997 – 12.1999 Chief of fire protection, ``Graditelj`` Building Industrial Complex
Leskovac
• Management of all fire protection activities
• Preparation of inetrnal document required by Law
• Coordination with fire protection inspection and Fire department
07.2001 – 08.2003 Fire protection engineer, ``Tehpro`` Beograd
• External management of the fire protection for enterprise customers
• Making investment technical documentation of fire protection for enterprise customers
08.2003 – 03.2013 Tim leader for fire protection, ``Banca Intesa ad`` Beograd
• Management of all fire protection activities
• Conceptual design of the of technical fire protection system s
• Maintenance of technical systems for fire protection
• Predictive thermographic recording inspection of electrical installations and equipment
• Preparation and monitoring of annual budget plans
2013 – 2015 Self – employed
Project design of fire protection industry, public, commercial and residential buildings
Skills • Computer Literacy: MS office, Acad, MS Project (basic), Outlook,
• Languages: English medium level
• Driving license: B
Additional
information
The engineering experience through independent projects:
REPLACEMENT OF THE OIL METERING FACILITIES WITH ASSOCIATED WORKS AT ES SIDER
TERMINAL, LIBIA WAHA OIL COMPANY- HEALTH, SAFETY & ENVIRONMENT PLAN, STUDY AND
DEFINITIONS OF EXPLOSIVE HAZARD ZONES,
NIS - installation of remotely controlled isolation valves - Pancevo refinery – HSE study,
Adaptation PF section TENG a Petrochemical Pančevo – HSE study,
Protection of gas pipeline for the Directorate for road construction Beograd – HSE study
The project of new heavy oil pipeline power steam boilers boiler facility - Power plant Novi Sad,
The project of building four tanks of 20 000 m3 storage of oil derivatives, the terminal Smederevo,
for the purposes of the Directorate for Commodity Reserves,
Consulting services in the field of fire protection activities for the construction of ODG plant in TE
Kostolac B terminal, service validation of technical documentation and consulting services,
Biodiesel Doo Beograd - project development for the detection of methanol in the production of
biodiesel by esterification of methanol,
Project to adapt the boiler BF 9602-RNP in Pancevo,
3 storage tanks of 10,000 m3 at the Terminal of petroleum products in Smederevo, for the
purposes of NIS ad Novi Sad.
Analysis of fire risks and the determination of technical fire protection maintenance system for: Ball
Packaging Europe Belgrade, DAHLIA BEOGRAD - Chemical industry - Cosmetics factory, ADP PLASTIC -
plastic industry – Belgrade Mladenovac, ADMINISTRATION OF BELGRADE CITY - Building Inspector's
Office and the authorities of the city, etc.
Speciality • urban planning of protection measures, access roads and fire safety distances,
• determining the required level of fire resistance of the building (TP19, TP21),
• calculation of fire load,
• calculation of fire risk,
• calculating the evacuation corridors,
• calculate the required quantities of water for fire extinguishing,
• calculate the required quantities of mobile fire fighting equipment,
• conceptual designs and drawings of detection and fire alarm systems,
• conceptual designs and drawings of systems for automatic fire extinguishing,
• preparation of budget plans and concepts for technical maintenance of fire protection,
• preventive thermographic recording of electrical and mechanical installations and equipment
(Fluke and Flir camera), 7 years experience, by recommendations ASTM Standard E1934 – 99a
(Standard Guide for Examing Electrical and Mechanical Equipment with Infrared Thermography)
and NETA (National Electrical Testing Association),
• validation of detection and fire alarm systems (by CEN/TS 54-14),
• validation of systems for automatic fire extinguishing (by EN 12845 sprinklers, EN 15004 gases),
• HSE studies.

More Related Content

Viewers also liked

Eloise Phillips Resume 3.01
Eloise Phillips Resume 3.01Eloise Phillips Resume 3.01
Eloise Phillips Resume 3.01Eloise Phillips
 
Analytical Modelling and Design of a Mechatronic Cradle System
Analytical Modelling and Design of a Mechatronic Cradle SystemAnalytical Modelling and Design of a Mechatronic Cradle System
Analytical Modelling and Design of a Mechatronic Cradle SystemIJSRD
 
Java lead developer & architect
Java lead developer & architectJava lead developer & architect
Java lead developer & architectMark Long
 
Lynch-BATech-2016
Lynch-BATech-2016Lynch-BATech-2016
Lynch-BATech-2016Louis Lynch
 
Oracle bi 10g_install_migration
Oracle bi 10g_install_migrationOracle bi 10g_install_migration
Oracle bi 10g_install_migrationMlx Le
 

Viewers also liked (11)

Eloise Phillips Resume 3.01
Eloise Phillips Resume 3.01Eloise Phillips Resume 3.01
Eloise Phillips Resume 3.01
 
