America's water infrastructure is aging and in need of renewal. An estimated $540 billion will need to be spent over the next 25 years to replace pipes. RePipe4710 offers a new trenchless technology to insert a folded plastic pipe into existing pipes to reline them without digging up streets. This provides advantages over traditional replacement by being 25-30% less expensive, faster to install, and less disruptive to communities. RePipe4710 seeks to become a key part of the estimated $80 billion market for new water pipes and fittings between 2015-2040.
2. REPIPE4710
• ACTION
• Drinking Water
State Revolving Funds
• Water Infrastructure
Finance Innovation Act
• Communities &
Water System Operators
• PPP
Clean
Water Act
1996
WIFIA
2014
Flint, MI
Syracuse
Phila
2
3. USA Will Spend
$540B
Over 25 Years
AWWA
1. Trenchless
2. Less Effort
3. Faster
4. Safer
5. Less Disruption
6. Structural
7. New System
Retrenching is Slow & Expensive
RePipe4710
25-30%
LESS
3
RePipe4710
Advantages
5. REPIPE4710
• SOLUTION
• Make a Completely
New, Structural, Plastic
Pipe Network
• DO NOT DIG UP
THE STREET
• NO HYBRIDs
PATENT
12-2015
5
6. REPIPE4710
• MILESTONES
• EPA Relationship
• US Military Relationship
• Independent Water Operators
• Publicly Traded Water Operators
6
7. RePipe4710 Business
• Make & Sell
– Folded Pipe
– Fittings
– Installation Equipment
• Purchase Drivers
– Water Main Breaks
– City-wide Rehabilitations
• Confidence: Proven in Europe
• First U.S. Patent Awarded,
Multiple Pending
• Not Capital Intensive, High Gross Margin, Repeat
Customers, Rich R&D Future
$80B in Pipe and Fittings
2015 to 2040
Pipe Folding in Action
7
8. How to RePipe a Pipe
1. Dig Entry Point
2. Dig Exit Point
3. Pull Folded Pipe Through
4. Force Round with Steam
5. Connect with Fittings
$80B in Pipe and Fittings 2015 to 2040
Folded, Coiled RePipe4710
Inserted into
Leaking Pipe “RePiped” Pipe
1. New, Strong Pipe
2. Dig Two Holes, Not a Trench
3. Less Disruption
4. Flexible Pipe Bends as Needed
5. Faster, Less Expensive Process
6. STRUCTURAL SOLUTION, Not a Hybrid
RePipe4710 Process Advantages
8
9. Competition
$80B in Pipe and Fittings 2015 to 2040 9
Option New Pipe Network?
Dig and replace Yes, costly, disruptive
Other Trench-less
Hybird, 100s/1000s New
Weak Links
RePipe4710
Yes, 25-30% less, fast,
limits disruption
11. RePipe4710 Team
• Leadership
– Tim Nippes, CEO
– 19 years in water, 26 years in heavy construction
– Dana Hoffer, EVP
– 25 years in business, enterprise to start-up
– Barry Blundin, Sales & Govt. Relations
– 25 years working in regulated industry
$80B in Pipe and Fittings 2015 to 2040 11