West Harris County Regional Water Authority 
TOWN HALL MEETING 
NOVEMBER 10, 2014 
1
TONIGHT’S TOPICS 
• Status of Conversion 
• Capital Projects 
• Other Accomplishments 
• 2025 System 
• Finances 
• Water Conservation 
• Q&A 
2
STATUS OF CONVERSION 
• Surface Water to 54 Water Plants 
• 40 Districts Converted 
• HCMUD 172 Water Plant #2 added in 2014 
• 36.5 percent converted in 2013 
• 39.0 percent converted to date 
• 2015 – Two more water plants will be added 
3
ONGOING DESIGN PROJECTS 
• CONTRACT 49 
* Design 95% complete 
* Construct in 2015 
* Serves Mayde Creek MUD & Ricewood MUD 
• CONTRACTS 33 & 34 
* Acquiring easements 
* Design Contract 34 90% complete 
* Serves HCMUD 371 
* Design Contract 33 starting now 
4
ONGOING DESIGN PROJECTS (Cont.) 
• CONTRACT 22D 
* Design starting now 
* Construct mid-2015-2016 
* Serves HCMUD 433 
5
NEXT CIP PROJECTS 
• Contracts 35, 36 
 Design starts January 2015 
 Construction starts late 2015 
 Connects 3 water plants in HC 165 
6
CAPITAL PROJECTS 
7
OTHER ACCOMPLISHMENTS 
• REFUNDING BONDS 
 2005 -- $49 million for PV savings 
of $6.2M or 12.51% 
 Redeeming the remainder 
of 2005 bonds in Dec. 
8
ALTERNATIVE WATER CREDIT AGREEMENTS 
• Incentivizing effluent reuse projects, 
non-potable surface water, and 
rainwater/stormwater capture projects 
• Credits for metered alternate water equal to 
½ current GRP rate – now $1.90/1000 gals 
• Allow potentially full reimbursement of 
capital cost 
9
ALTERNATIVE WATER CREDIT AGREEMENTS 
• Negotiating/Executed Contracts for: 
 6 effluent reuse projects to serve golf 
courses and green space 
 2 non-potable surface water project 
 4 rainwater/stormwater capture projects 
10
CONTRACT WATER 
AGREEMENTS 
• WHCRWA has contracted 
with MUDs to address water 
quality/quantity issues 
• Several new requests this year 
• Evaluating new water 
commitment policy 
• Currently over 40% of water 
supply is committed 
11
DEMAND RESPONSE PROGRAM 
PARTICIPATION 
• Sites Acquired 
• WHCRWA switches to emergency 
power during peak demands, helps 
stabilize power grid 
• Offsets power costs 
for Authority 
12
AUTOMATED METER READING (AMR) 
• For groundwater wells in Authority 
• 270 wells in aggregate Authority permit 
• Data reported lags by 6 weeks 
• Conversion requirements increasing 
• WHCRWA needs to track water usage 
more closely 
13
AMR PILOT PROGRAM 
• WHCRWA trial of various manufacturer’s 
technology 
• Paid by WHCRWA 
• Volunteer program 
• Work though pitfalls 
• Evaluate effectiveness of system-wide 
implementation 
14
BENEFITS OF AMR SYSTEM 
• Independent system used to verify pumpage 
• Protects both parties 
• Reduces human error 
• Saves time on pumpage reconciliations 
• Reduction in administrative requirements 
