SlideShare a Scribd company logo
1 of 1
Download to read offline
Owner
University of
Massachusetts
Medical School
EMC
Corporation
EMC
Corporation
DST Realty
Lincoln
Properties
Ave Maria
University, LLC
Columbus
Networks
Amerimar
Trizec
Properties, Inc
Massachusetts
Institute of
Technology
U.S. Navy -
NAVFAC South-
east
Raytheon Qualcomm Qualcomm
Project MassBiologics EMC
Corporation
EMC Corporation
Network Attached
Storage Center
Equiserve Massachusetts
Information
Technology Center
University Library
and Data Centers
Columbus
Networks
Warehouse
The Net-Works
Center
Innerbelt Bates High
Performance Lab
SPAWAR Data
Center at Naval
Weapons Station
Data Center Qualcomm Build-
ing W QCT Data
Center
Qualcomm Bldg E
MediaFlo
State Mattapan, MA Santa Clara, CA Southborough, MA Canton, MA Chelsea, MA Ave Maria, FL Boca Raton, FL Philadelphia, PA Somerville, MA Middleton, MA Charleston, SC Dulles, VA San Diego, CA San Diego, CA
Brief
Description
New building
housing research
and development
labs, wet labs,
and meeting and
teaching areas, as
well as a data center
that supports all
of UMass Medical
School’s campuses.
The data center
includes American
Power Conversion
(APC) server
room equipment,
uninterrupted
power supply
systems (UPS), a
standby generator,
a 5-ton emergency
chiller, a Novec
fire suppression
system, and an
extensive Technical
Assistance Center
(TAC) security
package.
Interior fit out
of two existing
four-story office
buildings, totaling
205,000 SF.
25,000 SF Tier
III data center
/ software
engineering labs,
full height offices
and conference
rooms, training
rooms, an executive
briefing center,
fitness center and
the renovation
of the existing
cafeteria.
Fast-track project.
Adaptive re-use
project involving a
complete interior
rehabilitation of the
existing 200,000
SF building into a
Network Attached
Storage Center.
New 25,000 SF
Tier III data
center/engineering
laboratories, offices,
utilities and a full
service cafeteria.
Fast-track project.
Fit-out of a three-
story, 189,000 SF
office building
consisted of three
simultaneous
phases: installation
of a 12,000 SF Tier
III data center/
server farm, the
tenant office
improvement work
and a five-floor
380-car pre-cast
concrete parking
garage.
Fast-track project.
Four-story, 460,000
SF data processing
center and office
building, containing
over 200,000 SF of
computer rooms.
Three 2,000 kw
back-up emergency
generators were
installed in the
rooftop penthouse,
and to full
substations were
installed in the
building.
Two Tier III data
centers providing
data services,
information
security, advanced
optical transport,
and stabilization
needed in
today’s world
of “on demand”
information.
Both network
centers utilize
Integrated
Datacenter Rack
Systems (IDRS).
with redundant N +
1 three-phase UPS
and main power
distribution units
and N + 1 rack
cooling.
12,000 SF Tier
III data center
building for tele-
communication
companies located
all over the world
to transmit data
overseas. The
facility includes
offices, a kitchen
and a conference
room for building
occupants. Two
generators and
a third transfer
switch intended for
emergency power
were also installed.
Fast-track project.
Extensive gut
renovation of The
Net-Works tele-
communications
and e-commerce
center. Providing
over 1,000,000 SF of
space.
E-commerce
tenants benefit
from the facility’s
several distinct
fiber lines and
telecommunication
