SlideShare a Scribd company logo
1 of 4
Download to read offline
1
No Uraian Koef. Sat Harga sat
1 2 3 4 5
I. PEKERJAAN PASANGAN & PLESTERAN
1 Pasang Bata (M2)
Bata 70,000 Bh 500,00 35.000,00
PC 16,370 Kg 1.250,00 20.462,50
Pasir pasang 0,060 M3 80.000,00 4.800,00
Tukang batu 0,200 H/O 45.000,00 9.000,00
Kepala Tukang 0,020 H/O 50.000,00 1.000,00
Pekerja 0,350 H/O 35.000,00 12.250,00
Mandor 0,250 H/O 50.000,00 12.500,00
Jumlah 95.012,50
2 Plesteran (M2)
PC 6,950 Kg 1.250,00 8.687,50
Pasir pasang 0,029 M3 80.000,00 2.320,00
Tukang batu 0,200 H/O 45.000,00 9.000,00
Kepala Tukang 0,020 H/O 50.000,00 1.000,00
Pekerja 0,350 H/O 35.000,00 12.250,00
Mandor 0,035 H/O 50.000,00 1.750,00
Jumlah 35.007,50
II. PEKERJAAN KAYU
1
Kayu kruing 1,000 M3 9.000.000,00 9.000.000,00
Besi begel 8,000 Kg 12.000,00 96.000,00
Paku/baut 0,500 Kg 13.500,00 6.750,00
Tukang kayu 5,000 H/O 45.000,00 225.000,00
Kepala Tukang 1,150 H/O 50.000,00 57.500,00
Pekerja 3,000 H/O 35.000,00 105.000,00
Mandor 0,200 H/O 50.000,00 10.000,00
Jumlah 9.500.250,00
2 Pas nok/jurai, gording kayu (M3)
Kayu kruing 1,000 M3 9.000.000,00 9.000.000,00
Paku/baut 0,500 Kg 13.500,00 6.750,00
Tukang kayu 6,000 H/O 45.000,00 270.000,00
Kepala Tukang 1,120 H/O 50.000,00 56.000,00
Pekerja 4,500 H/O 35.000,00 157.500,00
Mandor 0,200 H/O 50.000,00 10.000,00
Jumlah 9.500.250,00
3
Kayu Kruing 0,022 M3 9.000.000,00 198.000,00
Reng jati 2/3 5,000 M' 3.500,00 17.500,00
Paku 0,250 Kg 13.500,00 3.375,00
Tukang kayu 0,300 H/O 45.000,00 13.500,00
Kepala Tukang 0,250 H/O 50.000,00 12.500,00
Pekerja 0,250 H/O 35.000,00 8.750,00
Mandor 0,010 H/O 50.000,00 500,00
Jumlah 254.125,00
4 Pas usuk ky kruing 5/7 (M2)
Kayu Kruing 0,022 M3 9.000.000,00 198.000,00
Paku 0,250 Kg 13.500,00 3.375,00
Tukang kayu 0,300 H/O 45.000,00 13.500,00
Kepala Tukang 0,025 H/O 50.000,00 1.250,00
Pekerja 0,250 H/O 35.000,00 8.750,00
Mandor 0,010 H/O 50.000,00 500,00
Jumlah 225.375,00
Pas usuk ky kruing 5/7 + reng jati 2/3 (M2)
ANALISA HARGA SATUAN
Jumlah
6=4X5
SNI 03-2836-2002
SNI-03-3434 -2002
Pas rangka atap/kuda kuda (M3)
2
5 Pas lisplang (M')
Kayu kruing 0,007 M3 9.000.000,00 63.000,00
Paku 0,200 Kg 13.500,00 2.700,00
Tukang kayu 0,220 H/O 45.000,00 9.900,00
Kepala Tukang 0,020 H/O 50.000,00 1.000,00
Pekerja 0,150 H/O 35.000,00 5.250,00
Mandor 0,070 H/O 50.000,00 3.500,00
Jumlah 85.350,00
6 Pas rangka plafon (M2)
Kayu kruing 0,013 M3 9.000.000,00 117.000,00
Paku 0,150 KG 13.500,00 2.025,00
Pekerja 0,250 H/O 35.000,00 8.750,00
Mandor 0,050 H/O 50.000,00 2.500,00
Tukang kayu 0,350 H/O 45.000,00 15.750,00
Kepala Tukang 0,035 H/O 50.000,00 1.750,00
Jumlah.............. 147.775,00
7 Pas plafond (M2)
Plafond gybsum 0,521 M2 75.000,00 39.062,50
