1. RESUME
Name.
SADIK PASHA.
Permanent Contact Address.
Sadik Pasha, S/O Shabnoor,
C/O Noushad, Opposite Noorani
Masjid, Azad Nagar. Shimoga,
Kanataka, India. 577201.
E-mail.
pashasadik786@gmail.com
Contact No.
+966-0537280617
+91-9242342230
Personal Data.
Date of Birth : 25th
, Jan,1986
Place of Birth. : Shimoga, India.
Sex. : Male
Nationality. : Indian
Status. : Married
Hobbies.
Reading Quran
Travelling
Photography
Playing Cricket
Watching NEWS
Languages Known.
English
Kannada
Hindi
Urdu
Tamil
Arabic
I D Cards Details.
Passport No. F6662720.
Pan Card No. BVRPP8879F.
D.L. No. KA02 20120002342.
Iqama No. 2348983906
Transferable Iqama.
Education.
Bachelor of Engineering (B.E.) in Mechanical, S.K.I.T.
Bangalore-960056.
Karnataka.
India.
Objective.
To work in a competitive organizational environment where
there is scope for the enhancement of personal and professional
skills.
Technical Skills.
Computer Basics, MS office-Excel, Power-point etc.
Auto cad.
Heat Load Calculation (HAP) & (Blue Stare).
Study the HVAC Project.
HVAC System Design & Drafting.
Preparing HVAC Bill Of Quantity.
Preparing HVAC Quotation.
To prepare quotation.
To prepare Invoices.
Deal with the customers regard project.
Market Survey.
Marketing.
CNC Programming.
2. Educational Qualification.
School : J.P.N. High School, Shimoga.
Diploma in Mech. : V.I.S.S.J.Govt. Polytechnic, Bhadravathi, Shimoga.
Degree : BE. (MECHANICAL), S.K.I.T, Bangalore.
University : V.T.U. Belgaum, Karnataka.
Education Year of Passing University
BE 2011 VTU. India. (Attested By Delhi)
Dip in ME 2005 Technical Board Karnataka India.
SSLC 2002 State Board of Karnataka.
Employment History.
From Till Name of Company Type of company Designation in
Company
MAR 2014 Till the date
Innovative
Manufacturing
Ducting System
Technology.
Manufacturing and
Construction
Company.
HVAC Design,
Drafting & Project
Engineer.
MAY 2013 MAR 2014
Saf Al-Jazera
Company Ltd.
Mechanical
(HVAC) Company.
HVAC Design,
Drafting & Project
Engineer.
MAY 2010 MAY 2013
Armreache Air
conditioning India
(P) Ltd.
Project (designing
& Drafting)
HVAC Design,
Drafting & Project
Engineer.
JAN 2009 MAR 2010
Trinity
Engineering Works
Machine Shop
(Production)
Quality Assurance
Incharge.
JUN 2005 MAY 2006 S.P.C.P.L
Foundry
(Production)
Quality Inspector
3. Total Work Experience 5 years & 6 months.
1. Work Experience in SAUDI ARABIA.
Working as a Design, Drafting & Project Engineer in HVAC from May 2013 to Till the
date in (IMDST and Saf Al-Jazera Company Ltd.) In Saudi Arabia.
Major Projects: Saudi Aircon, Al-Bawani, Arson group company ltd, Rafal 1 & 2, Villas etc.
Major Projects: King Faisal special hospital, Rafal Tower, Safarah, Villas in Riyadh, Saudi Ceramic
Company, King Faisal Special Hospital, Lulu shopping mall, Al Othaim Palace, Jadwa
Project, King Abdullah Financial District Project, Saudi Oger. Co., Al Fouzan, Yasmine
Villas, National Factory for Glass Bottles. NCB Bank, East West Company, Jareer hotel,
Al hammadi super market, Water factory, Matco Company, Saad Al-Ajlan Mosque Lulu
Super Market Jeddah, Nadec & Car Showrooms, Najma International Company.
2. Work Experience in INDIA.
I was worked as a Design, Drafting & Project Engineer in HVAC from May 2010 to May
2010 in Armreache Air Conditioning (Daikin) India P. Ltd. 2 Years.
Total work experience in Production Sector (Foundry & M/C Shop). 2 Years & 1 month.
Major Clients: Embassy Groups, ASK Hotel, WTC-Nirani Sugars, Classic association, Genpact India,
Prestige Groups, Prestige Oasis Villas, Prestige County Villas, Prestige Shantinikethan
Apartments, British Telecom, K2 Vijay Malaya Hospital in Bangalore (K2).
Managerial Skills:
1. Daily Job Planning (Manpower Management).
2. Preparing Monthly Report (Status) on OT, Scrap etc.
3. First stage entry of components & Rejection.
4. Control the Project Cost.
5. Preparing Inspection Reports.
6. Preparing Tested Certificate (Chemical Mechanical & Dimensional).
7. Preparing Delivery Chelan to Vendors.
4. 8. Preparing Monthly Production & Rejection reports.
