Project Manager-Townley Hughes.
Twin Hybrid Theatre Project.
Manchester Royal Infirmary
3Mt square Dual Plenum Skirtless Canopy, with Ultra Clean
Ventilation system
Client: Townley Hughes
Duration of project: 16 Weeks project timescale.
Project details:
· Incorporating dimmable multi coloured lighting
· Offset surgical light to suit Siemens Zeigo Imaging system.
· Integration with BMS and Surgeons panel
· Independent Validation to HTM03-01
· Unrivalled energy saving EC motors to give maximum running
efficiency costs.
A bespoke system designed to suit the existing theatre sizes and fully
integrated with the chosen imaging system, for this Hybrid Theatre
project.
Coordination was key to include the Maquet Satellite pendant system,
and off set from centre to allow the free movement of the Zeigo imaging
system.
Flush fitted to the ceiling allows total free movement of all the ancillary
equipment and avoiding unnecessary clashes with skirts or screens as
fitted by some manufacturers.
The void spaces were extremely tight due to the existing structure and
concrete support beams, was designed to accommodate numerous
trades, including the medical gases, Electrical containment and plumbing
for the theatre utilities. All the plans and detail drawings were overlaid to
avoid clashes, and executed in tandem thus ensuring maximum use of
the space allocated.
Communication with the client and Project Management was a key to this
successful project being delivered to the satisfaction of the trust.

More Related Content

Similar to Case Study MRI

WC_August06_article_Hatien2
WC_August06_article_Hatien2WC_August06_article_Hatien2
WC_August06_article_Hatien2
Anh Nguyen
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDY
Paul Harrison
 
BIM at Stanford - Building Success
BIM at Stanford - Building SuccessBIM at Stanford - Building Success
BIM at Stanford - Building Success
Jason Holbrook, PMP
 
Crown House Technologies - Infoworks Magazine
Crown House Technologies - Infoworks MagazineCrown House Technologies - Infoworks Magazine
Crown House Technologies - Infoworks Magazine
Kevin Stanley
 
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield
 
Modular ot presentation
Modular ot presentationModular ot presentation
Modular ot presentation
mayur_32
 
Pneumatic tube system Presentation Hospital - full 97-2003
Pneumatic tube system Presentation Hospital - full 97-2003Pneumatic tube system Presentation Hospital - full 97-2003
Pneumatic tube system Presentation Hospital - full 97-2003
Gour. C Chakraborty
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction Brochure
RICHARD GORDON
 
C5111 Case Study - Acoustic enclosure for a Horizontal Balancing Machine
C5111 Case Study - Acoustic enclosure for a Horizontal Balancing MachineC5111 Case Study - Acoustic enclosure for a Horizontal Balancing Machine
C5111 Case Study - Acoustic enclosure for a Horizontal Balancing Machine
Christian Senior
 

Similar to Case Study MRI (20)

WC_August06_article_Hatien2
WC_August06_article_Hatien2WC_August06_article_Hatien2
WC_August06_article_Hatien2
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDY
 
Topic 7 Tooling Applications And Hybrid Processes
Topic 7  Tooling Applications And Hybrid Processes Topic 7  Tooling Applications And Hybrid Processes
Topic 7 Tooling Applications And Hybrid Processes
 
BIM at Stanford - Building Success
BIM at Stanford - Building SuccessBIM at Stanford - Building Success
BIM at Stanford - Building Success
 
Crown House Technologies - Infoworks Magazine
Crown House Technologies - Infoworks MagazineCrown House Technologies - Infoworks Magazine
Crown House Technologies - Infoworks Magazine
 
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdf
 
Jornada convocatoria experimentos H2020 FORTISSIMO2
Jornada convocatoria experimentos H2020 FORTISSIMO2Jornada convocatoria experimentos H2020 FORTISSIMO2
Jornada convocatoria experimentos H2020 FORTISSIMO2
 
Km75 pneumatic intelligent braking system (wecompress)
Km75 pneumatic intelligent braking system (wecompress)Km75 pneumatic intelligent braking system (wecompress)
Km75 pneumatic intelligent braking system (wecompress)
 
Km06 pneumatic punching machine abstract (wecompress)
Km06 pneumatic punching machine abstract (wecompress)Km06 pneumatic punching machine abstract (wecompress)
Km06 pneumatic punching machine abstract (wecompress)
 
Semanco workshop Theme1 - Baas
Semanco workshop Theme1 - BaasSemanco workshop Theme1 - Baas
Semanco workshop Theme1 - Baas
 
Semanco workshop Theme2 - Baas
Semanco workshop Theme2 - BaasSemanco workshop Theme2 - Baas
Semanco workshop Theme2 - Baas
 
Modular Operation Theater dealers ppt.pptx
Modular Operation Theater dealers ppt.pptxModular Operation Theater dealers ppt.pptx
Modular Operation Theater dealers ppt.pptx
 
Modular ot presentation
Modular ot presentationModular ot presentation
Modular ot presentation
 
Pneumatic tube system Presentation Hospital - full 97-2003
Pneumatic tube system Presentation Hospital - full 97-2003Pneumatic tube system Presentation Hospital - full 97-2003
Pneumatic tube system Presentation Hospital - full 97-2003
 
Article_Proof
Article_ProofArticle_Proof
Article_Proof
 
The Singapore Engineer Aug 2014: National University Hospital
The Singapore Engineer Aug 2014: National University Hospital The Singapore Engineer Aug 2014: National University Hospital
The Singapore Engineer Aug 2014: National University Hospital
 
Architekt en 240406
Architekt en 240406Architekt en 240406
Architekt en 240406
 
Pierson 06012016
Pierson 06012016Pierson 06012016
Pierson 06012016
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction Brochure
 
C5111 Case Study - Acoustic enclosure for a Horizontal Balancing Machine
C5111 Case Study - Acoustic enclosure for a Horizontal Balancing MachineC5111 Case Study - Acoustic enclosure for a Horizontal Balancing Machine
C5111 Case Study - Acoustic enclosure for a Horizontal Balancing Machine
 

Case Study MRI

  • 1. Testimonial: ‘’Excellent contractor to work with, Flexible in approach and attitude, friendly staff and totally client focused’’ Project Manager-Townley Hughes. Twin Hybrid Theatre Project. Manchester Royal Infirmary 3Mt square Dual Plenum Skirtless Canopy, with Ultra Clean Ventilation system Client: Townley Hughes Duration of project: 16 Weeks project timescale. Project details: · Incorporating dimmable multi coloured lighting · Offset surgical light to suit Siemens Zeigo Imaging system. · Integration with BMS and Surgeons panel · Independent Validation to HTM03-01 · Unrivalled energy saving EC motors to give maximum running efficiency costs. A bespoke system designed to suit the existing theatre sizes and fully integrated with the chosen imaging system, for this Hybrid Theatre project. Coordination was key to include the Maquet Satellite pendant system, and off set from centre to allow the free movement of the Zeigo imaging system. Flush fitted to the ceiling allows total free movement of all the ancillary equipment and avoiding unnecessary clashes with skirts or screens as fitted by some manufacturers. The void spaces were extremely tight due to the existing structure and concrete support beams, was designed to accommodate numerous trades, including the medical gases, Electrical containment and plumbing for the theatre utilities. All the plans and detail drawings were overlaid to avoid clashes, and executed in tandem thus ensuring maximum use of the space allocated. Communication with the client and Project Management was a key to this successful project being delivered to the satisfaction of the trust.