SlideShare a Scribd company logo
1 of 1
Download to read offline
Cost and material Estimation Summary of
A Residential Building
Jarsing Pauwa
S. No. Description Amount
1 Sub structure 856,238.84
2 GROUND FLOOR
Superstructure works 865,019.42
Finishing works 1,021,230.35
3 FIRST FLOOR
Superstructure works 1,122,900.15
Finishing works 919,568.22
4 Sloping roof
Superstructure works 389,474.94
Finishing works 11,658.00
Total Cost 5,186,089.91
5 Electrical works 8% of total cost 414,887.19
6 Sanitation works 7.5% of total cost 388,956.74
7 Miscellaneous expenses 10% of total cost 518,608.99
Grand Total 6,508,542.84
Certification:
Here with this, we certify that the present construction cost as estimated of a residential
building owned by JARSING PAUWA is in Nepalese Rupees six million five hundred eight
thousand five hundred and forty three.
REVIEW
Sub-Structure Cost 856,238.84 13%
Super-structure Cost 2,377,394.51 37%
Finishing Cost 1,952,456.57 30%
Electrical+Sanitation Cost 803,843.94 12%
Miscellaneous expances 518,608.99 8%
Total 6,508,542.84 100%
Total Floor area (1125+1145) 2,270.00 Sqft
Unit Cost in Aggregate 2,867.20 Sqft
Thank You.
Prepared By:
Er.Sarita Ranabhat
20 Janaurary 13

More Related Content

What's hot

What's hot (9)

Cost Variance (CV) in Project Management
Cost Variance (CV) in Project ManagementCost Variance (CV) in Project Management
Cost Variance (CV) in Project Management
 
Seismic Supervisor- Position available
Seismic Supervisor- Position availableSeismic Supervisor- Position available
Seismic Supervisor- Position available
 
One
OneOne
One
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Managing yourtime certificateofcompletion Samer Serhan
Managing yourtime certificateofcompletion Samer SerhanManaging yourtime certificateofcompletion Samer Serhan
Managing yourtime certificateofcompletion Samer Serhan
 
07-Records of professional employment 2
07-Records of professional employment 207-Records of professional employment 2
07-Records of professional employment 2
 
Resum.
Resum.Resum.
Resum.
 
Thermometer Project In Emu8086.
Thermometer Project In Emu8086.Thermometer Project In Emu8086.
Thermometer Project In Emu8086.
 
MBay BOD mtg 8.11.09
MBay BOD mtg 8.11.09MBay BOD mtg 8.11.09
MBay BOD mtg 8.11.09
 

Viewers also liked

SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential buildingVardhaman Sethia
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costingGanesh Murugan
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Control oil mechanism
Control oil mechanismControl oil mechanism
Control oil mechanismHasib Reza
 
Regenerative feed water heating cycle
Regenerative feed water heating cycleRegenerative feed water heating cycle
Regenerative feed water heating cycle431996
 
Brochure and registration form
Brochure and registration formBrochure and registration form
Brochure and registration formLamdade Akhil
 
Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Luigi Buglione
 
Estimation cost of a residential building (sample)
Estimation cost of a residential building (sample)Estimation cost of a residential building (sample)
Estimation cost of a residential building (sample)Shakhawat Hossain Mehran
 
Calculation of short circuit currents
Calculation of short circuit currents Calculation of short circuit currents
Calculation of short circuit currents Maria Romina Angustia
 

Viewers also liked (20)

Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Residential Apartment Building
Residential Apartment BuildingResidential Apartment Building
Residential Apartment Building
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential building
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
SPECIFICATIONS
SPECIFICATIONSSPECIFICATIONS
SPECIFICATIONS
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Swimming pool
Swimming poolSwimming pool
Swimming pool
 
Control oil mechanism
Control oil mechanismControl oil mechanism
Control oil mechanism
 
Regenerative feed water heating cycle
Regenerative feed water heating cycleRegenerative feed water heating cycle
Regenerative feed water heating cycle
 
Brochure and registration form
Brochure and registration formBrochure and registration form
Brochure and registration form
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
 
Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...
 
Estimation cost of a residential building (sample)
Estimation cost of a residential building (sample)Estimation cost of a residential building (sample)
Estimation cost of a residential building (sample)
 
Calculation of short circuit currents
Calculation of short circuit currents Calculation of short circuit currents
Calculation of short circuit currents
 

Cost and material Estimation Summary of

  • 1. Cost and material Estimation Summary of A Residential Building Jarsing Pauwa S. No. Description Amount 1 Sub structure 856,238.84 2 GROUND FLOOR Superstructure works 865,019.42 Finishing works 1,021,230.35 3 FIRST FLOOR Superstructure works 1,122,900.15 Finishing works 919,568.22 4 Sloping roof Superstructure works 389,474.94 Finishing works 11,658.00 Total Cost 5,186,089.91 5 Electrical works 8% of total cost 414,887.19 6 Sanitation works 7.5% of total cost 388,956.74 7 Miscellaneous expenses 10% of total cost 518,608.99 Grand Total 6,508,542.84 Certification: Here with this, we certify that the present construction cost as estimated of a residential building owned by JARSING PAUWA is in Nepalese Rupees six million five hundred eight thousand five hundred and forty three. REVIEW Sub-Structure Cost 856,238.84 13% Super-structure Cost 2,377,394.51 37% Finishing Cost 1,952,456.57 30% Electrical+Sanitation Cost 803,843.94 12% Miscellaneous expances 518,608.99 8% Total 6,508,542.84 100% Total Floor area (1125+1145) 2,270.00 Sqft Unit Cost in Aggregate 2,867.20 Sqft Thank You. Prepared By: Er.Sarita Ranabhat 20 Janaurary 13