Robin Fenstermaker Resume
Robin Fenstermaker ResumeRobin Fenstermaker Resume
Robin Fenstermaker Resume
 
Analytical Modelling and Design of a Mechatronic Cradle System
Analytical Modelling and Design of a Mechatronic Cradle SystemAnalytical Modelling and Design of a Mechatronic Cradle System
Analytical Modelling and Design of a Mechatronic Cradle System
 
Java lead developer & architect
Java lead developer & architectJava lead developer & architect
Java lead developer & architect
 
shivakumarswamy_Senior test engineer
shivakumarswamy_Senior test engineershivakumarswamy_Senior test engineer
shivakumarswamy_Senior test engineer
 
Kesha's resume
Kesha's resumeKesha's resume
Kesha's resume
 
Aida Panuco-Catano Resume
Aida Panuco-Catano ResumeAida Panuco-Catano Resume
Aida Panuco-Catano Resume
 
Resume415
Resume415Resume415
Resume415
 
Lynch-BATech-2016
Lynch-BATech-2016Lynch-BATech-2016
Lynch-BATech-2016
 
Oracle bi 10g_install_migration
Oracle bi 10g_install_migrationOracle bi 10g_install_migration
Oracle bi 10g_install_migration
 
Zafar Iqbal
Zafar IqbalZafar Iqbal
Zafar Iqbal
 

Similar to Zoran Joković CV, ENG

AMAN_HSE DESIGN_CV
AMAN_HSE DESIGN_CVAMAN_HSE DESIGN_CV
AMAN_HSE DESIGN_CVAman Goel
 
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016Nina Aleksic-Antonioli
 
Workshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imec
Workshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imecWorkshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imec
Workshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imecSirris
 
Gsec Corporate_Presentation 0515D
Gsec Corporate_Presentation 0515DGsec Corporate_Presentation 0515D
Gsec Corporate_Presentation 0515DIoannis Georgakakis
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Sigve Hamilton Aspelund
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production EngineerSigve Hamilton Aspelund
 
DEVELOP A GAS LEAKAGE DETECTOR .pptx
DEVELOP A GAS LEAKAGE DETECTOR .pptxDEVELOP A GAS LEAKAGE DETECTOR .pptx
DEVELOP A GAS LEAKAGE DETECTOR .pptxAshish Sadavarti
 
Mech. eng. I.Veljkovic
Mech. eng. I.VeljkovicMech. eng. I.Veljkovic
Mech. eng. I.VeljkovicIvan Veljkovic
 
Desk Yapı Katalog
Desk Yapı KatalogDesk Yapı Katalog
Desk Yapı KatalogDeskYap
 
CV_Svetoslav_Georgiev_ENG_Dec2016
CV_Svetoslav_Georgiev_ENG_Dec2016CV_Svetoslav_Georgiev_ENG_Dec2016
CV_Svetoslav_Georgiev_ENG_Dec2016Svetoslav Georgiev
 
UG_20090206_Merci
UG_20090206_MerciUG_20090206_Merci
UG_20090206_MerciBart Merci
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionSigve Hamilton Aspelund
 
Webinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology developmentWebinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology developmentGlobal CCS Institute
 

Similar to Zoran Joković CV, ENG (20)

AMAN_HSE DESIGN_CV
AMAN_HSE DESIGN_CVAMAN_HSE DESIGN_CV
AMAN_HSE DESIGN_CV
 
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
Nina Aleksic-Antonioili PERSONAL REFERENCE LIST 2016
 
Workshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imec
Workshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imecWorkshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imec
Workshop - Voorkomen van faling door vibraties - introductie-vis-prosperita-imec
 
Gsec Corporate_Presentation 0515D
Gsec Corporate_Presentation 0515DGsec Corporate_Presentation 0515D
Gsec Corporate_Presentation 0515D
 
Lawrence CV på English 2
Lawrence CV på English 2Lawrence CV på English 2
Lawrence CV på English 2
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production Engineer
 
DEVELOP A GAS LEAKAGE DETECTOR .pptx
DEVELOP A GAS LEAKAGE DETECTOR .pptxDEVELOP A GAS LEAKAGE DETECTOR .pptx
DEVELOP A GAS LEAKAGE DETECTOR .pptx
 
CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014 CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014
 
Mech. eng. I.Veljkovic
Mech. eng. I.VeljkovicMech. eng. I.Veljkovic
Mech. eng. I.Veljkovic
 
Desk Yapı Katalog
Desk Yapı KatalogDesk Yapı Katalog
Desk Yapı Katalog
 
Mhimdi.sameh. cv
Mhimdi.sameh. cvMhimdi.sameh. cv
Mhimdi.sameh. cv
 
CV Sigve Hamilton Aspelund 032015
CV Sigve Hamilton Aspelund 032015CV Sigve Hamilton Aspelund 032015
CV Sigve Hamilton Aspelund 032015
 
