The document provides design details for pile caps along a 17 km length of viaduct and sidings for the metro railway line between Science City and VIP Road in Kolkata, excluding station areas. It was prepared in May-June 2016 by Sayantan Tarafdar, a civil engineering student at Indian Institute of Engineering Science & Technology, and includes the design basis for the pile caps.