Client:
CAbi
Building Address:
21750 Arnold Center Drive
Carson, CA
Transaction Type:
Relocation
Size:
189,223 RSF
Services Provided:
Tenant Representation
Challenge
CAbi (Carol Anderson by invitation) is an apparel/fashion company focused
on designing woman’s clothing and creating a unique experience through its
thousands of individual sales representatives. The company had occupied
two Southern California facilities for many years and had grown into a third
due to their tremendous growth and brand success. CAbi realized in order to
accommodate current and future demand as well as maintaining the company
culture, CAbi must evaluate all potential operational scenarios with a focus on
getting all functions under one roof. One major challenge was identifying a
large Class A warehouse facility in a market that boasted a 2.6% vacancy and
would allow for a significant amount of office to be constructed.
Action
Our team began the process by assisting CAbi in analyzing a variety of
occupancy scenarios that included remaining in the existing three buildings
and expanding to a fourth, consolidating, bifurcating certain functions of
the operations and how to integrate and implement new systems to garner
efficiencies within the operations. Over the initial 3 months of the process,
it became evident consolidating the operations would not only produce the
lowest overall operating costs but also allow CAbi to redefine the culture of
the organization as they had occupied two of their existing facilities for well
over 15 years. We also led CAbi through a process of quantifying the amount
of space required by each department/function and ultimately created a
“project scope” that outlined the specific space needs of the operations.
Our team explored, evaluated and negotiated on select facilities that could
accommodate the multiple functions of CAbi’s requirement. In conjunction
with our Project Management Services, we were able to compare total costs
of each building under consideration which included capital contributions for
the select office and warehouse/material handling build out requirements.
At the conclusion of our leverage creation process and detailed budget for
each opportunity under consideration, CAbi was able to select the most ideal
facility and structure while understanding the total cost implication.
Result
Our team was able to secure a Flagship 189,223 square foot Class A facility
located in Carson that not only accommodated the warehouse requirements
but also allowed CAbi to construct the necessary building improvements.
The overall economic package included a significant landlord funded capital
allowance, multiple months of free rent, an aggressive rent schedule,
operating expense caps and liberal use of “how” we constructed the space.
Given the above standard amount of office CAbi required, we secured a
transaction that eliminated any future restoration requirements from CAbi
should they elect to relocate at the end of their 10-year lease term. In
addition to the overall economic structure, the building features allow CAbi to
implement a new material handling system that is oriented towards producing
significant efficiencies for apparel related distribution uses.
Team Experience
CAbi

More Related Content

Similar to CAbi relocates 189K SF operations

Taking Stock- Mergers and Acquisitions
Taking Stock- Mergers and AcquisitionsTaking Stock- Mergers and Acquisitions
Taking Stock- Mergers and AcquisitionsBryan Yeazel
 
Relationship management-plan template
Relationship management-plan templateRelationship management-plan template
Relationship management-plan templateVivek Srivastava
 
1. What were the three key elements that were part of Buck Knives.pdf
 1. What were the three key elements that were part of Buck Knives.pdf 1. What were the three key elements that were part of Buck Knives.pdf
1. What were the three key elements that were part of Buck Knives.pdfaniljain719651
 
Case studies for LinkedIn
Case studies for LinkedInCase studies for LinkedIn
Case studies for LinkedInNick Williams
 
Case Study_Goodwill of OC
Case Study_Goodwill of OCCase Study_Goodwill of OC
Case Study_Goodwill of OCWes Hunnicutt
 
PulseCheck 2016 | How we built new customer success organizational structure...
PulseCheck 2016  | How we built new customer success organizational structure...PulseCheck 2016  | How we built new customer success organizational structure...
PulseCheck 2016 | How we built new customer success organizational structure...Gainsight
 
Rapid Deployment
Rapid DeploymentRapid Deployment
Rapid Deploymentlaurasc
 
Project Sunrise Nears Completion - The Source
Project Sunrise Nears Completion - The SourceProject Sunrise Nears Completion - The Source
Project Sunrise Nears Completion - The SourceBarbara Jones
 
Brian Talbot - Sample Strategic Commercial Real Estate Work
Brian Talbot - Sample Strategic Commercial Real Estate WorkBrian Talbot - Sample Strategic Commercial Real Estate Work
Brian Talbot - Sample Strategic Commercial Real Estate WorkBrian Talbot
 
05 pmp scope management exam
05 pmp scope management exam05 pmp scope management exam
05 pmp scope management examJamil Faraj , PMP
 
Functional Business Advantages of Adopting Agile.pdf
Functional Business Advantages of Adopting Agile.pdfFunctional Business Advantages of Adopting Agile.pdf
Functional Business Advantages of Adopting Agile.pdfChris Marocchi
 
Leading PE-backed financial services marketplace reduces annualized costs by ...
Leading PE-backed financial services marketplace reduces annualized costs by ...Leading PE-backed financial services marketplace reduces annualized costs by ...
Leading PE-backed financial services marketplace reduces annualized costs by ...Firstsource Solutions Limited
 
K&b greenhouse powerpoint
K&b greenhouse powerpointK&b greenhouse powerpoint
K&b greenhouse powerpointronewing1369
 
Shambaugh & Son
Shambaugh & SonShambaugh & Son
Shambaugh & Sontpoinsett
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014William Crenshaw
 

