2. POLICY and OBJECTIVES
My quality policy is to achieve sustained, profitable growth for the
company by providing services which consistently satisfy the needs and
surpass the expectations of its customers.
This level of quality is achieved through adoption of a system of
procedures that reflect the competence of the Company to existing
customers, potential customers, and independent auditing authorities.
Achievement of this policy involves all staff, who are individually
responsible for the quality of their work, resulting in a continually
improving working environment for all.
As the Director of Operations, I ensure that this policy is provided and
explained to each employee. To achieve and maintain the required level
of competence, I retain responsibility for the Quality System with routine
operations controlled by my team.
Burj Khalifa – 150 Floor – Diamond Showroom – Al Qurashi Group KSA
3. Work Ethics
Working in both contemporary and traditional styles, I have
worked on projects to suit the individual client's requirements.
My work entails new construction, remodeling and renovation
of a variety of specialized, prominent and successful
environments.
My work ethics are about relationships. They are about achieving
the right balance between cost, quality and finishing within the
given time schedule.
I am happy to support my Clients in achieving their targets in
the spirit and direction of their company’s growth.the spirit and direction of their company’s growth.
Skilled in the coordination of design/construction teams, my
associates coordinate the preliminary conceptual stage through
the completed implementation of a project under my guidance
and supervision.
I find that the value of good design for the client is a positive
investment that is rewarding and long lasting.
Zabeel Sports Club – Zabeel Palace – Dubai
4. If it isn’t perfect, it isn’t finished. To some, that
is an extreme expectation. To me, it is the level
of quality I expect from my team.
My mission is to make every client completely
satisfied with their project.
To help ensure this high level of quality, I work
as a team, to develop solutions that will fulfill a
clients’ desires.
Forming a relationship is very important.Forming a relationship is very important.
Projects that look good on paper can often be
difficult to implement in the real world.
I work as partner and colleague and my Team
is able to turn problems into opportunities.
Al Lisaili Camel Racing Club
9. MBH Fortune Executive JLT Dubai
Execution of Fit-out Projects
•To maintain an Effective Quality Assurance System.
•b) To achieve and maintain a level of Professionalism which enhances the Company's Reputation with customers.
•c) To ensure compliance with relevant Statutory and Health and
•d) To endeavor, at all times, to Maximize Customer Satisfaction
MBH Fortune Executive JLT Dubai
rofessionalism which enhances the Company's Reputation with customers.
c) To ensure compliance with relevant Statutory and Health and Safety requirements.
aximize Customer Satisfaction.
13. Dr Hareb Al Muhairy – Private VillaPrivate Villa - Design and Turnkey Fit Out - Khawaneej Dubai
14. Dr Hareb Al Muhairy
Private Villa
Khawaneej Dubai
15. Laboratory
•Panacea Biotech Ltd., Okhla phase - I, New
Delhi. - 18,000 sqft Interior Design and Fit out
•Panacea Biotech Ltd., R & D Centre, Mohali,
Punjab – 50,000 sqft. Interior Design and Fit
out
16.
17. AZIZI STAR
Furnished Apartments
Furniture & Furnishings
Dubai
Al Wasl Properties Marble
Installation 40 Villas Dubai
Aldar Properties Kitchen Design
and Fit – out 90 Apartments
Sharjah
US Embassy OmanUS Embassy Oman
Interior and Exterior Painting
18. Corporate Offices
•Office Fit – out – Lenovo - Media Cuty Dubai
•Crestron Control and Automation Solutions
- BCT Towers
•
•Truly Nolen – Deira Business Park
•Blue Diamond Fire Systems – Dubai
Financial Center
•Vintage Bloom - 3 offices – Jumeirah Lake
Towers
•Business Center - Fit- out – Dubai - Key
Business group
•Private offices – Fit- out – Dubai – Al
RostamaniRostamani
•Private Office – PROJACS – Al Barsha
•Arbift Tower – Business Center 26, 000 Sq
ft.– Fit- out – Dubai
•Factory, Warehouse and Offices – Jebel Ali –
30,000 Sq. ft.– Turnkey - Dubai
•Office Legal Advisors – BCT Tower
•Office – Business Village – Mr. Essa Al Zaabi
•Office – Business Village – Mr. Ahmad Al
Bannai lawyers
•Office – Emaar square – Anjarwalla and
Khanna Lawyers
19. AIRTEL , Gurgaon , 80,000 Sft 11000 sq ft
Office Turnkey fit outOffice Turnkey fit out
Dubai
20. Office Projects
•Panacea Biotech Ltd., Admin. and Prod., Baddi, H.P. – 150,000 sqft. (
INTERIOR Design and Built OF ADMINISTRATION AREA, PRODUCTION STAFF
AREA, WASHROOMS AND CHANGE ROOMS, FIRST AID & SECURITY CHECK
ROOM, WAREHOUSE STAFF AREA)
•AIRTEL , Gurgaon , 80,000 Sft . ( DESIGN AND BUILT OF MARKETING AREA ,
2 floors 20000 sft each , BREAKOUT ZONE , BUSSINESS RELATION AREA,
CENTRAL COURTYARD CAFETERIA.)
•Tata Teleservices ( Mohali) Punjab. ( INTERIOR FITOUT JOB FOR ZONAL
OFFICE , Staff workstation , False ceiling, meeting and conference room fit
out)
21. Skilled in Coordination Design and
Construction
Oversee the preliminary Conceptual Stage
through to the Complete Implementation of
a project.
22. Some Projects
Hotel Yas marina circuit
DIFC Crown Plaza
Meydan hotel
Trader Vics - Dubai
Dusit Thani - Dubai –
Damac – Towers
Rotana Hotel Jumeirah
Fairmont Dubai
Atlantis Dubai
Hotel Jumeirah Saraya
Emirates Towers Hotel
Convention Center – Qatar
Armani Hotel
Europe Hotel – Baku Azerbaijan
Radisson SAS – Moscow
Restoration of Protected Buildings and Churches – Moscow
Luxury Apartments – Knightsbridge, Hyde Park – London
Grade II listed building – Restoration and Refurbishment –
Regent’s Park – London
Fairmont – Fujairah
Palace – Yas Island – HH Shk Nahyan
30. Fortune 1 Group
5 * Hotel Abu Dhabi
14 Floor – Sheesha Bar
Baku - Restaurant
Fortune Hotel Premium Abu DhabiFortune Hotel Premium Abu Dhabi
31.
32.
33.
34. Private Yacht for Sheikh Nahyan
Ruler of UAE
My work ethics are about achieving the right balance
between Cost, Quality and Finishing within the
given Time Schedule