Perhitungan Volume
ANALISA HARGA SATUAN PEKERJAAN
KODE ANALISA
SATUAN
PEKERJAAN
INDEKS SATUAN
HARGA SATUAN
TOTAL HARGA SATUAN PEKERJAAN (HSP)
BAHAN UPAH
II. PEKERJAAN TANAH
6.1
1 m3 Galian Tanah
Biasa Sedalam 1 m
6.1.1 Tenaga
Pekerja
0.400 Oh Rp 42,000.00 Rp 16,800.00
mandor 0.04 Oh
Rp 80,000.00
Rp 3,200.00
total Rp 20,000.00
6.2 1 m3 Galian Tanah Biasa sedalam 2
6.2.1 Tenaga
Pekerja 0.526 Oh Rp 42,000.00 Rp 22,092.00
Mandor 0.052 Oh Rp 80,000.00 Rp 4,160.00
Total Rp 26,252.00
1 m3 Galian Tanah Biasa sedalam 1.5 m Rp 23,126.00
HARGASATUANPEKERJAAN
(HSP)
ANALISA HARGA SATUAN PEKERJAAN
KODE
ANALISA
SATUAN
PEKERJAAN
INDEKS SATUAN
HARGA SATUAN
TOTAL HARGA SATUAN PEKERJAAN (HSP)
BAHAN UPAH
II. PEKERJAAN TANAH
6.4 1 m3 Urugan Kembali
6.4.1 Tenaga
Pekerja 0.192 Oh Rp 42,000.00 Rp 8,064.00
mandor 0.019 Oh Rp 80,000.00 Rp 1,520.00
Total Rp 9,584.00
6.5 1 m3 Urugan Pasir
6.5.1 Bahan
Pasir Urug 1.2 m3 Rp 115,000.00 Rp 138,000.00
Sub Total Rp 138,000.00
6.5.2 Tenaga
Pekerja 0.3 Oh Rp 42,000.00 Rp 12,600.00
Mandor 0.01 Oh Rp 80,000.00 Rp 800.00
Sub Total Rp 13,400.00
total Rp 151,400.00
ANALISA HARGA SATUAN PEKERJAAN
KODE
ANALISA
SATUAN PEKERJAAN INDEKS SATUAN
HARGA SATUAN
TOTAL HARGA SATUAN PEKERJAAN (HSP)
BAHAN UPAH
III. PEKERJAAN PONDASI
6.6 1 M3 Pasang Pondasi Batu Kali 1 Pc : 5 ps
6.6.1 Bahan
Batu Belah 1.1 m3 Rp 205,500.00 Rp 226,050.00
Semen Portland 136 m3 Rp 1,406.00 Rp 191,216.00
Pasir Pasang 0.544 m3 Rp 233,400.00 Rp 126,969.60
Sub Total Rp 544,235.60
6.6.2 Tenaga
Pekerja 1.5 Oh Rp 42,000.00 Rp 63,000.00
Tukang Batu 0.6 Oh Rp 65,000.00 Rp 39,000.00
Kepala Tukang 0.06 Oh Rp 75,000.00 Rp 4,500.00
Mandor 0.075 Oh Rp 80,000.00 Rp 6,000.00
Sub Total Rp 112,500.00
total Rp 656,735.60
ANALISA HARGA SATUAN PEKERJAAN
KODE
ANALISA
SATUAN PEKERJAAN INDEKS SATUAN
HARGA SATUAN
TOTAL HARGA SATUAN PEKERJAAN (HSP)
BAHAN UPAH
6.14 1 m3 Pasang Pondasi Batu Kosong
6.14.1 Bahan
Batu Belah 1.1 m3 Rp 205,500.00 Rp 226,050.00
Pasir Urug 0.3 kg Rp 115,000.00 Rp 34,500.00
Sub Total Rp 260,550.00
6.14.2 Tenaga
Pekerja 0.78 Oh Rp 42,000.00 Rp 32,760.00
Tukang Batu 0.39 Oh Rp 65,000.00 Rp 25,350.00
Kepala Tukang 0.039 Oh Rp 75,000.00 Rp 2,925.00
Mandor 0.039 Oh Rp 80,000.00 Rp 3,120.00
Sub Total Rp 64,155.00
Total 324705
6.39 1 m3 Membuat Sloof Bertulang (200 kg besi + beskisting
Bahan
Kayu Terentang
0.27 m3
Rp 2,127,500.00 -- Rp 574,425.00
Paku Biasa 2" - 5"
2 kg
Rp 13,800.00 -- Rp 27,600.00
Minyak Bekisting
0.6 lt
Rp 9,200.00 -- Rp 5,520.00
Besi Beton Polos
200 kg
Rp 10,925.00 -- Rp 2,185,000.00
Kawat Beton
3 kg
Rp 17,250.00 -- Rp 51,750.00
Semen Portland
323 kg
Rp 1,495.00 -- Rp 482,885.00
Pasir Beton
0.52 m3
Rp 133,750.00 -- Rp 69,550.00
Koral Beton
0.78 m3
Rp 162,500.00 -- Rp 126,750.00
Sub Total -- Rp 3,523,480.00
Tenaga
Pekerja 5.6 Oh -- Rp 42,000.00 Rp 235,200.00
Tukang Batu 0.35 Oh -- Rp 55,000.00 Rp 19,250.00
Tukang Kayu 1.56 Oh -- Rp 70,000.00 Rp 109,200.00
Tukang Besi 1.4 Oh -- Rp 55,000.00 Rp 77,000.00
Kepala Tukang 0.331 Oh -- Rp 60,000.00 Rp 19,860.00
Mandor 0.17 Oh -- Rp 80,000.00 Rp 13,600.00