over time 
15
HARRIS GALVESTON SUBSIDENCE DISTRICT 
• Submitted updated Groundwater 
Reduction Plan (GRP) 
• New conversion milestones 
• Changes from 1999 Plan 
• Convert to 60% by 2025 
• Convert to 80% by 2035 
• Current HGSD disincentive fee – 
$7.00/1000 gallons 
16
PROJECTS FOR THE 2025 SYSTEM 
• Luce Bayou 
• CoH Treatment Plant 
Expansion 
• Second Source Project 
• Repump Station 
• Central Pump Station 
• CIP Distribution Lines 
17
ADDITIONAL RAW WATER SUPPLY 
• Luce Bayou Interbasin Transfer Project 
brings raw water from Trinity River to 
Lake Houston 
• Design for River Intake 
Pump Station underway 
• Canal design project to 
start in 2015 
18
LUCE BAYOU 
19
LUCE BAYOU FACTS 
• Transfer of Trinity River Water 
• Capacity of 400 MGD 
• Estimated Cost $300 Million 
• Participants include CoH, WHCRWA, 
NHCRWA, NFBWA and CHCRWA 
• Start Design in 2014 
• Construction complete by June 30, 2019 
20
NE WATER PURIFICATION PLANT EXPANSION 
EXPANSION TO THE PLANT TENTATIVE SCHEDULE 
• 320 MGD expansion 
• Consisting of four 
80MGD Modules 
• New Intake Structure 
• 2015 – Permitting  
Pilot Studies 
• 2016 – Begin Design 
• 2017 – Begin 
Construction 
• 2021 – First Module 
(80MGD) complete 
• 2025 – Remaining 
Modules complete 
(240MGD) 
21
NEWPP NEGOTIATIONS 
• Negotiating a contract for Expansion 
of the CoH NEWPP at Lake 
Houston from 80MGD to 400MGD 
• Estimated cost of Expansion $1.27B 
22
SECOND SOURCE PROJECTS MAP 
23
SECOND SOURCE PROJECT WEBSITE 
• Website now live – www.secondsourceproject.com 
24
SECOND SOURCE TRANSMISSION LINES 
• Joint WHCRWA/NFBWA 
• Projected 39 miles of 96” pipe 
• Includes 2 Pump Stations 
• Obtained Environmental Permits 
• Acquiring additional easements, 
about 900 total needed 
• Estimated cost $600M 
25
2025 CIP DISTRIBUTION LINES 
• Approximately 75 new mi, 54 mi existing 
• Evaluating alternate routes 
• Acquiring easements; 90 next year 
• Designing and constructing sections 
• Estimated cost $300M 
26
There’s a lot left to pay for! 
Future Capital Improvement Plan 
Other 
Bellaire Pump Station 
NE Water Purification Plant Exp 
Central Pump Station 
Repump Station 
CenterPoint Line 
Segments 2, 4,  5 
NEWPP Meter Station 
Second Source Trans Main 
Joint Facilities 
Distribution System 
27
PROJECTED FUTURE 
BOND REQUIREMENTS 
2015 $ 78,580,000 
2016 46,760,000 
2017 308,860,000 
2018 234,080,000 
2019 195,455,000 
28 
28
INDEPENDENT RATE ANALYST… 
• Evaluated finances 
• Confirmed approach and 
financial policy of Board 
• Incremental increases in rates to 
support future project costs 
• Avoids dramatic rate increases 
29
WHERE ARE RATES GOING? 
30
WHCRWA ESTIMATED RATES 
Ground Water Surface Water 
GRP Rate Rate 
Current $1.90 $2.30 
2015 2.05 2.45 
2016 2.25 2.65 
31
SWIFT FUNDING 
TEXASWATER DEVELOPMENT BOARD 
• Low interest loans available in 2015 
• Rules regarding funds adopted in November 
• WHCRWA meeting with TWDB 
representatives to pursue available funding 
• Already received $42M in funding for the 
Second Source Line 
• Financing from TWDB will help rates 
32 
32
FINANCES 
• Bond Refunding  Early Calls 
• OM Surface Water Cost 
• Budget 
33
BOND REFUNDING IN AUGUST 
• Refunded $49.620 M of bonds with 
an average coupon of 5.00% 
• Issued only $46.03M in Refunding 
Bonds at 3.13% 
• Present Value Savings was 12.51% 
• Present Value Savings of $6.2M 
• Gross savings of $7.66 M 
34
BOND CALL IN DECEMBER 
• Board to use $10M in cash on hand to 
pay off 2005 bonds in December 2014 
• Interest savings of $5.149 M 
35
NEW BOND SALE EARLY 2015 
• Projected to be approximately $79M 
• Capital contribution correspondence 
going to MUDs in November 
36
OM SURFACE WATER COSTS 
CITY OF HOUSTON FY 
ITEM 2010 2011 2012 2013 2014 2015 
Treated 
Water Costs 
0.4341 0.3754 0.4088 0.4882 0.4544 0.4694 
Untreated 
Water Costs 
0.1170 0.1109 0.1130 0.1343 0.1291 0.1398 
Major 
Rehab 
0.1468 0.0158 0.0375 0.1667 0.4112 0.2949 
TotalWater 
Cost per 
1000 Gal. 
0.6979 0.5021 0.5594 0.7891 0.9946 0.9390 
Figures for FY 2010 through FY 2011 are based on true-up costs. FY 2012 from 
draft true-up not finalized. FY 2013 and FY 2014 are based on City of Houston 
estimated OM cost prior to true-up. FY 2015 current CoH Budget rates. 
37 
37
2014 BUDGET STATUS 
(through September) 
YTD BUDGET YTD ACTUAL 
Revenues $31,774,148 $30,773,866 
Expenditures 
Operating Fund $ 8,611,266 $ 9,674,022 
Bond Debt Service 
Fund Transfer 
(Excluding NFBWA Share) 
$18,813,976 $15,058,918 
38 
38
DRAFT 2015 BUDGET 
Revenues $46,241,395 
Expenditures 
Operating Fund $11,447,647 
Bond Debt Service 
Fund Transfer 
(Excluding NFBWA Share) 
$20,109,572 
39 
39
WATER CONSERVATION EDUCATION 
• Annual resident newsletter 
• Homeowner brochures and 
billing inserts 
• Participating Sponsor of 
major water conservation 
education outreach effort – 
Save Water Texas Coalition – 
• Radio and Television messages; 
comprehensive website 
www.SaveWaterTexas.org 
40
MOBILE TEACHING LAB 
COLLABORATIVE EFFORT WITH KATY ISD CURRICULUM SPECIALISTS 
SOCIAL STUDIES CURRICULUM (GRADES 4-7) 
FEATURES INTERACTIVE STORMWATER POLLUTION PANELS 
41
Mobile Teaching Lab 
 Interactive Display 
 Student “novel” and 
Teacher Guide 
 Classroom support 
activities about causes 
and prevention 
42
SUMMARY 
 Status of Conversion 
 Current System and 
Operations 
 2025 System 
 Finances 
 Water Conservation 
43 
WEST HARRIS COUNTY REGIONAL WATER AUTHORITY 
43
Questions? 
44
45

