1. ELECTRICAL MAINTENANCE ENGR - ‘C’ LICENSE HOLDER
SARAVANA KUMAR.S
Captain DA.Sundaram house,
No: 7, First Floor,
Ambikai Illam,
2nd
cross street, LL:044-37181945(Office Hours)
Ambikapuram, Thiruninravur, P.No:9790957333(after office hours)
Chennai-602024. E-mail: sharavana37@gmail.com
To become a manager in a well reputed growing company.
Working as Sr.Electrical and instrumentation Engineer in PPG Asian paints private ltd from June
2012 till now. Dealing with SCADA and advanced Delta V2 version DCS. Also having two plus
years of experience in Futura Polyesters Limited Chennai manali plant from Jan 2010 till June 2012.
It is a continuous process plant manufacturing fibre, polymer and preforms.
I was working in fibre division under Electrical maintenance department dealt with operation and
maintenance of
110KV/11KV HT Sub-Station, Power transformers ranging from 1MVA to 10MVA.
1100KVA D.G sets (3 nos). Air compressors ranging from 235 KW to 450 KW (7nos).
HT and LT Breakers. Utility plants like 550TR Chillers, 32TPH Boilers and Biomass plant.
Milling operations, Filling Packing machines and HVAC AHU spray booths.
Well trained in erection and commission of manufacturing lines like pelletizing and flakes
washing lines and also in attending breakdown of equipments and trouble shooting of
electromagnetic circuits.
C license no : C42221 valid till 02-05-2016.
Well experienced in PLC operations, AC and DC drives applications (ranging from 0.35 KW
to 250 KW) installation and programming and in overall electrical equipments preventive
maintenance.
Calibration of Mixers up to 10 KL, weighing balance up to 3 ton, 60 kg weighing balance &
40 ton weighing bridge of tankers.
My role is Team Leader in Engineering Dept taking care of overall engineering projects and
maintenance along with procurement but major focus on Electrical.
To ensure Legal and Statutory compliance in Electrical regulations.
My responsibility is to guide and lead a team comprising of 5 Electrical Technicians.
To reduce the breakdown time (MTTR).
To take preventive maintenance of all critical equipments in the plant.(UPTIME)
CAREER GOAL :
SUMMARY OF EXPERIENCE DETAILS :
ROLES AND RESPONSIBITIES:
2. PPG Global EHS Policies development and Implementation.
Electrical safe work practices procedure development and Implementation.
Hazardous Area Classification procedure development and implementation.
ARC FLASH study analysis and implementation.
PM strategies, planning and scheduling.
Breakdown Analysis.
RCA, 5 Y analysis and Effective CAPA.
Calibration of Mixers up to 10 KL, weighing balance up to 3 ton, 60 kg weighing balance &
40 ton weighing bridge of tankers.
Installation and erection of 125 KVA Energy saving lighting transformer.
Installation and erection of High Speed Dispensers.
Installation and erection of Pelletizing and Flaking machines.
Installation and erection of Grinding Mills.
Completed BE/EEE in PITAM with an aggregate of 72% first class in 2009.
Completed DEEE in AMS Polytechnic College with an aggregate of 73% first class in 2006.
Completed SSLC in Kalaipoonga Matric School with an aggregate of 62% first class in 2003.
Name : S.Saravana kumar.
Date of birth : 02-08-1988.
Father Name : P.M.Siva Shanmugam.
Nationality : Indian.
Marital Status : Single.
Languages Known : Tamil, English.
Hobbies
Passport number
Passport validity
Current CTC
Expected CTC
Notice Period
:
:
:
:
:
:
Surfing net, Listening Music,
Playing Carom.
K2241888.
20.04.2022 (D.O.I.-21.04.2012)
5,50,000/-
7,50,000/-
30 Days.
I hereby declare that all the details given above are true to the best of my knowledge and
belief.
SKILL SETS:
PROJECTS HANDLED :
EDUCATIONAL DETAILS:
PERSONAL PROFILE :
DECLARATION: