Intergate.Seattle
East Campus
Intergate.Seattle
Intergate Seattle’s East Campus is Sabey’s flagship data center property. Its award-winning
operations team has maintained an excellent service record throughout the facility’s history,
providing a secure and reliable mission critical environment and making Intergate.East the choice
of many of the world’s best-known enterprises and institutions.
77 MW of abundant hydro-power at rates among the lowest in the nation ($.056/kWh) ensure
clean, cost-effective and predictable energy.

Building 3
5,888 rsf
Building 3 offers the same build to suit data center
design options as Building 5 in addition to these
flex-tech features:
46,014 rsf

48,447 rsf

•	 94,461 sf of flex-tech space available
•	 60’ X 26’9” typical column spacing
•	 24’ clear height
•	 Large floor loads and power availability

Main Floor
Building 5
However measured – 566,000 square feet or nine
football fields, Building 5 is a colossus. Originally
designed to accommodate a Boeing military project’s
huge power requirements, Building 5 comprises
300,000 square feet of data center floor. Equipped
with a robust and redundant electrical, mechanical
and fiber optic infrastructure, Building 5 provides
design flexibility and full customization – whether
raised floor or on slab, extra-tall racks or legacy
equipment, this data center can support them all.

Building 5
Floor 1 // 188,000 RSF
SDC42 Generators / UPS

Building 5 is also home to SDC52 and SDC42, Sabey’s
Tier 3 wholesale colocation facilities at Intergate.East.

Infrastructure
•	 Installed HVAC capacity:
9,500 tons

Building 5

•	 Electrical service to building:
56 MW @ 26kv from 2 separate distribution stations

SDC42

•	 Fiber providers: AT&T, CenturyLink, Abovenet,
XO Communications, Level 3, Integra, Clearwire,	
Zayo/ 360 Networks, PAETEC, Time Warner Telecom,
Cogent Communications, Spectrum Networks,
Verizon, Intergate.Exchange

Floor 2 // 188,000 RSF

Air Handler
OFFICE 4,036sf

Back-up Systems

SDC42

• 	 28 generators in an N+1 configuration

1,500 kW
per
module

• 	 Concurrently maintainable
• 	 Fuel Storage: 240,000 gallons
	 (6 x 40K gallon fuel tanks)

4203

• 	 72 hours run time at peak load

Seismic zone construction:
•	 Built to 125% of Zone 3 - “Critical Importance”
factor (as required for hospitals and fire stations)

Security

Building 5

• 	 Man traps with dual authentication access

Floor 3 // 188,000 RSF

• 	 Ballistic-rated building access
• 	 Critical environment monitoring and security
24/7/365
• 	 Building monitoring system

Structure
• 	 Building 5: 566,000 sf
• 	 Data floor: 300,000 sf
• 	 Additional office space on site
• 	 On-slab or 30” raised floor height
• 	 20’ clear height available

SDC52

Air Handler

4202
4201
Intergate.Seattle
West Campus

East Campus
S Othello St

509

South
Beacon Hill

99

W

Boeing Field
King County
International
Airport

ina
rg
Ma
ay
lW

1

8th Ave S

3

Rainier
Beach

10Gbs

10Gb
10Gbs
bs

Spokane

To C
h

icag

10Gbs

o

S

10Gbs
Tukwila

ac
on

Av
e

Bryn
Mawr-Skyway

S

Foster Golf
Course

SW S

Av
eS

u n set Blvd

SW 7th

42nd Ave S

ity

S

ay
W
Jr
ing
rK

York C

rA
ve
S

dS
ry R

To New

M ili t a

WA
Westin
Seattle

518
S 154th St

SeaTac
Seattle-Tacoma
International
Airport

inie

Re
nto
n

Blvd
ional
rnat
Inte
la
wi

The campus is located 12 minutes south of Downtown Seattle via I-5 and Hwy 99/599. Both
Boeing Field and Sea-Tac International Airport are approximately 5 minutes away, north and
south, respectively along Tukwila International Boulevard.

Sunset
Park

509

Be

Tuk

Intergate.Seattle is the largest privately owned multi-tenant campus on the West Coast.

e morial Dr

S 136th St

Des M
oine
sM

8th Ave S

Area Description

Hilltop
Park

Ra

Av
e

he

l Way
rgina

509

S 128th St

Re
nt
on

Martin Lu t

E Ma

5

99

Starfire Sports
Complex
518

S 162th St

y Way
Grad
SW

Westfield
Southcenter

SABEY DATA CENTERS
INTERGATE.EXCHANGE
NETWORK (IGX)

10Gbs

Be more competitive in a network-driven world.
Portland
10Gbs

PD
PDXPit
Pittock

OR

10Gbs

Boise

To California,
Arizona

ID

Intergate.Seattle comprises the East and West campuses, 1.4 million
sf of data center space. The two campuses are connected to each
other and to Seattle’s major carrier hotel by Intergate.Exchange
(IGX), Sabey Data Centers’ managed, carrier-neutral communications
network. IGX seamlessly connects all Sabey Data Center campuses
and their tenants, east coast and west, rapidly and exclusively.
Capacity is available from 1 Gps to 10 Gps, in both virtual point–topoint and fully-protected (redundant) configurations.