More Related Content

What's hot

DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanCityofKilleen
 
Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...
Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...
Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...Kevin Perry
 
LNG in Transportation Executive Summary
LNG in Transportation Executive SummaryLNG in Transportation Executive Summary
LNG in Transportation Executive SummaryPaul Cassar
 
Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...The Texas Network, LLC
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreADDA
 
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13freshtrackscommunications
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06HartTWI
 
Benter, Water Rates
Benter, Water RatesBenter, Water Rates
Benter, Water RatesTWCA
 

What's hot (20)

San Antonio Vista Ridge Project
San Antonio Vista Ridge ProjectSan Antonio Vista Ridge Project
San Antonio Vista Ridge Project
 
DS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master PlanDS-16-161 Water Reuse Master Plan
DS-16-161 Water Reuse Master Plan
 
Master Plan
Master PlanMaster Plan
Master Plan
 
Wp mp-update-col riverconvey-april_25_2013
Wp   mp-update-col riverconvey-april_25_2013Wp   mp-update-col riverconvey-april_25_2013
Wp mp-update-col riverconvey-april_25_2013
 
Wastewater Capital Improvement Program
Wastewater Capital Improvement ProgramWastewater Capital Improvement Program
Wastewater Capital Improvement Program
 
Final master plan - wp workshop 5-16-13
Final   master plan - wp workshop 5-16-13Final   master plan - wp workshop 5-16-13
Final master plan - wp workshop 5-16-13
 
Greenway to Park Conversion
Greenway to Park ConversionGreenway to Park Conversion
Greenway to Park Conversion
 
Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...
Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...
Lawless, Mike, City of Lawrence, KS, Integrated Planning-City of Lawrence Cas...
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
LNG in Transportation Executive Summary
LNG in Transportation Executive SummaryLNG in Transportation Executive Summary
LNG in Transportation Executive Summary
 
Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
Wp special master-plan[071113]
Wp special master-plan[071113]Wp special master-plan[071113]
Wp special master-plan[071113]
 
Lng use in trucking
Lng use in truckingLng use in trucking
Lng use in trucking
 
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
 
Paul Helliker - BDCP
Paul Helliker - BDCPPaul Helliker - BDCP
Paul Helliker - BDCP
 
Update on ERCOT Activities
Update on ERCOT ActivitiesUpdate on ERCOT Activities
Update on ERCOT Activities
 
Road Salt Regional Perspective: New York State Success Stories
Road Salt Regional Perspective: New York State Success StoriesRoad Salt Regional Perspective: New York State Success Stories
Road Salt Regional Perspective: New York State Success Stories
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06
 
Benter, Water Rates
Benter, Water RatesBenter, Water Rates
Benter, Water Rates
 

Similar to WHCRWA Town Hall Meeting 11-10-2014

Water Management Strategies - Ryan Kelso
Water Management Strategies - Ryan KelsoWater Management Strategies - Ryan Kelso
Water Management Strategies - Ryan KelsoTWCA
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study PresentationVictoriaColangelo
 
Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyVictoriaColangelo
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects UpdateTownofAddison
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05HartTWI
 
Water and Wastewater System Master Plans
Water and Wastewater System Master PlansWater and Wastewater System Master Plans
Water and Wastewater System Master PlansCity of College Station
 
Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesCityofEvanston2
 
Norman economic summit presentation city of norman presentation - 5-2-13
Norman economic summit presentation   city of norman presentation - 5-2-13Norman economic summit presentation   city of norman presentation - 5-2-13
Norman economic summit presentation city of norman presentation - 5-2-13Norman Economic Development Coalition
 
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...San Diego County Water Authority
 
Franklin DPW Water Presentation
Franklin DPW Water PresentationFranklin DPW Water Presentation
Franklin DPW Water PresentationFranklin Matters
 

Similar to WHCRWA Town Hall Meeting 11-10-2014 (20)

College Station Water Supply
College Station Water SupplyCollege Station Water Supply
College Station Water Supply
 
Sprinkler Talks. People Listen.
Sprinkler Talks. People Listen.Sprinkler Talks. People Listen.
Sprinkler Talks. People Listen.
 
Water Management Strategies - Ryan Kelso
Water Management Strategies - Ryan KelsoWater Management Strategies - Ryan Kelso
Water Management Strategies - Ryan Kelso
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation
 
Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate Study
 
WHCRWA Town Hall 2012 - Fall
WHCRWA Town Hall 2012 - FallWHCRWA Town Hall 2012 - Fall
WHCRWA Town Hall 2012 - Fall
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05
 
FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)
 
Water and Wastewater System Master Plans
Water and Wastewater System Master PlansWater and Wastewater System Master Plans
Water and Wastewater System Master Plans
 
Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - Utilities
 
DOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant WorkshopDOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant Workshop
 
DOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant WorkshopDOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant Workshop
 
Norman economic summit presentation city of norman presentation - 5-2-13
Norman economic summit presentation   city of norman presentation - 5-2-13Norman economic summit presentation   city of norman presentation - 5-2-13
Norman economic summit presentation city of norman presentation - 5-2-13
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
 
Franklin DPW Water Presentation
Franklin DPW Water PresentationFranklin DPW Water Presentation
Franklin DPW Water Presentation
 