Paku 0,200 KG 13.500,00 2.700,00
Pekerja 0,350 H/O 35.000,00 12.250,00
Mandor 0,070 H/O 50.000,00 3.500,00
Tukang kayu 0,350 H/O 45.000,00 15.750,00
Kepala Tukang 0,035 H/O 50.000,00 1.750,00
Jumlah 75.012,50
8 Pasang genteng (M2)
Genteng galvalum 1,000 M2 175.000,00 175.000,00
Tukang kayu 0,065 H/O 45.000,00 2.925,00
Kepala Tukang 0,006 H/O 50.000,00 300,00
Pekerja 0,600 H/O 35.000,00 21.000,00
Mandor 0,015 H/O 50.000,00 750,00
Jumlah 199.975,00
9 Pasang bubungan galvalum (M')
Bubungan 1,000 M' 60.000,00 60.000,00
Paku 0,200 Kg 1.250,00 250,00
Tukang batu 0,300 H/O 45.000,00 13.500,00
Kepala Tukang 0,030 H/O 50.000,00 1.500,00
Pekerja 0,270 H/O 35.000,00 9.450,00
Mandor 0,001 H/O 50.000,00 70,00
Jumlah 84.770,00
10 Pasang talang (M')
Seng BJLS 0.30 lebar 80 cm 1,000 M' 35.000,00 35.000,00
Papan Kayu Meranti 0,004 M3 5.750.000,00 23.000,00
Paku 0,100 Kg 13.500,00 1.350,00
Tukang besi 0,400 H/O 45.000,00 18.000,00
Kepala tukang 0,040 H/O 50.000,00 2.000,00
Pekerja 0,300 H/O 35.000,00 10.500,00
Mandor 0,015 H/O 50.000,00 750,00
Jumlah 90.600,00
11 Pasang papan list tb. 2 cm (M2)
Kayu kruing 0,035 M3 9.000.000,00 315.000,00
Paku 0,120 Kg 13.500,00 1.620,00
Tukang kayu 0,700 H/O 45.000,00 31.500,00
Kepala Tukang 0,070 H/O 50.000,00 3.500,00
Pekerja 0,280 H/O 35.000,00 9.800,00
Mandor 0,014 H/O 50.000,00 700,00
362.120,00
1M' papan list lebar 25 cm (B2) = 0,25 362.120,00 90.530,00
3
III. PEKERJAAN LANTAI
1
Kermaik 20/25 1,000 M2 65.000,00 65.000,00
PC 11,380 Kg 1.250,00 14.225,00
Pasir Pasang 0,042 M3 80.000,00 3.360,00
PC warna 1,500 KG 6.000,00 9.000,00
Tukang batu 0,420 H/O 45.000,00 18.900,00
Kepala Tukang 0,042 H/O 50.000,00 2.100,00
Pekerja 0,620 H/O 35.000,00 21.700,00
Mandor 0,030 H/O 50.000,00 1.500,00
Jumlah 135.785,00
2
Kermaik 30/30 1,000 M2 80.000,00 80.000,00
PC 11,380 Kg 1.250,00 14.225,00
Pasir Pasang 0,042 M3 80.000,00 3.360,00
PC warna 1,500 KG 6.000,00 9.000,00
Tukang batu 0,420 H/O 45.000,00 18.900,00
Kepala Tukang 0,042 H/O 50.000,00 2.100,00
Pekerja 0,620 H/O 35.000,00 21.700,00
Mandor 0,030 H/O 50.000,00 1.500,00
Jumlah 150.785,00
IV. PEKERJAAN CAT
1 Meni kayu (M2)
Meni kayu 0,200 Kg 20.000,00 4.000,00
Minyak cat 0,075 Kg 17.500,00 1.312,50
Tukang cat 0,009 H/O 45.000,00 405,00
Kepala Tukang 0,008 H/O 50.000,00 375,00
Pekerja 0,050 H/O 35.000,00 1.750,00
Mandor 0,003 H/O 50.000,00 125,00
Jumlah 7.967,50
2 Cat besi dan kayu (M2)
Meni kayu 0,200 Kg 20.000,00 4.000,00
Cat kayu 0,630 Kg 45.000,00 28.350,00
Dempul kayu 0,250 Kg 15.000,00 3.750,00
Tukang Cat 0,068 H/O 45.000,00 3.060,00
Kepala Tukang 0,006 H/O 50.000,00 300,00
Pekerja 0,070 H/O 35.000,00 2.450,00
Mandor 0,003 H/O 50.000,00 125,00
Jumlah 42.035,00
3 Cat dinding (M2)
