Reliability Centered Maintenance of Segment Rolls in Thin Slab Continuous
Caster through ROLL TRACK TM
Software
Sandeep S Teredesai, Atanu Kumar Borkotoky, Pradip K Patra, Prakash Sappa, Satya Prakash
(Sandeep.Teredesai@jsw.in, Atanu.Borkotoky@jsw.in, Pradip.Patra@jsw.in, Prakash.Sappa@jsw.in,
Satya.Prakash@jsw.in)
JSW Steel Limited, Geetapuram, Dolvi, Tal - Pen, Dist- Raigad - 402107, Maharashtra, INDIA
Tel: +91-2143-277501 to 277515, Fax: +91-2143-277820
Website: www.jsw.com
Abstract:
Vertical Thin Slab Continuous Caster Machine is the state-of-art technology in today‟s steel making industries.
Advanced Compact Strip Process (CSP) casters are designed for larger casting length, higher casting speed with
compact equipments like segments. Ispat Industries Limited has two casting strands, of which one is equipped
with Liquid Core Reduction (LCR) Technology. Segments of both casters have more than 350 rolls and 700
bearings running in machine at any point of time. Besides this, there are more than 1200 rollers and 2400
bearings being installed in standby set of segments. Aforesaid figures signify the importance of having a good
roll maintenance management system for more than 1500 rolls and 3000 bearings which are transiting from
machine to repair area. Unhampered caster productivity and product quality largely necessitates reliable roll
performance with longer stay of segments in machine. Ispat has developed in-house unique software “Roll
Track”, with help of which, it is now possible for the segment repair shop personnel to track the life and as-on-
time status of each and every bearing and roll of the entire set of 27 segments. The software referred facilitates
proactive approach to segment maintenance planning. This, in turn, reduces unplanned machine stoppages or
breakdowns due to roll jam or bearing failures which generally lead to segment change in machines, thereby
causing losses in productivity as well as losses due to heavy inventory.
INTRODUCTION
Slab leaving from mould is entered in segments wherein the hot stand is provided the support through rollers.
More than 8 types of rolls of various size in single & double split design are installed in 27 segments. The total
quantity of rollers & bearings installed in two casting strands are 350 and 700 respectively. There are 3 such
sets are in use wherein more than 1000 rolls & 2000 bearings are installed. Besides this more than 500 rolls are
in spare for circulation. Movement of such large amount of rollers and bearings in to different segments, various
positions, re-welding & repair necessiates a good Roll Maintenance Management Sytem in Segment Repair
Shop. Every single roll being mounted in segment during repair should be reliable to deliver preset campaign
life to avaoid unplannned stoppages in caster on account of roll failure.
Segment Maintenance Practice
Conventional Method of Segment Maint.
Like any casters; in ISPAT Segment change from casting machine is based on the number of heats cast.
According to the segment type & its position in machine, a SOP is formulated indicating the change of segment
based on the number of heats cast since last installation in casting machine. However achievement of SOP life
shall be supported by defect free final product quality. At times the product quality is affected by the defects
like Scratch Marks, Deep Grooves etc. arise out of caster which more often than other related to failure of
segment rollers. Segment removed from casting machine is dismantled for either of following reasons
1. General lubrication testing
2. Replacement of failed rolls if any and
3. Re-alignment of roller table
1.1 Lubrication Test:
Segment roller bearings are having grease lubrication system through dual line grease manifold blocks (
Grease Distributors ). During this testing movement of block metering pins is checked, stroke setting is
done or replacement of faulty block is done to ensure proper lubrication to each bearing.
2.1 Replacement of Failed Rollers:
Roll failure is largely attributed to bearing failure resulting jamming of roll. Such jam rolls were
replaced by preassembled rolls.
3.1 Re-alignment of rolls:
Exposure to constant heat & rolling as slab gets extracted leads to wear of rolls. Uneven roll wear is
common; upsetting slab profile and if not corrected may leads to bulging. Realignment of rollers is
carried out with precision templates to ensure correct roll gap in each segment.
This conventional cycle was in practice since last more than 10 years which shown following major
disadvanges over the period of time.