infrastructure
variety.
Two new,
four-story tele-
communications
buildings with
385,000 SF of space.
Designed for
tenants with
intensive tele-
communications
requirements,
with the highest
quality fiber optic
access, security, and
power and cooling
capacity.
Renovation of an
existing 4,000
SF data center into
a high performance
research computing
facility and
an equipment
room. Project
included interior
demolition, raised
access flooring,
new chilled water,
complex electrical
and HVAC
upgrades and
office fit-out for a
computer network
room.
Design/Build of
the new Space and
Naval Warfare
Systems Command
(SPAWAR)
Data Center.
The 20,220 SF,
Tier III data center
includes office
space, redundant
mechanical
and electrical
systems, including:
uninterruptable
power supply
(UPS); generators;
access flooring;
utilities; parking;
site improvements;
accessibility and
antiterrorism force
protection (ATFP).
The project is
being designed
and constructed to
achieve LEED Silver
Certification.
Renovation of
Raytheon’s new
“Dulles Hub’
campus, with a goal
of LEED Silver. The
project consists
of consolidation
of two Rayheon
sectors: Raytheon
Intelligence &
Information
Systems, and
Raytheon Technical
Services Company.
Work includes:
New Tier III
Data Center; the
installation of
a new Mission
Critical Generator;
new duct bank
distribution
system; relamping/
replacement
of all fixtures;
SCIF space; and
reworking of the
existing 21 floors.
Fast-track project.
LEED Gold
Certified 12,000 SF
data center part of
the tenant broken
into two rooms - a
9,000 SF main data
center and a 3,000
SF data center
expansion space.
Backed up with
dual 1.6 Megawatt
APC systems for the
main data center &
dual 600 KW APC
systems for the Data
Center Expansion.
It is cooled with 42
CRAC units. The
entire area is on
a 30” raised floor
and is protected by
Argonite chemical
fire suppression
systems as well
as by pre-action
wet fire sprinkler
system.
22,000 SF tenant
improvement
project consisting
of high-end video
conference rooms,
office space, a 3,000
SF data center, and
a 3,000 SF network
operations center.
The data center
included OFCI
APC infrastructure
management
systems.
Size 110,000 SF 205,000 SF 200,000 SF 189,000 SF 460,000 SF 173,000 SF 12,000 SF 1,000,000 SF 385,000 SF 4,000 SF 20,220 SF 600,000 SF 103,000 SF 22,000 SF
Value $55,000,000 $20,375,000 $31,100,000 $20,700,000 $58,000,000 $36,000,000 $4,300,000 $40,000,000 $30,000,000 $3,100,000 $10,000,000 $26,000,000 $37,600,000 $7,700,000
Facility
Type
research,
administration, data
center
office, data center office, data center office, data center,
training rooms
office, data
center
offices, classrooms,
data centers, library,
student center,
central energy
plant, labs
office, data center office, data
center,
telecommunication
center
office, data center, computer center,
data center
data center,
office
data center,mission
critical generator,
office
office, lab, data
center
office, data center,
network operations
center, conference
rooms
Tier Level IV III III III III III III III III II III II
MIT Bates High Performance LabEMC Corporation MassBiologics Data Center
DATA CENTER EXPERIENCE
Qualcomm Bldg R Data Center Qualcomm Building W QCT Data Center
For further information on Suffolk’s capabilities, please contact either: Michael Walsh, Vice President Business Development, 978-223-9262
Robert Nichols, Project Executive, 978-223-9182

