More than Just Lines on a Map: Best Practices for U.S Bike Routes
acute assessment unit
1. notes:
OPD
General:-
- Ent (scale)
- Recep (scale)
- Shop (scale)
- Waiting (scale)
Medical:-
- Exam (scale)
- Mechanic (scale)
- lab (scale)
- Exercise lab (scale)
- PMR (scale)
Toilet area:-
- Shower (scale)
- Bath (scale)
- W.Cs (scale)
Staff:-
- RR (scale)
- Offices T1 (scale)
- T2 (scale) T3 (scale)
Ancillary areas:-
- PUVA (scale)
- Utility T1 (scale)
- T2 (scale)
- ES (scale)
- Store T1 (scale)
- T2 (scale)
Day Hospital:-
General :-
- Ent (scale)
- Recep (scale)
- Waiting (scale)
Medical :-
- Therapy rooms T1(scale)
- T2 (scale) T3 (scale )
Consulting T1 (scale)
- T2 (scale)
Toilet areas:-
- Assis bath (scale)
- Assis WC (scale)
- W.C.s (scale)
Patient areas:-
- Sitting (SCALE )
- quiet (SCALE)
- Dinning T1 (SCALE)
- T2 (SCALE)
- Kitchen (SCALE)
- Servery (SCALE)
Staff :-
- OPD admin (SCALE)
- OPD case (SCALE)
- Multi-therapy (SCALE)
- Records (SCALE)
- Official (SCALE)
Ancillary areas:-
- Utility (SCALE)
- Cloak (SCALE
- Store (SCALE)
Day Rehab
General:-
- Ent (SCALE)
- Recep (SCALE)
- Waiting (SCALE)
Medical :-
- Treat (SCALE)
- Consult (SCALE)
- Exam (SCALE)
- Occup (SCALE)
- Physio T1 (SCALE)
- T2 (SCALE)
- POD (SCALE)
- Speech (SCALE)
- Bedroom (SCALE)
Toilet areas:-
- Assis W.C.s (SCALE)
- Bath (SCALE)
- Shower T1 (SCALE)
- T2 (SCALE)
- W.C.s (SCALE)
Patient areas:-
- Dinning (SCALE)
- Kitchen (SCALE)
- Pantry (SCALE)
Staff:-
- Changing (SCALE)
- RR (SCALE)
- Off T1 (SCALE)
- T2 (SCALE) T3 (SCALE)
Anicallry
- Utility (SCALE)
- Store (SCALE)
Acute Assess
General:-
-Ent (SCALE)
-Wait (SCALE)
Medical:-
- Ens S (SCALE)
- Ens D (SCALE)
- S (SCALE)
- D (SCALE)
- Visit (SCALE)
- Sit (SCALE)
- Quiet (SCALE)
- High care (SCALE)
- Int (SCALE)
- Equip (SCALE)
- Nurses (SCALE)
Toilet area:-
- Assis Bath (SCALE)
- Assis W.C.s (SCALE)
- Shower (SCALE)
- Dis W.C.s (SCALE)
- Gen W.C.s (SCALE)
- W.C.s (SCALE)
Pateint areas:-
- Dinning (SCALE)
- Servery (SCALE)
Staff:-
- Changing (SCALE)
- Rest (SCALE)
- Mng's (SCALE)
- Off (SCALE)
Ancillary areas:-
- Utility (SCALE)
- Store (SCALE)
21/2 A RN Description chd aprd
COMPLETE
total area
OPD:-
DAY HOSPITAl:-
DAY REHAB:-
ACUTE ASSESMENT:-
TOTAL CONSTRUCTION SITE:-
p.s provide the area of the ground floor * by the number of stories and then
write the total area
Hospital
Redevelopment
Construction Site Permanent buildings scheme 1
Alexsander Sampson
Jansel Aghajanian
Joanna Maguire
Josephe Gayle
Ramzi Nassar
Shafiq Haq
University of Birmingham
School of Civil Engineering
SCALE
21/2
Job No.3 Drawing No.1 A
WaitingArea
Waiting
Area
Visitor's
Room
High
Care
Room
Interview
Room
Equipment
Store
Nurses
Office
Changing
Room
Manager's
Office
Manager's
Office
W.C
Disa
bled
W.C
Ensuite
Single
Rest
Room
Sitting
Room
Utility
Room
Entrance
Dining
Room
Servery
Ensuite
Double
Ensuite
Double
Ensuite
Double
Exterior
Storerooms
Store
room
Office
Office
Fire Exit
FireExit
Plant
Room
Store
room
Fire Exit
Rain
Gardens
plantation
trees
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
Single
Quiet
Room
Quiet
Room
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
Single
Ensuite
SingleEnsuite
Double
Ensuite
Double
Ensuite
Double
Ensuite
Single
Ensuit
e
Single
Ensuit
e
Single
Ensuit
e
Single
Ensuit
e
Single
Ensuite
Double
Sitting
Room
Dining
Room
Ensuite
Double
Nurs
es
Offic
e
Interview
Room
Elevator
Elevator
U-Shape
Stairs
U-Shape
Stairs
U-Shape
Stairs
Elevator
Stud partition
145mm
masonry
block
300mm