SlideShare a Scribd company logo
1 of 29
WELCOME TO THIS
PRESENTATION
ON
BY
SAPITWA PROJECT HOUSE (PTY) LTD
“THE EPC ADVANTAGE”
Sapitwa Project House (Pty) Ltd:
www.sapitwaprojecthouse.com
THE SPH WAY
Sapitwa Project House brings together expert
practitioners in a variety of spheres to:
• visualize
• prepare
• fund
• Implement (with all required technology partners
much needed infrastructure and development projects
throughout Southern Africa.
THE SPH WAY
Our core operating model is what we term the Vision-
Resources-Reality Nexus.
Simply explained, a project owner/sponsor’s vision
must be brought into harmony with available
technological and investment capital resources, in
order to become a functioning reality.
HOW CAN WE ASSIST
OUR CLIENT
• Identification of Bankable Projects among the client’s
portfolio of industrial and municipal wastewater
treatment and reuse projects ranging from waste-to-
energy plants to potable/non-potable quality water
recycling
• Project Capital Raising from a variety of sources
• EPC (turnkey implementation)
• Own-Operate-Transfer Concessions where feasible
THE “EPC” WAY
FOR
ECONOMICAL & TIMELY
EXECUTION OF
PLANT BASED PROJECTS
Factors for Success of a Plant -
Based Project
• Project Financials
– Project cost
• Capital Cost
• Interest Cost
• Development Expenses
– Operating cost of the plant
• Heat rate, Energy input and output, Chemicals
Developer's Risks
• Technical Risks
– Proven Technology
– Developer / Contractor’s Competence &
Experience
• Commercial Risks
– Feasibility
– Project schedule
– Contractor’s Financial Strength
Developer's Concerns
• To Ensure Return on Investments
– Technical & commercial viability
– Guarantees
• Project Cost - No Escalation.
• Performance- Adequate Guarantees
• Schedule -Adequate Guarantees
– Possible Approaches for execution
• Single point responsibility ( EPC )
• Conventional procurement from equipment
manufacturers ( NON-EPC)
Developer's Concerns
• Equipment Performance
– To remain within the planned revenues
• Project Schedule
– To Ensure No Delays
– To maintain predicted cash flows
• Project Overruns
– To keep the overall cost within the project
outlay
Conventional Approach to Project
Execution
↳ Appointing an Engineering Consultant
↳ Buying out multiple packages
↳ Awarding Construction Contract
↳ Project Management
↳ Liaison with various agencies
↳ Checking on performance
The EPC Approach to Project
Execution
➢Single point responsibility for:
= System Configuration
= Basic Design
= Procurement
= Erection & Commissioning
= Performance Trial
= Training & Handing over
= Own-Operate-Transfer (optional)
Conventional Execution-Limitations
• Overall performance
guarantee
• No Gaurantee
• Individual package supplies
• Does not constitute overall
performance guarantee
• Difficult to fix responsibility
A
• Overall schedule • No Gaurantee
• Overall price
guarantee
• No Gaurantee
Overall Project Conventional Route
The EPC Advantage
A
Overall Project EPC Route
•Overall Performance
Guarantee
•Higher Damages on Total Project
•Larger risks for EPC Contractor-
hence obliged to perform
•Overall performance assured
•Overall Schedule
Guarantee
•Overall Price
guarantee
•Overall commissioning schedule
monitored and maintained
•Firm price contract
Conventional Execution-Limitations
B
Engineering Conventional Route
•Responsibility
& Coordination
•All documents need to be checked
•Needs dedicated manpower
•Miss-outs in scope
•Interactions with multiple firms:
The EPC Advantage
B
Engineering EPC Route
•Responsibility
& Coordination
•Single point responsibility
•Fewer documents to be checked
•Faster communication
•Lower resources required
•Total scope responsibility
•No miss-outs & surprises allowed
Conventional Execution-Limitations
Procurement Conventional Route
•Buying Power
•Sourcing
Lower negotiation power
•Single project execution
•No vendor
partnership/synergy
•Limited vendor data
Lower global sourcing
C
The EPC Advantage
C
Procurement EPC Route
•Buying Power
•Sourcing
Better negotiation power
•Multiple project execution
•Vast vendor data bank
•Vendor partnership
•Rate contracts
Lower purchase cost
•Global sourcing at lower cost
•Higher flexibility in vendor selection
Conventional Execution-Limitations
D
Construction Conventional Route
•Faculties required Resources required for :
•Project Management
•Scheduling
•Quality
•Inspection
•Erection & Commissioning
•Needs to be installed
The EPC Advantage
D
Construction EPC Route
•Faculties required •These faculties already exist
with EPC contractor
Conventional Execution-Limitations
E
Project Management Conventional Route
•Skills required •May require to acquire
project management skills
•Scheduling: L1,L2,L3
•Planning
•Monitoring
•Integration
Conventional Execution-Limitations
E
Project Management Conventional Route
•Monitoring Requires to generate :
•Daily reports
•Weekly reports
•Monthly reports
•Critical issue reports
The EPC Advantage
E
Project Management EPC Route
•Skills required
•Monitoring
•Skills and Resources
•already with EPC
contractor
Progress review through :
•Daily reports
•Weekly reports
•Monthly reports
•Critical issue reports
Conventional Execution-Limitations
F
Quality Conventional Route
•Skills
•Resources
Resources/ Skills
need to be in place for :
•Design Reviews
•Quality plans
•Site/Vendor
•Quality Inspectors
The EPC Advantage
F
Quality
•Skills
•Resources
EPC Route
Following are part of
EPC setup :
• Reviews
•Quality plans
•Site/Vendor
Quality checks
•Quality Inspectors
Conventional Execution-Limitations
G
Results Conventional Route
•Project cost
•Project Schedule
•Project Quality
?
?
?
The EPC Advantage
G
Results EPC Route
•Project cost
•Project Schedule
•Project Quality
•Fixed
•Guaranteed
•Guaranteed
The EPC Advantage
A Case Study
→Project Management Personnel Cost
→Inspection & Expediting Cost
→Contingency, Escalations & Miss-outs
→Cost Overruns due to delayed
commissioning
Intangible Benefits
The EPC Way
Benefits to :
•The Developer
•The Lender
THANK YOU