To D
Denver

For more information contact: info@sabeydatacenters.com

Power Players Award
SDC‘s turnkey datacenters, SDC52 and SDC42,
are the winner of Seattle City Light’s largest
Power Players Award for saving an estimated
six million kWhs at full build out. This combined
with Seattle’s moderate climate and air-side
economizer cooling shaves 60 – 70% off data
center cooling costs.
01.14

12201 Tukwila International Blvd. 4th Floor
Seattle, WA 98168 | Main 206.281.8700
sabeydatacenters.com

Intergate.Seattle Brochure

  • 1.
  • 2.
    Intergate.Seattle Intergate Seattle’s EastCampus is Sabey’s flagship data center property. Its award-winning operations team has maintained an excellent service record throughout the facility’s history, providing a secure and reliable mission critical environment and making Intergate.East the choice of many of the world’s best-known enterprises and institutions. 77 MW of abundant hydro-power at rates among the lowest in the nation ($.056/kWh) ensure clean, cost-effective and predictable energy. Building 3 5,888 rsf Building 3 offers the same build to suit data center design options as Building 5 in addition to these flex-tech features: 46,014 rsf 48,447 rsf • 94,461 sf of flex-tech space available • 60’ X 26’9” typical column spacing • 24’ clear height • Large floor loads and power availability Main Floor
  • 3.
    Building 5 However measured– 566,000 square feet or nine football fields, Building 5 is a colossus. Originally designed to accommodate a Boeing military project’s huge power requirements, Building 5 comprises 300,000 square feet of data center floor. Equipped with a robust and redundant electrical, mechanical and fiber optic infrastructure, Building 5 provides design flexibility and full customization – whether raised floor or on slab, extra-tall racks or legacy equipment, this data center can support them all. Building 5 Floor 1 // 188,000 RSF SDC42 Generators / UPS Building 5 is also home to SDC52 and SDC42, Sabey’s Tier 3 wholesale colocation facilities at Intergate.East. Infrastructure • Installed HVAC capacity: 9,500 tons Building 5 • Electrical service to building: 56 MW @ 26kv from 2 separate distribution stations SDC42 • Fiber providers: AT&T, CenturyLink, Abovenet, XO Communications, Level 3, Integra, Clearwire, Zayo/ 360 Networks, PAETEC, Time Warner Telecom, Cogent Communications, Spectrum Networks, Verizon, Intergate.Exchange Floor 2 // 188,000 RSF Air Handler OFFICE 4,036sf Back-up Systems SDC42 • 28 generators in an N+1 configuration 1,500 kW per module • Concurrently maintainable • Fuel Storage: 240,000 gallons (6 x 40K gallon fuel tanks) 4203 • 72 hours run time at peak load Seismic zone construction: • Built to 125% of Zone 3 - “Critical Importance” factor (as required for hospitals and fire stations) Security Building 5 • Man traps with dual authentication access Floor 3 // 188,000 RSF • Ballistic-rated building access • Critical environment monitoring and security 24/7/365 • Building monitoring system Structure • Building 5: 566,000 sf • Data floor: 300,000 sf • Additional office space on site • On-slab or 30” raised floor height • 20’ clear height available SDC52 Air Handler 4202 4201
  • 4.
    Intergate.Seattle West Campus East Campus SOthello St 509 South Beacon Hill 99 W Boeing Field King County International Airport ina rg Ma ay lW 1 8th Ave S 3 Rainier Beach 10Gbs 10Gb 10Gbs bs Spokane To C h icag 10Gbs o S 10Gbs Tukwila ac on Av e Bryn Mawr-Skyway S Foster Golf Course SW S Av eS u n set Blvd SW 7th 42nd Ave S ity S ay W Jr ing rK York C rA ve S dS ry R To New M ili t a WA Westin Seattle 518 S 154th St SeaTac Seattle-Tacoma International Airport inie Re nto n Blvd ional rnat Inte la wi The campus is located 12 minutes south of Downtown Seattle via I-5 and Hwy 99/599. Both Boeing Field and Sea-Tac International Airport are approximately 5 minutes away, north and south, respectively along Tukwila International Boulevard. Sunset Park 509 Be Tuk Intergate.Seattle is the largest privately owned multi-tenant campus on the West Coast. e morial Dr S 136th St Des M oine sM 8th Ave S Area Description Hilltop Park Ra Av e he l Way rgina 509 S 128th St Re nt on Martin Lu t E Ma 5 99 Starfire Sports Complex 518 S 162th St y Way Grad SW Westfield Southcenter SABEY DATA CENTERS INTERGATE.EXCHANGE NETWORK (IGX) 10Gbs Be more competitive in a network-driven world. Portland 10Gbs PD PDXPit Pittock OR 10Gbs Boise To California, Arizona ID Intergate.Seattle comprises the East and West campuses, 1.4 million sf of data center space. The two campuses are connected to each other and to Seattle’s major carrier hotel by Intergate.Exchange (IGX), Sabey Data Centers’ managed, carrier-neutral communications network. IGX seamlessly connects all Sabey Data Center campuses and their tenants, east coast and west, rapidly and exclusively. Capacity is available from 1 Gps to 10 Gps, in both virtual point–topoint and fully-protected (redundant) configurations. To D Denver For more information contact: info@sabeydatacenters.com Power Players Award SDC‘s turnkey datacenters, SDC52 and SDC42, are the winner of Seattle City Light’s largest Power Players Award for saving an estimated six million kWhs at full build out. This combined with Seattle’s moderate climate and air-side economizer cooling shaves 60 – 70% off data center cooling costs. 01.14 12201 Tukwila International Blvd. 4th Floor Seattle, WA 98168 | Main 206.281.8700 sabeydatacenters.com