Similar to CAbi relocates 189K SF operations (20)

Taking Stock- Mergers and Acquisitions
Taking Stock- Mergers and AcquisitionsTaking Stock- Mergers and Acquisitions
Taking Stock- Mergers and Acquisitions
 
Relationship management-plan template
Relationship management-plan templateRelationship management-plan template
Relationship management-plan template
 
1. What were the three key elements that were part of Buck Knives.pdf
 1. What were the three key elements that were part of Buck Knives.pdf 1. What were the three key elements that were part of Buck Knives.pdf
1. What were the three key elements that were part of Buck Knives.pdf
 
Case Study_JC Sales
Case Study_JC SalesCase Study_JC Sales
Case Study_JC Sales
 
Case studies for LinkedIn
Case studies for LinkedInCase studies for LinkedIn
Case studies for LinkedIn
 
Case Study_Goodwill of OC
Case Study_Goodwill of OCCase Study_Goodwill of OC
Case Study_Goodwill of OC
 
PulseCheck 2016 | How we built new customer success organizational structure...
PulseCheck 2016  | How we built new customer success organizational structure...PulseCheck 2016  | How we built new customer success organizational structure...
PulseCheck 2016 | How we built new customer success organizational structure...
 
Rapid Deployment
Rapid DeploymentRapid Deployment
Rapid Deployment
 
Project Sunrise Nears Completion - The Source
Project Sunrise Nears Completion - The SourceProject Sunrise Nears Completion - The Source
Project Sunrise Nears Completion - The Source
 
IAM Project_JPMC
IAM Project_JPMCIAM Project_JPMC
IAM Project_JPMC
 
KBS Brochure
KBS BrochureKBS Brochure
KBS Brochure
 
Brian Talbot - Sample Strategic Commercial Real Estate Work
Brian Talbot - Sample Strategic Commercial Real Estate WorkBrian Talbot - Sample Strategic Commercial Real Estate Work
Brian Talbot - Sample Strategic Commercial Real Estate Work
 
05 pmp scope management exam
05 pmp scope management exam05 pmp scope management exam
05 pmp scope management exam
 
Functional Business Advantages of Adopting Agile.pdf
Functional Business Advantages of Adopting Agile.pdfFunctional Business Advantages of Adopting Agile.pdf
Functional Business Advantages of Adopting Agile.pdf
 
Leading PE-backed financial services marketplace reduces annualized costs by ...
Leading PE-backed financial services marketplace reduces annualized costs by ...Leading PE-backed financial services marketplace reduces annualized costs by ...
Leading PE-backed financial services marketplace reduces annualized costs by ...
 
K&b greenhouse powerpoint
K&b greenhouse powerpointK&b greenhouse powerpoint
K&b greenhouse powerpoint
 
Shambaugh & Son
Shambaugh & SonShambaugh & Son
Shambaugh & Son
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014
 

CAbi relocates 189K SF operations

  • 1. Client: CAbi Building Address: 21750 Arnold Center Drive Carson, CA Transaction Type: Relocation Size: 189,223 RSF Services Provided: Tenant Representation Challenge CAbi (Carol Anderson by invitation) is an apparel/fashion company focused on designing woman’s clothing and creating a unique experience through its thousands of individual sales representatives. The company had occupied two Southern California facilities for many years and had grown into a third due to their tremendous growth and brand success. CAbi realized in order to accommodate current and future demand as well as maintaining the company culture, CAbi must evaluate all potential operational scenarios with a focus on getting all functions under one roof. One major challenge was identifying a large Class A warehouse facility in a market that boasted a 2.6% vacancy and would allow for a significant amount of office to be constructed. Action Our team began the process by assisting CAbi in analyzing a variety of occupancy scenarios that included remaining in the existing three buildings and expanding to a fourth, consolidating, bifurcating certain functions of the operations and how to integrate and implement new systems to garner efficiencies within the operations. Over the initial 3 months of the process, it became evident consolidating the operations would not only produce the lowest overall operating costs but also allow CAbi to redefine the culture of the organization as they had occupied two of their existing facilities for well over 15 years. We also led CAbi through a process of quantifying the amount of space required by each department/function and ultimately created a “project scope” that outlined the specific space needs of the operations. Our team explored, evaluated and negotiated on select facilities that could accommodate the multiple functions of CAbi’s requirement. In conjunction with our Project Management Services, we were able to compare total costs of each building under consideration which included capital contributions for the select office and warehouse/material handling build out requirements. At the conclusion of our leverage creation process and detailed budget for each opportunity under consideration, CAbi was able to select the most ideal facility and structure while understanding the total cost implication. Result Our team was able to secure a Flagship 189,223 square foot Class A facility located in Carson that not only accommodated the warehouse requirements but also allowed CAbi to construct the necessary building improvements. The overall economic package included a significant landlord funded capital allowance, multiple months of free rent, an aggressive rent schedule, operating expense caps and liberal use of “how” we constructed the space. Given the above standard amount of office CAbi required, we secured a transaction that eliminated any future restoration requirements from CAbi should they elect to relocate at the end of their 10-year lease term. In addition to the overall economic structure, the building features allow CAbi to implement a new material handling system that is oriented towards producing significant efficiencies for apparel related distribution uses. Team Experience CAbi