CV_Svetoslav_Georgiev_ENG_Dec2016
CV_Svetoslav_Georgiev_ENG_Dec2016CV_Svetoslav_Georgiev_ENG_Dec2016
CV_Svetoslav_Georgiev_ENG_Dec2016
 
Cv mišković ranko
Cv mišković rankoCv mišković ranko
Cv mišković ranko
 
UG_20090206_Merci
UG_20090206_MerciUG_20090206_Merci
UG_20090206_Merci
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short version
 
fire & gas specialsit
fire & gas specialsitfire & gas specialsit
fire & gas specialsit
 
Webinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology developmentWebinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology development
 
M.Ashraf
M.AshrafM.Ashraf
M.Ashraf
 

Zoran Joković CV, ENG

  • 1. Zoran Joković Personal data Date of birth: 13th November 1968 Address: Braće Jerkovića 139 Beograd Mobile phone: 381648111490 Email: zokijokovic@gmail.com Skype: cm052512 Education 1988 - 1997 University of Niš Faculty of Occupational Safety Course: Fire protection, Mark average: 7 Key achievements • Fire protection engineer (Master) • State License for the design of fire protection • State License management of fire protection • Experience of fire protection and HSE design in the oil industry • State HSE License Work experience 11.1997 – 12.1999 Chief of fire protection, ``Graditelj`` Building Industrial Complex Leskovac • Management of all fire protection activities • Preparation of inetrnal document required by Law • Coordination with fire protection inspection and Fire department 07.2001 – 08.2003 Fire protection engineer, ``Tehpro`` Beograd • External management of the fire protection for enterprise customers • Making investment technical documentation of fire protection for enterprise customers 08.2003 – 03.2013 Tim leader for fire protection, ``Banca Intesa ad`` Beograd • Management of all fire protection activities • Conceptual design of the of technical fire protection system s • Maintenance of technical systems for fire protection • Predictive thermographic recording inspection of electrical installations and equipment • Preparation and monitoring of annual budget plans 2013 – 2015 Self – employed Project design of fire protection industry, public, commercial and residential buildings Skills • Computer Literacy: MS office, Acad, MS Project (basic), Outlook, • Languages: English medium level • Driving license: B Additional information The engineering experience through independent projects: REPLACEMENT OF THE OIL METERING FACILITIES WITH ASSOCIATED WORKS AT ES SIDER TERMINAL, LIBIA WAHA OIL COMPANY- HEALTH, SAFETY & ENVIRONMENT PLAN, STUDY AND DEFINITIONS OF EXPLOSIVE HAZARD ZONES, NIS - installation of remotely controlled isolation valves - Pancevo refinery – HSE study, Adaptation PF section TENG a Petrochemical Pančevo – HSE study, Protection of gas pipeline for the Directorate for road construction Beograd – HSE study The project of new heavy oil pipeline power steam boilers boiler facility - Power plant Novi Sad, The project of building four tanks of 20 000 m3 storage of oil derivatives, the terminal Smederevo,
  • 2. for the purposes of the Directorate for Commodity Reserves, Consulting services in the field of fire protection activities for the construction of ODG plant in TE Kostolac B terminal, service validation of technical documentation and consulting services, Biodiesel Doo Beograd - project development for the detection of methanol in the production of biodiesel by esterification of methanol, Project to adapt the boiler BF 9602-RNP in Pancevo, 3 storage tanks of 10,000 m3 at the Terminal of petroleum products in Smederevo, for the purposes of NIS ad Novi Sad. Analysis of fire risks and the determination of technical fire protection maintenance system for: Ball Packaging Europe Belgrade, DAHLIA BEOGRAD - Chemical industry - Cosmetics factory, ADP PLASTIC - plastic industry – Belgrade Mladenovac, ADMINISTRATION OF BELGRADE CITY - Building Inspector's Office and the authorities of the city, etc. Speciality • urban planning of protection measures, access roads and fire safety distances, • determining the required level of fire resistance of the building (TP19, TP21), • calculation of fire load, • calculation of fire risk, • calculating the evacuation corridors, • calculate the required quantities of water for fire extinguishing, • calculate the required quantities of mobile fire fighting equipment, • conceptual designs and drawings of detection and fire alarm systems, • conceptual designs and drawings of systems for automatic fire extinguishing, • preparation of budget plans and concepts for technical maintenance of fire protection, • preventive thermographic recording of electrical and mechanical installations and equipment (Fluke and Flir camera), 7 years experience, by recommendations ASTM Standard E1934 – 99a (Standard Guide for Examing Electrical and Mechanical Equipment with Infrared Thermography) and NETA (National Electrical Testing Association), • validation of detection and fire alarm systems (by CEN/TS 54-14), • validation of systems for automatic fire extinguishing (by EN 12845 sprinklers, EN 15004 gases), • HSE studies.