Sub Total -- Rp 474,110.00
Total -- Rp 3,997,590.00
Uraian
no
URAIAN PEKERJAAN SATUAN
VOLUME KODE
ANALISA
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA
BAHAN UPAH BAHAN UPAH
II PEKERJAAN TANAH
1 M3 Galian Tanah Biasa Sedalam 1 m
m3 --
Rp 20,000.00 Rp 20,000.00 Rp 20,000.00
1 m3 Galian Tanah Biasa Sedalam 2 m
m3 --
Rp 26,252.00 Rp 26,252.00 Rp 26,252.00
1 m3 Galian Tanah Biasa Sedalam 1.5 m
m3 17.25
Rp 23,126.00 Rp 398,923.50 Rp 398,923.50
1 m3 Urugan Kembali
m3 7.5
Rp 9,584.00 Rp 71,880.00 Rp 71,880.00
1 m3 Urugan Pasir
m3 --
Rp 13,800.00 Rp 13,400.00 Rp 13,800.00 Rp 13,400.00 Rp 27,200.00
Total Rp 544,255.50
III PEKERJAAN PONDASI
1 m3 Pasang Pondasi Batu Kzli 1 Pc : 5 Ps m3 9.75 Rp 112,500.00 Rp 544,235.60 Rp 1,096,875.00 Rp 5,306,297.10 Rp 6,403,172.10
total Rp 6,457,427.10
1 m3 Membuat Sloof Beton Bertulang (200 kg
besi + bekisting)
m3 0.15
Rp 3,523,480.00 Rp 474,110.00 Rp 528,522.00 Rp 71,116.50 Rp 599,638.50
TOTAL KESELURUSAH PEMBUATAN PONDASI Rp 7,547,065.5
TABEL KURVA S
Pekerjaan HSP VOLUME HARGA Prosentase (%)
Galian Tanah Rp 23,126.00 17.25 Rp 398,923.50 5
Pemasangan Pondasi Rp 656,735.00 9.75 Rp 6,403,166.25 86
Penimbunan Tanah Rp 9,584.00 7.5 Rp 71,880.00 1
Pemasangan Sloof Rp 3,997,590.00 0.15 Rp 599,638.50 8
Rp 7,547,065.5 100
TABEL KEBUTUHAN PEKERJA
Kebutuhan Tenaga Indeks Volume Jumlah
Galian Tanah
pekerja 0.526 17.25 9
mandor 0.052 17.25 1
Pemasangan Pondasi
Pekerja 1.5 9.75 15
Tukang Batu 0.6 9.75 6
Kepala Tukang 0.06 9.75 1
Mandor 0.075 9.75 1
Urugan
Pekerja 0.192 7.5 1
Mandor 0.019 7.5 0
Pemasangan Sloof
Pekerja 5.6 0.15 0.84
Tukang Batu 0.35 0.15 0.0525
Tukang Kayu 1.56 0.15 0.234
Tukang Besi 1.4 0.15 0.21
Kepala Tukang 0.331 0.15 0.04965
Mandor 0.17 0.15 0.0255
No Prosentase (%) 1 2 3 4 5
1 5 4 1
2 86 30 33 23
3 1 1
4 8 8
100 4 31 33 24 8
4 35 68 92 100
0, 1 1, 4
2, 35
3, 68
4, 92
5, 100
0
20
40
60
80
100
120
0 1 2 3 4 5 6
Tabel Kurva S
Series1
6 6 6 6
3
1 1 1
2
1
2 2 2
1 1 11 1 1 1
0
1
2
3
4
5
6
7
1 2 3 4 5
Tabel Pekerja
Pekerja Mandor T. Batu T. Kayu T. Besi Kepala Tukang
3.865988372
477.9767442
1.897848837
0
100
200
300
400
500
600
Batu Belah Semen Portland Pasir Pasang
JumlahMterial
Material (m3)
GRAFIK KEBUTUHAN MATERIAL
HARI KE-2
4.115406977
508.8139535
2.020290698
0
100
200
300
400
500
600
Batu Belah Semen Portland Pasir Pasang
JumlahMaterial
Material (m3)
GRAFIK KEBUTUHAN MATERIAL
HARI KE-3
Series1
2.993023256
370.0465116
1.469302326
0
50
100
150
200
250
300
350
400
Batu Belah Semen Portland Pasir Pasang
JumlahMaterial
Material (m3)
GRAFIK KEBUTUHAN MATERIAL
HARI KE-4
Series1
pasir urug, 0.044
0
0.005
0.01
0.015
0.02
0.025
0.03
0.035
0.04
0.045
0.05
1
JumlahMaterial
Material (kg)
GRAFIK KEBUTUHAN MATERIAL
HARI KE-4
0.324
0.624
0.936
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Kayu Rentang Pasir Beton Koral Beton
JumlahMaterial
Material (m3)
GRAFIK KEBUTUHAN MATERIAL
HARI KE-5
2.4
240
3.6
0
50
100
150
200
250
300
Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton
JumlahMaterial
Material (kg)
GRAFIK KEBUTUHAN MATERIAL
HARI KE-5