More Related Content

What's hot

SI Competence in Capgemini Czech
SI Competence in Capgemini CzechSI Competence in Capgemini Czech
SI Competence in Capgemini CzechJan Luc
 
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...Aconex
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo
 
Keep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesKeep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesAconex
 
Proposed Project Office Strategy
Proposed Project Office StrategyProposed Project Office Strategy
Proposed Project Office StrategyJosh Folgado
 
Global Trends in Delivery Projects
Global Trends in Delivery ProjectsGlobal Trends in Delivery Projects
Global Trends in Delivery ProjectsAconex
 
Modernize project controls to ensure project success aecom
Modernize project controls to ensure project success   aecomModernize project controls to ensure project success   aecom
Modernize project controls to ensure project success aecomAconex
 
K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511REDceo.net
 
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedMajor CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedEnergy Construction Forum
 
Aconex connected cost webinar - drive project performance
Aconex connected cost webinar - drive project performanceAconex connected cost webinar - drive project performance
Aconex connected cost webinar - drive project performanceAconex
 
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016Aconex
 
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...Project Controls Expo
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016Aconex
 
Collaborative project controls across your entire portfolio
Collaborative project controls across your entire portfolioCollaborative project controls across your entire portfolio
Collaborative project controls across your entire portfolioAconex
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationCCT International
 
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)The Advanced Work Packaging Institute
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceCCT International
 
5 methods session 2 webinar slideshare systems co
5 methods session 2 webinar slideshare systems co5 methods session 2 webinar slideshare systems co
5 methods session 2 webinar slideshare systems coAconex
 

What's hot (20)

SI Competence in Capgemini Czech
SI Competence in Capgemini CzechSI Competence in Capgemini Czech
SI Competence in Capgemini Czech
 
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
 
Keep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesKeep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slides
 
Proposed Project Office Strategy
Proposed Project Office StrategyProposed Project Office Strategy
Proposed Project Office Strategy
 
Cost Effective Debottleneck Expansions
Cost Effective Debottleneck Expansions Cost Effective Debottleneck Expansions
Cost Effective Debottleneck Expansions
 
Global Trends in Delivery Projects
Global Trends in Delivery ProjectsGlobal Trends in Delivery Projects
Global Trends in Delivery Projects
 
Modernize project controls to ensure project success aecom
Modernize project controls to ensure project success   aecomModernize project controls to ensure project success   aecom
Modernize project controls to ensure project success aecom
 
K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511
 
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedMajor CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
 
Aconex connected cost webinar - drive project performance
Aconex connected cost webinar - drive project performanceAconex connected cost webinar - drive project performance
Aconex connected cost webinar - drive project performance
 
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
 
ACONEX-workflow System
ACONEX-workflow SystemACONEX-workflow System
ACONEX-workflow System
 
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
 
Collaborative project controls across your entire portfolio
Collaborative project controls across your entire portfolioCollaborative project controls across your entire portfolio
Collaborative project controls across your entire portfolio
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life Implementation
 
