REPLY TO 
ATTENTION OF 
DEPARTMENT OF THE ARMY 
US ARMY INSTALLATION MANAGEMENT COMMAND 
HEADQUARTERS, UNITED STATES ARMY GARRISON, FORT HOOD 
FORT HOOD, TEXAS 76544-5002 
IMHD-PWE 30 Jul 12 
MEMORANDUM FOR Contracting Officer’s Representative, Mr. Robert Deaton, 
Directorate of Public Works, Engineering Division 
SUBJECT: Environmental Compliance Assessment and Environmental Management 
System (EMS) Audit of NSS Fencing located in the Contractor Yard 
1. References: 
a. Fort Hood Regulation 200-1, Environment and Natural Resources, 
15 Jul 04. 
b. International Organization for Standardization (ISO) 14001:2004(E), EMS. 
2. Purpose: To assess environmental readiness and gauge compliance standards 
associated with environmental protection IAW FH Reg 200-1. The assessment also 
includes an audit of conformance with Fort Hood’s EMS IAW ISO 14001:2004(E). 
3. The results of this assessment and audit will be compiled with the remaining Fort 
Hood Activities as an overall roll-up of the Installation and sent to the III Corps Chief of 
Staff. 
4. On 2 Jul 12, Dale Frederick, Directorate of Public Works (DPW), Environmental 
Compliance Assessment Team, conducted a formal environmental compliance 
assessment and audit of the EMS at NSS Fencing located in the Contractor Yard. The 
assessment is designed to ensure the facilities are in compliance with Fort Hood 
regulations. The EMS audit is designed to ensure that the facilities conform to Fort 
Hood’s EMS, which promotes environmental performance beyond compliance. 
5. Mr. Paul Batcha, is doing a commendable job maintaining environmental standards 
within his footprint. 
6. No Reply by Memorandum is required from this audit. 
7. HAZARDOUS MATERIALS: There were no discrepancies identified in this area. 
8. POLLUTION PREVENTION: There were no discrepancies identified in this area. 
9. AIR: There were no discrepancies identified in this area. 
10. WATER: There were no discrepancies identified in this area.
IMHD-PWE 
SUBJECT: Environmental Compliance Assessment and Environmental Management 
System (EMS) Audit of NSS Fencing located in the Contractor Yard 
11. SOLID WASTE AND RECYCLING: There were no discrepancies identified in this 
area. 
12. Based on a cumulative rating of 100%, the compliance status is GREEN. 
13. NONCONFORMANCE OF THE INSTALLATION EMS: ISO 14001:2004, no non-conformance 
was noted during this audit. 
14. OPPORTUNITY FOR IMPROVEMENT OF THE INSTALLATION EMS: Continue 
to communicate the Commanding General’s policy and incorporate EMS and the 
installation sustainability goals into daily operations. 
15. POC for this assessment is Dale Frederick, 287-9103. 
X 
STEVEN G. BURROW 
Chief, Environmental Programs 
CF: 
Inspector General, III Corps 
Chief, Engineering Division, DPW 
2

More Related Content

Similar to Audit NSS Fencing July 12

EPA New Rules Governing Air Pollution Standards for Hydraulic Fracturing
EPA New Rules Governing Air Pollution Standards for Hydraulic FracturingEPA New Rules Governing Air Pollution Standards for Hydraulic Fracturing
EPA New Rules Governing Air Pollution Standards for Hydraulic FracturingMarcellus Drilling News
 
Merool holding svp
Merool holding svpMerool holding svp
Merool holding svpLindsayBeck2
 
Section 13 Planning Law and Environment protection CAPE2020 2021.pptx
Section 13 Planning Law and Environment protection CAPE2020 2021.pptxSection 13 Planning Law and Environment protection CAPE2020 2021.pptx
Section 13 Planning Law and Environment protection CAPE2020 2021.pptxMuhammadZaki983995
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters
 
Environmental competence criteria iso 17021 2 techical spec
Environmental competence criteria iso 17021 2 techical spec Environmental competence criteria iso 17021 2 techical spec
Environmental competence criteria iso 17021 2 techical spec Tim Matthews
 
Life Cycle Assessment of An Air Freshener
Life Cycle Assessment of An Air FreshenerLife Cycle Assessment of An Air Freshener
Life Cycle Assessment of An Air FreshenerLuke Martin
 
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docxQuestion 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docxIRESH3
 
Psm 2010
Psm 2010Psm 2010
Psm 2010vtsiri
 
RESUME - Joseph Auge
RESUME - Joseph AugeRESUME - Joseph Auge
RESUME - Joseph AugeJoseph Auge
 
Revisions to the ASTM E 1527 Standard: Three Insider’s Perspective
Revisions to the ASTM E 1527 Standard: Three Insider’s PerspectiveRevisions to the ASTM E 1527 Standard: Three Insider’s Perspective
Revisions to the ASTM E 1527 Standard: Three Insider’s PerspectiveEDR
 
FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...
FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...
FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...Lyle Birkey
 

Similar to Audit NSS Fencing July 12 (20)

EPA New Rules Governing Air Pollution Standards for Hydraulic Fracturing
EPA New Rules Governing Air Pollution Standards for Hydraulic FracturingEPA New Rules Governing Air Pollution Standards for Hydraulic Fracturing
EPA New Rules Governing Air Pollution Standards for Hydraulic Fracturing
 
