BUKA Power Plant Consultants
Efficiency Through Innovation
ARAR
OPPORTUNITIES OF WORKING
TOGETHER BETWEEN BUKA AND
CUSTOMER
Place: Chennai
Date:
Efficiency Through Innovation
BUKA Power Plant Consultants
Introduction
BUKA Power Plant Consultants Pvt. Ltd. is a company headquartered at
Chennai, which is promoted by experienced engineers with power plant
background.
The Main objective of the company is to increase energy efficiency of
existing power plants through Up-Gradation & Redesign of existing
systems by adopting proven technology developments that are in current
practice.
The company has a tie up with LOESCHE, UK for pulveriser Classifier
upgrade – Introduction of Dynamic Classifier.
Apart from having engineers of skills in design, engineering and
execution, Company has tied up with experts in specific areas.
Efficiency Through Innovation
BUKA Power Plant Consultants
Scenario: New Challenges - Imperatives
Power
Plant
Efficient
performance
Compliance
to
EC Act 2010
(PENALITIES)
Energy Savings
Target 48%
PAT
(INCENTIVE)
Efficiency Through Innovation
BUKA Power Plant Consultants
New Challenges - Opportunities
Improvement
Segments
• Efficiency
improvement by
tapping all the
opportunities
• Availability
improvement through
strategic planning
• Technical Upgrades
through Improved
Technologies.
Process
• Standardizing O&M
processes and
procedures
• Training the
personnel
Monitoring
Improvements
• Task Forces
• Identify
• Evaluate
• Monitor
• Certify
Efficiency Through Innovation
BUKA Power Plant Consultants
Efficiency Improvement Areas
Thermal efficiency improvement
by reducing leaving gas
temperature
Thermal efficiency
improvement by reducing
leaving gas temperature
Combustion efficiency
improvement through Mill
product fineness
Boiler setting , F&D expansion
joints,APH leakages reduction,
Auxiliary power reduction
Introduction of Dry bottom ash
handling
Co-firing of Biomass
Boiler
Efficiency Through Innovation
BUKA Power Plant Consultants
Combustion Efficiency - Challenge
Temperature
Good
combustion
Time
Turbulence
Smaller the size of Coal particle, better the chances for higher
Combustion Efficiency . Coal Mill is the key auxiliary Equipment..
General Scenario in Plants
Efficiency Through Innovation
BUKA Power Plant Consultants
OWNER
BUYS PLANT FROM
REPUTED
SUPPLIER(OEM) WITH
HELP FROM THEIR
CONSULTANT
OEM DELIEVERS
SYSTEMS &
EQUIPMENTS,
COMMISSIONS &HAND
OVER TO
CUSTOMER(OBJECTIVE IS
TO CLOSE CONTRACT)
MANAGE O&M BY SELF
WITH REPUTED SPECALIST
O&M COMPANY
DEVELOP LOCAL
SUPPLIERS & MAINTANACE
CONTRACTORS TO MEET
DAILY NEEDS
Efficiency Through Innovation
BUKA Power Plant Consultants
Scenario: New Challenges - Imperatives
TARGET IMPROVE
MARGINS
WHO IS
RESPONSIBLE
FOR
IMPROVEMENTS
SMALL BY O&M
TEAM
MEDIUM TO BIG
ONES BY OEM/
EQUIVALENT
LONG SHUT
IMPACTS
FINANCIALS
OEM`S INTEREST
DEPENDS ON
VALUE OF JOB
GAP
BUKA FILLS THE GAP
WITH OEM
EXPERTISE
KNOWLEDGE
THROUGH
INCREMENTAL
IMPROVEMENTS IN
MOST COST
EFFECTIVE WAY
PLANT LOCAL
CONTRACTOR
KNOWLEDGE
LIMITATION
INSTRUCTION
BASED&SKILL IN
CARRYING WORK
Efficiency Through Innovation
BUKA Power Plant Consultants
To Recap Objectives of BUKA
 To provide boiler performance improvement services
 Efficiency improvement
 Availability improvement
 To provide services to improve the performance / up grade
coal mills.
 To help meeting the statutory requirements.
 To be your partner in cost reduction
Efficiency Through Innovation
BUKA Power Plant Consultants

More Related Content

What's hot

RE:NEW Programme
RE:NEW ProgrammeRE:NEW Programme
RE:NEW ProgrammeEMEX
 
MC.01A-Safari CV.PBL_141217
MC.01A-Safari CV.PBL_141217MC.01A-Safari CV.PBL_141217
MC.01A-Safari CV.PBL_141217Don Brodhecker
 
How do you maintain a comfortable recreation facility whilst minimizing energ...
How do you maintain a comfortable recreation facility whilst minimizing energ...How do you maintain a comfortable recreation facility whilst minimizing energ...
How do you maintain a comfortable recreation facility whilst minimizing energ...VeoliaANZ
 
Fenerbahce Ülker Arena - Stadium lighting project with GE
Fenerbahce Ülker Arena - Stadium lighting project with GEFenerbahce Ülker Arena - Stadium lighting project with GE
Fenerbahce Ülker Arena - Stadium lighting project with GEGE Lighting Europe
 
Marafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINALMarafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINALEmily Getty
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project developmentGreenQ Partners
 
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...sdchrosis
 

What's hot (14)

A3_solatubes_vsf
A3_solatubes_vsfA3_solatubes_vsf
A3_solatubes_vsf
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 
RE:NEW Programme
RE:NEW ProgrammeRE:NEW Programme
RE:NEW Programme
 
MC.01A-Safari CV.PBL_141217
MC.01A-Safari CV.PBL_141217MC.01A-Safari CV.PBL_141217
MC.01A-Safari CV.PBL_141217
 
How do you maintain a comfortable recreation facility whilst minimizing energ...
How do you maintain a comfortable recreation facility whilst minimizing energ...How do you maintain a comfortable recreation facility whilst minimizing energ...
How do you maintain a comfortable recreation facility whilst minimizing energ...
 
Energy Intelligence for Industry
Energy Intelligence for IndustryEnergy Intelligence for Industry
Energy Intelligence for Industry
 
Fenerbahce Ülker Arena - Stadium lighting project with GE
Fenerbahce Ülker Arena - Stadium lighting project with GEFenerbahce Ülker Arena - Stadium lighting project with GE
Fenerbahce Ülker Arena - Stadium lighting project with GE
 
Marafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINALMarafiq Plant Profile MarkVIe - FINAL
Marafiq Plant Profile MarkVIe - FINAL
 
One-Stop Efficiency Shop® Lighting Retrofit Program
One-Stop Efficiency Shop® Lighting Retrofit ProgramOne-Stop Efficiency Shop® Lighting Retrofit Program
One-Stop Efficiency Shop® Lighting Retrofit Program
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project development
 
GEIC
GEICGEIC
GEIC
 
harpreet cv purchase
harpreet  cv purchaseharpreet  cv purchase
harpreet cv purchase
 
Karmasukom energy overview
Karmasukom energy overviewKarmasukom energy overview
Karmasukom energy overview
 
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
 

Similar to BUKA - STD 1

Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing hrl:
 
Resume of Anoop with 18 yrs exp
Resume   of Anoop  with 18 yrs expResume   of Anoop  with 18 yrs exp
Resume of Anoop with 18 yrs expAnoop Gupta
 
Resume final(17.11.16) of Anoop Gupta
Resume  final(17.11.16) of Anoop GuptaResume  final(17.11.16) of Anoop Gupta
Resume final(17.11.16) of Anoop GuptaAnoop Gupta
 
Pulse webinar: Energy Managers, Carve out Your Niche, June 2011
Pulse webinar: Energy Managers, Carve out Your Niche, June 2011Pulse webinar: Energy Managers, Carve out Your Niche, June 2011
Pulse webinar: Energy Managers, Carve out Your Niche, June 2011Pulse Energy
 
Ebi may 2015 overview sg b
Ebi may 2015 overview sg bEbi may 2015 overview sg b
Ebi may 2015 overview sg bfrankjoh
 
Advanced Energy Storage 10-2010
Advanced Energy Storage 10-2010Advanced Energy Storage 10-2010
Advanced Energy Storage 10-2010Larry Stapleton
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Raja Ratnam
 
Electrical Engineer - Tarun (1) (1)
Electrical Engineer - Tarun (1) (1)Electrical Engineer - Tarun (1) (1)
Electrical Engineer - Tarun (1) (1)Tarun Bhateja
 
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpointCBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpointConfederation of British Industry
 
Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014Company Spotlight
 

Similar to BUKA - STD 1 (20)

Fuelcell 13 Company Update
Fuelcell 13 Company UpdateFuelcell 13 Company Update
Fuelcell 13 Company Update
 
Fuelcell jun13 update
Fuelcell jun13 updateFuelcell jun13 update
Fuelcell jun13 update
 
Fcel corporate presentation
Fcel corporate presentationFcel corporate presentation
Fcel corporate presentation
 
ESCO Contracting - CII Danfoss, Chennai Aug 2017
ESCO Contracting - CII Danfoss, Chennai Aug 2017ESCO Contracting - CII Danfoss, Chennai Aug 2017
ESCO Contracting - CII Danfoss, Chennai Aug 2017
 
Ballard Technology Solutions
Ballard Technology SolutionsBallard Technology Solutions
Ballard Technology Solutions
 
Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing
 
Improving O&M Operational Efficiency: Gina Binnard, Belectric
 Improving O&M Operational Efficiency: Gina Binnard, Belectric Improving O&M Operational Efficiency: Gina Binnard, Belectric
Improving O&M Operational Efficiency: Gina Binnard, Belectric
 
Resume of Anoop with 18 yrs exp
Resume   of Anoop  with 18 yrs expResume   of Anoop  with 18 yrs exp
Resume of Anoop with 18 yrs exp
 
Resume final(17.11.16) of Anoop Gupta
Resume  final(17.11.16) of Anoop GuptaResume  final(17.11.16) of Anoop Gupta
Resume final(17.11.16) of Anoop Gupta
 