Plamur tembok 0,380 Kg 15.000,00 5.700,00
Cat tembok 0,530 Kg 55.000,00 29.150,00
Tukang cat 0,060 H/O 45.000,00 2.700,00
Kepala Tukang 0,006 H/O 50.000,00 300,00
Pekerja 0,060 H/O 35.000,00 2.100,00
Mandor 0,002 H/O 50.000,00 110,00
Jumlah 40.060,00
4 Cat plafond (M2)
Plamur tembok 0,200 Kg 15.000,00 3.000,00
Cat tembok 0,510 Kg 55.000,00 28.050,00
Tukang cat 0,045 H/O 45.000,00 2.025,00
Kepala Tukang 0,005 H/O 50.000,00 250,00
Pekerja 0,045 H/O 35.000,00 1.575,00
Mandor 0,002 H/O 50.000,00 110,00
Jumlah 35.010,00
5 Pek. finishing politur (M2)
Mendempul+menggosok kayu
Plamur tembok 0,080 Kg 15.000,00 = Rp. 1.200,00
Batu apung 0,010 Kg 50.000,00 = Rp. 500,00
Tukang cat 0,040 H/O 45.000,00 = Rp. 1.800,00
Kepala Tukang 0,004 H/O 50.000,00 = Rp. 200,00
Pekerja 0,040 H/O 35.000,00 = Rp. 1.400,00
Mandor 0,0025 H/O 50.000,00 = Rp. 125,00
Jumlah ( a ) 5.225,00
SNI- BSN '02 ED.REVISI
Pasang lantai keramik 20/25 (M2)
Pasang lantai keramik 30/30 (M2)
SNI- BSN '02 ED.REVISI
4
Politur kayu
Bahan politur 0,522 LT 35.000,00 = Rp. 18.270,00
Amplas 0,100 LB 3.500,00 = Rp. 350,00
Tukang cat 0,060 H/O 45.000,00 = Rp. 2.700,00
Kepala Tukang 0,016 H/O 50.000,00 = Rp. 800,00
Mandor 0,0025 H/O 50.000,00 = Rp. 125,00
Jumlah ( b ) 22.245,00
Jadi untuk 1 m2 pek. Polituran Jumlah (a + b) 27.470,00

More Related Content

Featured

Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 

Featured (20)

Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 

Analisa amkt solo

  • 1. 1 No Uraian Koef. Sat Harga sat 1 2 3 4 5 I. PEKERJAAN PASANGAN & PLESTERAN 1 Pasang Bata (M2) Bata 70,000 Bh 500,00 35.000,00 PC 16,370 Kg 1.250,00 20.462,50 Pasir pasang 0,060 M3 80.000,00 4.800,00 Tukang batu 0,200 H/O 45.000,00 9.000,00 Kepala Tukang 0,020 H/O 50.000,00 1.000,00 Pekerja 0,350 H/O 35.000,00 12.250,00 Mandor 0,250 H/O 50.000,00 12.500,00 Jumlah 95.012,50 2 Plesteran (M2) PC 6,950 Kg 1.250,00 8.687,50 Pasir pasang 0,029 M3 80.000,00 2.320,00 Tukang batu 0,200 H/O 45.000,00 9.000,00 Kepala Tukang 0,020 H/O 50.000,00 1.000,00 Pekerja 0,350 H/O 35.000,00 12.250,00 Mandor 0,035 H/O 50.000,00 1.750,00 Jumlah 35.007,50 II. PEKERJAAN KAYU 1 Kayu kruing 1,000 M3 9.000.000,00 9.000.000,00 Besi begel 8,000 Kg 12.000,00 96.000,00 Paku/baut 0,500 Kg 13.500,00 6.750,00 Tukang kayu 5,000 H/O 45.000,00 225.000,00 Kepala Tukang 1,150 H/O 50.000,00 57.500,00 Pekerja 3,000 H/O 35.000,00 105.000,00 Mandor 0,200 H/O 50.000,00 10.000,00 Jumlah 9.500.250,00 2 Pas nok/jurai, gording kayu (M3) Kayu kruing 1,000 M3 9.000.000,00 9.000.000,00 Paku/baut 0,500 Kg 13.500,00 6.750,00 Tukang kayu 6,000 H/O 45.000,00 270.000,00 Kepala Tukang 1,120 H/O 50.000,00 56.000,00 Pekerja 4,500 H/O 35.000,00 157.500,00 Mandor 0,200 H/O 