1. Task 6.4
Third integration -System validation
• Leader: Graphitech
• Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE
Objectives
•
•
Whole system validation and testing
Cost and productivity final calculation
Kick-off Meeting
8-9/jan/2014
2. How to achieve these objectives?
• Environment setup (SOA)
• Interactons validation one by one
• Fix issues one by one until threshold has been reached
(e.g. 80% of tests cases passed)
Kick-off Meeting
8-9/jan/2014
3. Deliverables
Reports:
• D.6.023 System Integration Report III (M34)
• D.6.043 SLOPE System Techno-Economic Evaluation Report III
(M34)
• D.6.03 SLOPE System Field Trials Readiness Assessment Report
(M36)
Kick-off Meeting
8-9/jan/2014