9. To Prepare the Plan for Dispatch the Product.
10. Sand Casting and Investment Casting Production knowledge.
11. To prepare the rejected reports.
Responsibilities in HVAC Sector:
Responsible for preparing of sequence of operations for HVAC Systems (VRV units, fan
coil units, ducted split units, Chillers, air-handling units).
Duct design and Routing by using Auto CAD.
Co-ordinate and plan HVAC projects for onshore and offshore client from conceptual design
through to close out.
Preparations of HVAC layout using Auto CAD.
Design & selection of HVAC Equipment’s.
Preparing details of Bill of Materials including all Equipment’s.
Interaction / Coordination with Clients & Consultants till the design meet the required design
standards & it gets approved.
Visiting Project sites at Pre-design & Approval stages for better design & Ensure our support
for the on time Completion of Project.
Inspecting the site before taking up projects, check for all relevant drawings with detail
dimensions.
Co-coordinating with various Vendors/Sub Contractors in Fabrication & Erection of
Equipment’s like Duct, Duct Insulation, Thermal Insulation& Instrumentation etc.
Handing the Approved design to Project Dept. for the Execution.
Visiting Sites Periodically to solve real time Problems.
Instruct Technicians accordingly.
Finally, to prepare as-built Drawings as per site during the Commissioning with all required
Details.
Experience in designing HVAC systems for multi construction sites.
Ability to work better on HVAC designs as I am comfortable regarding design codes and
blueprints.
5. Patience to test each unit of an HVAC system one at a time.
Immensely knowledgeable when it comes to rules, regulations and HVAC system safety
protocols laid down by the valid authorities.
Good budget foresight and budgetary control capability.
Ability to work on multiple projects.
Interacting with Clients, Contractors, Vendors and Consultants for technical, commercial and
other clarifications to meet the end result of the project completion date and contractual
obligation.
Responsible for collection of payment against deliveries, installation, commissioning and final
payment. Also, liquidation of outstanding payment and timely invoicing.
Responsible for acceptance of measurement of verification of quantities and extra items
including value amendments and activities from customers/ consultants.
Responsible for savings through cost reduction.
Responsible for visiting site for pre-inspection to mark drawings and understand
the feasibility before commissioning of a project. On pre-inspection, to prepare
drawings, duly communicate to management for obtaining approval, and forward the same
to customers.Visiting sites to supervise work during project stage. Execute final inspection /test
trail in coordination with technician before commissioning.
Also promote sales while attending to customer’s call and providesuch information to marketing
department for further action.
On receipt of sales order from marketing, to provide recommendations / suggestion
for corrective action if any and intimate marketing dept for further action.
To record complaints from customers regarding drawing specification and take necessary steps /
follow-up to sort out issues.
To coordinate with service department to arrange materials whenever required.
To maintain all records like drawings, reports during site visit, customer’s feedback etc and
make available to management as and when required.
To maintain all records like drawings, reports during site visit, customer’s feedback etc and
make available to management as and when required.
Attending Installation and Testing & Commissioning Inspections on site.
6. Technical Skills in Production Sector:
Finding the mechanical properties by Universal testing machine.
To Finding the Microstructure of components By Microscope.
To check the components whether the components are ok for dispatch or not.
I have knowledge of Precision Instruments like Screw gauge, Vernier caliper, Height
gauges, Angle gauges, CMM (Co-Ordinate Measuring Machine), PP (Profile Projector),
Visual Measuring machine, and Two Dimensional Measuring Height Gauge etc.
I know how set the components in CMM to measure.
I Know About Heat Treatment Cycle.
Blasting Equipment’s – Sand & Ball.
I Know About Investment Casting by Wax Molding (How to prepare wax patterns? How to
prepare the Shell around the wax pattern? How to remove the wax from the prepared shall?
How to Pour the molten metal in shall cavity? After solidification how to remove the
components from the solidified tree? How to clean the components for dispatch?
Now I am working in a QA as ISO & TS16949 Co-Ordinate in Trinity Engineering works.
I am able to prepare the ISO & TS16949 documentations. (PPAP, Control Plan, FMEA,
Process Flow Chart, CAPPA and APQP).
In Control Plan from beginning to dispatch which type of we are did in our organization to
get a approval and satisfaction from the customer.
In FMEA (Failure Mode Evaluation Analysis) in which place maximum Failure chances is
there and how to reduce that problems, what is the reason for the failure, how to get good
Quality product from the failure.
In Flow Process Chart which process are doing after which process (like Facing, Turning,
Drilling, Threading, Grinding, Heat Treatment, Plating, Final Inspection, Packing, finally
Dispatch).
I declare that the information given above is true to the best to my knowledge.
Date:
Place: Riyadh Saudi Arabia. (SADIK PASHA).