More Related Content

Similar to RAB PONDASI

Similar to RAB PONDASI (20)

4. AHSP GEDUNG.pdf
4. AHSP GEDUNG.pdf4. AHSP GEDUNG.pdf
4. AHSP GEDUNG.pdf
 
Analisa bq check point tuban fix
Analisa bq check point tuban fixAnalisa bq check point tuban fix
Analisa bq check point tuban fix
 
Disuruh catleen ngetikk
Disuruh catleen ngetikkDisuruh catleen ngetikk
Disuruh catleen ngetikk
 
Drainase bungaejaya
Drainase bungaejayaDrainase bungaejaya
Drainase bungaejaya
 
Pengelolaan RAB.ppt
Pengelolaan RAB.pptPengelolaan RAB.ppt
Pengelolaan RAB.ppt
 
Analisa hal .2
Analisa hal .2Analisa hal .2
Analisa hal .2
 
Gapura batas desa, kawasan wisata, dan selo asri
Gapura batas desa, kawasan wisata, dan selo asriGapura batas desa, kawasan wisata, dan selo asri
Gapura batas desa, kawasan wisata, dan selo asri
 
Ahsp gedung seni
Ahsp gedung seniAhsp gedung seni
Ahsp gedung seni
 
BOQ GUDANG MOBIL.pdf
BOQ GUDANG MOBIL.pdfBOQ GUDANG MOBIL.pdf
BOQ GUDANG MOBIL.pdf
 
Aspek hukum amar
Aspek hukum amarAspek hukum amar
Aspek hukum amar
 
Rab teknik pamsimas iii
Rab teknik pamsimas iiiRab teknik pamsimas iii
Rab teknik pamsimas iii
 
Boq 2. analisa
Boq 2. analisaBoq 2. analisa
Boq 2. analisa
 
Analisa Harga.pptx
Analisa Harga.pptxAnalisa Harga.pptx
Analisa Harga.pptx
 
Rab pos security km 1.5
Rab pos security km 1.5Rab pos security km 1.5
Rab pos security km 1.5
 