Disadvantages:
1) Increase in unplanned stoppages of casting machine for segment change
2) Unpredictable failure of segment rolls.
3) Reduced campaign life & reliability of segment
4) Poor performance
5) Increase overall workload due to frequent re-work on segment
6) Increase in Inventories of rolls, bearings and other associated parts
However the above disadvantages is offset with marginal improvement in segment performance by
implementing periodical revamping of segments but consistency in performance is not achieved.
The conventional method apparently shows advantages such as low maintenance cost and less manpower but if
looked closely it has shown many disadvantages over the period of time; incurring high losses not only towards
productivity but also in monitory terms.
To defy on aforesaid disadvantages ISPAT has developed software ROLL TARCK TM
which completely
redefined the conventional segment roll maintenance practice to Reliability Centered Segment Maintenance
Practice in cost effective manner.
New RCM Method with ROLL TRACK
It is strongly felt that the tracking the segment performance ( Life in heats ) and its scheduled revamping is not
just enough as it shows improvement in a particular segment for short time but leads to increase maintenance
cost significantly. Roll Track System provides unique way to keep tracking of every individual bearing along
with roll & its assembly. It facilitates approach of Proactive & Predictive Maintenance rather than Preventive
Maintenance among the thousands of roll & bearing running in 27 segments. The each roll, every bearing &
their assembly is provided unique Track ID against which its performance, current location, life achieved, PM
and RCA data etc is recorded in system. This information is available on line for analysis, decision making &
help to focus on maintenance of a particular roll than entire 40 rolls when the segment is removed for routine
maintenance.
A figure_____ below is Roll Mapping Screen shows as-on-time status of installed bearing & rolls in segment no
3-2. Roll No 3 & 4 is highlighted indicating that the bearings of Roll No. CR157510156 and CL158210155
need inspection. Similarly „A‟ side bearing ( Yellow Colour ) of roll no. CR157510364 need to be inspected
whereas „B‟ side bearing ( Red Colour ) need to be changed. It also shows no. of heats cast since last PM giving
one step view for comparison between various segments. The roll arrangement is Single Split defined as Type-1
and two rolls forming an assembly is identified separately with Roll ID. Ex – CL158210325 (Ref.
Nomenclature details in Fig_____)
Bearing is due for Inspection Bearing Due for Replacement Bearing is OK
Like roll, every bearing is also identified with a unique logical ID. This logical ID provides information about
the roll or bearing against which its performance & repair history is recorded starting from its receipt in stores
to discard / scrap. Fig_____ shows information about a roll which is presently in assembled condition and ready
in spare for replacement. The other information like mounted bearings ID & its life, assembly number, vendor
detail, heats after last machining, present diameter any many other is fetch from database when required.
Further, history records of last change as well as overhauling is also displayed in subsequent tabs below current
details.
A pair of roll after mounting the bearing is assembled together and each such assembly is also identified with
incremental assembly number for its type to locate the parts fit in. Software generate alarms referring to SOP
guiding engineers to plan segment maintenance activities, make preassembled rollers ready for installation in
advance. Another in-house developed software APPIM helps to optimize the inventory levels for more than 113
items pertaining to roll maintenance area.
New system focus on Proactive Maintenance of every roll prioritized by software based on its performance and
this information is available in MIS reports. Fig. _____ shows the roll change frequency with respect to each
segment for desired duration. The report also shows comparison between different segments in view of heats
cast, number of times it is changed from caster and numbers of rolls changed during the desired period. The
tabulated data when is plotted gives the trend of roll failure for any segment which is further analyzed w.r.t.
position of roll, diameter, bearing life etc.
Conclusion:
The following results are achieved.
The highest ever campaign life is achieved 705 heats ( 1.33 MT ) with a single roll failure

