1. Birth date: 19/11/1984
Place of Birth: Egypt
Nationality: Egyptian
Gender: Male
Marital Status: Married
Religion: Muslim
Military Status: Exempted
Education
Languages
WALID ZAKI MOHAMMED
Phone: (+97455110394) – (+2 01100590593)
Address: 1st
Al Qaeiya, St S.N(835) – Old Rayyan – Doha – Qatar
Email: walid.zaki84@gmail.com
Personal Data
B.Sc in Electrical Power & Machine engineering Faculty of Engineering –
Al-Azhar university in Cairo.
Graduated in 2008
Graduation Grade: Good (69.2%)
Graduation Project Grade: Excellent
2. Work Experiences:-
Training and Courses:-
;
Computer Skilles:-
• Documents Control : (5 Hour): in Arab Contractor Training Institute.
• Preparation Modern Electrical Mechanical Engineer (60 Hour – 2 Week):
in Arab Contractor Training Institute.
• OSHA Construction (30 Hour – 1 Week): in Arab Contractor Training
Institute.
• Extra High Voltage (60 Hour – 2 Week) : in Egyptian Distribution Electricity
Co.
• Substations – Electricity Protection (60 Hour – 2 Week) : in Egyptian
Electricity Transmission Co.
• Circuit Breakers – Transmission Lines (60 Hour – 2 Week) : in Egyptian
Electricity Transmission Co.
• Excellent usage of Windows & Internet Applications.
• Excellent usage of Microsoft Office Excel & Word.
• Making Presentations by Power point.
• Excellent usage of Auto CAD.
- Now I am working in: The Arab Contractor Company (Osman
Ahmed Osman) in the Electromechanical department, as Electrical
Engineer. Herein the projects where I worked in:-
From April 2009 Up to Sept 2011;
The Project: The treatment water plant of Tammia in Fayom;
Main Contractor: The Arab Contractors;
Project Engineer: ENVIRO CIVEC.
Total Budget: 1000,000,000 L.E.;
My Position: Electrical Site Engineers ( for 24 months) &
Maintenance & Operation Engineer ( for 5 months);
From Sept 2011 Up to April 2013;
Projec The Project: EL Masraf Elkataa pumping station in Fayom;
Main Contractor: The Arab Contractors;
Arabic: Mother Tongue.
English: Good reading, written and spoken.
3. Note
Project Engineer: ENCOM GROUP.
Total Budget: 100,000,000 L.E.;
My Position: Project Manager;
From April 2013 Up to Oct 2014;
The Project: The treatment water plant of Abo-Sleem in Bany soyf;
Main Contractor: The Arab Contractors;
Project Engineer: Moharam Bakhom ;
Total Budget: 800,000,000 L.E.;
My Position: Electrical Site Engineers ( for 19 months)
From Oct 2014 Up to May 2016;
Technical office Manager for Electromechanical Works For treatment water
projects.
From May 2016 Up to Date;
The Project: Re-Centralization of Heliopolis co for chemical industries
(Factory No 81 Elharby);
Main Contractor: Arab Contractors ;
Project Engineer: Moharam Bakhom ;
Total Budget: More Than 1,000,000,000 LE;
My Position: Technical office Manager for Electromechanical
Works;
My Responsibilities:
• In Site: Installation of Construction power, Lighting systems & Low current
systems, Installation of Pumps, Pipes Lines, Valves , Motor , Soft Starters ,Medium
Voltage Main Switchgear, Low and medium Voltage Main Switchgear,
Generators , Actuators, Low and Medium Voltage Cables , Earthing, Transformers,
control systems.
• In Technical Office: Contract management, Follow up of Time schedule and
execution progress, Technical submittals and Drawings, Procurements for
materials, Inspection of materials, Preparing the Client & Subcontractors invoices ,
Document control , Cash flow preparing , Low voltage cables design calculations
& etc.