1.1 mdwasd update
1.1 mdwasd update1.1 mdwasd update
1.1 mdwasd update
 
State of the City 2012
State of the City 2012State of the City 2012
State of the City 2012
 

More from The Texas Network, LLC

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017The Texas Network, LLC
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleThe Texas Network, LLC
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesThe Texas Network, LLC
 
Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayThe Texas Network, LLC
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Texas Network, LLC
 
Texas Drought Over? (But then again…)
Texas Drought Over?  (But then again…)Texas Drought Over?  (But then again…)
Texas Drought Over? (But then again…)The Texas Network, LLC
 
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...The Texas Network, LLC
 
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSSURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSThe Texas Network, LLC
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT The Texas Network, LLC
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasThe Texas Network, LLC
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersThe Texas Network, LLC
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Texas Network, LLC
 
Pecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIPecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIThe Texas Network, LLC
 
Groundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggGroundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggThe Texas Network, LLC
 

More from The Texas Network, LLC (20)

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” Rule
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal Challenges
 
Texas Water Development Board Update
Texas Water Development Board UpdateTexas Water Development Board Update
Texas Water Development Board Update
 
Professional Ethics
Professional EthicsProfessional Ethics
Professional Ethics
 
Groundwater Management GMA/GCD Panel
Groundwater Management GMA/GCD PanelGroundwater Management GMA/GCD Panel
Groundwater Management GMA/GCD Panel
 
Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda Bay
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on Reuse
 
Texas Drought Over? (But then again…)
Texas Drought Over?  (But then again…)Texas Drought Over?  (But then again…)
Texas Drought Over? (But then again…)
 
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
 
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSSURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
 
TWCA Speech – Rep. James Frank
TWCA Speech – Rep. James FrankTWCA Speech – Rep. James Frank
TWCA Speech – Rep. James Frank
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board Members
 
From Projectile to Pump Station
From Projectile to Pump StationFrom Projectile to Pump Station
From Projectile to Pump Station
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
 
Pecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIPecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part II
 
National Floodplain Policy: FFRMS
National Floodplain Policy: FFRMSNational Floodplain Policy: FFRMS
National Floodplain Policy: FFRMS
 
Groundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggGroundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and Bragg
 

