Chapter 6Batching & Flow InterruptionsSetup Times & EOQ
The Cost Minimizing Order Quantity Cost C(Q) Q
The Impact of Set-ups on Capacity Production cycle Batch of 12 Production cycle Batch of 60 Batch of 120 Batch of 300 Time [minutes] 60 240 300 120 180 Produce steer supports (1 box holds 12 units = 12 scooters) Set-up from ribs to steer support Produce ribs (1 box holds 24 units = 12 scooters) Set-up from steer support to ribs
 Capacity calculation changes: Note: Capacity increases with batch size…  … and so does inventory (and thus flow time) ,[object Object]
 Also: transportation, education / training
 Creates an inherent mismatch between demand and supply0.5 Capacity 1/p 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Batch Size 10 50 90 130 170 210 250 290 330 370 410 450 490 530 570 610 650 Process Analysis with Batching
Batch Flow Operations Carry a Lot of Inventory Produce Sedan Produce Station wagon Production with large batches Production with large batches Production with large batches Production with large batches Production with small batches Production with small batches Production with small batches Production with small batches Cycle Cycle Cycle Cycle Cycle Cycle Cycle Cycle Inventory Inventory Inventory Inventory Inventory Inventory Inventory Inventory Produce Sedan Produce Sedan Produce Sedan ISedan IWagon Produce Station wagon Produce Station wagon Produce Station wagon ISedan IWagon End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Movie theater vs. a room full of DVD players  SMED (Single minute exchange of die): reduce set-up times

More Related Content

Similar to Ct6

CIM report - final
CIM report - finalCIM report - final
CIM report - finalPraveen S R
 
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)LI HE
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysisvideoaakash15
 
Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysisvideoaakash15
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Naveen K
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Ishan Parekh
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jitsree19881988
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industryGanesh TN
 
Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)MohsinAljiwala
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production Systemjasonhian
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systemsAyman Aljahdali
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
Micro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityMicro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityAmr El-Ganainy
 

Similar to Ct6 (20)

CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
Pmm
PmmPmm
Pmm
 
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 
Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysis
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industry
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)Introduction to TPS (Toyota Production System)
Introduction to TPS (Toyota Production System)
 
Just in time
Just in timeJust in time
Just in time
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
Micro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityMicro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing Facility
 

Ct6

  • 1. Chapter 6Batching & Flow InterruptionsSetup Times & EOQ
  • 2. The Cost Minimizing Order Quantity Cost C(Q) Q
  • 3. The Impact of Set-ups on Capacity Production cycle Batch of 12 Production cycle Batch of 60 Batch of 120 Batch of 300 Time [minutes] 60 240 300 120 180 Produce steer supports (1 box holds 12 units = 12 scooters) Set-up from ribs to steer support Produce ribs (1 box holds 24 units = 12 scooters) Set-up from steer support to ribs
  • 4.
  • 5. Also: transportation, education / training
  • 6. Creates an inherent mismatch between demand and supply0.5 Capacity 1/p 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Batch Size 10 50 90 130 170 210 250 290 330 370 410 450 490 530 570 610 650 Process Analysis with Batching
  • 7. Batch Flow Operations Carry a Lot of Inventory Produce Sedan Produce Station wagon Production with large batches Production with large batches Production with large batches Production with large batches Production with small batches Production with small batches Production with small batches Production with small batches Cycle Cycle Cycle Cycle Cycle Cycle Cycle Cycle Inventory Inventory Inventory Inventory Inventory Inventory Inventory Inventory Produce Sedan Produce Sedan Produce Sedan ISedan IWagon Produce Station wagon Produce Station wagon Produce Station wagon ISedan IWagon End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of End of Beginning of Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Movie theater vs. a room full of DVD players SMED (Single minute exchange of die): reduce set-up times
  • 8. 6.1 Metal window boxes are manufactured in two process steps: stamping and assembly. Each window box is made of 3 pieces: base A and two side Bs. These parts are fabricated by a stamping machine with a setup time of 2 hours whenever switching between the two part types. Once the machine is set up, the activity time for part A is one minute and for part B is 30 seconds. The current rotation is 360 As to 720 Bs. Completed parts move from stamping to assembly once a batch is complete. At assembly, one A, two Bs and some purchased parts are required per finished unit. Each product requires 27 minutes of labor to assemble; there are 12 workers in assembly; there is sufficient demand to sell every box produced. What’s the capacity at stamping? What should the batch size be?
  • 9. Step 1 Step 2 Step 3 Activity Time 0.25 min/part Setup Time 30 min Activity Time 0.20 min/part Setup Time 20 min Activity Time 0.15 min/part Setup Time 45 min 6.3 Consider the following batch-flow process consisting of 3 process steps performed by 3 machines. Work is processed in batches at each step. Before a batch is processed at a step, the machine must be set up during which it is unable to produce. Each machine has a dedicated setup operator. What is the capacity of step 1 if the batch size is 35? For what batch sizes is step 1 (2,3) the bottleneck?