SlideShare a Scribd company logo
1 of 6
Optus
GSMIS
INPP
DISC
COO
SMART
PAY
OLE
MRE
Incident Management
Problem management (RCA/RFC)
Change/Service Management
CIP (Continuous improvement Plan)
Application Availability Management
Part - ing Ways – The Daily Edge
1
2 3 4
5 6
7
8
9
10
11
12
13
14
1516
1718
1920
21
22
23
24
25
26
27
28
29 30
I want 13 I got 13
but I am late
13
Monthly Daily System
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24
25 26 27 28 29 30 31
I want 13 I got 13
so fast
13
Monthly Daily System
Part - ing Ways – The Daily Edge
1
2
3
4
5
6
7
8
9
10 11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
9 10 11 12
13 14 15 16
17 18 19 20
21 22 23 24
25 26 27 28
29 30 31
1 2 3 4
5 6 7 8
Drastically improved Stats Generation
Backup time greatly reduced
Number of Major Incidents - Reduced
Query Performance - More Focused
Part - ing Ways – The Daily Edge
• Stats generation time is consistent of 5 to 6 minutes through out the month.
• Time taken
o Before Daily Partition : 58Hour/month.
o After Daily Partition : 4Hour/month.
• 14 times of Time Saved from Original.
• Reports generation time is significantly improved.
• Backup time is significantly reduced by approx 300%.
• Day to day Manageability is simplified.
• Results of a query can be achieved by accessing a subset of partitions, rather than the
entire table which will improve the Query Performance.
• Major & Normal Incident Reduction.
Observations
Thank You

More Related Content

Viewers also liked

Warmers,fillers, improvisations in efl classroom
Warmers,fillers, improvisations in efl classroomWarmers,fillers, improvisations in efl classroom
Warmers,fillers, improvisations in efl classroomEva Buyuksimkesyan
 
Vocabulary game
Vocabulary gameVocabulary game
Vocabulary gamevalydan
 
Pass the word - Gestures game
Pass the word - Gestures gamePass the word - Gestures game
Pass the word - Gestures gamecrisgarlop
 
Motivation games
Motivation gamesMotivation games
Motivation gamesjanehbasto
 
Warm-up Activities for Teaching Children in ESL Class
Warm-up Activities for Teaching Children in ESL ClassWarm-up Activities for Teaching Children in ESL Class
Warm-up Activities for Teaching Children in ESL ClassVo Linh Truong
 
Tác hại và lợi ích của Game Online(go)
Tác hại và lợi ích của Game Online(go)Tác hại và lợi ích của Game Online(go)
Tác hại và lợi ích của Game Online(go)Dũng Krb
 

Viewers also liked (11)

Warmers,fillers, improvisations in efl classroom
Warmers,fillers, improvisations in efl classroomWarmers,fillers, improvisations in efl classroom
Warmers,fillers, improvisations in efl classroom
 
Flash Word Games
Flash Word GamesFlash Word Games
Flash Word Games
 
Word games 3
Word games 3Word games 3
Word games 3
 
Game
GameGame
Game
 
Vocabulary game
Vocabulary gameVocabulary game
Vocabulary game
 
Vocabulary game
Vocabulary gameVocabulary game
Vocabulary game
 
Pass the word - Gestures game
Pass the word - Gestures gamePass the word - Gestures game
Pass the word - Gestures game
 
Motivation games
Motivation gamesMotivation games
Motivation games
 
Warm-up Activities for Teaching Children in ESL Class
Warm-up Activities for Teaching Children in ESL ClassWarm-up Activities for Teaching Children in ESL Class
Warm-up Activities for Teaching Children in ESL Class
 
Tác hại và lợi ích của Game Online(go)
Tác hại và lợi ích của Game Online(go)Tác hại và lợi ích của Game Online(go)
Tác hại và lợi ích của Game Online(go)
 
Warm up activities-uü
Warm up activities-uüWarm up activities-uü
Warm up activities-uü
 

Similar to HP Optus Innovate Final

Incident Management Report
Incident Management ReportIncident Management Report
Incident Management ReportCharles Fox
 
07_Extending Workforce Management_Verizon (3)dp
07_Extending Workforce Management_Verizon (3)dp07_Extending Workforce Management_Verizon (3)dp
07_Extending Workforce Management_Verizon (3)dpDebra L Phillips
 
PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223Carl Briggs
 
Advanced Agile Planning - NDC 2014
Advanced Agile Planning - NDC 2014Advanced Agile Planning - NDC 2014
Advanced Agile Planning - NDC 2014Mike Cohn
 
CSI approach to your Production Management
CSI approach to your Production ManagementCSI approach to your Production Management
CSI approach to your Production ManagementAndrius Gudaitis
 
Advanced Topics in Agile Planning
Advanced Topics in Agile PlanningAdvanced Topics in Agile Planning
Advanced Topics in Agile PlanningMike Cohn
 
Liz's Bakery Master_kb0428
Liz's Bakery Master_kb0428Liz's Bakery Master_kb0428
Liz's Bakery Master_kb0428Angela Harrison
 