Rab 14
Rab 14Rab 14
Rab 14
 
Rab pondasi
Rab pondasiRab pondasi
Rab pondasi
 
Rab pondasi
Rab pondasiRab pondasi
Rab pondasi
 
Rab Pondasi
Rab PondasiRab Pondasi
Rab Pondasi
 
Rab pembangunan pasar desa ma'minasa kec. pasimasunggu dak 2015
Rab pembangunan pasar desa ma'minasa kec. pasimasunggu dak 2015Rab pembangunan pasar desa ma'minasa kec. pasimasunggu dak 2015
Rab pembangunan pasar desa ma'minasa kec. pasimasunggu dak 2015
 
1. RAB TANGKI SEPTIK 2021 PERENCANAAN DAK.pdf
1. RAB TANGKI SEPTIK  2021 PERENCANAAN DAK.pdf1. RAB TANGKI SEPTIK  2021 PERENCANAAN DAK.pdf
1. RAB TANGKI SEPTIK 2021 PERENCANAAN DAK.pdf
 

Recently uploaded

MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdfMODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdfihsan386426
 
Metode numerik Bidang Teknik Sipil perencanaan.pdf
Metode numerik Bidang Teknik Sipil perencanaan.pdfMetode numerik Bidang Teknik Sipil perencanaan.pdf
Metode numerik Bidang Teknik Sipil perencanaan.pdfArvinThamsir1
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++FujiAdam
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxRemigius1984
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaRenaYunita2
 
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdfAnonymous6yIobha8QY
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfYogiCahyoPurnomo
 
10.-Programable-Logic-Controller (1).ppt
10.-Programable-Logic-Controller (1).ppt10.-Programable-Logic-Controller (1).ppt
10.-Programable-Logic-Controller (1).ppttaniaalda710
 

Recently uploaded (8)

MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdfMODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
MODUL AJAR PENGANTAR SURVEY PEMETAAN.pdf
 
Metode numerik Bidang Teknik Sipil perencanaan.pdf
Metode numerik Bidang Teknik Sipil perencanaan.pdfMetode numerik Bidang Teknik Sipil perencanaan.pdf
Metode numerik Bidang Teknik Sipil perencanaan.pdf
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptx
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di Indonesia
 
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
4. GWTJWRYJJJJJJJJJJJJJJJJJJWJSNJYSRR.pdf
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
 
10.-Programable-Logic-Controller (1).ppt
10.-Programable-Logic-Controller (1).ppt10.-Programable-Logic-Controller (1).ppt
10.-Programable-Logic-Controller (1).ppt
 

