ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 1/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Pallet Carts Process
-The purpose of the documentation is to effectively explain and train on a new structured process and allow the associate to ask questions
and fully understand what there responsibilities are for the tasks. This will set clear expectations on staying on pace “Tact Time” so that both
parties are accountable for the actions of the task and process in place. Signing off on this documentation states that the associate takes full
ownership and responsibilities for there actions for this process and task.
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 2/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
1. - The way to identify the Kanban being
a pallet cart is by the top of the
Kanban stating Pallet Cart.
-The part number that the Kanban
card is utilizing.
-The picture of the part.
2. -Description of the part.
- The quantity amount that you are to
fill to the Kanban.
- There can also be a no number and
the word FILL meaning you Fill to the
maximum quantity the unit calls for
that Pallet Cart Kanban example
-So you would be FILL to the
Maximum quantity of PCS for this
Kanban
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 3/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
3. -The type of unit you will be looking
for.
-Boxes
-Pallets
-Pcs ( Pieces)
4. -Under the Bulk Location the Box state
ting IN and OUT will tell the Material
Handler weather the part is Outside or
Inside the warehouse.
IN OUT
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 4/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
5. - Each of animals and color in the
animals represents a correlation to
pallet and to area were the pallet is
allocated through the Kanban system.
Grey Fish – Sub Assembly and Cab
line. User location are A and B’s
Aisle’s
Grey Painted Pallet the Kanban Card
is on
6. - Each of animals and color in the
animals represents a correlation to
pallet and to area were the pallet is
allocated through the Kanban system.
Red Eagle- Everything on the South
Side of the production Line. User
location are E to 60S Aisle’s
Red Painted Pallet the Kanban Card is
on
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 5/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
7. - Each of animals and color in the
animals represents a correlation to
pallet and to area were the pallet is
allocated through the Kanban system.
-Blue Bear- Everything North of the
Production Line. User location are in
Aisle’s G
-Blue Painted Pallet the Kanban Card
is on
8. - Each of animals and color in the
animals represents a correlation to
pallet and to area were the pallet is
allocated through the Kanban system.
-Green Lion- Cab Line
User location are D Aisle
Red Painted Pallet the Kanban Card is
on
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 6/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
Pallet Cart Process
9. -The Material Handler picks up the
parts and gives them to the
assembler. The Material Handler is
responsible and accountable for
giving the right amount of parts to
the Kanban Card Pallet in quantity
and units the Kanban that is being
requested.
-The assembler is responsible for
emptying the cart and getting it
refilled on time.
One Cart System
10. -With a 2 part Pallet system when
the Kanban needs filled it is the
assembler’s responsibility to clean
and move the carts to the aisle area
to be refilled. The full cart is moved
towards the station to replace the
empty one.
Two Cart System
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 7/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
11. - The assembler is responsible for
emptying carts are picked up by the
tugger driver and taken to be
refilled. Empty Boxes must be
labeled with large “MT” on the
outside of the box in a location the
tugger driver can see.
12.
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 8/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
13.
14.
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 9/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
15.
16.
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 10/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
17.
18.
ISB EXHAUST
Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID
Mark Magrath/Lead A Internal 11/11
Standard Process Check Symbols:
Copies of this document are considered Uncontrolled and
used for Reference Only
Quality SWIP Critical Opt. Work Seq. Work SeqSafety
Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason
19.
20.

More Related Content

Similar to Kalmar Work Instructions 2015

Maintaining aggregates
Maintaining aggregatesMaintaining aggregates
Maintaining aggregatesSirisha Kumari
 
A case study of encouraging compliance with Spectrum data standards and proce...
A case study of encouraging compliance with Spectrum data standards and proce...A case study of encouraging compliance with Spectrum data standards and proce...
A case study of encouraging compliance with Spectrum data standards and proce...Axiell ALM
 
1010 introducing the new sap global batch traceability gbt key to manage qual...
1010 introducing the new sap global batch traceability gbt key to manage qual...1010 introducing the new sap global batch traceability gbt key to manage qual...
1010 introducing the new sap global batch traceability gbt key to manage qual...Sri Kumar
 