WHCRWA Town Hall Meeting 11-10-2014

  • 1. West Harris County Regional Water Authority TOWN HALL MEETING NOVEMBER 10, 2014 1
  • 2. TONIGHT’S TOPICS • Status of Conversion • Capital Projects • Other Accomplishments • 2025 System • Finances • Water Conservation • Q&A 2
  • 3. STATUS OF CONVERSION • Surface Water to 54 Water Plants • 40 Districts Converted • HCMUD 172 Water Plant #2 added in 2014 • 36.5 percent converted in 2013 • 39.0 percent converted to date • 2015 – Two more water plants will be added 3
  • 4. ONGOING DESIGN PROJECTS • CONTRACT 49 * Design 95% complete * Construct in 2015 * Serves Mayde Creek MUD & Ricewood MUD • CONTRACTS 33 & 34 * Acquiring easements * Design Contract 34 90% complete * Serves HCMUD 371 * Design Contract 33 starting now 4
  • 5. ONGOING DESIGN PROJECTS (Cont.) • CONTRACT 22D * Design starting now * Construct mid-2015-2016 * Serves HCMUD 433 5
  • 6. NEXT CIP PROJECTS • Contracts 35, 36 Design starts January 2015 Construction starts late 2015 Connects 3 water plants in HC 165 6
  • 8. OTHER ACCOMPLISHMENTS • REFUNDING BONDS 2005 -- $49 million for PV savings of $6.2M or 12.51% Redeeming the remainder of 2005 bonds in Dec. 8
  • 9. ALTERNATIVE WATER CREDIT AGREEMENTS • Incentivizing effluent reuse projects, non-potable surface water, and rainwater/stormwater capture projects • Credits for metered alternate water equal to ½ current GRP rate – now $1.90/1000 gals • Allow potentially full reimbursement of capital cost 9
  • 10. ALTERNATIVE WATER CREDIT AGREEMENTS • Negotiating/Executed Contracts for: 6 effluent reuse projects to serve golf courses and green space 2 non-potable surface water project 4 rainwater/stormwater capture projects 10
  • 11. CONTRACT WATER AGREEMENTS • WHCRWA has contracted with MUDs to address water quality/quantity issues • Several new requests this year • Evaluating new water commitment policy • Currently over 40% of water supply is committed 11
  • 12. DEMAND RESPONSE PROGRAM PARTICIPATION • Sites Acquired • WHCRWA switches to emergency power during peak demands, helps stabilize power grid • Offsets power costs for Authority 12
  • 13. AUTOMATED METER READING (AMR) • For groundwater wells in Authority • 270 wells in aggregate Authority permit • Data reported lags by 6 weeks • Conversion requirements increasing • WHCRWA needs to track water usage more closely 13
  • 14. AMR PILOT PROGRAM • WHCRWA trial of various manufacturer’s technology • Paid by WHCRWA • Volunteer program • Work though pitfalls • Evaluate effectiveness of system-wide implementation 14
  • 15. BENEFITS OF AMR SYSTEM • Independent system used to verify pumpage • Protects both parties • Reduces human error • Saves time on pumpage reconciliations • Reduction in administrative requirements over time 15
  • 16. HARRIS GALVESTON SUBSIDENCE DISTRICT • Submitted updated Groundwater Reduction Plan (GRP) • New conversion milestones • Changes from 1999 Plan • Convert to 60% by 2025 • Convert to 80% by 2035 • Current HGSD disincentive fee – $7.00/1000 gallons 16
  • 17. PROJECTS FOR THE 2025 SYSTEM • Luce Bayou • CoH Treatment Plant Expansion • Second Source Project • Repump Station • Central Pump Station • CIP Distribution Lines 17
  • 18. ADDITIONAL RAW WATER SUPPLY • Luce Bayou Interbasin Transfer Project brings raw water from Trinity River to Lake Houston • Design for River Intake Pump Station underway • Canal design project to start in 2015 18
  • 20. LUCE BAYOU FACTS • Transfer of Trinity River Water • Capacity of 400 MGD • Estimated Cost $300 Million • Participants include CoH, WHCRWA, NHCRWA, NFBWA and CHCRWA • Start Design in 2014 • Construction complete by June 30, 2019 20
  • 21. NE WATER PURIFICATION PLANT EXPANSION EXPANSION TO THE PLANT TENTATIVE SCHEDULE • 320 MGD expansion • Consisting of four 80MGD Modules • New Intake Structure • 2015 – Permitting Pilot Studies • 2016 – Begin Design • 2017 – Begin Construction • 2021 – First Module (80MGD) complete • 2025 – Remaining Modules complete (240MGD) 21