More Related Content

Similar to Data Center Experience Table Rob Nichols

SDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan BrochureSDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan Brochure
ArleneECarvalho
 
Alan Crosswell Canarie20090304
Alan Crosswell  Canarie20090304Alan Crosswell  Canarie20090304
Alan Crosswell Canarie20090304
Bill St. Arnaud
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016
Lee Hanvey
 
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHUREBLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
Berry Veney
 

Similar to Data Center Experience Table Rob Nichols (20)

Intergate.Seattle Brochure
Intergate.Seattle Brochure Intergate.Seattle Brochure
Intergate.Seattle Brochure
 
SDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan BrochureSDC Intergate.Manhattan Brochure
SDC Intergate.Manhattan Brochure
 
Intergate.ashburn brocure0315
Intergate.ashburn brocure0315 Intergate.ashburn brocure0315
Intergate.ashburn brocure0315
 
Alan Crosswell Canarie20090304
Alan Crosswell  Canarie20090304Alan Crosswell  Canarie20090304
Alan Crosswell Canarie20090304
 
Igq brochure web_0315
Igq brochure web_0315 Igq brochure web_0315
Igq brochure web_0315
 
Data Center Lessons Learned
Data Center Lessons LearnedData Center Lessons Learned
Data Center Lessons Learned
 
Thamesgate :Build Energy Efficient Data Centre for Server Choice
Thamesgate :Build Energy Efficient Data Centre for Server ChoiceThamesgate :Build Energy Efficient Data Centre for Server Choice
Thamesgate :Build Energy Efficient Data Centre for Server Choice
 
Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive
 
Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive Technology Meet Humanity - Opus Interactive
Technology Meet Humanity - Opus Interactive
 
Opus Interactive - Hillsboro, Oregon Data Center
Opus Interactive -  Hillsboro, Oregon  Data CenterOpus Interactive -  Hillsboro, Oregon  Data Center
Opus Interactive - Hillsboro, Oregon Data Center
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedin
 
HomeLand Defense Journal Conference
HomeLand Defense Journal ConferenceHomeLand Defense Journal Conference
HomeLand Defense Journal Conference
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016
 
Raritan Presents the Worlds Largest Data Centers
Raritan Presents the Worlds Largest Data CentersRaritan Presents the Worlds Largest Data Centers
Raritan Presents the Worlds Largest Data Centers
 
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHUREBLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
BLV PROFESSIONAL ENGINEERS - 2016 PROJECT BROCHURE
 
Intergate.Manhattan Brochure_022114
Intergate.Manhattan Brochure_022114Intergate.Manhattan Brochure_022114
Intergate.Manhattan Brochure_022114
 
Intergate.Seattle Brochure
Intergate.Seattle Brochure Intergate.Seattle Brochure
Intergate.Seattle Brochure
 
Cisco tech center y la tecnologia lan wireless herbert carrillo
Cisco tech center y la tecnologia lan wireless herbert carrilloCisco tech center y la tecnologia lan wireless herbert carrillo
Cisco tech center y la tecnologia lan wireless herbert carrillo
 
What Are Science Clouds?
What Are Science Clouds?What Are Science Clouds?
What Are Science Clouds?
 
[.ppt]
[.ppt][.ppt]
[.ppt]
 