RAB PONDASI

  • 1. Perhitungan RAB (Pondasi) PRASETYO I8514029 RACHADIAN DESY ANDARU P. I8514030
  • 3. ANALISA HARGA SATUAN PEKERJAAN KODE ANALISA SATUAN PEKERJAAN INDEKS SATUAN HARGA SATUAN TOTAL HARGA SATUAN PEKERJAAN (HSP) BAHAN UPAH II. PEKERJAAN TANAH 6.1 1 m3 Galian Tanah Biasa Sedalam 1 m 6.1.1 Tenaga Pekerja 0.400 Oh Rp 42,000.00 Rp 16,800.00 mandor 0.04 Oh Rp 80,000.00 Rp 3,200.00 total Rp 20,000.00 6.2 1 m3 Galian Tanah Biasa sedalam 2 6.2.1 Tenaga Pekerja 0.526 Oh Rp 42,000.00 Rp 22,092.00 Mandor 0.052 Oh Rp 80,000.00 Rp 4,160.00 Total Rp 26,252.00 1 m3 Galian Tanah Biasa sedalam 1.5 m Rp 23,126.00 HARGASATUANPEKERJAAN (HSP)
  • 4. ANALISA HARGA SATUAN PEKERJAAN KODE ANALISA SATUAN PEKERJAAN INDEKS SATUAN HARGA SATUAN TOTAL HARGA SATUAN PEKERJAAN (HSP) BAHAN UPAH II. PEKERJAAN TANAH 6.4 1 m3 Urugan Kembali 6.4.1 Tenaga Pekerja 0.192 Oh Rp 42,000.00 Rp 8,064.00 mandor 0.019 Oh Rp 80,000.00 Rp 1,520.00 Total Rp 9,584.00 6.5 1 m3 Urugan Pasir 6.5.1 Bahan Pasir Urug 1.2 m3 Rp 115,000.00 Rp 138,000.00 Sub Total Rp 138,000.00 6.5.2 Tenaga Pekerja 0.3 Oh Rp 42,000.00 Rp 12,600.00 Mandor 0.01 Oh Rp 80,000.00 Rp 800.00 Sub Total Rp 13,400.00 total Rp 151,400.00
  • 5. ANALISA HARGA SATUAN PEKERJAAN KODE ANALISA SATUAN PEKERJAAN INDEKS SATUAN HARGA SATUAN TOTAL HARGA SATUAN PEKERJAAN (HSP) BAHAN UPAH III. PEKERJAAN PONDASI 6.6 1 M3 Pasang Pondasi Batu Kali 1 Pc : 5 ps 6.6.1 Bahan Batu Belah 1.1 m3 Rp 205,500.00 Rp 226,050.00 Semen Portland 136 m3 Rp 1,406.00 Rp 191,216.00 Pasir Pasang 0.544 m3 Rp 233,400.00 Rp 126,969.60 Sub Total Rp 544,235.60 6.6.2 Tenaga Pekerja 1.5 Oh Rp 42,000.00 Rp 63,000.00 Tukang Batu 0.6 Oh Rp 65,000.00 Rp 39,000.00 Kepala Tukang 0.06 Oh Rp 75,000.00 Rp 4,500.00 Mandor 0.075 Oh Rp 80,000.00 Rp 6,000.00 Sub Total Rp 112,500.00 total Rp 656,735.60
  • 6. ANALISA HARGA SATUAN PEKERJAAN KODE ANALISA SATUAN PEKERJAAN INDEKS SATUAN HARGA SATUAN TOTAL HARGA SATUAN PEKERJAAN (HSP) BAHAN UPAH 6.14 1 m3 Pasang Pondasi Batu Kosong 6.14.1 Bahan Batu Belah 1.1 m3 Rp 205,500.00 Rp 226,050.00 Pasir Urug 0.3 kg Rp 115,000.00 Rp 34,500.00 Sub Total Rp 260,550.00 6.14.2 Tenaga Pekerja 0.78 Oh Rp 42,000.00 Rp 32,760.00 Tukang Batu 0.39 Oh Rp 65,000.00 Rp 25,350.00 Kepala Tukang 0.039 Oh Rp 75,000.00 Rp 2,925.00 Mandor 0.039 Oh Rp 80,000.00 Rp 3,120.00 Sub Total Rp 64,155.00 Total 324705
  • 7. 6.39 1 m3 Membuat Sloof Bertulang (200 kg besi + beskisting Bahan Kayu Terentang 0.27 m3 Rp 2,127,500.00 -- Rp 574,425.00 Paku Biasa 2" - 5" 2 kg Rp 13,800.00 -- Rp 27,600.00 Minyak Bekisting 0.6 lt Rp 9,200.00 -- Rp 5,520.00 Besi Beton Polos 200 kg Rp 10,925.00 -- Rp 2,185,000.00 Kawat Beton 3 kg Rp 17,250.00 -- Rp 51,750.00 Semen Portland 323 kg Rp 1,495.00 -- Rp 482,885.00 Pasir Beton 0.52 m3 Rp 133,750.00 -- Rp 69,550.00 Koral Beton 0.78 m3 Rp 162,500.00 -- Rp 126,750.00 Sub Total -- Rp 3,523,480.00 Tenaga Pekerja 5.6 Oh -- Rp 42,000.00 Rp 235,200.00 Tukang Batu 0.35 Oh -- Rp 55,000.00 Rp 19,250.00 Tukang Kayu 1.56 Oh -- Rp 70,000.00 Rp 109,200.00 Tukang Besi 1.4 Oh -- Rp 55,000.00 Rp 77,000.00 Kepala Tukang 0.331 Oh -- Rp 60,000.00 Rp 19,860.00 Mandor 0.17 Oh -- Rp 80,000.00 Rp 13,600.00 Sub Total -- Rp 474,110.00 Total -- Rp 3,997,590.00