More Related Content

What's hot

ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...
ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...
ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...IAEME Publication
 
Etd 02-02 - resilient rail fastenings for concrete sleepers
Etd 02-02 - resilient rail fastenings for  concrete sleepersEtd 02-02 - resilient rail fastenings for  concrete sleepers
Etd 02-02 - resilient rail fastenings for concrete sleepersNECB
 
Bring แบบริ่งเอ็นทีเอ็นแคทตาล็อค
Bring แบบริ่งเอ็นทีเอ็นแคทตาล็อคBring แบบริ่งเอ็นทีเอ็นแคทตาล็อค
Bring แบบริ่งเอ็นทีเอ็นแคทตาล็อคNarasak Sripakdee
 
IRJET- Experimental Analysis of Passive/Active Suspension System
IRJET- Experimental Analysis of Passive/Active Suspension SystemIRJET- Experimental Analysis of Passive/Active Suspension System
IRJET- Experimental Analysis of Passive/Active Suspension SystemIRJET Journal
 
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...IRJET Journal
 
IRJET - Design, Simulation and Analysis of Double Wishbone Suspension Sys...
IRJET -  	  Design, Simulation and Analysis of Double Wishbone Suspension Sys...IRJET -  	  Design, Simulation and Analysis of Double Wishbone Suspension Sys...
IRJET - Design, Simulation and Analysis of Double Wishbone Suspension Sys...IRJET Journal
 
Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289
Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289
Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289udjjfkkskemm
 
Case Study - Grinding Mill Bearing Failure
Case Study - Grinding Mill Bearing FailureCase Study - Grinding Mill Bearing Failure
Case Study - Grinding Mill Bearing FailureRicky Smith CMRP, CMRT
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualufjjjskekemme
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualfudfjjjskefkme
 
Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...
Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...
Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...IJERA Editor
 
Toro reelmaster 3100 d mower service repair manual
Toro reelmaster 3100 d mower service repair manualToro reelmaster 3100 d mower service repair manual
Toro reelmaster 3100 d mower service repair manualfujjfdjjskkfemm
 
Summer training project report anurag
Summer training project report anuragSummer training project report anurag
Summer training project report anuragAnurag Mishra
 

What's hot (15)

ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...
ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...
ANALYSIS OF SPACE FRAME OF FORMULA SAE AT HIGH SPEED WITH ERGONOMIC AND VIBRA...
 
Etd 02-02 - resilient rail fastenings for concrete sleepers
Etd 02-02 - resilient rail fastenings for  concrete sleepersEtd 02-02 - resilient rail fastenings for  concrete sleepers
Etd 02-02 - resilient rail fastenings for concrete sleepers
 
Bring แบบริ่งเอ็นทีเอ็นแคทตาล็อค
Bring แบบริ่งเอ็นทีเอ็นแคทตาล็อคBring แบบริ่งเอ็นทีเอ็นแคทตาล็อค
Bring แบบริ่งเอ็นทีเอ็นแคทตาล็อค
 
IRJET- Experimental Analysis of Passive/Active Suspension System
IRJET- Experimental Analysis of Passive/Active Suspension SystemIRJET- Experimental Analysis of Passive/Active Suspension System
IRJET- Experimental Analysis of Passive/Active Suspension System
 
MEKA INCLINED VIBRATING SCREEN
MEKA INCLINED VIBRATING SCREENMEKA INCLINED VIBRATING SCREEN
MEKA INCLINED VIBRATING SCREEN
 
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
IRJET- Development and Analysis of Special Purpose Machine (Peck Drilling Mac...
 
IRJET - Design, Simulation and Analysis of Double Wishbone Suspension Sys...
IRJET -  	  Design, Simulation and Analysis of Double Wishbone Suspension Sys...IRJET -  	  Design, Simulation and Analysis of Double Wishbone Suspension Sys...
IRJET - Design, Simulation and Analysis of Double Wishbone Suspension Sys...
 
Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289
Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289
Mercruiser sterndrive mc 228 r service repair manual sn6216687 to 6849289
 
IJET-V2I6P27
IJET-V2I6P27IJET-V2I6P27
IJET-V2I6P27
 
Case Study - Grinding Mill Bearing Failure
Case Study - Grinding Mill Bearing FailureCase Study - Grinding Mill Bearing Failure
Case Study - Grinding Mill Bearing Failure
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manual
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manual
 
Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...
Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...
Finite Element Analysis of Fire Truck Chassis for Steel and Carbon Fiber Mate...
 
Toro reelmaster 3100 d mower service repair manual
Toro reelmaster 3100 d mower service repair manualToro reelmaster 3100 d mower service repair manual
Toro reelmaster 3100 d mower service repair manual
 
Summer training project report anurag
Summer training project report anuragSummer training project report anurag
Summer training project report anurag
 

Similar to Reliability Centered Maintenance of Segment Rolls in Thin Slab Continuous Caster

IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...
IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...
IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...IRJET Journal
 
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...fjskedsxmmem
 
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...fjjskedmmemm
 
Study and Analysis of Tire Changing Machine Components
Study and Analysis of Tire Changing Machine ComponentsStudy and Analysis of Tire Changing Machine Components
Study and Analysis of Tire Changing Machine ComponentsIRJET Journal
 
Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...
Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...
Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...IRJET Journal
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...fujsjefkskem
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...fujsjefkskem
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...dfjjsjkemmm
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...dujjsjekkekmme
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...fjskekfmsmeer
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...dfjjsjkemmm
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...fjskekfmsmeer
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...dujjsjekkekmme
 
High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009Shaun West
 

Similar to Reliability Centered Maintenance of Segment Rolls in Thin Slab Continuous Caster (14)

IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...
IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...
IRJET- Analysis of Stress and Bending Strength of Involutes Spur Gears with F...
 