Data Center Experience Table Rob Nichols

  • 1. Owner University of Massachusetts Medical School EMC Corporation EMC Corporation DST Realty Lincoln Properties Ave Maria University, LLC Columbus Networks Amerimar Trizec Properties, Inc Massachusetts Institute of Technology U.S. Navy - NAVFAC South- east Raytheon Qualcomm Qualcomm Project MassBiologics EMC Corporation EMC Corporation Network Attached Storage Center Equiserve Massachusetts Information Technology Center University Library and Data Centers Columbus Networks Warehouse The Net-Works Center Innerbelt Bates High Performance Lab SPAWAR Data Center at Naval Weapons Station Data Center Qualcomm Build- ing W QCT Data Center Qualcomm Bldg E MediaFlo State Mattapan, MA Santa Clara, CA Southborough, MA Canton, MA Chelsea, MA Ave Maria, FL Boca Raton, FL Philadelphia, PA Somerville, MA Middleton, MA Charleston, SC Dulles, VA San Diego, CA San Diego, CA Brief Description New building housing research and development labs, wet labs, and meeting and teaching areas, as well as a data center that supports all of UMass Medical School’s campuses. The data center includes American Power Conversion (APC) server room equipment, uninterrupted power supply systems (UPS), a standby generator, a 5-ton emergency chiller, a Novec fire suppression system, and an extensive Technical Assistance Center (TAC) security package. Interior fit out of two existing four-story office buildings, totaling 205,000 SF. 25,000 SF Tier III data center / software engineering labs, full height offices and conference rooms, training rooms, an executive briefing center, fitness center and the renovation of the existing cafeteria. Fast-track project. Adaptive re-use project involving a complete interior rehabilitation of the existing 200,000 SF building into a Network Attached Storage Center. New 25,000 SF Tier III data center/engineering laboratories, offices, utilities and a full service cafeteria. Fast-track project. Fit-out of a three- story, 189,000 SF office building consisted of three simultaneous phases: installation of a 12,000 SF Tier III data center/ server farm, the tenant office improvement work and a five-floor 380-car pre-cast concrete parking garage. Fast-track project. Four-story, 460,000 SF data processing center and office building, containing over 200,000 SF of computer rooms. Three 2,000 kw back-up emergency generators were installed in the rooftop penthouse, and to full substations were installed in the building. Two Tier III data centers providing data services, information security, advanced optical transport, and stabilization needed in today’s world of “on demand” information. Both network centers utilize Integrated Datacenter Rack Systems (IDRS). with redundant N + 1 three-phase UPS and main power distribution units and N + 1 rack cooling. 12,000 SF Tier III data center building for tele- communication companies located all over the world to transmit data overseas. The facility includes offices, a kitchen and a conference room for building occupants. Two generators and a third transfer switch intended for emergency power were also installed. Fast-track project. Extensive gut renovation of The Net-Works tele- communications and e-commerce center. Providing over 1,000,000 SF of space. E-commerce tenants benefit from the facility’s several distinct fiber lines and telecommunication infrastructure variety. Two new, four-story tele- communications buildings with 385,000 SF of space. Designed for tenants with intensive tele- communications requirements, with the highest quality fiber optic access, security, and power and cooling capacity. Renovation of an existing 4,000 SF data center into a high performance research computing facility and an equipment room. Project included interior demolition, raised access flooring, new chilled water, complex electrical and HVAC upgrades and office fit-out for a computer network room. Design/Build of the new Space and Naval Warfare Systems Command (SPAWAR) Data Center. The 20,220 SF, Tier III data center includes office space, redundant mechanical and electrical systems, including: uninterruptable power supply (UPS); generators; access flooring; utilities; parking; site improvements; accessibility and antiterrorism force protection (ATFP). The project is being designed and constructed to achieve LEED Silver Certification. Renovation of Raytheon’s new “Dulles Hub’ campus, with a goal of LEED Silver. The project consists of consolidation of two Rayheon sectors: Raytheon Intelligence & Information Systems, and Raytheon Technical Services Company. Work includes: New Tier III Data Center; the installation of a new Mission Critical Generator; new duct bank distribution system; relamping/ replacement of all fixtures; SCIF space; and reworking of the existing 21 floors. Fast-track project. LEED Gold Certified 12,000 SF data center part of the tenant broken into two rooms - a 9,000 SF main data center and a 3,000 SF data center expansion space. Backed up with dual 1.6 Megawatt APC systems for the main data center & dual 600 KW APC systems for the Data Center Expansion. It is cooled with 42 CRAC units. The entire area is on a 30” raised floor and is protected by Argonite chemical fire suppression systems as well as by pre-action wet fire sprinkler system. 22,000 SF tenant improvement project consisting of high-end video conference rooms, office space, a 3,000 SF data center, and a 3,000 SF network operations center. The data center included OFCI APC infrastructure management systems. Size 110,000 SF 205,000 SF 200,000 SF 189,000 SF 460,000 SF 173,000 SF 12,000 SF 1,000,000 SF 385,000 SF 4,000 SF 20,220 SF 600,000 SF 103,000 SF 22,000 SF Value $55,000,000 $20,375,000 $31,100,000 $20,700,000 $58,000,000 $36,000,000 $4,300,000 $40,000,000 $30,000,000 $3,100,000 $10,000,000 $26,000,000 $37,600,000 $7,700,000 Facility Type research, administration, data center office, data center office, data center office, data center, training rooms office, data center offices, classrooms, data centers, library, student center, central energy plant, labs office, data center office, data center, telecommunication center office, data center, computer center, data center data center, office data center,mission critical generator, office office, lab, data center office, data center, network operations center, conference rooms Tier Level IV III III III III III III III III II III II MIT Bates High Performance LabEMC Corporation MassBiologics Data Center DATA CENTER EXPERIENCE Qualcomm Bldg R Data Center Qualcomm Building W QCT Data Center For further information on Suffolk’s capabilities, please contact either: Michael Walsh, Vice President Business Development, 978-223-9262 Robert Nichols, Project Executive, 978-223-9182