50.000,00 10.000,00 Jumlah 9.500.250,00 3 Kayu Kruing 0,022 M3 9.000.000,00 198.000,00 Reng jati 2/3 5,000 M' 3.500,00 17.500,00 Paku 0,250 Kg 13.500,00 3.375,00 Tukang kayu 0,300 H/O 45.000,00 13.500,00 Kepala Tukang 0,250 H/O 50.000,00 12.500,00 Pekerja 0,250 H/O 35.000,00 8.750,00 Mandor 0,010 H/O 50.000,00 500,00 Jumlah 254.125,00 4 Pas usuk ky kruing 5/7 (M2) Kayu Kruing 0,022 M3 9.000.000,00 198.000,00 Paku 0,250 Kg 13.500,00 3.375,00 Tukang kayu 0,300 H/O 45.000,00 13.500,00 Kepala Tukang 0,025 H/O 50.000,00 1.250,00 Pekerja 0,250 H/O 35.000,00 8.750,00 Mandor 0,010 H/O 50.000,00 500,00 Jumlah 225.375,00 Pas usuk ky kruing 5/7 + reng jati 2/3 (M2) ANALISA HARGA SATUAN Jumlah 6=4X5 SNI 03-2836-2002 SNI-03-3434 -2002 Pas rangka atap/kuda kuda (M3)
  • 2. 2 5 Pas lisplang (M') Kayu kruing 0,007 M3 9.000.000,00 63.000,00 Paku 0,200 Kg 13.500,00 2.700,00 Tukang kayu 0,220 H/O 45.000,00 9.900,00 Kepala Tukang 0,020 H/O 50.000,00 1.000,00 Pekerja 0,150 H/O 35.000,00 5.250,00 Mandor 0,070 H/O 50.000,00 3.500,00 Jumlah 85.350,00 6 Pas rangka plafon (M2) Kayu kruing 0,013 M3 9.000.000,00 117.000,00 Paku 0,150 KG 13.500,00 2.025,00 Pekerja 0,250 H/O 35.000,00 8.750,00 Mandor 0,050 H/O 50.000,00 2.500,00 Tukang kayu 0,350 H/O 45.000,00 15.750,00 Kepala Tukang 0,035 H/O 50.000,00 1.750,00 Jumlah.............. 147.775,00 7 Pas plafond (M2) Plafond gybsum 0,521 M2 75.000,00 39.062,50 Paku 0,200 KG 13.500,00 2.700,00 Pekerja 0,350 H/O 35.000,00 12.250,00 Mandor 0,070 H/O 50.000,00 3.500,00 Tukang kayu 0,350 H/O 45.000,00 15.750,00 Kepala Tukang 0,035 H/O 50.000,00 1.750,00 Jumlah 75.012,50 8 Pasang genteng (M2) Genteng galvalum 1,000 M2 175.000,00 175.000,00 Tukang kayu 0,065 H/O 45.000,00 2.925,00 Kepala Tukang 0,006 H/O 50.000,00 300,00 Pekerja 0,600 H/O 35.000,00 21.000,00 Mandor 0,015 H/O 50.000,00 750,00 Jumlah 199.975,00 9 Pasang bubungan galvalum (M') Bubungan 1,000 M' 60.000,00 60.000,00 Paku 0,200 Kg 1.250,00 250,00 Tukang batu 0,300 H/O 45.000,00 13.500,00 Kepala Tukang 0,030 H/O 50.000,00 1.500,00 Pekerja 0,270 H/O 35.000,00 9.450,00 Mandor 0,001 H/O 50.000,00 70,00 Jumlah 84.770,00 10 Pasang talang (M') Seng BJLS 0.30 lebar 80 cm 1,000 M' 35.000,00 35.000,00 Papan Kayu Meranti 0,004 M3 5.750.000,00 23.000,00 Paku 0,100 Kg 13.500,00 1.350,00 Tukang besi 0,400 H/O 45.000,00 18.000,00 Kepala tukang 0,040 H/O 50.000,00 2.000,00 Pekerja 0,300 H/O 35.000,00 10.500,00 Mandor 0,015 H/O 50.000,00 750,00 Jumlah 90.600,00 11 Pasang papan list tb. 2 cm (M2) Kayu kruing 0,035 M3 9.000.000,00 315.000,00 Paku 0,120 Kg 13.500,00 1.620,00 Tukang kayu 0,700 H/O 45.000,00 31.500,00 Kepala Tukang 0,070 H/O 50.000,00 3.500,00 Pekerja 0,280 H/O 35.000,00 9.800,00 Mandor 0,014 H/O 50.000,00 700,00 362.120,00 1M' papan list lebar 25 cm (B2) = 0,25 362.120,00 90.530,00
