1. SARKALE SOMNATH SHANKAR
Basal City,
Old Dhigi road,Wing-A, room No. 28,
Bhosari, Pune-39
Mobil -8811051137
Email - sarkale.somnath@gmail.com
• RESUME
Application for the post of senior Manager Survey
Name : Sarkale Somnath Shankar
Father Name : Shankar N. Sarkale
Date of Birth : 1st
May 1977
Marital status : Married
Permanent Address : SARKALE SOMNATH SHANKAR
Basal City,
Old Dhigi road, Wing-A, room No. 28,
Bhosari, Pune-39
Mobil -8811051137
Present Address : C/o Isolux corsan, Akash Bajaj showroom, 3rd
floor,
A.T. road, Jorhat, Assam
Technical Qualification : Surveyor (Passed 1993 to1995) 1st
Class
Diploma in Civil Engineering complete on 2012
Working Experience : 18 Year’s
Computer Proficiency : Ms Word, Ms Excel, Auto cad, Calquan Software
version 2012&2014.
2. KEY EXPERIENCE OF DIFFERENCE COMPANY
ISOLUX CORSAN ( CORSAN CORVIAM CONSTRUCTION S.A.)
Four laning of Jorhat to near Jahanji & Jhanji to Demo section from Km 453+000
535+250 ( with toll plaza). In the state of assam (NHIDCL project)
Designation: Manager – Survey
Working period – 4 January 2016 to till date.
IL&FS Engineering and Construction Co.Ltd.
Designation: Manager - Survey
Working period – 28 May 2011to 4 January2016.
i) Construction of 4- lane road for Km. 83+400 to Km. 111+000 of Lumding to Mobing
section of NH- 54E in the state of Assam. Contract package – EW-II (AS-25)
ii) 2 laning of Longleng- Changtongya road, Mon-Tamlu-Merangkong road, Phek-Pfutzero
and Zunheboto-Chakabama road in the sate of Nagaland under Phase ‘A’ of SARDP-NE
LANCO INFRATECH LIMITED.
Designation: Deputy Manager - Survey
Working period – 1 November 2009 to 28 April 2011
Company has got ISO-9001-2001
Transportation engineering projects including roads, highways, bridges and flyovers.
81 km Road connecting Bangalore –Hoskote–Mudbagal in Karnataka for NHAI.
National Highway construction package on NH-4 in karnatka sate. From Km 0.000 to Km 81.402
Widening to four laning & strengthening of existing two lain carriageway of NH-4
GAMMON INDIA LIMITED.
Designation: Officer - Survey
Working period – 1 May 2006 to 28 October 2009
This is one of leading Construction Company in India. The company holds strong reputation in its
domain in India. Company has got ISO-9001-2001
i) Construction of 4- lane road for Km. 60+00 to Km. 83+400 & 111+000 to 127+000 of
Lumding to Maibong section of NH- 54E in the state of Assam. Contract package – EW-II
(AS-24 & AS-26)
BRAHMPUTRA CONSORTIUM LIMITED.
Designation: Senior Surveyor
Working period – 10th
April 2005 to 20th
may 2006
Under NHDP four laning project
Strengthening & Widening of NH – 31 from (1040.30 km to 1065.00 km) for conversion of existing
two lane Road to four lane (New lane of concrete pavement) under NHDP phase-II project of East
West corridor.
3. GAMMON INDIA LIMITED.
Designation: Senior Surveyor
Working period – 10th
Dec 2001 to15th April 2005
This is one of leading Construction Company in India. The company holds strong reputation in its
domain in India. Company has got ISO-9001-2001
National Highway construction package ‘VA “construction of P.Q.C. Road National Highway on
NH-2
Strengthening & Widening of NH – 2 existing two lane Road to four lane in BIHAR state.
SAPOORJI PALLANJI CO. LIMITED
Designation: Surveyor
Working period – 12 Jan 1999 to 18 Dec 2001
Mumbai Pune Express Highway construction on NH-4 in Maharashtra
Widening of our laning & strengthening of existing two lane carriageway of NH-4
HIDUSTAN CONSTRUCTION CO. LIMITED.
Designation: Leveler
Working period –From2 April 1998 to 25 Jan 1999
This is one of leading Construction Company in India. The company holds strong reputation in its
domain in India. Company has got ISO-9001-2001
Mumbai Pune Express Highway construction on NH-4 in Maharashtra
SHRI SAI ENGINEERING
Designation: Surveyor
Working period – Sep. 1995 toFeb1998
This company work in Maharastra doing the irrigation, water supply, under ground Drainage
project etc.
4. Nature of works different company
Planning of Survey Works
Design Horizontal & Vertical curve as per IRC specification.
Lay out of all activities such as well foundation, well cap & super structure etc.
Checking of well sinking, Well tilt & shift.
Traversing work of Road project and Making control point
Traversing Error Adjust
Calculation of all projects setting out data.
Topographical survey.
Open minis survey under coal India Ltd. In Assam, Ledo (BCL Limited)
Quantity billing helps of local co-ordinate of minis and Hydro power project.
N.G.L. and P.G.L. tacking help of total station.
Curve Data calculation.
Vertical alignment F.R.L. data calculation.
Center line marking of Road project.
Use CALQUAN software for cross section of road project.
Working drawing of Box culvert Slab culvert and Pipe culvert as per GFC drawing.
Finishing of Cross-Section Drawing in AutoCAD.
Cross-section make and Quantity calculation of Highway.
As per IRC Super Elevation calculation of Road project.
TBM Flying and Error Adjust.
Layout Data Calculation for Slab culvert, Box culvert and Pipe culvert
Contour Survey of Stone Quarry.
Stock yard materials Aggregate and Sand Quantity Calculation.
Office layout, Batching Plant Layout, Crusher Plant Layout.
OGL and Working progress strip chart made in Auto CAD and Excel Software
RE Wall panel of lay out for flyover
Retaining wall working dwg. Prepared as per GFC dwg.
As build cross section of road project.
Instruments knowledge
Total station : PENTAX ATS101, 102, PCS325, TOPCON, LEICA102,
SOKKIA102, 1030,
Auto Level : All type of Auto Level like PENTAX, TOPCON, and SOKKIA Etc
Present Salary : 9.7 Lakh.CTC
Expected Salary : 13 Lakh
Yours Faithfully
Sarkale Somnath
Date :