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
 
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
Jcb js330 auto tier3 tracked excavator service repair manual sn1240500 to 124...
 
Study and Analysis of Tire Changing Machine Components
Study and Analysis of Tire Changing Machine ComponentsStudy and Analysis of Tire Changing Machine Components
Study and Analysis of Tire Changing Machine Components
 
Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...
Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...
Condition Monitoring of Ball Bearing Using Vibration Analysis and Feature Ext...
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3230 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
Jcb 3200 tier 4 fastrac service repair manual (serial no. from 1272500 to 127...
 
High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009
 

Reliability Centered Maintenance of Segment Rolls in Thin Slab Continuous Caster

  • 1. Reliability Centered Maintenance of Segment Rolls in Thin Slab Continuous Caster through ROLL TRACK TM Software Sandeep S Teredesai, Atanu Kumar Borkotoky, Pradip K Patra, Prakash Sappa, Satya Prakash (Sandeep.Teredesai@jsw.in, Atanu.Borkotoky@jsw.in, Pradip.Patra@jsw.in, Prakash.Sappa@jsw.in, Satya.Prakash@jsw.in) JSW Steel Limited, Geetapuram, Dolvi, Tal - Pen, Dist- Raigad - 402107, Maharashtra, INDIA Tel: +91-2143-277501 to 277515, Fax: +91-2143-277820 Website: www.jsw.com Abstract: Vertical Thin Slab Continuous Caster Machine is the state-of-art technology in today‟s steel making industries. Advanced Compact Strip Process (CSP) casters are designed for larger casting length, higher casting speed with compact equipments like segments. Ispat Industries Limited has two casting strands, of which one is equipped with Liquid Core Reduction (LCR) Technology. Segments of both casters have more than 350 rolls and 700 bearings running in machine at any point of time. Besides this, there are more than 1200 rollers and 2400 bearings being installed in standby set of segments. Aforesaid figures signify the importance of having a good roll maintenance management system for more than 1500 rolls and 3000 bearings which are transiting from machine to repair area. Unhampered caster productivity and product quality largely necessitates reliable roll performance with longer stay of segments in machine. Ispat has developed in-house unique software “Roll Track”, with help of which, it is now possible for the segment repair shop personnel to track the life and as-on- time status of each and every bearing and roll of the entire set of 27 segments. The software referred facilitates proactive approach to segment maintenance planning. This, in turn, reduces unplanned machine stoppages or breakdowns due to roll jam or bearing failures which generally lead to segment change in machines, thereby causing losses in productivity as well as losses due to heavy inventory. INTRODUCTION Slab leaving from mould is entered in segments wherein the hot stand is provided the support through rollers. More than 8 types of rolls of various size in single & double split design are installed in 27 segments. The total quantity of rollers & bearings installed in two casting strands are 350 and 700 respectively. There are 3 such sets are in use wherein more than 1000 rolls & 2000 bearings are installed. Besides this more than 500 rolls are in spare for circulation. Movement of such large amount of rollers and bearings in to different segments, various positions, re-welding & repair necessiates a good Roll Maintenance Management Sytem in Segment Repair Shop. Every single roll being mounted in segment during repair should be reliable to deliver preset campaign life to avaoid unplannned stoppages in caster on account of roll failure. Segment Maintenance Practice Conventional Method of Segment Maint. Like any casters; in ISPAT Segment change from casting machine is based on the number of heats cast. According to the segment type & its position in machine, a SOP is formulated indicating the change of segment based on the number of heats cast since last installation in casting machine. However achievement of SOP life shall be supported by defect free final product quality. At times the product quality is affected by the defects like Scratch Marks, Deep Grooves etc. arise out of caster which more often than other related to failure of segment rollers. Segment removed from casting machine is dismantled for either of following reasons