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...Yole Developpement
 
POS/409 ENTIRE CLASS UOP TUTORIALS
POS/409 ENTIRE CLASS UOP TUTORIALSPOS/409 ENTIRE CLASS UOP TUTORIALS
POS/409 ENTIRE CLASS UOP TUTORIALSSharon Reynolds
 
jabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdfjabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdfTraptiSharma28
 
Cs inhouse subcontracting process
Cs inhouse subcontracting processCs inhouse subcontracting process
Cs inhouse subcontracting processRamani Thinakaran
 
Scoping Workshop WrapupTemplate.ppt
Scoping Workshop WrapupTemplate.pptScoping Workshop WrapupTemplate.ppt
Scoping Workshop WrapupTemplate.pptshubhtomar5
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxwoodruffeloisa
 
Clip, Clip, Hooray! Get Just the Data You Need with Clipping
Clip, Clip, Hooray! Get Just the Data You Need with ClippingClip, Clip, Hooray! Get Just the Data You Need with Clipping
Clip, Clip, Hooray! Get Just the Data You Need with ClippingSafe Software
 
abapin21days.pdf
abapin21days.pdfabapin21days.pdf
abapin21days.pdfsampath k
 
RACI Team Practice
RACI Team PracticeRACI Team Practice
RACI Team PracticeMartin Ruddy
 
CV_Latest_Anbalagan
CV_Latest_AnbalaganCV_Latest_Anbalagan
CV_Latest_AnbalaganANBALAGAN A
 
Delvin bolling resume
Delvin bolling   resumeDelvin bolling   resume
Delvin bolling resumeDelvinBolling
 
IoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and MahindraIoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and MahindraSurendra Kancherla
 
Infrastructure as Code for Network
Infrastructure as Code for NetworkInfrastructure as Code for Network
Infrastructure as Code for NetworkDamien Garros
 
Agentless System Crawler - InterConnect 2016
Agentless System Crawler - InterConnect 2016Agentless System Crawler - InterConnect 2016
Agentless System Crawler - InterConnect 2016Canturk Isci
 

Similar to Kalmar Work Instructions 2015 (20)

Maintaining aggregates
Maintaining aggregatesMaintaining aggregates
Maintaining aggregates
 
A case study of encouraging compliance with Spectrum data standards and proce...
A case study of encouraging compliance with Spectrum data standards and proce...A case study of encouraging compliance with Spectrum data standards and proce...
A case study of encouraging compliance with Spectrum data standards and proce...
 
Usgage of ABAP in BI
Usgage of ABAP in BIUsgage of ABAP in BI
Usgage of ABAP in BI
 
1010 introducing the new sap global batch traceability gbt key to manage qual...
1010 introducing the new sap global batch traceability gbt key to manage qual...1010 introducing the new sap global batch traceability gbt key to manage qual...
1010 introducing the new sap global batch traceability gbt key to manage qual...
 
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
 
POS/409 ENTIRE CLASS UOP TUTORIALS
POS/409 ENTIRE CLASS UOP TUTORIALSPOS/409 ENTIRE CLASS UOP TUTORIALS
POS/409 ENTIRE CLASS UOP TUTORIALS
 
jabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdfjabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdf
 
Cs inhouse subcontracting process
Cs inhouse subcontracting processCs inhouse subcontracting process
Cs inhouse subcontracting process
 
Scoping Workshop WrapupTemplate.ppt
Scoping Workshop WrapupTemplate.pptScoping Workshop WrapupTemplate.ppt
Scoping Workshop WrapupTemplate.ppt
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
 
Clip, Clip, Hooray! Get Just the Data You Need with Clipping
Clip, Clip, Hooray! Get Just the Data You Need with ClippingClip, Clip, Hooray! Get Just the Data You Need with Clipping
Clip, Clip, Hooray! Get Just the Data You Need with Clipping
 
abapin21days.pdf
abapin21days.pdfabapin21days.pdf
abapin21days.pdf
 
RACI Team Practice
RACI Team PracticeRACI Team Practice
RACI Team Practice
 
CV_Latest_Anbalagan
CV_Latest_AnbalaganCV_Latest_Anbalagan
CV_Latest_Anbalagan
 
1030 iordanescu
1030 iordanescu1030 iordanescu
1030 iordanescu
 
8D Catalog.pdf
8D Catalog.pdf8D Catalog.pdf
8D Catalog.pdf
 
Delvin bolling resume
Delvin bolling   resumeDelvin bolling   resume
Delvin bolling resume
 
IoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and MahindraIoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
 
Infrastructure as Code for Network
Infrastructure as Code for NetworkInfrastructure as Code for Network
Infrastructure as Code for Network
 
Agentless System Crawler - InterConnect 2016
Agentless System Crawler - InterConnect 2016Agentless System Crawler - InterConnect 2016
Agentless System Crawler - InterConnect 2016
 

Kalmar Work Instructions 2015

  • 1. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 1/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Pallet Carts Process -The purpose of the documentation is to effectively explain and train on a new structured process and allow the associate to ask questions and fully understand what there responsibilities are for the tasks. This will set clear expectations on staying on pace “Tact Time” so that both parties are accountable for the actions of the task and process in place. Signing off on this documentation states that the associate takes full ownership and responsibilities for there actions for this process and task.
  • 2. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 2/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 1. - The way to identify the Kanban being a pallet cart is by the top of the Kanban stating Pallet Cart. -The part number that the Kanban card is utilizing. -The picture of the part. 2. -Description of the part. - The quantity amount that you are to fill to the Kanban. - There can also be a no number and the word FILL meaning you Fill to the maximum quantity the unit calls for that Pallet Cart Kanban example -So you would be FILL to the Maximum quantity of PCS for this Kanban
  • 3. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 3/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 3. -The type of unit you will be looking for. -Boxes -Pallets -Pcs ( Pieces) 4. -Under the Bulk Location the Box state ting IN and OUT will tell the Material Handler weather the part is Outside or Inside the warehouse. IN OUT
  • 4. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 4/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 5. - Each of animals and color in the animals represents a correlation to pallet and to area were the pallet is allocated through the Kanban system. Grey Fish – Sub Assembly and Cab line. User location are A and B’s Aisle’s Grey Painted Pallet the Kanban Card is on 6. - Each of animals and color in the animals represents a correlation to pallet and to area were the pallet is allocated through the Kanban system. Red Eagle- Everything on the South Side of the production Line. User location are E to 60S Aisle’s Red Painted Pallet the Kanban Card is on
  • 5. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 5/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 7. - Each of animals and color in the animals represents a correlation to pallet and to area were the pallet is allocated through the Kanban system. -Blue Bear- Everything North of the Production Line. User location are in Aisle’s G -Blue Painted Pallet the Kanban Card is on 8. - Each of animals and color in the animals represents a correlation to pallet and to area were the pallet is allocated through the Kanban system. -Green Lion- Cab Line User location are D Aisle Red Painted Pallet the Kanban Card is on
  • 6. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 6/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason Pallet Cart Process 9. -The Material Handler picks up the parts and gives them to the assembler. The Material Handler is responsible and accountable for giving the right amount of parts to the Kanban Card Pallet in quantity and units the Kanban that is being requested. -The assembler is responsible for emptying the cart and getting it refilled on time. One Cart System 10. -With a 2 part Pallet system when the Kanban needs filled it is the assembler’s responsibility to clean and move the carts to the aisle area to be refilled. The full cart is moved towards the station to replace the empty one. Two Cart System
  • 7. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 7/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 11. - The assembler is responsible for emptying carts are picked up by the tugger driver and taken to be refilled. Empty Boxes must be labeled with large “MT” on the outside of the box in a location the tugger driver can see. 12.
  • 8. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 8/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 13. 14.
  • 9. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 9/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 15. 16.
  • 10. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 10/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 17. 18.
  • 11. ISB EXHAUST Author / Updated By Approved / Owned by Version Valid From Document Sensitivity Page Document ID Mark Magrath/Lead A Internal 11/11 Standard Process Check Symbols: Copies of this document are considered Uncontrolled and used for Reference Only Quality SWIP Critical Opt. Work Seq. Work SeqSafety Insert Drawings/Images Here Sy mbol Step# Major Step Key Point Reason 19. 20.