  • 3. 3 III. PEKERJAAN LANTAI 1 Kermaik 20/25 1,000 M2 65.000,00 65.000,00 PC 11,380 Kg 1.250,00 14.225,00 Pasir Pasang 0,042 M3 80.000,00 3.360,00 PC warna 1,500 KG 6.000,00 9.000,00 Tukang batu 0,420 H/O 45.000,00 18.900,00 Kepala Tukang 0,042 H/O 50.000,00 2.100,00 Pekerja 0,620 H/O 35.000,00 21.700,00 Mandor 0,030 H/O 50.000,00 1.500,00 Jumlah 135.785,00 2 Kermaik 30/30 1,000 M2 80.000,00 80.000,00 PC 11,380 Kg 1.250,00 14.225,00 Pasir Pasang 0,042 M3 80.000,00 3.360,00 PC warna 1,500 KG 6.000,00 9.000,00 Tukang batu 0,420 H/O 45.000,00 18.900,00 Kepala Tukang 0,042 H/O 50.000,00 2.100,00 Pekerja 0,620 H/O 35.000,00 21.700,00 Mandor 0,030 H/O 50.000,00 1.500,00 Jumlah 150.785,00 IV. PEKERJAAN CAT 1 Meni kayu (M2) Meni kayu 0,200 Kg 20.000,00 4.000,00 Minyak cat 0,075 Kg 17.500,00 1.312,50 Tukang cat 0,009 H/O 45.000,00 405,00 Kepala Tukang 0,008 H/O 50.000,00 375,00 Pekerja 0,050 H/O 35.000,00 1.750,00 Mandor 0,003 H/O 50.000,00 125,00 Jumlah 7.967,50 2 Cat besi dan kayu (M2) Meni kayu 0,200 Kg 20.000,00 4.000,00 Cat kayu 0,630 Kg 45.000,00 28.350,00 Dempul kayu 0,250 Kg 15.000,00 3.750,00 Tukang Cat 0,068 H/O 45.000,00 3.060,00 Kepala Tukang 0,006 H/O 50.000,00 300,00 Pekerja 0,070 H/O 35.000,00 2.450,00 Mandor 0,003 H/O 50.000,00 125,00 Jumlah 42.035,00 3 Cat dinding (M2) Plamur tembok 0,380 Kg 15.000,00 5.700,00 Cat tembok 0,530 Kg 55.000,00 29.150,00 Tukang cat 0,060 H/O 45.000,00 2.700,00 Kepala Tukang 0,006 H/O 50.000,00 300,00 Pekerja 0,060 H/O 35.000,00 2.100,00 Mandor 0,002 H/O 50.000,00 110,00 Jumlah 40.060,00 4 Cat plafond (M2) Plamur tembok 0,200 Kg 15.000,00 3.000,00 Cat tembok 0,510 Kg 55.000,00 28.050,00 Tukang cat 0,045 H/O 45.000,00 2.025,00 Kepala Tukang 0,005 H/O 50.000,00 250,00 Pekerja 0,045 H/O 35.000,00 1.575,00 Mandor 0,002 H/O 50.000,00 110,00 Jumlah 35.010,00 5 Pek. finishing politur (M2) Mendempul+menggosok kayu Plamur tembok 0,080 Kg 15.000,00 = Rp. 1.200,00 Batu apung 0,010 Kg 50.000,00 = Rp. 500,00 Tukang cat 0,040 H/O 45.000,00 = Rp. 1.800,00 Kepala Tukang 0,004 H/O 50.000,00 = Rp. 200,00 Pekerja 0,040 H/O 35.000,00 = Rp. 1.400,00 Mandor 0,0025 H/O 50.000,00 = Rp. 125,00 Jumlah ( a ) 5.225,00 SNI- BSN '02 ED.REVISI Pasang lantai keramik 20/25 (M2) Pasang lantai keramik 30/30 (M2) SNI- BSN '02 ED.REVISI
  • 4. 4 Politur kayu Bahan politur 0,522 LT 35.000,00 = Rp. 18.270,00 Amplas 0,100 LB 3.500,00 = Rp. 350,00 Tukang cat 0,060 H/O 45.000,00 = Rp. 2.700,00 Kepala Tukang 0,016 H/O 50.000,00 = Rp. 800,00 Mandor 0,0025 H/O 50.000,00 = Rp. 125,00 Jumlah ( b ) 22.245,00 Jadi untuk 1 m2 pek. Polituran Jumlah (a + b) 27.470,00