  • 2. 1. General lubrication testing 2. Replacement of failed rolls if any and 3. Re-alignment of roller table 1.1 Lubrication Test: Segment roller bearings are having grease lubrication system through dual line grease manifold blocks ( Grease Distributors ). During this testing movement of block metering pins is checked, stroke setting is done or replacement of faulty block is done to ensure proper lubrication to each bearing. 2.1 Replacement of Failed Rollers: Roll failure is largely attributed to bearing failure resulting jamming of roll. Such jam rolls were replaced by preassembled rolls. 3.1 Re-alignment of rolls: Exposure to constant heat & rolling as slab gets extracted leads to wear of rolls. Uneven roll wear is common; upsetting slab profile and if not corrected may leads to bulging. Realignment of rollers is carried out with precision templates to ensure correct roll gap in each segment. This conventional cycle was in practice since last more than 10 years which shown following major disadvanges over the period of time. Disadvantages: 1) Increase in unplanned stoppages of casting machine for segment change 2) Unpredictable failure of segment rolls. 3) Reduced campaign life & reliability of segment 4) Poor performance 5) Increase overall workload due to frequent re-work on segment 6) Increase in Inventories of rolls, bearings and other associated parts However the above disadvantages is offset with marginal improvement in segment performance by implementing periodical revamping of segments but consistency in performance is not achieved. The conventional method apparently shows advantages such as low maintenance cost and less manpower but if looked closely it has shown many disadvantages over the period of time; incurring high losses not only towards productivity but also in monitory terms. To defy on aforesaid disadvantages ISPAT has developed software ROLL TARCK TM which completely redefined the conventional segment roll maintenance practice to Reliability Centered Segment Maintenance Practice in cost effective manner.
  • 3. New RCM Method with ROLL TRACK It is strongly felt that the tracking the segment performance ( Life in heats ) and its scheduled revamping is not just enough as it shows improvement in a particular segment for short time but leads to increase maintenance cost significantly. Roll Track System provides unique way to keep tracking of every individual bearing along with roll & its assembly. It facilitates approach of Proactive & Predictive Maintenance rather than Preventive Maintenance among the thousands of roll & bearing running in 27 segments. The each roll, every bearing & their assembly is provided unique Track ID against which its performance, current location, life achieved, PM and RCA data etc is recorded in system. This information is available on line for analysis, decision making & help to focus on maintenance of a particular roll than entire 40 rolls when the segment is removed for routine maintenance. A figure_____ below is Roll Mapping Screen shows as-on-time status of installed bearing & rolls in segment no 3-2. Roll No 3 & 4 is highlighted indicating that the bearings of Roll No. CR157510156 and CL158210155 need inspection. Similarly „A‟ side bearing ( Yellow Colour ) of roll no. CR157510364 need to be inspected whereas „B‟ side bearing ( Red Colour ) need to be changed. It also shows no. of heats cast since last PM giving one step view for comparison between various segments. The roll arrangement is Single Split defined as Type-1 and two rolls forming an assembly is identified separately with Roll ID. Ex – CL158210325 (Ref. Nomenclature details in Fig_____) Bearing is due for Inspection Bearing Due for Replacement Bearing is OK
  • 4. Like roll, every bearing is also identified with a unique logical ID. This logical ID provides information about the roll or bearing against which its performance & repair history is recorded starting from its receipt in stores to discard / scrap. Fig_____ shows information about a roll which is presently in assembled condition and ready in spare for replacement. The other information like mounted bearings ID & its life, assembly number, vendor detail, heats after last machining, present diameter any many other is fetch from database when required. Further, history records of last change as well as overhauling is also displayed in subsequent tabs below current details.
  • 5. A pair of roll after mounting the bearing is assembled together and each such assembly is also identified with incremental assembly number for its type to locate the parts fit in. Software generate alarms referring to SOP guiding engineers to plan segment maintenance activities, make preassembled rollers ready for installation in advance. Another in-house developed software APPIM helps to optimize the inventory levels for more than 113 items pertaining to roll maintenance area. New system focus on Proactive Maintenance of every roll prioritized by software based on its performance and this information is available in MIS reports. Fig. _____ shows the roll change frequency with respect to each segment for desired duration. The report also shows comparison between different segments in view of heats cast, number of times it is changed from caster and numbers of rolls changed during the desired period. The tabulated data when is plotted gives the trend of roll failure for any segment which is further analyzed w.r.t. position of roll, diameter, bearing life etc.
  • 6. Conclusion: The following results are achieved. The highest ever campaign life is achieved 705 heats ( 1.33 MT ) with a single roll failure