Pulse webinar: Energy Managers, Carve out Your Niche, June 2011
Pulse webinar: Energy Managers, Carve out Your Niche, June 2011Pulse webinar: Energy Managers, Carve out Your Niche, June 2011
Pulse webinar: Energy Managers, Carve out Your Niche, June 2011
 
Santhosh Resume updated
Santhosh Resume updatedSanthosh Resume updated
Santhosh Resume updated
 
Hydrolink ppt
Hydrolink pptHydrolink ppt
Hydrolink ppt
 
Ebi may 2015 overview sg b
Ebi may 2015 overview sg bEbi may 2015 overview sg b
Ebi may 2015 overview sg b
 
Advanced Energy Storage 10-2010
Advanced Energy Storage 10-2010Advanced Energy Storage 10-2010
Advanced Energy Storage 10-2010
 
Ballard Power Systems Technology Solutions
Ballard Power Systems Technology SolutionsBallard Power Systems Technology Solutions
Ballard Power Systems Technology Solutions
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Electrical Engineer - Tarun (1) (1)
Electrical Engineer - Tarun (1) (1)Electrical Engineer - Tarun (1) (1)
Electrical Engineer - Tarun (1) (1)
 
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpointCBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
CBI Northern Ireland Annual Energy Forum - Energy: A customer viewpoint
 
Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014
 

BUKA - STD 1

  • 1. BUKA Power Plant Consultants Efficiency Through Innovation ARAR OPPORTUNITIES OF WORKING TOGETHER BETWEEN BUKA AND CUSTOMER Place: Chennai Date:
  • 2. Efficiency Through Innovation BUKA Power Plant Consultants Introduction BUKA Power Plant Consultants Pvt. Ltd. is a company headquartered at Chennai, which is promoted by experienced engineers with power plant background. The Main objective of the company is to increase energy efficiency of existing power plants through Up-Gradation & Redesign of existing systems by adopting proven technology developments that are in current practice. The company has a tie up with LOESCHE, UK for pulveriser Classifier upgrade – Introduction of Dynamic Classifier. Apart from having engineers of skills in design, engineering and execution, Company has tied up with experts in specific areas.
  • 3. Efficiency Through Innovation BUKA Power Plant Consultants Scenario: New Challenges - Imperatives Power Plant Efficient performance Compliance to EC Act 2010 (PENALITIES) Energy Savings Target 48% PAT (INCENTIVE)
  • 4. Efficiency Through Innovation BUKA Power Plant Consultants New Challenges - Opportunities Improvement Segments • Efficiency improvement by tapping all the opportunities • Availability improvement through strategic planning • Technical Upgrades through Improved Technologies. Process • Standardizing O&M processes and procedures • Training the personnel Monitoring Improvements • Task Forces • Identify • Evaluate • Monitor • Certify
  • 5. Efficiency Through Innovation BUKA Power Plant Consultants Efficiency Improvement Areas Thermal efficiency improvement by reducing leaving gas temperature Thermal efficiency improvement by reducing leaving gas temperature Combustion efficiency improvement through Mill product fineness Boiler setting , F&D expansion joints,APH leakages reduction, Auxiliary power reduction Introduction of Dry bottom ash handling Co-firing of Biomass Boiler
  • 6. Efficiency Through Innovation BUKA Power Plant Consultants Combustion Efficiency - Challenge Temperature Good combustion Time Turbulence Smaller the size of Coal particle, better the chances for higher Combustion Efficiency . Coal Mill is the key auxiliary Equipment..
  • 7. General Scenario in Plants Efficiency Through Innovation BUKA Power Plant Consultants OWNER BUYS PLANT FROM REPUTED SUPPLIER(OEM) WITH HELP FROM THEIR CONSULTANT OEM DELIEVERS SYSTEMS & EQUIPMENTS, COMMISSIONS &HAND OVER TO CUSTOMER(OBJECTIVE IS TO CLOSE CONTRACT) MANAGE O&M BY SELF WITH REPUTED SPECALIST O&M COMPANY DEVELOP LOCAL SUPPLIERS & MAINTANACE CONTRACTORS TO MEET DAILY NEEDS
  • 8. Efficiency Through Innovation BUKA Power Plant Consultants Scenario: New Challenges - Imperatives TARGET IMPROVE MARGINS WHO IS RESPONSIBLE FOR IMPROVEMENTS SMALL BY O&M TEAM MEDIUM TO BIG ONES BY OEM/ EQUIVALENT LONG SHUT IMPACTS FINANCIALS OEM`S INTEREST DEPENDS ON VALUE OF JOB GAP BUKA FILLS THE GAP WITH OEM EXPERTISE KNOWLEDGE THROUGH INCREMENTAL IMPROVEMENTS IN MOST COST EFFECTIVE WAY PLANT LOCAL CONTRACTOR KNOWLEDGE LIMITATION INSTRUCTION BASED&SKILL IN CARRYING WORK
  • 9. Efficiency Through Innovation BUKA Power Plant Consultants To Recap Objectives of BUKA  To provide boiler performance improvement services  Efficiency improvement  Availability improvement  To provide services to improve the performance / up grade coal mills.  To help meeting the statutory requirements.  To be your partner in cost reduction
  • 10. Efficiency Through Innovation BUKA Power Plant Consultants