  • 8. Uraian no URAIAN PEKERJAAN SATUAN VOLUME KODE ANALISA HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BAHAN UPAH BAHAN UPAH II PEKERJAAN TANAH 1 M3 Galian Tanah Biasa Sedalam 1 m m3 -- Rp 20,000.00 Rp 20,000.00 Rp 20,000.00 1 m3 Galian Tanah Biasa Sedalam 2 m m3 -- Rp 26,252.00 Rp 26,252.00 Rp 26,252.00 1 m3 Galian Tanah Biasa Sedalam 1.5 m m3 17.25 Rp 23,126.00 Rp 398,923.50 Rp 398,923.50 1 m3 Urugan Kembali m3 7.5 Rp 9,584.00 Rp 71,880.00 Rp 71,880.00 1 m3 Urugan Pasir m3 -- Rp 13,800.00 Rp 13,400.00 Rp 13,800.00 Rp 13,400.00 Rp 27,200.00 Total Rp 544,255.50 III PEKERJAAN PONDASI 1 m3 Pasang Pondasi Batu Kzli 1 Pc : 5 Ps m3 9.75 Rp 112,500.00 Rp 544,235.60 Rp 1,096,875.00 Rp 5,306,297.10 Rp 6,403,172.10 total Rp 6,457,427.10 1 m3 Membuat Sloof Beton Bertulang (200 kg besi + bekisting) m3 0.15 Rp 3,523,480.00 Rp 474,110.00 Rp 528,522.00 Rp 71,116.50 Rp 599,638.50 TOTAL KESELURUSAH PEMBUATAN PONDASI Rp 7,547,065.5
  • 9. TABEL KURVA S Pekerjaan HSP VOLUME HARGA Prosentase (%) Galian Tanah Rp 23,126.00 17.25 Rp 398,923.50 5 Pemasangan Pondasi Rp 656,735.00 9.75 Rp 6,403,166.25 86 Penimbunan Tanah Rp 9,584.00 7.5 Rp 71,880.00 1 Pemasangan Sloof Rp 3,997,590.00 0.15 Rp 599,638.50 8 Rp 7,547,065.5 100
  • 10. TABEL KEBUTUHAN PEKERJA Kebutuhan Tenaga Indeks Volume Jumlah Galian Tanah pekerja 0.526 17.25 9 mandor 0.052 17.25 1 Pemasangan Pondasi Pekerja 1.5 9.75 15 Tukang Batu 0.6 9.75 6 Kepala Tukang 0.06 9.75 1 Mandor 0.075 9.75 1 Urugan Pekerja 0.192 7.5 1 Mandor 0.019 7.5 0 Pemasangan Sloof Pekerja 5.6 0.15 0.84 Tukang Batu 0.35 0.15 0.0525 Tukang Kayu 1.56 0.15 0.234 Tukang Besi 1.4 0.15 0.21 Kepala Tukang 0.331 0.15 0.04965 Mandor 0.17 0.15 0.0255 No Prosentase (%) 1 2 3 4 5 1 5 4 1 2 86 30 33 23 3 1 1 4 8 8 100 4 31 33 24 8 4 35 68 92 100
  • 11. 0, 1 1, 4 2, 35 3, 68 4, 92 5, 100 0 20 40 60 80 100 120 0 1 2 3 4 5 6 Tabel Kurva S Series1 6 6 6 6 3 1 1 1 2 1 2 2 2 1 1 11 1 1 1 0 1 2 3 4 5 6 7 1 2 3 4 5 Tabel Pekerja Pekerja Mandor T. Batu T. Kayu T. Besi Kepala Tukang
  • 12. 3.865988372 477.9767442 1.897848837 0 100 200 300 400 500 600 Batu Belah Semen Portland Pasir Pasang JumlahMterial Material (m3) GRAFIK KEBUTUHAN MATERIAL HARI KE-2 4.115406977 508.8139535 2.020290698 0 100 200 300 400 500 600 Batu Belah Semen Portland Pasir Pasang JumlahMaterial Material (m3) GRAFIK KEBUTUHAN MATERIAL HARI KE-3 Series1
  • 13. 2.993023256 370.0465116 1.469302326 0 50 100 150 200 250 300 350 400 Batu Belah Semen Portland Pasir Pasang JumlahMaterial Material (m3) GRAFIK KEBUTUHAN MATERIAL HARI KE-4 Series1 pasir urug, 0.044 0 0.005 0.01 0.015 0.02 0.025 0.03 0.035 0.04 0.045 0.05 1 JumlahMaterial Material (kg) GRAFIK KEBUTUHAN MATERIAL HARI KE-4
  • 14. 0.324 0.624 0.936 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Kayu Rentang Pasir Beton Koral Beton JumlahMaterial Material (m3) GRAFIK KEBUTUHAN MATERIAL HARI KE-5 2.4 240 3.6 0 50 100 150 200 250 300 Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton JumlahMaterial Material (kg) GRAFIK KEBUTUHAN MATERIAL HARI KE-5