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a Glance
 
5 methods session 2 webinar slideshare systems co
5 methods session 2 webinar slideshare systems co5 methods session 2 webinar slideshare systems co
5 methods session 2 webinar slideshare systems co
 

Similar to The SPH EPC Way

Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...mike benedetto
 
Complexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementComplexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementMDCSystems
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesaAconex
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
Development of Universal Credit with Agile
Development of Universal Credit with AgileDevelopment of Universal Credit with Agile
Development of Universal Credit with AgileDavid Nicoll
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE S. Sathishkumar
 
Finance Transformation 20 Steps
Finance Transformation 20 StepsFinance Transformation 20 Steps
Finance Transformation 20 StepsPhil Keet
 
Team Structures and Project Performance in the Design-Build Marketplace
Team Structures and Project Performance in the Design-Build MarketplaceTeam Structures and Project Performance in the Design-Build Marketplace
Team Structures and Project Performance in the Design-Build MarketplaceWater Design-Build Council
 
Prepare the sled in summer and project release at its beginning
Prepare the sled in summer and project release at its beginningPrepare the sled in summer and project release at its beginning
Prepare the sled in summer and project release at its beginningVadym Fedorov
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsRory McKenna
 
Introduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.pptIntroduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.pptAyushSrivastava8761
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTNiruban Projoth
 
How to improve RFI management across your projects
How to improve RFI management across your projectsHow to improve RFI management across your projects
How to improve RFI management across your projectsAconex
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016Aconex
 

Similar to The SPH EPC Way (20)

Why EPC
Why EPCWhy EPC
Why EPC
 
Essentialsof Project Management
Essentialsof Project ManagementEssentialsof Project Management
Essentialsof Project Management
 
Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...
 
PEEM 4.pptx
PEEM 4.pptxPEEM 4.pptx
PEEM 4.pptx
 
Complexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementComplexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project Management
 
PEEM 2.pptx
PEEM 2.pptxPEEM 2.pptx
PEEM 2.pptx
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
Development of Universal Credit with Agile
Development of Universal Credit with AgileDevelopment of Universal Credit with Agile
Development of Universal Credit with Agile
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
 
Finance Transformation 20 Steps
Finance Transformation 20 StepsFinance Transformation 20 Steps
Finance Transformation 20 Steps
 
Team Structures and Project Performance in the Design-Build Marketplace
Team Structures and Project Performance in the Design-Build MarketplaceTeam Structures and Project Performance in the Design-Build Marketplace
Team Structures and Project Performance in the Design-Build Marketplace
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Prepare the sled in summer and project release at its beginning
Prepare the sled in summer and project release at its beginningPrepare the sled in summer and project release at its beginning
Prepare the sled in summer and project release at its beginning
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications Professionals
 
Introduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.pptIntroduction to Project Management and Planning.ppt
Introduction to Project Management and Planning.ppt
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
 
How to improve RFI management across your projects
How to improve RFI management across your projectsHow to improve RFI management across your projects
How to improve RFI management across your projects
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
 

Recently uploaded

Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 

Recently uploaded (20)

Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 

The SPH EPC Way

  • 1. WELCOME TO THIS PRESENTATION ON BY SAPITWA PROJECT HOUSE (PTY) LTD “THE EPC ADVANTAGE” Sapitwa Project House (Pty) Ltd: www.sapitwaprojecthouse.com
  • 2. THE SPH WAY Sapitwa Project House brings together expert practitioners in a variety of spheres to: • visualize • prepare • fund • Implement (with all required technology partners much needed infrastructure and development projects throughout Southern Africa.
  • 3. THE SPH WAY Our core operating model is what we term the Vision- Resources-Reality Nexus. Simply explained, a project owner/sponsor’s vision must be brought into harmony with available technological and investment capital resources, in order to become a functioning reality.
  • 4. HOW CAN WE ASSIST OUR CLIENT • Identification of Bankable Projects among the client’s portfolio of industrial and municipal wastewater treatment and reuse projects ranging from waste-to- energy plants to potable/non-potable quality water recycling • Project Capital Raising from a variety of sources • EPC (turnkey implementation) • Own-Operate-Transfer Concessions where feasible
  • 5. THE “EPC” WAY FOR ECONOMICAL & TIMELY EXECUTION OF PLANT BASED PROJECTS
  • 6. Factors for Success of a Plant - Based Project • Project Financials – Project cost • Capital Cost • Interest Cost • Development Expenses – Operating cost of the plant • Heat rate, Energy input and output, Chemicals
  • 7. Developer's Risks • Technical Risks – Proven Technology – Developer / Contractor’s Competence & Experience • Commercial Risks – Feasibility – Project schedule – Contractor’s Financial Strength
  • 8. Developer's Concerns • To Ensure Return on Investments – Technical & commercial viability – Guarantees • Project Cost - No Escalation. • Performance- Adequate Guarantees • Schedule -Adequate Guarantees – Possible Approaches for execution • Single point responsibility ( EPC ) • Conventional procurement from equipment manufacturers ( NON-EPC)
  • 9. Developer's Concerns • Equipment Performance – To remain within the planned revenues • Project Schedule – To Ensure No Delays – To maintain predicted cash flows • Project Overruns – To keep the overall cost within the project outlay
  • 10. Conventional Approach to Project Execution ↳ Appointing an Engineering Consultant ↳ Buying out multiple packages ↳ Awarding Construction Contract ↳ Project Management ↳ Liaison with various agencies ↳ Checking on performance
  • 11. The EPC Approach to Project Execution ➢Single point responsibility for: = System Configuration = Basic Design = Procurement = Erection & Commissioning = Performance Trial = Training & Handing over = Own-Operate-Transfer (optional)
  • 12. Conventional Execution-Limitations • Overall performance guarantee • No Gaurantee • Individual package supplies • Does not constitute overall performance guarantee • Difficult to fix responsibility A • Overall schedule • No Gaurantee • Overall price guarantee • No Gaurantee Overall Project Conventional Route
  • 13. The EPC Advantage A Overall Project EPC Route •Overall Performance Guarantee •Higher Damages on Total Project •Larger risks for EPC Contractor- hence obliged to perform •Overall performance assured •Overall Schedule Guarantee •Overall Price guarantee •Overall commissioning schedule monitored and maintained •Firm price contract
  • 14. Conventional Execution-Limitations B Engineering Conventional Route •Responsibility & Coordination •All documents need to be checked •Needs dedicated manpower •Miss-outs in scope •Interactions with multiple firms:
  • 15. The EPC Advantage B Engineering EPC Route •Responsibility & Coordination •Single point responsibility •Fewer documents to be checked •Faster communication •Lower resources required •Total scope responsibility •No miss-outs & surprises allowed
  • 16. Conventional Execution-Limitations Procurement Conventional Route •Buying Power •Sourcing Lower negotiation power •Single project execution •No vendor partnership/synergy •Limited vendor data Lower global sourcing C
  • 17. The EPC Advantage C Procurement EPC Route •Buying Power •Sourcing Better negotiation power •Multiple project execution •Vast vendor data bank •Vendor partnership •Rate contracts Lower purchase cost •Global sourcing at lower cost •Higher flexibility in vendor selection
  • 18. Conventional Execution-Limitations D Construction Conventional Route •Faculties required Resources required for : •Project Management •Scheduling •Quality •Inspection •Erection & Commissioning •Needs to be installed
  • 19. The EPC Advantage D Construction EPC Route •Faculties required •These faculties already exist with EPC contractor
  • 20. Conventional Execution-Limitations E Project Management Conventional Route •Skills required •May require to acquire project management skills •Scheduling: L1,L2,L3 •Planning •Monitoring •Integration
  • 21. Conventional Execution-Limitations E Project Management Conventional Route •Monitoring Requires to generate : •Daily reports •Weekly reports •Monthly reports •Critical issue reports
  • 22. The EPC Advantage E Project Management EPC Route •Skills required •Monitoring •Skills and Resources •already with EPC contractor Progress review through : •Daily reports •Weekly reports •Monthly reports •Critical issue reports
  • 23. Conventional Execution-Limitations F Quality Conventional Route •Skills •Resources Resources/ Skills need to be in place for : •Design Reviews •Quality plans •Site/Vendor •Quality Inspectors
  • 24. The EPC Advantage F Quality •Skills •Resources EPC Route Following are part of EPC setup : • Reviews •Quality plans •Site/Vendor Quality checks •Quality Inspectors
  • 25. Conventional Execution-Limitations G Results Conventional Route •Project cost •Project Schedule •Project Quality ? ? ?
  • 26. The EPC Advantage G Results EPC Route •Project cost •Project Schedule •Project Quality •Fixed •Guaranteed •Guaranteed
  • 27. The EPC Advantage A Case Study →Project Management Personnel Cost →Inspection & Expediting Cost →Contingency, Escalations & Miss-outs →Cost Overruns due to delayed commissioning Intangible Benefits
  • 28. The EPC Way Benefits to : •The Developer •The Lender