SlideShare a Scribd company logo
1 of 1
Download to read offline
Thermal insulation and ventilation
manage internal temperature in
summer and winter, and conserve
energy
Building a Future
in the
Mountainsof Pakistan
CDM Smith designed and built four earthquake-resistant schools in the district
of Bagh, Azad Jammu and Kashmir. The project was part of the U.S. Agency for
International Development (USAID) Pakistan Reconstruction Program, established
to rebuild many of the schools and hospitals destroyed in the country’s devastating
earthquake on October 8, 2005. The project aided earthquake recovery by fast-
tracking completion of the schools, performing extensive community outreach
and providing job training that will continue to benefit the local workforce.
2012
Design-Build
Award Winner
Concrete structures and roofs
are reinforced to ensure the
buildings’longevity
Designs optimize natural
light to compensate for
frequent disruptions to
the electric system
USAID Pakistan Reconstruction Program: Task Order 10
District of Bagh, Azad Jammu and Kashmir, Pakistan
Category: Educational Facilities
The schools are the first in the
region to meet Seismic Zone 4
regulations and be accessible
to the disabled

More Related Content

Similar to DBIA_pakistan usaid reconstruction program 2012 dbia panel

druk white lotus school study for material.pptx
druk white lotus school study for material.pptxdruk white lotus school study for material.pptx
druk white lotus school study for material.pptxYACHANACHHAJED
 
Case Study
Case StudyCase Study
Case Studycrugg
 
First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement USGBC
 
Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...JamieChanMarcos
 
Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015Victor Yongkun Liao
 
Success Story Solar at DPS Gurgaon
Success Story Solar at DPS GurgaonSuccess Story Solar at DPS Gurgaon
Success Story Solar at DPS GurgaonSunkalp Energy
 
Case Study: School Renovations
Case Study: School RenovationsCase Study: School Renovations
Case Study: School RenovationsStudioGarchitects
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf8-koi
 
Resume [Kyle Kendall]
Resume [Kyle Kendall]Resume [Kyle Kendall]
Resume [Kyle Kendall]Kyle Kendall
 
Conergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINALConergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINALAlbe Alberto
 
Wood Scores A+ for Schools & Student Housing
Wood Scores A+ for Schools & Student HousingWood Scores A+ for Schools & Student Housing
Wood Scores A+ for Schools & Student HousingThink Wood
 
Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.M SPACE
 

Similar to DBIA_pakistan usaid reconstruction program 2012 dbia panel (19)

druk white lotus school study for material.pptx
druk white lotus school study for material.pptxdruk white lotus school study for material.pptx
druk white lotus school study for material.pptx
 
Case Study
Case StudyCase Study
Case Study
 
S&T ESD BOOKLET
S&T ESD BOOKLETS&T ESD BOOKLET
S&T ESD BOOKLET
 
Campus training center is a marvel of efficiency
Campus training center is a marvel of efficiencyCampus training center is a marvel of efficiency
Campus training center is a marvel of efficiency
 
Amphibious house
Amphibious houseAmphibious house
Amphibious house
 
First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement
 
Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...
 
Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015
 
Success Story Solar at DPS Gurgaon
Success Story Solar at DPS GurgaonSuccess Story Solar at DPS Gurgaon
Success Story Solar at DPS Gurgaon
 
Project Proposal.pptx
Project Proposal.pptxProject Proposal.pptx
Project Proposal.pptx
 
Case Study: School Renovations
Case Study: School RenovationsCase Study: School Renovations
Case Study: School Renovations
 
NACUBO 7 23 07
NACUBO 7 23 07NACUBO 7 23 07
NACUBO 7 23 07
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
 
Rtc case study
Rtc case study  Rtc case study
Rtc case study
 
Resume [Kyle Kendall]
Resume [Kyle Kendall]Resume [Kyle Kendall]
Resume [Kyle Kendall]
 
Innovation Hotspots of Kankakee County
Innovation Hotspots of Kankakee CountyInnovation Hotspots of Kankakee County
Innovation Hotspots of Kankakee County
 
Conergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINALConergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINAL
 
Wood Scores A+ for Schools & Student Housing
Wood Scores A+ for Schools & Student HousingWood Scores A+ for Schools & Student Housing
Wood Scores A+ for Schools & Student Housing
 
Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.
 

More from Qaisar Abbas MSc,PMP, PMI-RMP (13)

Million Work Hours Award_Pakistan
Million Work Hours Award_PakistanMillion Work Hours Award_Pakistan
Million Work Hours Award_Pakistan
 
Experience Certifcate _PPAF
Experience Certifcate _PPAFExperience Certifcate _PPAF
Experience Certifcate _PPAF
 
pakistan usaid reconstruction program minister appreciation letter
pakistan usaid reconstruction program minister appreciation letterpakistan usaid reconstruction program minister appreciation letter
pakistan usaid reconstruction program minister appreciation letter
 
pakistan usaid reconstruction program letter from us ambassador
pakistan usaid reconstruction program letter from us ambassadorpakistan usaid reconstruction program letter from us ambassador
pakistan usaid reconstruction program letter from us ambassador
 
Education_BSc Degree
Education_BSc DegreeEducation_BSc Degree
Education_BSc Degree
 
Education_B.Sc
Education_B.ScEducation_B.Sc
Education_B.Sc
 
Education_M.Sc Transcript
Education_M.Sc TranscriptEducation_M.Sc Transcript
Education_M.Sc Transcript
 
Education_M.Sc_Provisional Certificate and Degree
Education_M.Sc_Provisional Certificate and DegreeEducation_M.Sc_Provisional Certificate and Degree
Education_M.Sc_Provisional Certificate and Degree
 
Education_MBA_Transcript_Finance
Education_MBA_Transcript_FinanceEducation_MBA_Transcript_Finance
Education_MBA_Transcript_Finance
 
Education_MBA Degree
Education_MBA DegreeEducation_MBA Degree
Education_MBA Degree
 
Experience Certifcate _PPAF
Experience Certifcate _PPAFExperience Certifcate _PPAF
Experience Certifcate _PPAF
 
pakistan usaid reconstruction program feingold letter
pakistan usaid reconstruction program feingold letterpakistan usaid reconstruction program feingold letter
pakistan usaid reconstruction program feingold letter
 
Certificate of Closeout of Pakistan Reconstruction Program
Certificate of Closeout of Pakistan Reconstruction ProgramCertificate of Closeout of Pakistan Reconstruction Program
Certificate of Closeout of Pakistan Reconstruction Program
 

DBIA_pakistan usaid reconstruction program 2012 dbia panel

  • 1. Thermal insulation and ventilation manage internal temperature in summer and winter, and conserve energy Building a Future in the Mountainsof Pakistan CDM Smith designed and built four earthquake-resistant schools in the district of Bagh, Azad Jammu and Kashmir. The project was part of the U.S. Agency for International Development (USAID) Pakistan Reconstruction Program, established to rebuild many of the schools and hospitals destroyed in the country’s devastating earthquake on October 8, 2005. The project aided earthquake recovery by fast- tracking completion of the schools, performing extensive community outreach and providing job training that will continue to benefit the local workforce. 2012 Design-Build Award Winner Concrete structures and roofs are reinforced to ensure the buildings’longevity Designs optimize natural light to compensate for frequent disruptions to the electric system USAID Pakistan Reconstruction Program: Task Order 10 District of Bagh, Azad Jammu and Kashmir, Pakistan Category: Educational Facilities The schools are the first in the region to meet Seismic Zone 4 regulations and be accessible to the disabled