Merool holding svp
Merool holding svpMerool holding svp
Merool holding svp
 
MIL-STD-810H.pdf
MIL-STD-810H.pdfMIL-STD-810H.pdf
MIL-STD-810H.pdf
 
Lead asbestos mgmt plan -ems
Lead asbestos mgmt plan -emsLead asbestos mgmt plan -ems
Lead asbestos mgmt plan -ems
 
Section 13 Planning Law and Environment protection CAPE2020 2021.pptx
Section 13 Planning Law and Environment protection CAPE2020 2021.pptxSection 13 Planning Law and Environment protection CAPE2020 2021.pptx
Section 13 Planning Law and Environment protection CAPE2020 2021.pptx
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
 
Environmental competence criteria iso 17021 2 techical spec
Environmental competence criteria iso 17021 2 techical spec Environmental competence criteria iso 17021 2 techical spec
Environmental competence criteria iso 17021 2 techical spec
 
Life Cycle Assessment of An Air Freshener
Life Cycle Assessment of An Air FreshenerLife Cycle Assessment of An Air Freshener
Life Cycle Assessment of An Air Freshener
 
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docxQuestion 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
 
LARRY SLATON
LARRY SLATONLARRY SLATON
LARRY SLATON
 
Aniket seminar ppt.pdf
Aniket seminar ppt.pdfAniket seminar ppt.pdf
Aniket seminar ppt.pdf
 
Psm 2010
Psm 2010Psm 2010
Psm 2010
 
RESUME - Joseph Auge
RESUME - Joseph AugeRESUME - Joseph Auge
RESUME - Joseph Auge
 
EA 366FW to Gowen Field
EA 366FW to Gowen FieldEA 366FW to Gowen Field
EA 366FW to Gowen Field
 
Revisions to the ASTM E 1527 Standard: Three Insider’s Perspective
Revisions to the ASTM E 1527 Standard: Three Insider’s PerspectiveRevisions to the ASTM E 1527 Standard: Three Insider’s Perspective
Revisions to the ASTM E 1527 Standard: Three Insider’s Perspective
 
Hines, Scott
Hines, ScottHines, Scott
Hines, Scott
 
Hafiz abdullah naeem HSE Incharge
Hafiz abdullah naeem HSE InchargeHafiz abdullah naeem HSE Incharge
Hafiz abdullah naeem HSE Incharge
 
Hafiz abdullah naeem HSE Incharge
Hafiz abdullah naeem HSE InchargeHafiz abdullah naeem HSE Incharge
Hafiz abdullah naeem HSE Incharge
 
Denning Resumev3
Denning Resumev3Denning Resumev3
Denning Resumev3
 
FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...
FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...
FUNDING FOR ENVIRONMENTAL RESEARCH AND DEVELOPMENT BY THE U.S. DEPARTMENT OF ...
 

Audit NSS Fencing July 12

  • 1. REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY US ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, FORT HOOD FORT HOOD, TEXAS 76544-5002 IMHD-PWE 30 Jul 12 MEMORANDUM FOR Contracting Officer’s Representative, Mr. Robert Deaton, Directorate of Public Works, Engineering Division SUBJECT: Environmental Compliance Assessment and Environmental Management System (EMS) Audit of NSS Fencing located in the Contractor Yard 1. References: a. Fort Hood Regulation 200-1, Environment and Natural Resources, 15 Jul 04. b. International Organization for Standardization (ISO) 14001:2004(E), EMS. 2. Purpose: To assess environmental readiness and gauge compliance standards associated with environmental protection IAW FH Reg 200-1. The assessment also includes an audit of conformance with Fort Hood’s EMS IAW ISO 14001:2004(E). 3. The results of this assessment and audit will be compiled with the remaining Fort Hood Activities as an overall roll-up of the Installation and sent to the III Corps Chief of Staff. 4. On 2 Jul 12, Dale Frederick, Directorate of Public Works (DPW), Environmental Compliance Assessment Team, conducted a formal environmental compliance assessment and audit of the EMS at NSS Fencing located in the Contractor Yard. The assessment is designed to ensure the facilities are in compliance with Fort Hood regulations. The EMS audit is designed to ensure that the facilities conform to Fort Hood’s EMS, which promotes environmental performance beyond compliance. 5. Mr. Paul Batcha, is doing a commendable job maintaining environmental standards within his footprint. 6. No Reply by Memorandum is required from this audit. 7. HAZARDOUS MATERIALS: There were no discrepancies identified in this area. 8. POLLUTION PREVENTION: There were no discrepancies identified in this area. 9. AIR: There were no discrepancies identified in this area. 10. WATER: There were no discrepancies identified in this area.
  • 2. IMHD-PWE SUBJECT: Environmental Compliance Assessment and Environmental Management System (EMS) Audit of NSS Fencing located in the Contractor Yard 11. SOLID WASTE AND RECYCLING: There were no discrepancies identified in this area. 12. Based on a cumulative rating of 100%, the compliance status is GREEN. 13. NONCONFORMANCE OF THE INSTALLATION EMS: ISO 14001:2004, no non-conformance was noted during this audit. 14. OPPORTUNITY FOR IMPROVEMENT OF THE INSTALLATION EMS: Continue to communicate the Commanding General’s policy and incorporate EMS and the installation sustainability goals into daily operations. 15. POC for this assessment is Dale Frederick, 287-9103. X STEVEN G. BURROW Chief, Environmental Programs CF: Inspector General, III Corps Chief, Engineering Division, DPW 2