SlideShare a Scribd company logo
1 of 1
Download to read offline
ADITYA BIRTA
Date: 17l0ll20l5
to '(Cfrom So lEver It Wtay Concern
sfiri srfiwa was worfung witfr us in our
Instruments oepartment from 10.04.2014 to 16.01.2015
as dn resifent engineer 0f gw/s lEmerson. t{e was
invohef in a[[ activities of tfre ACS syst;em
ste1fisation an[ OeC project of ,4spentecfr. Sicfr os
maintendnce tf ACS system, ,Trou6[e sfiooting of
systems refatef to ACS anf OeC connectivity f;
Aspentecfi project. 94.r. srtlrtfl(B was assignef jios n
a[[ tfre acs slstems of tfie pfant anf fie fiis prir.,uf, to
6e a competent trngineer, witfr tot of potenil;t to come
up. I{e is frarfworLing anf sincere.
Crasim lndustries i.imited
Unit : Crasilerie Division
Kumarapatnam-581 123, Dist. Haveri, Karnataka
Birto Cellutose
1...,. ! .,.:, ....,
Telephorre 08373-242637 To 39
08192-247550fo 51
Fax 08373-242875,08L92-247555
ru")-,t,Manohar K
t'
AGM(Instrumentation)
Website www.grasim.com
E-mail grasimharihar@adityabirla.com
ReAd, Office P.O. Birlagram, Nagda-456331 (M.P.)
LilFl I '. ,' ; f{pgp r +"*.11:,, .-.. r.-rJ r ,J

More Related Content

What's hot (12)

Adel alshaikh resume
Adel alshaikh resumeAdel alshaikh resume
Adel alshaikh resume
 
CV20170111
CV20170111CV20170111
CV20170111
 
Trend analysis 2016 17
Trend analysis 2016 17Trend analysis 2016 17
Trend analysis 2016 17
 
Keyence meassure station eng
Keyence meassure station engKeyence meassure station eng
Keyence meassure station eng
 
WH Integration
WH IntegrationWH Integration
WH Integration
 
Ansys
AnsysAnsys
Ansys
 
Board package attachment 4 c gltc ridership report - March 11th - fy 2015
Board package attachment 4 c   gltc ridership report - March 11th - fy 2015Board package attachment 4 c   gltc ridership report - March 11th - fy 2015
Board package attachment 4 c gltc ridership report - March 11th - fy 2015
 
Oxygen cylinder filling plant
Oxygen cylinder filling plantOxygen cylinder filling plant
Oxygen cylinder filling plant
 
confined spaces_cert
confined spaces_certconfined spaces_cert
confined spaces_cert
 
Nuberg Corporate Calendar 2015
Nuberg Corporate Calendar 2015Nuberg Corporate Calendar 2015
Nuberg Corporate Calendar 2015
 
Attachement 1
Attachement 1Attachement 1
Attachement 1
 
CompletionEvaluation (2)
CompletionEvaluation (2)CompletionEvaluation (2)
CompletionEvaluation (2)
 

shanal

  • 1. ADITYA BIRTA Date: 17l0ll20l5 to '(Cfrom So lEver It Wtay Concern sfiri srfiwa was worfung witfr us in our Instruments oepartment from 10.04.2014 to 16.01.2015 as dn resifent engineer 0f gw/s lEmerson. t{e was invohef in a[[ activities of tfre ACS syst;em ste1fisation an[ OeC project of ,4spentecfr. Sicfr os maintendnce tf ACS system, ,Trou6[e sfiooting of systems refatef to ACS anf OeC connectivity f; Aspentecfi project. 94.r. srtlrtfl(B was assignef jios n a[[ tfre acs slstems of tfie pfant anf fie fiis prir.,uf, to 6e a competent trngineer, witfr tot of potenil;t to come up. I{e is frarfworLing anf sincere. Crasim lndustries i.imited Unit : Crasilerie Division Kumarapatnam-581 123, Dist. Haveri, Karnataka Birto Cellutose 1...,. ! .,.:, ...., Telephorre 08373-242637 To 39 08192-247550fo 51 Fax 08373-242875,08L92-247555 ru")-,t,Manohar K t' AGM(Instrumentation) Website www.grasim.com E-mail grasimharihar@adityabirla.com ReAd, Office P.O. Birlagram, Nagda-456331 (M.P.) LilFl I '. ,' ; f{pgp r +"*.11:,, .-.. r.-rJ r ,J