  • 22. NEWPP NEGOTIATIONS • Negotiating a contract for Expansion of the CoH NEWPP at Lake Houston from 80MGD to 400MGD • Estimated cost of Expansion $1.27B 22
  • 24. SECOND SOURCE PROJECT WEBSITE • Website now live – www.secondsourceproject.com 24
  • 25. SECOND SOURCE TRANSMISSION LINES • Joint WHCRWA/NFBWA • Projected 39 miles of 96” pipe • Includes 2 Pump Stations • Obtained Environmental Permits • Acquiring additional easements, about 900 total needed • Estimated cost $600M 25
  • 26. 2025 CIP DISTRIBUTION LINES • Approximately 75 new mi, 54 mi existing • Evaluating alternate routes • Acquiring easements; 90 next year • Designing and constructing sections • Estimated cost $300M 26
  • 27. There’s a lot left to pay for! Future Capital Improvement Plan Other Bellaire Pump Station NE Water Purification Plant Exp Central Pump Station Repump Station CenterPoint Line Segments 2, 4, 5 NEWPP Meter Station Second Source Trans Main Joint Facilities Distribution System 27
  • 28. PROJECTED FUTURE BOND REQUIREMENTS 2015 $ 78,580,000 2016 46,760,000 2017 308,860,000 2018 234,080,000 2019 195,455,000 28 28
  • 29. INDEPENDENT RATE ANALYST… • Evaluated finances • Confirmed approach and financial policy of Board • Incremental increases in rates to support future project costs • Avoids dramatic rate increases 29
  • 30. WHERE ARE RATES GOING? 30
  • 31. WHCRWA ESTIMATED RATES Ground Water Surface Water GRP Rate Rate Current $1.90 $2.30 2015 2.05 2.45 2016 2.25 2.65 31
  • 32. SWIFT FUNDING TEXASWATER DEVELOPMENT BOARD • Low interest loans available in 2015 • Rules regarding funds adopted in November • WHCRWA meeting with TWDB representatives to pursue available funding • Already received $42M in funding for the Second Source Line • Financing from TWDB will help rates 32 32
  • 33. FINANCES • Bond Refunding Early Calls • OM Surface Water Cost • Budget 33
  • 34. BOND REFUNDING IN AUGUST • Refunded $49.620 M of bonds with an average coupon of 5.00% • Issued only $46.03M in Refunding Bonds at 3.13% • Present Value Savings was 12.51% • Present Value Savings of $6.2M • Gross savings of $7.66 M 34
  • 35. BOND CALL IN DECEMBER • Board to use $10M in cash on hand to pay off 2005 bonds in December 2014 • Interest savings of $5.149 M 35
  • 36. NEW BOND SALE EARLY 2015 • Projected to be approximately $79M • Capital contribution correspondence going to MUDs in November 36
  • 37. OM SURFACE WATER COSTS CITY OF HOUSTON FY ITEM 2010 2011 2012 2013 2014 2015 Treated Water Costs 0.4341 0.3754 0.4088 0.4882 0.4544 0.4694 Untreated Water Costs 0.1170 0.1109 0.1130 0.1343 0.1291 0.1398 Major Rehab 0.1468 0.0158 0.0375 0.1667 0.4112 0.2949 TotalWater Cost per 1000 Gal. 0.6979 0.5021 0.5594 0.7891 0.9946 0.9390 Figures for FY 2010 through FY 2011 are based on true-up costs. FY 2012 from draft true-up not finalized. FY 2013 and FY 2014 are based on City of Houston estimated OM cost prior to true-up. FY 2015 current CoH Budget rates. 37 37
  • 38. 2014 BUDGET STATUS (through September) YTD BUDGET YTD ACTUAL Revenues $31,774,148 $30,773,866 Expenditures Operating Fund $ 8,611,266 $ 9,674,022 Bond Debt Service Fund Transfer (Excluding NFBWA Share) $18,813,976 $15,058,918 38 38
  • 39. DRAFT 2015 BUDGET Revenues $46,241,395 Expenditures Operating Fund $11,447,647 Bond Debt Service Fund Transfer (Excluding NFBWA Share) $20,109,572 39 39
  • 40. WATER CONSERVATION EDUCATION • Annual resident newsletter • Homeowner brochures and billing inserts • Participating Sponsor of major water conservation education outreach effort – Save Water Texas Coalition – • Radio and Television messages; comprehensive website www.SaveWaterTexas.org 40
  • 41. MOBILE TEACHING LAB COLLABORATIVE EFFORT WITH KATY ISD CURRICULUM SPECIALISTS SOCIAL STUDIES CURRICULUM (GRADES 4-7) FEATURES INTERACTIVE STORMWATER POLLUTION PANELS 41
  • 42. Mobile Teaching Lab Interactive Display Student “novel” and Teacher Guide Classroom support activities about causes and prevention 42
  • 43. SUMMARY Status of Conversion Current System and Operations 2025 System Finances Water Conservation 43 WEST HARRIS COUNTY REGIONAL WATER AUTHORITY 43
  • 45. 45