System Analysis and Design Project
System Analysis and Design ProjectSystem Analysis and Design Project
System Analysis and Design ProjectSiddharth Shah
 
Web TCard - Speed optimization
Web TCard - Speed optimizationWeb TCard - Speed optimization
Web TCard - Speed optimizationEric Guo
 
ATAGTR2017 Batch Workload Modelling and Performance Optimization
ATAGTR2017 Batch Workload Modelling and Performance Optimization ATAGTR2017 Batch Workload Modelling and Performance Optimization
ATAGTR2017 Batch Workload Modelling and Performance Optimization Agile Testing Alliance
 
How Graphs are Taming the Complexity of Network & IT Ops
How Graphs are Taming the Complexity of Network & IT OpsHow Graphs are Taming the Complexity of Network & IT Ops
How Graphs are Taming the Complexity of Network & IT OpsNeo4j
 
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff ShinSing Yee Khoo
 
Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset
Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset
Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset Microsoft
 
Achieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSAchieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSeMaint Enterprises
 
Lean kanban India 16
Lean kanban India 16Lean kanban India 16
Lean kanban India 16Marcio Sete
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008John Napier
 

Similar to HP Optus Innovate Final (20)

Incident Management Report
Incident Management ReportIncident Management Report
Incident Management Report
 
07_Extending Workforce Management_Verizon (3)dp
07_Extending Workforce Management_Verizon (3)dp07_Extending Workforce Management_Verizon (3)dp
07_Extending Workforce Management_Verizon (3)dp
 
PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223
 
Advanced Agile Planning - NDC 2014
Advanced Agile Planning - NDC 2014Advanced Agile Planning - NDC 2014
Advanced Agile Planning - NDC 2014
 
A kanban scrum mashup to deliver fp projects
A kanban scrum mashup to deliver fp projectsA kanban scrum mashup to deliver fp projects
A kanban scrum mashup to deliver fp projects
 
Actionable information 3
Actionable information 3Actionable information 3
Actionable information 3
 
CSI approach to your Production Management
CSI approach to your Production ManagementCSI approach to your Production Management
CSI approach to your Production Management
 
Advanced Topics in Agile Planning
Advanced Topics in Agile PlanningAdvanced Topics in Agile Planning
Advanced Topics in Agile Planning
 
Liz's Bakery Master_kb0428
Liz's Bakery Master_kb0428Liz's Bakery Master_kb0428
Liz's Bakery Master_kb0428
 
System Analysis and Design Project
System Analysis and Design ProjectSystem Analysis and Design Project
System Analysis and Design Project
 
24-HourClock.pdf
24-HourClock.pdf24-HourClock.pdf
24-HourClock.pdf
 
Web TCard - Speed optimization
Web TCard - Speed optimizationWeb TCard - Speed optimization
Web TCard - Speed optimization
 
ATAGTR2017 Batch Workload Modelling and Performance Optimization
ATAGTR2017 Batch Workload Modelling and Performance Optimization ATAGTR2017 Batch Workload Modelling and Performance Optimization
ATAGTR2017 Batch Workload Modelling and Performance Optimization
 
How Graphs are Taming the Complexity of Network & IT Ops
How Graphs are Taming the Complexity of Network & IT OpsHow Graphs are Taming the Complexity of Network & IT Ops
How Graphs are Taming the Complexity of Network & IT Ops
 
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
3. Rebalancing Support and Innovation_SAP UEM by KNOA Data Analysis_Jeff Shin
 
Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset
Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset
Den moderne dataplatform - gør din dataplatform til det mest værdifulde asset
 
E2i Accelerate Tech 2016 presentation
E2i Accelerate Tech 2016 presentationE2i Accelerate Tech 2016 presentation
E2i Accelerate Tech 2016 presentation
 
Achieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMSAchieving Profitability Turnaround With A CMMS
Achieving Profitability Turnaround With A CMMS
 
Lean kanban India 16
Lean kanban India 16Lean kanban India 16
Lean kanban India 16
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008
 

HP Optus Innovate Final

  • 1. Optus GSMIS INPP DISC COO SMART PAY OLE MRE Incident Management Problem management (RCA/RFC) Change/Service Management CIP (Continuous improvement Plan) Application Availability Management
  • 2. Part - ing Ways – The Daily Edge 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1516 1718 1920 21 22 23 24 25 26 27 28 29 30 I want 13 I got 13 but I am late 13 Monthly Daily System
  • 3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 I want 13 I got 13 so fast 13 Monthly Daily System Part - ing Ways – The Daily Edge
  • 4. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 Drastically improved Stats Generation Backup time greatly reduced Number of Major Incidents - Reduced Query Performance - More Focused Part - ing Ways – The Daily Edge
  • 5. • Stats generation time is consistent of 5 to 6 minutes through out the month. • Time taken o Before Daily Partition : 58Hour/month. o After Daily Partition : 4Hour/month. • 14 times of Time Saved from Original. • Reports generation time is significantly improved. • Backup time is significantly reduced by approx 300%. • Day to day Manageability is simplified. • Results of a query can be achieved by accessing a subset of partitions, rather than the entire table which will improve the Query Performance. • Major & Normal Incident Reduction. Observations